You are on page 1of 2

Federal Register / Vol. 72, No.

51 / Friday, March 16, 2007 / Notices 12597

clutter. A processor mitigates a clutter DEPARTMENT OF DEFENSE 3213 or Ms. Susan D. McRae, Office of
cloud in a reflected radar signal, the Research and Technology Applications,
clutter cloud having a velocity growth Department of the Army e-mail: susan.mcrae@army.mil; (256)
rate. The processor includes an input for 955–1501.
Availability of Non-Exclusive, SUPPLEMENTARY INFORMATION: The
receiving a reflected radar signal, a
Exclusive License or Partially invention pertains to the amplification
delay line having a plurality of moving
Exclusive Licensing of U.S. Patent of Faraday or Voigt rotation in thin film
target indicator (MTI) Doppler filters,
Concerning Methods for materials by passing a light beam
and an output connected in circuit with Polymerization of Electronic and
the plurality of MTI Doppler filters. The through a sample of material many
Photonic Polymers times through use of multiple internal
delay line covers a Doppler frequency
range corresponding to the velocity AGENCY: Department of the Army, DoD. reflections and successive mirrored
growth rate of the clutter cloud. The ACTION: Notice. chambers that repeatedly send the light
beam back through the sample.
reflected radar signal passes through the
SUMMARY: In accordance with 37 CFR
delay line to mitigate a portion of the Brenda S. Bowen,
part 404.6, announcement is made of
reflected radar signal that is reflected by Army Federal Register Liaison Officer.
the availability for licensing of U.S.
the clutter cloud from the reflected Patent No. US 7,186,791 B2 entitled [FR Doc. 07–1276 Filed 3–15–07; 8:45 am]
radar signal. ‘‘Methods for Polymerization of BILLING CODE 3710–08–M

Brenda S. Bowen, Electronic and Photonic Polymers’’


Army Federal Register Liaison Officer. issued March 6, 2007. This patent has
DEPARTMENT OF DEFENSE
been assigned to the United States
[FR Doc. 07–1277 Filed 3–15–07; 8:45 am]
Government as represented by the Department of the Army, Corps of
BILLING CODE 3710–08–M
Secretary of the Army. Engineers
FOR FURTHER INFORMATION CONTACT: Mr.
Jeffrey DiTullio at U.S. Army Soldier Notice of Availability for the Final
DEPARTMENT OF DEFENSE
Systems Center, Kansas Street, Natick, Environmental Impact Statement/
Department of the Army MA 01760, Phone; (508) 233–4184 or E- Environmental Impact Report for the
mail: Jeffrey.DiTullio@us.army.mil. Burlington Northern Santa Fe (BNSF)
Availability of Non-Exclusive, SUPPLEMENTARY INFORMATION: Any Cajon Third Main Track Summit to
Exclusive License or Partially licenses granted shall comply with 35 Keenbrook, San Bernardino County,
Exclusive Licensing of U.S. Patent U.S.C. 209 and 37 CFR part 404. CA
Concerning Methods for Brenda S. Bowen, AGENCY: Department of the Army, U.S.
Polymerization of Electronic and Army Federal Register Liaison Officer. Army Corps of Engineers, DoD.
Photonic Polymers ACTION: Notice of Availability.
[FR Doc. 07–1280 Filed 3–15–07; 8:45 am]
AGENCY: Department of the Army, DoD. BILLING CODE 3710–08–M SUMMARY: Pursuant to section 102(2)(c)
of the National Environmental Policy
ACTION: Notice. Act (NEPA) of 1969 (as amended), the
DEPARTMENT OF DEFENSE U.S. Army Corps of Engineers, Los
SUMMARY: In accordance with 37 CFR Angeles District (Corps) Regulatory
part 404.6, announcement is made of Department of the Army
Branch, in coordination with the County
the availability for licensing of U.S. Availability for Non-Exclusive, of San Bernardino and in cooperation
Patent No. US 7,186,792 B2 entitled Exclusive, or Partially Exclusive with U.S. Forest Service, has completed
‘‘Methods for Polymerization of Licensing of U.S. Patent Concerning a a Final Environmental Impact
Electronic and Photonic Polymers’’ Multiple Pass Faraday Rotation Statement/Environmental Impact Report
issued March 6 2007. This patent has Amplifier (EIS/EIR) for the Burlington Northern
been assigned to the United States Santa Fe (BNSF) Third Main Track
Government as represented by the AGENCY: Department of the Army, DoD. Summit to Keenbrook Project. The
Secretary of the Army. ACTION: Notice. proposed BNSF project requires
authorization pursuant to section 404 of
FOR FURTHER INFORMATION CONTACT: Mr. SUMMARY: In accordance with 37 CFR the Clean Water Act for approximately
Jeffrey DiTullio at U.S. Army Soldier 404.6 and 404.7, announcement is made 2.95 acres of fill placement in
Systems Center, Kansas Street, Natick, of the availability for licensing of the jurisdictional waters of the United
MA 01760, Phone; (508) 233–4184 or E- invention set forth in U.S. Patent No. States, including wetlands, to construct
mail: Jeffrey.DiTullio@us.army.mil. 7,095,555 entitled ‘‘Multiple Pass 15.9 miles of a new main track through
Faraday Rotation Amplifier,’’ issued on the Cajon Pass in San Bernardino
SUPPLEMENTARY INFORMATION: Any August 22, 2006. The United States County, California. Three alternatives
licenses granted shall comply with 35 Government, as represented by the were co-equally analyzed in the EIS/
U.S.C. 209 and 37 CFR part 404. Secretary of the Army, has rights in this EIR, including Alternative 1 (Reduced
Brenda S. Bowen,
invention. Footprint), Alternative 2 (Standard
ADDRESSES: Office of Research and Engineering Design) and the No Action
Army Federal Register Liaison Officer.
Technology Applications, SDMC– Alternative, as required by NEPA. As
[FR Doc. 07–1279 Filed 3–15–07; 8:45 am]
RDTC–TDL (Ms. Susan D. McRae), Bldg. the project proponent and applicant, the
sroberts on PROD1PC70 with NOTICES

BILLING CODE 3710–08–M 5520, Von Braun Complex, Redstone BNSF Railway Co. selected Alternative
Arsenal, AL 35898. 1 as its preferred alternative. The Corps
FOR FURTHER INFORMATION CONTACT: Ms. determined Alternative 1 is the
Joan Gilsdorf, Patent Attorney, e-mail: environmentally preferred alternative
joan.gilsdorf@smdc.army.mil (256) 955– and the least environmentally damaging

VerDate Aug<31>2005 16:13 Mar 15, 2007 Jkt 211001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 E:\FR\FM\16MRN1.SGM 16MRN1
12598 Federal Register / Vol. 72, No. 51 / Friday, March 16, 2007 / Notices

practicable alternative pursuant to the for the Port Canaveral Improvements channel; depths of 35 and 39 feet in the
404(b)(1) Guidelines (40 CFR 230.12). Section 203 Feasibility Study. The study middle turning basin; a channel 39 feet
FOR FURTHER INFORMATION CONTACT: is being conducted by the Canaveral deep and 400 feet wide from the middle
Questions or comments concerning the Port Authority under authority granted turning basin west, 1,800 feet, hence a
Final EIS/EIR should be directed to Ms. by section 203 of Water Resources channel 31 feet deep and 400 feet wide
Susan A. Meyer, Senior Project Development Act (WRDA) 1986. to the west turning basin also 31 feet
Manager, Regulatory Branch, U.S. Army ADDRESSES: U.S. Army Corps of deep; a channel 39 feet deep and 350
Corps of Engineers, Los Angeles District, Engineers, Planning Division, feet wide from the middle turning basin
P.O. Box 532711, 915 Wilshire Environmental Branch, P.O. 4970, and channel north to the end of Berth
Boulevard, Los Angeles, CA 90053– Jacksonville, FL, 32232–0019. 4; relocation of the perimeter dike about
2325, (808) 438–2137. Alternatively, FOR FURTHER INFORMATION CONTACT: Mr.
4,000 feet westward and extension of
comments can be submitted Paul Stodola, by e-mail the harbor westward; a south entrance
electronically to: Paul.E.Stodola@saj02.usace.army.mil or jetty 1,100 feet long and an entrance
susan.a.meyer@usace.army.mil. by telephone at (904) 232–3271. jetty 1,150 long; a barge dock 90 feet
wide and 600 feet long west of the
SUPPLEMENTARY INFORMATION: Paper SUPPLEMENTARY INFORMATION:
harbor dike; and a barge canal 12 feet by
copies of the Final EIS/EIR will be made a. Proposed Action. Canaveral Port
125 feet from the middle turning basin
available to the public for review at the Authority has elected to conduct a
tot he Atlantic Intracoastal Waterway.
following libraries: Norman F. feasibility study of potential The without project condition is for
Feldheym Central Library (San improvements under the authority continuation of the same channel
Bernardino, California), Hesperia granted by section 203 of WRDA 1986. depths and dimensions, with
Branch Library (Hesperia, California), Section 203 states (in part) that ‘‘A non- maintenance dredging as needed to
and the Rancho Cucamonga Public Federal interest may on its own maintain current authorized depths.
Library (Rancho Cucamonga, undertake a feasibility study of a Without proposed project improvements
California). A CD copy of the document proposed harbor or inland harbor the port will continue to experience the
may be obtained by contacting Ms. project and submit it to the Secretary of following three major problems which
Meyer in writing at the address or email the Army.’’ Corps of Engineers guidance greatly impact port operations, safety,
above. Interested parties are invited to for implementation of Section 203 is and economic viability.
provide their comments on the Final contained in Engineering Regulation 1. The size of cruise ships calling at
EIS/EIR, which will become a part of the (ER) 1165–2–122, August 26, 1991. Port Canaveral is constrained by
official record and will be considered in b. Objectives. The objectives of the channel and turning basin dimensions.
the final decision. Written comments Port Canaveral Navigation The potential for future cruise ship
must be received on or before April 16, Improvements feasibility study are to terminal expansion cannot be fully
2007 and should be submitted to the prepare a Section 203 Study Report that exploited under existing channel and
contact listed above. A Record of fully complies with all Federal laws and turning basin dimensions and
Decision (ROD) will be issued by the regulations applicable to navigation configurations. In addition, the
Corps no earlier than 30 days after the project General Investigation feasibility increasingly larger cruise ships calling
Notice of Receipt for the Final EIS/EIR studies, and to enable the Assistant at Port Canaveral are beginning to
is published in the Federal Register. As Secretary of the Army to make encroach on the existing west turning
a cooperating agency, the USFS intends appropriate recommendations to basin. Also, passage of large cruise ships
to adopt the Final EIS/EIR and issue its Congress regarding authorization of the through the narrow ship channel causes
own ROD in support of the issuance of Federal navigation improvements surges at cargo piers, which result in
a USFS special use permit. project for Port Canaveral. cargo vessels having to stop loading and
c. Study Purpose and Need for Action. unloading activities while the cruise
Dated: March 7, 2007. The purpose of the study is to evaluate ships pass.
David J. Castanon, modification to the Federal project for 2. The size of cargo vessels calling at
Chief, Regulatory Branch. improvements to the navigational Port Canaveral is constrained by
[FR Doc. E7–4823 Filed 3–15–07; 8:45 am] channels, the west turning basin, and existing channel dimensions and
BILLING CODE 3710–KF–P wideners at the port, all of which would configuration. Larger, more efficient
result in an increase in the efficiency of vessels could be used for bulk items
cargo vessels and cruise ships using the such as aggregates and cement if
DEPARTMENT OF THE DEFENSE port. The study will identify and channels were improved.
evaluate alternatives that will (2) reduce 3. Congestion at cargo berths reduces
Department of the Army; Corps of future congestion at Port Canaveral; (2) the effectiveness and efficiency of cargo
Engineers accommodate anticipated future growth vessels and landside facilities. Given the
in vessel traffic; (3) improve the rapid growth in commodity movements
Intent To Prepare a Draft
efficiency of operations for cruise ships at Port Canaveral, in the very near future
Environmental Impact Statement for
and cargo vessels within the Port a significant proportion of cargo vessels
the Port Canaveral Navigation
complex; (4) allow for use of the Port by calling at Port Canaveral will have to
Improvements Section 203 Feasibility
larger, more efficient, cruise ships and wait offshore for a berth to become
Study Located in Brevard County, FL
cargo vessels; and (5) allow for available. Some of these vessels will
AGENCY: Department of the Army, U.S. development of additional terminals/ likely divert to an alternative port, and
Army Corps of Engineers, DoD. berths without encroaching on the West incur increased transportation costs, if
Turning Basin. channels are not improved. In addition,
sroberts on PROD1PC70 with NOTICES

ACTION: Notice of intent.


The total Federal project includes, a landside facilities will stand idle as
SUMMARY: The U.S. Army Corps of 41-foot-deep entrance channel and vessels wait offshore for an available
Engineers (Corps), Jacksonville District maintenance of the 44-foot-deep Navy berth.
intends to prepare a Draft Channel in the 41-foot channel reach; a d. Alternatives. The proposed