You are on page 1of 1

29546 Federal Register / Vol. 72, No.

102 / Tuesday, May 29, 2007 / Notices

Field Office. The proposed amendment DEPARTMENT OF THE INTERIOR SUMMARY: The Bureau of Land
includes four primary components: (1) Management (BLM) proposes to amend
A third tailings facility, which includes Bureau of Land Management the Las Vegas Resource Management
burial of an existing tailings facility, (2) [NM–910–07–0777–XX] Plan (RMP) to allow for the relocation
a new waste rock facility (Clydesdale), of a section of a BLM utility corridor,
(3) an expansion of the open pit by 296 Notice of Public Meeting, New Mexico and to prepare an environmental
acres, which will result in an increase Resource Advisory Council Meeting assessment (EA), pursuant to Section
of the size of the post-mining pit lake 102 of the National Environmental
AGENCY: Bureau of Land Management, Policy Act of 1969 (NEPA) to analyze
from 800 to 900 acres, and (4) an Department of the Interior.
extension of mining activities until the effects of that action. The BLM
ACTION: Notice of public meeting. proposes to relocate an 11.4-mile length
approximately 2015, including mining
employment for 4 years as well as an SUMMARY: In accordance with the of the half-mile wide BLM Utility
Federal Land Policy and Management Corridor that currently extends across
extension of the dewatering program to
Act and the Federal Advisory the southern portion of Indian Springs
maintain the water table at its current
Committee Act of 1972, the U.S. in Clark County, NV. The Corridor as
level for an additional four years. designated overlaps private lands. The
Ancillary disturbance includes a new Department of the Interior, Bureau of
Land Management, New Mexico amendment would relocate the Corridor
haul road with culverts over Rodeo further south behind Grandpa Mountain
Creek, an intermittent drainage, Resource Advisory Council (RAC), will
meet as indicated below. to avoid the private lands.
diversion channels for a portion of the
Brush Creek, an intermittent drainage, DATES: the meeting dates are July 24–25, DATES: The scoping comment period
and Rodeo Creek, and accelerated 2007, at the Convention Center, 302 will commence with the publication of
South Canal Street, Carlsbad, New this notice and will end 30 days after its
reclamation of the Bazza Waste Rock
Mexico, Room 3. the public comment publication. Comments should be
Facility. A focal point of the SEIS will
period is scheduled July 24, 2007, from submitted in writing to the address
be the analysis of the cumulative
6–7 p.m. at the Convention Center. the below and will be accepted throughout
impacts of mining and related actions public may present written comments to the scoping period. Any scoping
along the Carlin Trend, including the RAC. Depending on the number of meetings will be announced 15 days in
incorporation of the re-analysis of individuals wishing to comment and advance through the local news media,
cumulative impacts for the Leeville and time available, oral comments may be newsletters, and the BLM Web site at
South Operations Area Projects limited. The three established RAC http://www.nv.blm.gov/vegas/
currently underway by the Elko Field working groups may have a later default.htm.
Office. The BLM is asking the public for afternoon or an evening meeting.
information on any issues, including SUPPLEMENTARY INFORMATION: The 15-
ADDRESSES: Please mail written
cumulative impacts, relevant to this member RAC advises the Secretary of comments to the Bureau of Land
amendment. Comments, including the Interior, through the Bureau of Land Management, Las Vegas Field Office,
names and street addresses of Management, on a variety of planning 4701 North Torrey Pines Drive, Las
respondents, will be available for public and management issues associated with Vegas, NV, 89130–2301, (fax (702) 515–
review at the above address during public land management in New 5023) attention Mark R. Chatterton.
regular business hours 7:30 a.m. to 4:30 Mexico. All meetings are open to the FOR FURTHER INFORMATION CONTACT:
p.m., Monday through Friday, except public. At this meeting, topics include Mark R. Chatterton at the Las Vegas
holidays, and may be published as part issues on renewable and nonrenewable Field Office (see address above),
of the SEIS. Before including your resources. telephone (702) 515–5049; e-mail
address, phone number, e-mail address, FOR FURTHER INFORMATION CONTACT: Mark_Chatterton@nv.blm.gov.
or other personal identifying Theresa Herrera, New Mexico State
Office, Office of External Affairs, Bureau SUPPLEMENTARY INFORMATION: The Las
information in your comment, you
of Land Management, P.O. Box 27115, Vegas RMP was approved on October 5,
should be aware that your entire 1998. The BLM Utility Corridor in the
comment—including your personal Santa Fe, New Mexico 87502–0115,
505.438.7517. vicinity of Indian Springs (see Map 2–
identifying information—may be made 4 of Volume II of the Las Vegas RMP)
publicly available at any time. While Dated: May 22, 2007. was established along an existing power
you can ask us in your comment to Linda S.C. Rundell, line. The existing BLM Utility Corridor
withhold your personal identifying State Director. is approximately 2,640 feet wide in the
information from public review, we [FR Doc. 07–2650 Filed 5–25–07; 8:45 am] vicinity of Indian Springs. This half-
cannot guarantee that we will be able to BILLING CODE 4310–FB–M mile wide utility corridor extends
do so. northwest from T. 16 S., R. 57 E., sec.
33, M.D.M. along U.S. Highway 95 to
Danielle Yroz, DEPARTMENT OF THE INTERIOR the community of Indian Springs where
Associate Field Manager. the corridor diverges south around
[FR Doc. E7–10162 Filed 5–25–07; 8:45 am] Bureau of Land Management Indian Springs. Approximately one-
BILLING CODE 4310–HC–P [NV–050–1430–ER; N–62861; 7–08807] quarter-mile of the Corridor width
extends into private property. This RMP
Notice of Intent To Amend the Las amendment is intended to relocate 11.4
Vegas Resource Management Plan To miles of the half-mile wide corridor,
sroberts on PROD1PC70 with NOTICES

Relocate a Utility Corridor; Nevada centered on Indian Springs, further


AGENCY: Bureau of Land Management, south behind Grandpa Mountain to
Interior. avoid abutting any private lands.
Beyond Indian Springs, the Corridor
ACTION: Notice of intent.
continues west parallel to U.S. Highway

VerDate Aug<31>2005 20:45 May 25, 2007 Jkt 211001 PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 E:\FR\FM\29MYN1.SGM 29MYN1

You might also like