Professional Documents
Culture Documents
[FR Doc. 07–728 Filed 2–15–07; 8:45 am] DEPARTMENT OF DEFENSE SUMMARY: This notice announces the
BILLING CODE 5001–06–C availability of the Missile Defense
Office of the Secretary Agency’s (MDA) Ballistic Missile
Defense System (BMDS) Final
[DOD–2007–OS–0008] Programmatic Environmental Impact
Statement (PEIS), which analyzes the
Notice of Availability of the Ballistic potential impacts to the environment of
Missile Defense System Final MDA’s proposal to develop, test,
Programmatic Environmental Impact deploy, and plan for decommissioning
Statement an integrated BMDS. The PEIS
sroberts on PROD1PC70 with NOTICES
VerDate Aug<31>2005 19:03 Feb 15, 2007 Jkt 211001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\16FEN1.SGM 16FEN1
7618 Federal Register / Vol. 72, No. 32 / Friday, February 16, 2007 / Notices
provides a framework for future capabilities, working together to defend decommissioning activities for an
environmental analyses as activities against all classes and ranges of threat integrated BMDS. Instead, the MDA
evolve and mature. ballistic missiles in all phases of flight. would continue existing development
DATES: A Record of Decision will be Multiple defensive weapons would be and testing of discrete systems as stand-
issued no earlier than 30 days from the used to create a layered defense alone missile defense capabilities.
date of this notice. comprised of multiple intercept Individual systems would continue to
Copies of the Final PEIS have been opportunities along the incoming threat be tested but would not be subjected to
distributed to Federal, State, local missile’s trajectory. This would provide System Integration Tests.
agencies, and public officials that a layered defensive system of
capabilities designed to back up one Dated: February 7, 2007.
previously requested copies of the PEIS.
Copies of the Final PEIS will be another. L. M. Bynum,
available at the following public On April 11, 2003, MDA initiated the Alternate OSD Federal Register Liaison
libraries: public scoping process by publishing Officer, DoD.
• Anchorage Municipal Library, 3600 the Notice of Intent (NOI) to prepare the [FR Doc. E7–2433 Filed 2–15–07; 8:45 am]
Denali Street, Anchorage, AK 99503. PEIS for the BMDS in the Federal
BILLING CODE 5001–06–P
• Mountain View Branch Library, 150 Register. MDA held public scoping
S. Street, Anchorage, AK 99508. meetings in Arlington, Virginia;
• California State Library, Library and Sacramento, California; Anchorage, DEPARTMENT OF DEFENSE
Courts Building, 914 Capitol Mall, Alaska; and Honolulu, Hawaii. The
Sacramento, CA 95814. Notice of Availability (NOA) of the Office of the Secretary
• Sacramento Public Library, 828 I MDA Ballistic Missile Defense System
Street, Sacramento, CA 95814. Draft PEIS was published in the Federal Strategic Environmental Research and
• Hawaii State Library, Hawaii Register on September 17, 2004. This Development Program, Scientific
Documents Center, 478 South King initiated a public review and comment Advisory Board
Street, Honolulu, HI 96813. period for the Draft PEIS. MDA held
• University of Hawaii at Manoa, public hearings in Arlington, Virginia; AGENCY: Department of Defense.
Hamilton Library, 2550 The Mall, Sacramento, California; Anchorage,
Alaska; and Honolulu, Hawaii. MDA ACTION: Notice of open meeting.
Honolulu, HI 96822.
• Arlington County Public Library, received approximately 8,500 comments
Central Branch, 1015 North Quincy on the Draft PEIS; MDA considered all SUMMARY: This Notice is published in
Street, Arlington, VA 22201. of these comments in preparing the accordance with Section 10(a)(2) of the
• District of Columbia Public Library, Final PEIS. Responses to all of the in- Federal Advisory Committee Act (Pub.
Central Branch—Martin Luther King, Jr. scope comments can be found in L. 92–463). The topic of the meeting on
Memorial Library, 901 G Street NW., Appendix K of the PEIS. Three recurring March 13–14, 2007 are to review new
Washington, DC 20001. issues of public concern-orbital debris, start and continuing research and
Requests for electronic copies of the perchlorate, and radar impacts to development projects requesting
Final BMDS PEIS should be directed to wildlife-were addressed in more Strategic Environmental Research and
MDA BMDS PEIS, c/o ICF International, technical detail in Appendices L, M, Development Program funds in excess
9300 Lee Highway, Fairfax, VA 22031; and N of the PEIS. of $1M. This meeting is open to the
Phone (Toll-Free) 1–877–MDA–PEIS (1– Alternatives Analysis public. Any interested person may
877–632–7347); Fax (Toll-Free) 1–877– attend, appear before, or file statements
851–5451; E-mail The MDA considers two alternatives
to implementing an integrated BMDS with the Scientific Advisory Board at
mda.bmds.peis@icfconsulting.com; or the time and in the manner permitted by
Web site. An electronic version of the that address the use of weapons
components from land-, sea-, air-, and the Board.
Final PEIS is available on the MDA Web
site at http://www.mda.mil/mdalink/ space-based platforms in addition to the DATES: March 13, 2007 from 8:30 a.m. to
html/enviro.html. No Action alternative as required by the 4:30 p.m. and March 14 from 8:30 a.m.
National Environmental Policy Act. to 11:30 a.m.
FOR FURTHER INFORMATION CONTACT: • Alternative 1. Under Alternative 1,
Please call Mr. Rick Lehner, MDA the MDA would develop, test, deploy, ADDRESSES: SERDP Program Office
Director of Public Affairs, at (703) 697– and plan to decommission land-, sea-, Conference Center, 901 North Stuart
8997. and air-based platforms for BMDS Street, Suite 804, Arlington, VA 22203.
SUPPLEMENTARY INFORMATION: MDA has weapons components and related
a requirement to develop, test, deploy, FOR FURTHER INFORMATION CONTACT: Ms.
architecture and assets. Alternative 1
and prepare for decommissioning the Misa Jensen, SERDP Program Office, 901
would include space-based sensors, but
BMDS to protect the United States, its would not include space-based North Stuart Street, Suite 303,
deployed forces, friends, and allies from defensive weapons. Arlington, VA or by telephone at (703)
ballistic missile threats. The proposed • Alternative 2. Under Alternative 2, 696–2126.
action would provide an integrated the MDA would develop, test, deploy, Dated: February 12, 2007.
BMDS using existing infrastructure and and plan to decommission land-, sea-, C.R. Choate,
capabilities, when feasible, as well as air-, and space-based platforms for
Alternate OSD Federal Register Liaison
emerging and new technologies, to meet BMDS weapons components and related Officer, Department of Defense.
current and evolving threats in support architecture and assets. Alternative 2
[FR Doc. 07–729 Filed 2–15–07; 8:45 am]
of the MDA’s mission. Conceptually, the would be identical to Alternative 1,
sroberts on PROD1PC70 with NOTICES
BMDS would be a layered system of with the addition of space-based BILLING CODE 5001–06–M
VerDate Aug<31>2005 19:03 Feb 15, 2007 Jkt 211001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\16FEN1.SGM 16FEN1