21362 Federal Register / Vol. 73, No.

77 / Monday, April 21, 2008 / Notices

Amendment within the 45-day statutory ADDRESSES: You may submit comments transmission line. The transmission line
time frame. by any of the following methods: would be supported by single steel or
Dated: March 25, 2008. • E-mail: id_chinamtn_eis@blm.gov. double wood poles with a distance of
• Fax: (208) 736–2375 or (208) 735– 400 to 500 feet between poles. Other
Carl J. Artman,
2076. required facilities would include one or
Assistant Secretary—Indian Affairs. • Mail: Project Manager, China two fenced, graveled switching stations
[FR Doc. E8–8494 Filed 4–18–08; 8:45 am] Mountain EIS, Jarbidge Field Office, of approximately 2 acres each; one or
BILLING CODE 4310–4N–P 2536 Kimberly Road, Twin Falls, Idaho more Operations and Maintenance
83301. buildings; approximately 40 miles of
Comments can also be hand delivered new access roads; approximately 30
DEPARTMENT OF THE INTERIOR to the Jarbidge Field Office at the miles of improved existing road; and a
address above. Documents pertinent to temporary concrete batch plant. This
Bureau of Land Management this proposal may be examined at the plant would be centrally located on the
Jarbidge Field Office. site, occupying an area of approximately
[ID–210–5101–ER–D050, IDI–35183/NVN– FOR FURTHER INFORMATION CONTACT: 5 acres, and would operate during
84663] China Mountain Wind Project Manager, project construction. The proposed
Jarbidge Field Office, 2536 Kimberly project would disturb up to 540 acres on
Notice of Intent To Prepare an Road, Twin Falls, Idaho 83301,
Environmental Impact Statement for a temporary basis and up to 180 acres
telephone (208) 732–7413. on a permanent basis, following
the Proposed China Mountain Wind
SUPPLEMENTARY INFORMATION: China reclamation of construction disturbance.
Project
Mountain Wind, LLC, has submitted a Approximately 60% of both the
AGENCY: Bureau of Land Management, right-of-way application to BLM to build temporary and permanent impacts
Interior. a commercial wind power generation would be on lands under the
ACTION: Notice of intent.
facility capable of generating up to 425 administration of the BLM and
megawatts (MW) of electricity. Up to approximately 40% would be on State
SUMMARY: The Bureau of Land 185 wind turbines, each having a of Idaho and private lands. The
Management (BLM) Jarbidge Field generating capacity between 2.3 and 3.0 proposed project would operate year-
Office, Twin Falls District, Idaho, MW, would be installed on an area round for a minimum of 30 years.
intends to prepare an Environmental covering approximately 30,700 acres in The purpose and need for the
Impact Statement (EIS) for the proposed the Jarbidge Foothills, southwest of proposed project are: (1) Construct a
China Mountain Wind Project, located Rogerson, Idaho and west of Jackpot, wind power generation facility that
on 30,700 acres of public, state, and Nevada. The proposed project area utilizes wind energy resources in an
private lands in the Jarbidge Foothills, includes public land administered by environmentally sound manner to meet
southwest of the town of Rogerson in the BLM Elko District, Wells Field existing and future electricity demands
Twin Falls County, Idaho, and west of Office in northeastern Nevada, public in Idaho and Nevada. (2) Provide for
the town of Jackpot in Elko County, lands administered by the BLM Twin renewable energy resources as
Nevada. The EIS will analyze the Falls District, Jarbidge Field Office, and encouraged by the Energy Policy Act of
potential environmental impacts of the State of Idaho and private lands in 2005 and consistent with the BLM’s
construction and operation of a south-central Idaho. Wind Energy Development Policy, as
proposed wind power generation described in the Record of Decision for
facility, associated transmission Acres the Final Programmatic EIS on Wind
Administrating ownership (rounded) Energy Development on BLM-
facilities, and access roads. The EIS will
be prepared in accordance with the Administered Lands in the Western
BLM—Jarbidge Field Office, United States (December 2005).
Federal Land Policy and Management Twin Falls District, Idaho ........ 15,300 Public Participation: The purpose of
Act of 1976 (FLPMA) (43 U.S.C. 1701), BLM—Wells Field Office, Elko
as amended; the National District, Nevada ....................... 4,700 the public scoping process is to
Environmental Policy Act of 1969 State of Idaho ............................. 2,000 determine relevant issues that will
(NEPA) (42 U.S.C. 4321), as amended; Private ......................................... 8,700 influence the scope of the
environmental analysis and EIS
and the Council on Environmental Total ..................................... 30,700 alternatives. General concerns in the
Quality (CEQ) regulations (40 CFR parts following categories have been
1500–1508). This notice initiates the The turbines proposed for the project identified to date: Tribal concerns;
public scoping process to identify would have tower heights ranging from wildlife (including birds and bats);
relevant issues associated with the 200 to 250 feet and rotor diameters vegetation (including noxious and
proposed project. ranging from 250 to 300 feet. Each invasive weeds); threatened, endangered
DATES: The scoping period will turbine would be set on a large concrete and sensitive plants and animals,
commence with the publication of this foundation. Turbines would be including sage grouse; public safety;
notice. The formal scoping period will connected by underground electrical public access; recreational
end 60 days after the publication of this cable to one or two substations. Each opportunities; visual resources; cultural
notice. Comments regarding issues substation would be sited on a 2-acre resources; rangeland resources; geology
relative to the proposed project should area and would consist of a graveled, and soils; water quality; climate change
be received on or before June 20, 2008 fenced area containing transformer and and variability; hazardous materials; air
using one of the methods listed below. switching equipment and an area to quality; noise; fire management and
The BLM will announce public scoping park utility vehicles. Up to 15 miles of socioeconomics. You may submit
rwilkins on PROD1PC63 with NOTICES

meetings through local news media, new 3-phase 138 kV or 345 kV overhead comments on issues in writing to the
newsletters, and the BLM Web site: transmissions circuit would be BLM at any public scoping meeting, or
http://www.blm.gov/id/st/en/fo/ constructed from each substation to a you may submit them to the BLM using
jarbidge.html at least 15 days prior to switching station at the point of one of the methods listed in the
the first meeting. interconnection with an existing ADDRESSES section above. E-mailed

VerDate Aug<31>2005 16:59 Apr 18, 2008 Jkt 214001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 E:\FR\FM\21APN1.SGM 21APN1
Federal Register / Vol. 73, No. 77 / Monday, April 21, 2008 / Notices 21363

comments, including attachments, requirements in new Form MMS–0001, Abstract: Section 388 of the Energy
should be provided in .doc, .pdf, .html, Lease of Submerged Lands for Policy Act of 2005 amended the OCS
or .txt format. Electronic submissions in Alternative Energy Activities on the Lands Act to add a new paragraph (p)
other formats or containing viruses will Outer Continental Shelf (OCS), which is to section 8 of the Act (43 U.S.C.
be rejected. Before including your printed within this Federal Register 1337(p)) to allow the Department of the
address, phone number, e-mail address, notice. This new form is the instrument Interior, acting through the Minerals
or other personal identifying that MMS will use to issue a lease on Management Service (MMS), to grant a
information in your comment, you the OCS to conduct data collection and/ lease, easement, or right-of-way on the
should be aware that your entire or technology testing. This notice also OCS for activities that produce or
comment—including your personal provides the public a second support the production of energy from
identifying information—may be made opportunity to comment on the sources other than oil and gas. MMS has
publicly available at any time. While paperwork burdens associated with the established an Alternative Energy and
you can ask us in your comment to lease form. Alternate Use Program to authorize and
withhold your personal identifying DATES: Submit written comments by regulate OCS activities pursuant to this
information from public review, we May 21, 2008. new authority. MMS is in the process of
cannot guarantee that we will be able to developing proposed regulations that,
do so. ADDRESSES: You may submit comments once finalized, will set the framework
The EIS process will be a by any of the following methods listed for issuing leases, easements and rights-
collaborative effort that will consider below. of-way and authorizing OCS alternative
local, regional, and national needs and • By fax (202) 395–6566 or e-mail energy activities. On November 6, 2007,
concerns. The BLM will work closely (OIRA_DOCKET@omb.eop.gov) directly MMS announced an interim policy that
with interested parties to identify the to the Office of Information and allows the issuance of leases, under this
management decisions that are best Regulatory Affairs, OMB, Attention: statutory authority, for activities limited
suited to the needs of the public. After Desk Officer for the Department of the to alternative energy resource data
gathering public comments, the BLM Interior (1010–NEW). Please also send a collection and technology testing. The
will identify and provide rationale on copy to MMS. interim policy does not allow the
those issues that will be addressed in • Electronically: Go to http:// issuance of leases for commercial
the EIS or those issues beyond the scope www.regulations.gov. Under the tab production of alternative energy, such
of the EIS. The Draft EIS, which is ‘‘More Search Options,’’ click as the full build-out of commercial wind
scheduled for completion in early 2010, ‘‘Advanced Docket Search’’, then select farms.
will be provided to the public for review ‘‘Minerals Management Service’’ from On December 14, 2007, we published
and comment. The BLM will consider the agency drop-down menu, then click a Federal Register notice (72 FR 71152)
and respond to public comments on the ‘‘submit.’’ In the Docket ID column, announcing a new lease form and new
Draft EIS in the Final EIS. The Final EIS select MMS–2007–OMM–0072 to information collection requirements.
is expected to be published in late 2010. submit public comments and to view This new lease form is the instrument
Dated: April 11, 2008. available supporting and related for limited-term leases issued under
Rick Vander Voet,
materials. Information on using MMS’ interim policy. The new
Regulations.gov, including instructions information collection requirements are
Jarbidge Field Office Manager, Idaho Bureau
of Land Management. for accessing documents, submitting needed by MMS in order to authorize
comments, and viewing the docket after activities and convey rights through
[FR Doc. E8–8511 Filed 4–18–08; 8:45 am]
the close of the comment period, is limited-term leases to conduct data
BILLING CODE 4310–GG–P
available through the site’s ‘‘User Tips’’ collection and/or technology testing
link. All comments submitted will be activities on specific areas of the OCS.
DEPARTMENT OF THE INTERIOR published and posted to the docket after This information collection request
the closing period. (ICR) addresses the form and
Minerals Management Service • Mail or hand-carry comments to the accompanying information. The new
Department of the Interior; Minerals lease form will be used by MMS and the
[Docket No. MMS–2007–OMM–0072] emerging alternative energy industry as
Management Service; Attention: Cheryl
MMS Information Collection Activity: Blundon, 381 Elden Street, MS–4024, an instrument specifying the parties’
1010–NEW Lease of Submerged Lands Herndon, Virginia 20170–4817. Please rights and responsibilities under the
for Alternative Energy Activities on the reference ‘‘Information Collection 1010– lease.
NEW’’ in your comment and include We will protect information from
Outer Continental Shelf (OCS); New
your name and return address. respondents considered proprietary
Collection; Submitted for Office of
FOR FURTHER INFORMATION CONTACT:
under the Freedom of Information Act
Management and Budget (OMB)
Cheryl Blundon, Regulations and (5 U.S.C. 552) and its implementing
Review; Comment Request
Standards Branch at (703) 787–1607. regulations (43 CFR part 2). No items of
AGENCY: Minerals Management Service You may also contact Cheryl Blundon to a sensitive nature are collected.
(MMS), Interior. obtain a copy, at no cost, of Section 388 Responses are required to obtain or
ACTION: Notice of a new information of the Energy Policy Act. You may retain benefits or mandatory.
collection (1010–NEW) and request for Frequency: On occasion.
contact Maureen A. Bornholdt, Program Estimated Number and Description of
comments. Manager, Alternative Energy Programs Respondents: Approximately 18–25
SUMMARY: To comply with the at (703) 787–1300 for lease questions. (alternative energy) respondents.
Paperwork Reduction Act of 1995 SUPPLEMENTARY INFORMATION: Estimated Reporting and
rwilkins on PROD1PC63 with NOTICES

(PRA), we are notifying the public that Title: Lease of Submerged Lands for Recordkeeping ‘‘Hour’’ Burden: The
we have submitted to the Office of Alternative Energy Activities on the estimated annual ‘‘hour’’ burden for this
Management and Budget (OMB) an OCS. information collection is a total of 3,560
information collection request (ICR) for Form(s): MMS–0001. hours. The total estimated annual
a new approval of the paperwork OMB Control Number: 1010–NEW. ‘‘hour’’ burden decreased from the

VerDate Aug<31>2005 16:59 Apr 18, 2008 Jkt 214001 PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 E:\FR\FM\21APN1.SGM 21APN1