You are on page 1of 2

Participant:

Mr. Gaurav Joshi; Mr. Malay Mondal;


Mr.Parthiban; Mr.Rana; Mr. Sourav

Location: Lubumbashi Office

Date: 24/12/2014
Time: 7:30 pm 9:30 pm

Discussion:
Project Cycle concept of Project 217
Areas of Concern (Gap between Execution and Documentation which leads to delay in realization)
How to apply the resources from in and around without any investment
Effective utilization of tools already available with us
Basic concepts; e.g. how to take an effective photo, self progress monitoring, loop holes in execution monitoring
Participant:
Location: Likasi Office
Date: 25/12/2014
Mr. G. C. Pani; Mr. Manoj; Mr. Srinivas; Mr.
Time: 11:30 am 2:30 pm
Argho; Mr.
Discussion:
Project Cycle concept of Project 217
How to do sorting of photos in an effective way so time can be saved
GPS location and Photo quality two essential parameters of an acceptable image
How to check GPS location of all photos at a time
How to reduce the operating cycle of Painting activity and effective utilization of resources (identification of rusted
members and prior planning)
How to make proper documentation of bush cutting & painting activity (Photo and Worksheet or certified length)
General discussion regarding infrastructure problem
Participant:
Mr. Palash Banerjee; Mr.Parthiban; Mr.Rana;
Mr. Sourav

Location: Kolwezi Office

Date: 25/12/2014
Time: 7:00 pm 9:30 pm
Date: 26/12/2014
Time: 9:30am 11:00 pm

Discussion:
How to do sorting of photos in an effective way so time can be saved
GPS location and Photo quality two essential parameters of an acceptable image
How to check GPS location of all photos at a time
How to reduce the operating cycle of Painting activity and effective utilization of resources (identification of rusted
members and prior planning)
How to make proper documentation of bush cutting & painting activity (Photo and Worksheet or certified length)
General discussion regarding infrastructure problem
Photo transferring methodology to reduce billing cycle
Participant:
Mr. P. Biswas; Mr. Gaurav Joshi; Mr. Malay
Mondal

Location: Kolwezi Office

Date: 27/12/2014
Time: 9:30am 7:30 pm

Discussion:
How to do sorting of photos in an effective way so time can be saved
GPS location and Photo quality two essential parameters of an acceptable image
How to check GPS location of all photos at a time
Photo transferring methodology to reduce billing cycle
How to reduce the operating cycle of Painting activity and effective utilization of resources (identification of rusted
members and prior planning)
How to make proper documentation of bush cutting & painting activity (Photo and Worksheet or certified length)
General discussion regarding infrastructure problem in Likasi and Kolwezi
Inference:

You might also like