You are on page 1of 2

12170 Federal Register / Vol. 72, No.

50 / Thursday, March 15, 2007 / Notices

appropriate. Such notices, motions, or accordance with Rules 211 and 214 of DEPARTMENT OF ENERGY
protests must be filed in accordance the Commission’s Rules of Practice and
with the provisions of Section 154.210 Procedure (18 CFR 385.211 and Federal Energy Regulatory
of the Commission’s regulations (18 CFR 385.214). Protests will be considered by Commission
154.210). Anyone filing an intervention the Commission in determining the [Docket No. EL07–44–000]
or protest must serve a copy of that appropriate action to be taken, but will
document on the Applicant. Anyone not serve to make protestants parties to Complainant: Dakota Wind Harvest,
filing an intervention or protest on or the proceeding. Any person wishing to LLC, vs. Respondents: Midwest
before the intervention or protest date become a party must file a notice of Independent Transmission System
need not serve motions to intervene or intervention or motion to intervene, as Operator, Inc., Montana-Dakota
protests on persons other than the appropriate. Such notices, motions, or Utilities Company, Western Area
Applicant. protests must be filed in accordance Power Administration; Notice of
The Commission encourages Complaint
with the provisions of Section 154.210
electronic submission of protests and
interventions in lieu of paper using the of the Commission’s regulations (18 CFR March 9, 2007.
‘‘eFiling’’ link at http://www.ferc.gov. 154.210). Anyone filing an intervention Take notice that on March 8, 2007,
Persons unable to file electronically or protest must serve a copy of that Dakota Wind Harvest, LLC (Dakota
should submit an original and 14 copies document on the Applicant. Anyone Wind) pursuant to Rule 206 of the Rules
of the protest or intervention to the filing an intervention or protest on or of Practice and Procedures of the
Federal Energy Regulatory Commission, before the intervention or protest date Commission, 18 CFR 385.206 and
888 First Street, NE., Washington, DC need not serve motions to intervene or sections 206 and 215 of the Federal
20426. protests on persons other than the Power Act, hereby submits the
This filing is accessible on-line at Applicant. Complaint Requesting Fast Track
http://www.ferc.gov, using the Processing against Midwest
The Commission encourages Independent Transmission System
‘‘eLibrary’’ link and is available for electronic submission of protests and
review in the Commission’s Public Operator, Inc. (Midwest ISO), Montana-
interventions in lieu of paper using the Dakota Utilities Company (MDU) and
Reference Room in Washington, DC. ‘‘eFiling’’ link at http://www.ferc.gov.
There is an ‘‘eSubscription’’ link on the Western Area Power Administration
Persons unable to file electronically (Western). Dakota Wind is required to
Web site that enables subscribers to should submit an original and 14 copies
receive e-mail notification when a file this Complaint due to: (i) Midwest
of the protest or intervention to the ISO’s refusal to allow Dakota Wind’s
document is added to a subscribed
Federal Energy Regulatory Commission, wind-powered electricity generation
docket(s). For assistance with any FERC
888 First Street, NE., Washington, DC facility currently under development to
Online service, please e-mail
20426. commence operations without first
FERCOnlineSupport@ferc.gov, or call
This filing is accessible on-line at having a Balancing Authority
(866) 208–3676 (toll free). For TTY, call
designated; (ii) MDU’s and Western’s
(202) 502–8659. http://www.ferc.gov, using the
refusal to serve as Balancing Authority
‘‘eLibrary’’ link and is available for
Philis J. Posey, despite the fact that the Project will be
review in the Commission’s Public interconnected to the transmission
Acting Secretary.
Reference Room in Washington, DC. system owned by MDU and located in
[FR Doc. E7–4719 Filed 3–14–07; 8:45 am]
There is an ‘‘eSubscription’’ link on the the geographic area in which Western is
BILLING CODE 6717–01–P
Web site that enables subscribers to the designated Balancing Authority; and
receive e-mail notification when a (iii) Midwest ISO’s and MDU’s refusal to
DEPARTMENT OF ENERGY document is added to a subscribed act to ensure that a Balancing Authority
docket(s). For assistance with any FERC agrees to provide balancing serviced to
Federal Energy Regulatory Online service, please e-mail Dakota Wind.
Commission FERCOnlineSupport@ferc.gov, or call Any person desiring to intervene or to
(866) 208–3676 (toll free). For TTY, call protest this filing must file in
[Docket No. RP07–341–000]
(202) 502–8659. accordance with Rules 211 and 214 of
Transcontinental Gas Pipe Line the Commission’s Rules of Practice and
Philis J. Posey, Procedure (18 CFR 385.211, 385.214).
Corporation; Notice of Proposed
Acting Secretary. Protests will be considered by the
Changes in FERC Gas Tariff
[FR Doc. E7–4720 Filed 3–14–07; 8:45 am] Commission in determining the
March 9, 2007. BILLING CODE 6717–01–P appropriate action to be taken, but will
Take notice that on March 6, 2007, not serve to make protestants parties to
Transcontinental Gas Pipe Line the proceeding. Any person wishing to
Corporation (Transco) tendered for become a party must file a notice of
filing as part of its FERC Gas Tariff, intervention or motion to intervene, as
Third Revised Volume No. 1, First appropriate. The Respondent’s answer
Revised Thirty-Second Revised Sheet and all interventions or protests must be
No. 28B and Second Substitute Thirty- filed on or before the comment date.
Third Revised Sheet No. 28B, to become The Respondent’s answer, motions to
effective February 9, 2007 and March 1, intervene, and protests must be served
2007, respectively. on the Complainants.
rmajette on PROD1PC67 with NOTICES

Transco states that copies of the filing The Commission encourages


are being mailed to affected customers electronic submission of protests and
and interested state commissions. interventions in lieu of paper using the
Any person desiring to intervene or to ‘‘eFiling’’ link at http://www.ferc.gov.
protest this filing must file in Persons unable to file electronically

VerDate Aug<31>2005 14:20 Mar 14, 2007 Jkt 211001 PO 00000 Frm 00007 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1
Federal Register / Vol. 72, No. 50 / Thursday, March 15, 2007 / Notices 12171

should submit an original and 14 copies significantly affecting the quality of the include a separate section entitled
of the protest or intervention to the human environment. ‘‘Statement of Issues’’ listing each issue
Federal Energy Regulatory Commission, The EA is attached to a Commission presented to the Commission in a
888 First Street, NE., Washington, DC order titled ‘‘Order Modifying and separately enumerated paragraph that
20426. Approving Non-Project Use of Project includes representative Commission
This filing is accessible on-line at Lands and Waters,’’ which was issued and court precedent on which the
http://www.ferc.gov, using the February 22, 2007, and is available for participant is relying.2 Under Rule 713,
‘‘eLibrary’’ link and is available for review and reproduction at the any issue not so listed will be deemed
review in the Commission’s Public Commission’s Public Reference Room, waived. Accordingly, Fall Creek’s
Reference Room in Washington, DC. located at 888 First Street, NE., Room rehearing request is dismissed.3
There is an ‘‘eSubscription’’ link on the 2A, Washington, DC 20426. The EA may
Web site that enables subscribers to In any event, Fall Creek’s arguments
also be viewed on the Commission’s
receive e-mail notification when a Web site at http://www.ferc.gov using on rehearing are without merit. The
document is added to a subscribed the ‘‘elibrary’’ link. Enter the project purpose of a preliminary permit is to
docket(s). For assistance with any FERC number (prefaced by P- and excluding maintain priority of application for a
Online service, please e-mail the last three digits) in the docket license during the term of the permit
FERCOnlineSupport@ferc.gov, or call number field to access the document. while the permittee conducts
(866) 208–3676 (toll free). For TTY, call For assistance, contact FERC Online investigations and secures data
(202) 502–8659. Support at necessary to determine the feasibility of
Comment Date: 5 p.m. eastern time on FERCOnlineSupport@ferc.gov or toll- the proposed project and, if the project
March 23, 2007. free at (866) 208–3676, or for TTY, is found to be feasible, prepares an
contact (202) 502–8659. acceptable development application.
Philis J. Posey, While an applicant is not precluded
Acting Secretary. Philis J. Posey, from seeking and obtaining a successive
[FR Doc. E7–4714 Filed 3–14–07; 8:45 am] Acting Secretary. preliminary permit for the same site, it
BILLING CODE 6717–01–P [FR Doc. E7–4718 Filed 3–14–07; 8:45 am] must demonstrate that, under the prior
BILLING CODE 6717–01–P permit, it pursued the proposal in good
faith and with due diligence.4 A
DEPARTMENT OF ENERGY permittee seeking a successive permit is
DEPARTMENT OF ENERGY therefore required to take certain
Federal Energy Regulatory
minimal steps, including filing six-
Commission Federal Energy Regulatory
month progress reports and consulting
[Project No. 349–115—Alabama] Commission
with the appropriate federal and state
[Project No. 12617–001] resource agencies.5
Alabama Power Company; Notice of
Availability of Environmental Fall Creek Hydro, LLC; Notice In October 2002, Commission staff
Assessment Dismissing Filing as Deficient granted Fall Creek a three-year
preliminary permit to study its
March 9, 2007. March 9, 2007. proposed project.6 Upon expiration of
In accordance with the National On January 10, 2007, Commission the first permit term, Fall Creek
Environmental Policy Act of 1969 and staff issued an order dismissing Fall immediately filed its application for a
the Federal Energy Regulatory Creek Hydro, LLC’s (Fall Creek) second permit. Commission staff
Commission’s (Commission) application for a second three-year dismissed Fall Creek’s application for a
regulations, 18 CFR Part 380 (Order No. preliminary permit to study the successive permit, concluding that Fall
486, 52 FR 47897), the Office of Energy proposed 4.7-megawattt Fall Creek Creek failed to prosecute diligently the
Projects has reviewed an application for Hydroelectric Project No. 12617, to be requirements of its previous permit.
non-project use of project lands and located at the existing U.S. Army Corps On rehearing, Fall Creek contends
waters at the Martin Dam Project (FERC of Engineers’ (Corps) Fall Creek Dam, on that it has made substantial progress in
No. 349), and has prepared an Fall Creek in Lane County, Oregon. On analyzing the proposed project’s
environmental assessment (EA) for the February 8, 2007, Fall Creek filed a feasibility and completing the Pre-
proposal. The project is located on Lake timely request for rehearing, seeking
Martin near Dadeville, in Tallapoosa reinstatement of its application. 2 As explained in Order No. 663, the purpose of
County, Alabama. Fall Creek’s rehearing request is this requirement is to benefit all participants in a
In the application, Alabama Power deficient because it fails to include a proceeding by ensuring that the filer, the
(licensee) requests Commission Statement of Issues section separate Commission, and all other participants understand
authorization to permit The Pointe at from its arguments, as required by Rule the issues raised by the filer, and to enable the
Commission to respond to these issues. Having a
Sunset Pointe, LLC (The Pointe) to 713 of the Commission’s Rules of clearly articulated Statement of Issues ensures that
install 30 boat slips as well as a pier/ Practice and Procedure.1 Rule 713(c)(2) issues are properly raised before the Commission
platform and floating-dock structure on requires that a rehearing request must and avoids the waste of time and resources
Lake Martin, the project reservoir. These involved in litigating appeals regarding which the
courts of appeals lack jurisdiction because the
structures would serve the residents of 1 18 CFR 385.713(c)(2) (2006). See Revision of
issues on appeal were not clearly identified before
condominiums that are located on Rules of Practice and Procedure Regarding Issue
the Commission. See Order No. 663 at P 3–4.
Identification, Order No. 663, 70 FR 55,723
adjoining project lands. The EA (September 23, 2005), FERC Statutes and
3 See, e.g., South Carolina Electric & Gas

contains Commission staff’s analysis of Company, 116 FERC ¶ 61,218 (2006); and Duke
rmajette on PROD1PC67 with NOTICES

Regulations ¶ 31,193 (2005). See also, Order 663–


the potential environmental impacts of A, effective March 23, 2006, which amended Order Power Company, LLC, 116 FERC ¶ 61,171 (2006).
4 See Little Horn Energy Wyoming, Inc., 58 FERC
the proposal and concludes that 663 to limit its applicability to rehearing requests.
Revision of Rules of Practice and Procedure ¶ 61,132 (1992).
approval of the proposal, as modified by Regarding Issue Identification, Order No. 663–A, 71 5 See Burke Dam Hydro Associates, 47 FERC ¶
the staff-identified alternative, would FR 14,640 (March 23, 2006), FERC Statutes and 61,449 (1989).
not constitute a major federal action Regulations ¶ 31,211 (2006). 6 101 FERC ¶ 62,038 (2002).

VerDate Aug<31>2005 14:20 Mar 14, 2007 Jkt 211001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 E:\FR\FM\15MRN1.SGM 15MRN1