Federal Register / Vol. 72, No.

173 / Friday, September 7, 2007 / Notices 51431

Filed Date: 08/28/2007. Anyone filing an intervention or protest gather environmental input from the
Accession Number: 20070829–0188. must serve a copy of that document on public and interested agencies on the
Comment Date: 5 p.m. Eastern Time the Applicant. Anyone filing an project. Your input will help the
on Monday, September 10, 2007. intervention or protest on or before the Commission staff determine which
Docket Numbers: RP07–620–000. intervention or protest date need not issues need to be evaluated in the EA.
Applicants: TransColorado Gas serve motions to intervene or protests Please note that the scoping period will
Transmission Company. on persons other than the Applicant. close on September 28, 2007.
Description: TransColorado Gas The Commission encourages Comments may be submitted in
Transmission Co. submits Seventh electronic submission of protests and written or verbal form. Further details
Revised Sheet 20 to its FERC Gas Tariff, interventions in lieu of paper using the on how to submit written comments are
First Revised Volume 1 under RP07– ‘‘eFiling’’ link at http://www.ferc.gov. provided in the Public Participation
620. Persons unable to file electronically section of this notice. In lieu of sending
Filed Date: 08/28/2007. should submit an original and 14 copies written comments, you may choose to
Accession Number: 20070829–0185. of the protest or intervention to the attend the public scoping meeting
Comment Date: 5 p.m. Eastern Time Federal Energy Regulatory Commission, scheduled as follows:
on Monday, September 10, 2007. 888 First Street, NE., Washington, DC
Docket Numbers: RP07–621–000. 20426. Date and time Location
Applicants: Discovery Gas This filing is accessible on-line at
http://www.ferc.gov, using the Tuesday, September Lawrenceville Fire
Transmission LLC. 18, 2007 7 p.m. to Department, 9–11
Description: Discovery Gas ‘‘eLibrary’’ link and is available for 9 p.m. (EDT). Mechanic St.,
Transmission LLC submits Twelfth review in the Commission’s Public Lawrenceville, PA
Revised Sheet 20 to FERC Gas Tariff, Reference Room in Washington, DC. 16901. Telephone:
Original Volume 1, effective 10/1/07 There is an ‘‘eSubscription’’ link on the (570) 827–2047.
pursuant to Order 472 under RP07–621. Web site that enables subscribers to
Filed Date: 08/28/2007. receive e-mail notification when a This notice is being sent to affected
Accession Number: 20070829–0190. document is added to a subscribed landowners; federal, state, and local
Comment Date: 5 p.m. Eastern Time docket(s). For assistance with any FERC government representatives and
on Monday, September 10, 2007. Online service, please e-mail agencies; environmental and public
Docket Numbers: RP07–622–000. FERCOnlineSupport@ferc.gov, or call interest groups; Native American tribes;
Applicants: Black Marlin Pipeline (866) 208–3676 (toll free). For TTY, call other interested parties in this
Company. (202) 502–8659. proceeding; and local libraries and
Description: Black Marlin Pipeline newspapers. We 1 encourage
Nathaniel J. Davis, Sr.
Company’s CD containing Statement of government representatives to notify
Acting Deputy Secretary.
Rates—Sixteenth Revised Sheet 4 to their constituents of this planned
[FR Doc. E7–17694 Filed 9–6–07; 8:45 am] project and encourage them to comment
FERC Gas Tariff, Original Volume 1,
effective 10/1/07 under RP07–622. BILLING CODE 6717–01–P on their areas of concern.
Filed Date: 08/28/2007. If you are a landowner receiving this
Accession Number: 20070828–4006. notice, you may be contacted by a
DEPARTMENT OF ENERGY Dominion representative about the
Comment Date: 5 p.m. Eastern Time
on Monday, September 10, 2007. acquisition of an easement to construct,
Federal Energy Regulatory
Docket Numbers: RP99–301–162. operate, and maintain the proposed
Commission
Applicants: ANR Pipeline Company. project facilities. The pipeline company
Description: ANR Pipeline Co submits [Docket No. PF07–12–000] would seek to negotiate a mutually
an amendment to Rate Schedule FTS–1 acceptable agreement. However, if the
Dominion Transmission, Inc.; Notice of project is approved by the Commission,
negotiated rate agreement with Integrys
Intent to Prepare an Environmental that approval conveys with it the right
Energy Services, Inc under RP99–301.
Assessment for the Proposed Storage of eminent domain. Therefore, if
Filed Date: 08/28/2007.
Factory Project, Request for easement negotiations fail to produce an
Accession Number: 20070829–0186.
Comment Date: 5 p.m. Eastern Time Comments on Environmental Issues, agreement, Dominion could initiate
on Monday, September 10, 2007. and Notice of Public Scoping Meetings condemnation proceedings in
and Site Visit accordance with state law.
Any person desiring to intervene or to
protest this filing must file in August 29, 2007.
A fact sheet prepared by the FERC
accordance with Rules 211 and 214 of entitled ‘‘An Interstate Natural Gas
The staff of the Federal Energy
the Commission’s Rules of Practice and Facility on My Land? What Do I Need
Regulatory Commission (FERC or
Procedure (18 CFR 385.211 and to Know?’’ addresses a number of
Commission) will prepare an
385.214) on or before 5 p.m. Eastern typically asked questions, including the
environmental assessment (EA) that will
time on the specified comment date. It use of eminent domain and how to
discuss the environmental impacts of
is not necessary to separately intervene participate in the Commission’s
the Storage Factory Project, involving
again in a subdocket related to a proceedings. It is available for viewing
construction and operation of facilities
compliance filing if you have previously on the FERC Internet Web site (http://
by Dominion Transmission, Inc.
intervened in the same docket. Protests www.ferc.gov).
(Dominion) in Clinton, Elk, and Tioga
will be considered by the Commission Counties, Pennsylvania. The EA will be Summary of the Proposed Project
mstockstill on PROD1PC66 with NOTICES

in determining the appropriate action to used by the Commission in its decision- The Storage Factory Project would
be taken, but will not serve to make making process to determine whether involve the leaching of two salt caverns
protestants parties to the proceeding. the project is in the public convenience
Any person wishing to become a party and necessity. 1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
must file a notice of intervention or This notice announces the opening of environmental staff of the Office of Energy Projects
motion to intervene, as appropriate. the scoping period that will be used to (OEP), part of the Commission staff.

VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\07SEN1.SGM 07SEN1
51432 Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices

and placing the first cavern in service by The EA Process Commission, and the Pennsylvania
2014. The project consists of For this project, the FERC staff has Department of Environmental
constructing leaching/pumping initiated its National Environmental Protection.
facilities, a brine processing facility, Policy Act (NEPA) review prior to By this notice, we are asking these
water and brine pipelines, and a new receiving the application. The purpose and other federal, state, and local
compressor station for gas storage of the Commission’s Pre-Filing Process agencies with jurisdiction and/or
injection/withdrawal purposes in Tioga is to involve interested stakeholders special expertise with respect to
County. early in project planning and to identify environmental issues to formally
Dominion is also proposing on-system and resolve issues before an application cooperate with us in the preparation of
enhancements to other existing facilities is filed with the FERC. A docket number the EA. Agencies that would like to
in Pennsylvania, including piping (PF07–12–000) has been established to request cooperating status should follow
upgrades to the Sabinsville Storage place information filed by Dominion, the instructions for filing comments
Pool. Proposed modifications to and related documents issued by the provided below.
transmission related facilities include Commission, into the public record. Currently Identified Environmental
additional compression at Dominion’s Once a formal application is filed with Issues
existing Ardell Station (approximately the FERC, a new docket number will be
4,000 horsepower located in Elk County, The EA will discuss impacts that
established. The FERC will be the lead could occur as a result of the
Pennsylvania) and approximately 7.5 federal agency for the preparation of the
miles of new 30-inch-diameter pipeline construction and operation of the
EA which will satisfy the requirements proposed project. We have already
looping in Clinton County. of NEPA.
The Storage Factory Project is in the identified several issues that we think
The NEPA requires the Commission
preliminary design state. Dominion deserve attention based on a
to take into account the environmental
anticipates filing an application with preliminary review of the project site
impacts that could result from an action
the FERC in March 2008 and to seek the and the facility information provided by
whenever it considers the issuance of a
Commission’s approval in time for Iroquois. This preliminary list of issues
Certificate of Public Convenience and
Dominion to begin construction by and potential impacts may change based
Necessity. NEPA also requires us to
March 2009, with a proposed in-service on your comments and our analysis.
discover and address concerns the • Impacts on perennial and
date of January 2014. public may have about proposals. This
Project location maps are included in intermittent streams and waterbodies.
process is referred to as ‘‘scoping.’’ The • Water withdrawals from
Appendix A.2 main goal of the scoping process is to Cowanesque Reservoir or other water
Land Requirements for Construction focus the analysis in the EA on the source.
The Storage Factory Project is in the important environmental issues. By this • Evaluation of temporary and
preliminary planning stage. The precise Notice of Intent, we are requesting permanent impacts on wetlands and
facility design, pipeline route, rights-of- public comments on the scope of the development of appropriate mitigation.
way, and other details have not yet been issues that should be addressed in the • Effect on federally and state-listed
finalized. Specific information on the EA. We will consider all comments species.
proposed project location and the land received during scoping in the • Impacts on existing land uses.
used by it will be made available to the preparation of the EA. • Visual effects of the aboveground
Our independent analysis and facilities on surrounding areas.
public when it is finalized.
Construction of the proposed project evaluation of the issues will be included • Impacts on local air and noise
would affect a total of about 250.7 acres in the EA. The EA will also include quality associated with construction and
during construction. Following possible alternatives to the proposed operation.
construction, about 160 acres would be project or portions of the project, and • Public safety and potential hazards
allowed to revert to its previous we will make recommendations on how associated with the transport of natural
conditions. Disturbance associated with to lessen or avoid impacts on the gas and the proposed compressor
aboveground facilities would various resource areas of concern. facilities.
permanently impact 51.2 acres of land. Depending on the comments received
during the scoping process, the EA may Public Participation
Dominion proposes to construct its
pipeline in Clinton County and the be published and mailed to federal, You can make a difference by
pipelines associated with the state, and local agencies; elected providing us with your specific
Sabinsville Storage Pool in existing officials; environmental and public comments or concerns about the project.
rights-of-way. Dominion has indicated interest groups; other interested parties; By becoming a commenter, your
that it would seek 100-foot-wide affected landowners; Native American concerns will be addressed in the EA
construction right-of-way for the tribes; libraries, and newspapers; and and considered by the Commission.
pipelines associated with the leaching the Commission’s official service list for Your comments should focus on the
and gas storage areas. this proceeding. A 30-day comment potential environmental effects of the
period will be allotted for review of the proposal, reasonable alternatives to the
2 The appendices referenced in this notice are not EA. We will consider all comments proposal (including alternative locations
being printed in the Federal Register. Copies of all submitted on the EA in any Commission and routes), and measures to avoid or
appendices, other than Appendix A (maps), are Order that is issued for the project. lessen environmental impact. The more
available on the Commission’s Web site at the We are currently involved in specific your comments, the more useful
‘‘eLibrary’’ link or from the Commission’s Public
Reference Room, 888 First Street, NE., Washington,
discussions with other jurisdictional they will be. Please carefully follow
mstockstill on PROD1PC66 with NOTICES

DC 20426, or call (202) 502–8371. For instructions agencies to identify their issues and these instructions to ensure that your
on connecting to eLibrary refer to the ‘‘Additional concerns. These agencies include the comments are received in time and
Information’’ section of this notice. Copies of the U.S. Army Corps of Engineers, U.S. Fish properly recorded:
appendices were sent to all those receiving this
notice in the mail. Requests for detailed maps of the
and Wildlife Service, U.S. EPA Region • Send an original and two copies of
proposed facilities should be made directly to III Groundwater and Enforcement your letter to: Kimberly D. Bose,
Dominion. Branch, Susquehanna River Basin Secretary, Federal Energy Regulatory

VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\07SEN1.SGM 07SEN1
Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices 51433

Commission, 888 First Street, NE., We will view Dominion’s proposed amount of time you spend researching
Room 1A, Washington, DC 20426. pipeline route, route variations, and proceedings by automatically providing
• Label one copy of the comments for aboveground facilities that are being you with notification of these filings,
the attention of Gas Branch 1; considered for the proposed project. document summaries and direct links to
• Reference Docket No. PF07–12–000; Staff will tour the proposed project area the documents. Go to http://
• Mail your comments so that they by automobile and on foot. www.ferc.gov/esubscribenow.htm.
will be received in Washington, DC on Representatives of Dominion will Finally, Dominion has established an
or before September 28, 2007. accompany the OEP staff. Internet Web site for this project at
Please note that the Commission All interested parties may attend the http://www.dom.com/about/gas-
strongly encourages electronic filing of site visit. Those planning to attend must transmission/storage/index.jsp. The
comments. See 18 Code of Federal provide their own transportation. If you Web site includes a project overview,
Regulations (CFR) 385.2001(a)(1)(iii) are interested in attending the site visit, status, and answers to frequently asked
and the instructions on the please meet us at 1 p.m. in the parking questions. You can also request
Commission’s Internet Web site at lot of the Lawrenceville Fire Department additional information by calling
http://www.ferc.gov under the ‘‘eFiling’’ at 9–11 Mechanic St., Lawrenceville, PA Dominion at 1–880–882–5055.
link and the link to the User’s Guide. 16901.
Prepare your submission in the same For additional information, please Kimberly D. Bose,
manner as you would if filing on paper contact the Commission’s Office of Secretary.
and save it to a file on your hard drive. External Affairs at 1–866–208–FERC [FR Doc. E7–17664 Filed 9–6–07; 8:45 am]
Before you can file comments you will (3372). BILLING CODE 6717–01–P
need to create an account by clicking on
Environmental Mailing List
‘‘Login to File’’ and then ‘‘New User
Account.’’ You will be asked to select An effort is being made to send this DEPARTMENT OF ENERGY
the type of filing you are making. This notice to all individuals, organizations,
filing is considered a ‘‘Comment on and government entities interested in Federal Energy Regulatory
Filing.’’ and/or potentially affected by the Commission
The public scoping meeting (date, proposed project. This includes all [Docket No. CP07–430–000]
time, and location is listed above) is landowners who are potential right-of-
designed to provide state and local way grantors, whose property may be Kinder Morgan Interstate Gas
agencies, interested groups, affected used temporarily for project purposes, Transmission LLC; Notice of Intent To
landowners, and the general public with or who own homes within distances Prepare an Environmental Assessment
another opportunity to offer your defined in the Commission’s regulations for the Proposed Colorado Lateral
comments on the project. Interested of certain aboveground facilities. If you Expansion Project and Request for
groups and individuals are encouraged do not return the attached form Comments on Environmental Issues
to attend the meetings and to present (Appendix B), you will be removed from
comments on the environmental issues the Commission’s environmental August 29, 2007.
they believe should be addressed in the mailing list. All individuals who The staff of the Federal Energy
EA. A transcript of each meeting will be provide written comments, attend the Regulatory Commission (FERC or
made so that your comments will be scoping meeting, or return the Commission) will prepare an
accurately recorded. Information Request will remain on our environmental assessment (EA) that will
All public meetings will be posted on environmental mailing list for this discuss the environmental impacts of
the Commission’s calendar located at project. the Colorado Lateral Expansion Project,
http://www.ferc.gov/EventCalendar/ involving construction and operation of
Additional Information natural gas facilities by Kinder Morgan
EventsList.aspx along with other related
information. Additional information about the Interstate Gas Transmission LLC (Kinder
Once Dominion formally files its project is available from the Morgan) in Weld County, Colorado. The
application with the Commission, you Commission’s Office of External Affairs EA will be used by the Commission in
may want to become an official party to at 1–866–208 FERC (3372) or on the its decision-making process to
the proceeding known as an FERC Internet Web site (http:// determine whether the project is in the
‘‘intervenor.’’ Intervenors play a more www.ferc.gov). Using the ‘‘eLibrary’’ public convenience and necessity.
formal role in the process and are able link, select ‘‘General Search’’ from the This notice announces the opening of
to file briefs, appear at hearings, and be eLibrary menu, enter the selected date the scoping period that will be used to
heard by the courts if they choose to range and ‘‘Docket Number’’ excluding gather environmental input from the
appeal the Commission’s final ruling. the last three digits (i.e., PF07–12), and public and interested agencies on the
An intervenor formally participates in a follow the instructions. For assistance project. Your input will help the
Commission proceeding by filing a with access to eLibrary, the helpline can Commission staff determine which
request to intervene. Instructions for be reached at 1–866–208–3676, TTY issues need to be evaluated in the EA.
becoming an intervenor are included in (202) 502–8659, or at Please note that the scoping period will
the User’s Guide under the ‘‘e-filing’’ FERCOnlineSupport@ferc.gov. The close on October 1, 2007. Details on
link on the Commission’s Web site. eLibrary link on the FERC Internet Web how to submit comments are provided
Please note that you may not request site also provides access to the texts of in the Public Participation section of
intervenor status at this time. You must formal documents issued by the this notice.
wait until a formal application is filed Commission, such as orders, notices, If you are a landowner receiving this
mstockstill on PROD1PC66 with NOTICES

with the Commission. and rule makings. notice, you may be contacted by a
In addition, the Commission now Kinder Morgan representative about the
Site Visit offers a free service called eSubscription acquisition of an easement to construct,
On September 18, 2007, the OEP staff which allows you to keep track of all operate, and maintain the proposed
will conduct a pre-certification site visit formal issuances and submittals in project facilities. The pipeline company
of the proposed Storage Factory Project. specific dockets. This can reduce the would seek to negotiate a mutually

VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\07SEN1.SGM 07SEN1