You are on page 1of 10

TECHNICAL ANALYSIS

Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha
ITEM # 1
Requirement: 1.3 Objectives of this document

Signature:
STATUS: OPEN

Bredero Shaw Analysis: November 1, 2012


Please note that this requirement will be addressed in our Comercial offer for this scope of work.

ITEM # 2
Requirement: 1.3 Objectives of this document

Technical Analysis - Order 12 2651 - Saipem - Rev0.xls

STATUS: OPEN

1 / 10

TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha

Signature:

Bredero Shaw Analysis: November 1, 2012


Bredero Shaw is considering that the field joint application won't be performed on the of CONTRACTOR's pipe laying vessel. Also our understanding is
that all the field joint applications will be done only in a horizontal position. Please confirm.
ITEM # 3

STATUS: OPEN
Requirement: 2. SCOPE

Bredero Shaw Analysis: November 1, 2012


As commented in the item #2.

ITEM # 4
Requirement: 2. SCOPE + OTHER RELATED ITEMS

Technical Analysis - Order 12 2651 - Saipem - Rev0.xls

STATUS: OPEN

2 / 10

TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha

Signature:

Bredero Shaw Analysis: November 1, 2012


Our proposal are as follows:
1. The FBE layer thickness will be between 200 m and 500 m. In case of any reading outside this range, four additional readings will be taken around
such spot and then their average will be within 200-500 m. Please consider.
2. The Adhesive layer thickness will be between 200 m and 500 m. In case of any reading outside this range, four additional readings will be taken
around such spot and then their average will be within 200-500 m. Please consider.

ITEM # 5

STATUS: OPEN
Requirement: 2. SCOPE

Technical Analysis - Order 12 2651 - Saipem - Rev0.xls

3 / 10

TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha

Signature:

Bredero Shaw Analysis: November 1, 2012


As commented in the item #2.
ITEM # 6
Requirement: 3.2 After Award of Contract

STATUS: OPEN

Bredero Shaw Analysis: November 1, 2012


Bredero Shaw is not considering a Qualification process for this scope of work. Our understanding is to carry out only a PPT process. Please confirm.
ITEM # 7
Requirement: 3.3 Field Joint Coating Production

Technical Analysis - Order 12 2651 - Saipem - Rev0.xls

STATUS: OPEN

4 / 10

TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha

Signature:

Bredero Shaw Analysis: November 1, 2012


During the PPT process, five field joints will be coated, being that: One field joint for FBE evaluation, one field joint for adhesive layer thickness
evaluation and three complete field joints (two of them will be submitted to Peel Adhesion tests).
All field joints will be set only in the horizontal position.
ITEM # 8
Requirement: 5.2 Pre-Production Testing

STATUS: OPEN

Bredero Shaw Analysis: November 1, 2012


As commented in the item #2.

Technical Analysis - Order 12 2651 - Saipem - Rev0.xls

5 / 10

TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha

ITEM # 9
Requirement: 6. COATING MATERIALS PROPERTIES

Signature:

STATUS: OPEN

Entire item
Bredero Shaw Analysis: November 1, 2012
Our understanding is that all the materials were already defined by CONTRACTOR, which means that all of them are in compliace with the relevant tables
presented in the item 6 of this Technical specification. Please confirm.

ITEM # 10
Requirement: 8.2 Pre-Production Testing (PPT)

STATUS: OPEN

Bredero Shaw Analysis: November 1, 2012


As commented in the item #2.

Technical Analysis - Order 12 2651 - Saipem - Rev0.xls

6 / 10

TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha

ITEM # 11
Requirement: 9.2 Field Joint Heating

Signature:

STATUS: OPEN

Bredero Shaw Analysis: November 1, 2012


Bredero Shaw understands the technical reason behind this requirement. Anyway we also understand that this range is stringent for field joint operations
due to the fact that any variation on the pipe wall thickness will bring as consequence readings out of the maximum tolerance of 15C. Therefore we would
like to propose that the difference between temperatures over the field joint shall be 25C as maximum. Please consider.
ITEM # 12
Requirement: 9.3 Epoxy Powder Primer (FBE) Application

Technical Analysis - Order 12 2651 - Saipem - Rev0.xls

STATUS: OPEN

7 / 10

TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha

Signature:

Bredero Shaw Analysis: November 1, 2012


Bredero Shaw proposes a manual application for the FBE material. Please consider.

ITEM # 13
Requirement: 10.5 Holiday Detection

STATUS: OPEN

Bredero Shaw Analysis: November 1, 2012


The minimum specified FBE layer thickness shall be 200 microns. Thus we propose a test voltage of 5 V/m, which means a voltage of 1.0 kV.
The requested voltage of 3.5 kV represents more than 17 V/m regarding to the minimum specified FBE layer thickness, which is unusual.
For the complete field joint coating system we propose a test voltage of 20 kV. Please consider.
ITEM # 14
Requirement: 10.7 Peel Strength

Technical Analysis - Order 12 2651 - Saipem - Rev0.xls

STATUS: OPEN

8 / 10

TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha

Signature:

Bredero Shaw Analysis: November 1, 2012


Bredero Shaw doesn't have track records for the Peel Adhesion test before the temperature on the hot applied HSS FJC decreases to below 90C.
Additionaly there are not track records even for Peel adhesion test at ambient temperature. Therefore we would like to request the PQT data book for the
relevant field joint coating system in order to verify if during that phase consistent adhesion performances were achieved in compliance with the Project
requirements.

ITEM # 15
Requirement: 11. FREQUENCY OF INSPECTION AND TESTING

Technical Analysis - Order 12 2651 - Saipem - Rev0.xls

STATUS: OPEN

9 / 10

TECHNICAL ANALYSIS
Document: I-ET-3A03.00-6520-276-XSA-264
Revision: D
Title: FIELD JOINT COATING SPECIFICATION (FBE + HSS)
Project: SAPINHO & LULA-NE GASLINE PROJECT
Client: Saipem
Issued by: Normando Cunha

Signature:

Bredero Shaw Analysis: November 1, 2012


Our comments are as follows:
1. Bredero Shaw is considering the columns related only to the PPT and Production phases. PQT won't be applicable for this scope of work.
2. Abrasive material contamination will be carried out on the extracted abrasive media from the blasting process.
3. FBE Holiday detection will consider as reference the minimum FBE layer thickness of 200 m, i.e a test voltage of 5 V/m, which means a test
voltage of 1.0 kV. Please see comment #13.
4. Regarding to the Peel Adhesion tests, please see comment #14.

ITEM # 16
Requirement: 13. REPAIR OF FJC AND PARENT COATING AND REPAIR QUALIFICATION

STATUS: OPEN

General comments
Bredero Shaw Analysis: November 1, 2012
Our comments are as follows:
1. Bredero Shaw is not considering for this scope of work a qualification process for the repair procedure as mentioned in the tables IX, X, XI and XII.

Technical Analysis - Order 12 2651 - Saipem - Rev0.xls

10 / 10