Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
ITEM # 1
Requirement: 1.3 Objectives of this document
Signature:
STATUS: OPEN
ITEM # 2
Requirement: 1.3 Objectives of this document
STATUS: OPEN
1 / 10
TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
Signature:
STATUS: OPEN
Requirement: 2. SCOPE
ITEM # 4
Requirement: 2. SCOPE + OTHER RELATED ITEMS
STATUS: OPEN
2 / 10
TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
Signature:
ITEM # 5
STATUS: OPEN
Requirement: 2. SCOPE
3 / 10
TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
Signature:
STATUS: OPEN
STATUS: OPEN
4 / 10
TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
Signature:
STATUS: OPEN
5 / 10
TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
ITEM # 9
Requirement: 6. COATING MATERIALS PROPERTIES
Signature:
STATUS: OPEN
Entire item
Bredero Shaw Analysis: November 1, 2012
Our understanding is that all the materials were already defined by CONTRACTOR, which means that all of them are in compliace with the relevant tables
presented in the item 6 of this Technical specification. Please confirm.
ITEM # 10
Requirement: 8.2 Pre-Production Testing (PPT)
STATUS: OPEN
6 / 10
TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
ITEM # 11
Requirement: 9.2 Field Joint Heating
Signature:
STATUS: OPEN
STATUS: OPEN
7 / 10
TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
Signature:
ITEM # 13
Requirement: 10.5 Holiday Detection
STATUS: OPEN
STATUS: OPEN
8 / 10
TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
Signature:
ITEM # 15
Requirement: 11. FREQUENCY OF INSPECTION AND TESTING
STATUS: OPEN
9 / 10
TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
Signature:
ITEM # 16
Requirement: 13. REPAIR OF FJC AND PARENT COATING AND REPAIR QUALIFICATION
STATUS: OPEN
General comments
Bredero Shaw Analysis: November 1, 2012
Our comments are as follows:
1. Bredero Shaw is not considering for this scope of work a qualification process for the repair procedure as mentioned in the tables IX, X, XI and XII.
10 / 10