You are on page 1of 1

Federal Register / Vol. 72, No.

100 / Thursday, May 24, 2007 / Notices 29147

application for preliminary permit for a intervene in accordance with the 358 of the Commission’s regulations and
proposed project must submit the Commission’s Rules may become a Order No. 2004.
competing application itself, or a notice party to the proceeding. Any comments, Any person desiring to intervene or to
of intent to file such an application, to protests, or motions to intervene must protest this filing must file in
the Commission on or before the be received on or before the specified accordance with Rules 211 and 214 of
specified comment date for the comment date for the particular
the Commission’s Rules of Practice and
particular application (see 18 CFR 4.36). application.
Submission of a timely notice of intent Procedure (18 CFR 385.211 and
Comments, protests and interventions
allows an interested person to file the may be filed electronically via the 385.214). Protests will be considered by
competing preliminary permit Internet in lieu of paper; See 18 CFR the Commission in determining the
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions appropriate action to be taken, but will
the specified comment date for the on the Commission’s Web site under ‘‘e- not serve to make protestants parties to
particular application. A competing filing’’ link. The Commission strongly the proceeding. Any person wishing to
preliminary permit application must encourages electronic filing. become a party must file a notice of
conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive intervention or motion to intervene, as
o. Competing Development Documents—Any filings must bear in appropriate. Such notices, motions, or
Application—Any qualified all capital letters the title protests must be filed on or before the
development applicant desiring to file a ‘‘COMMENTS’’, comment date. Anyone filing a motion
competing development application ‘‘RECOMMENDATIONS FOR TERMS to intervene or protest must serve a copy
must submit to the Commission, on or AND CONDITIONS’’, ‘‘PROTEST’’, of that document on the Applicant. On
before a specified comment date for the ‘‘COMPETING APPLICATION’’ OR or before the comment date, it is not
particular application, either a ‘‘MOTION TO INTERVENE’’, as necessary to serve motions to intervene
competing development application or a applicable, and the Project Number of or protests on persons other than the
notice of intent to file such an the particular application to which the Applicant.
application. Submission of a timely filing refers. Any of the above-named
notice of intent to file a development The Commission encourages
documents must be filed by providing
application allows an interested person electronic submission of protests and
the original and the number of copies
to file the competing application no interventions in lieu of paper using the
provided by the Commission’s
later than 120 days after the specified regulations to: The Secretary, Federal ‘‘eFiling’’ link at http://www.ferc.gov.
comment date for the particular Energy Regulatory Commission, 888 Persons unable to file electronically
application. A competing license First Street, NE., Washington, DC 20426. should submit an original and 14 copies
application must conform with 18 CFR A copy of any motion to intervene must of the protest or intervention to the
4.30(b) and 4.36. also be served upon each representative Federal Energy Regulatory Commission,
p. Notice of Intent—A notice of intent 888 First Street, NE., Washington, DC
of the Applicant specified in the
must specify the exact name, business 20426.
particular application.
address, and telephone number of the
t. Agency Comments—Federal, State, This filing is accessible on-line at
prospective applicant, and must include
and local agencies are invited to file http://www.ferc.gov, using the
an unequivocal statement of intent to
comments on the described application. ‘‘eLibrary’’ link and is available for
submit, if such an application may be
filed, either a preliminary permit A copy of the application may be review in the Commission’s Public
application or a development obtained by agencies directly from the Reference Room in Washington, DC.
application (specify which type of Applicant. If an agency does not file There is an ‘‘eSubscription’’ link on the
application). A notice of intent must be comments within the time specified for Web site that enables subscribers to
served on the applicant(s) named in this filing comments, it will be presumed to receive e-mail notification when a
public notice. have no comments. One copy of an
document is added to a subscribed
q. Proposed Scope of Studies under agency’s comments must also be sent to
docket(s). For assistance with any FERC
Permit—A preliminary permit, if issued, the Applicant’s representatives.
Online service, please e-mail
does not authorize construction. The Kimberly D. Bose, FERCOnlineSupport@ferc.gov, or call
term of the proposed preliminary permit Secretary. (866) 208–3676 (toll free). For TTY, call
would be 36 months. The work [FR Doc. E7–10006 Filed 5–23–07; 8:45 am] (202) 502–8659.
proposed under the preliminary permit
would include economic analysis, BILLING CODE 6717–01–P Comment Date: 5 p.m. Eastern Time
preparation of preliminary engineering on June 11, 2007.
plans, and a study of environmental DEPARTMENT OF ENERGY Kimberly D. Bose,
impacts. Based on the results of these
Secretary.
studies, the Applicant would decide Federal Energy Regulatory
whether to proceed with the preparation [FR Doc. E7–9992 Filed 5–23–07; 8:45 am]
Commission
of a development application to BILLING CODE 6717–01–P
construct and operate the project. [Docket No. TS07–5–000]
r. Comments, Protests, or Motions to
Intervene—Anyone may submit Neptune Regional Transmission
comments, a protest, or a motion to System; Notice of Request for
intervene in accordance with the Exemption
requirements of Rules of Practice and
rmajette on PROD1PC67 with NOTICES

Procedure, 18 CFR 385.210, .211, .214. May 17, 2007.


In determining the appropriate action to Take notice that on May 10, 2007,
take, the Commission will consider all Neptune Regional Transmission System
protests or other comments filed, but filed a request for exemption from
only those who file a motion to standards of conduct, pursuant to Part

VerDate Aug<31>2005 15:52 May 23, 2007 Jkt 211001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\24MYN1.SGM 24MYN1

You might also like