Components
purchased equipment
purchased equipment
installation
instrumentation
piping
electrical
buildings
yard improvement
service facilities
land
engineering and supervision
construction expense
legal expense
contractor's fee
contigency
Total
Selected Range
24
Percentage
Range
0.24
Cost
30.29
10
8
7
4
4
2
12
0
8
9
2
2
8
100
0.10
0.08
0.07
0.04
0.04
0.02
0.12
0.00
0.08
0.09
0.02
0.02
0.08
1
12.62
10.10
8.83
5.05
5.05
2.52
15.15
0.00
10.10
11.36
2.52
2.52
10.10
126.21
materials, utilities cost, and the operating labor costs. The table below showed every
component cost in the TPC. The percentage range was chosen according to Plant
economic calculation, after ten years, the married process was able to generate a total
profit of $75 million, while the direct process lost around $65.58 million; therefore, the
married process was preferred due to the economic profitability. For the purpose of
increasing the projects profit, a project life was extended out to ten years. Figure 4 was
the cash cumulative position graph, which indicated the capital cost was totally repaid in
between year 7th and 8th, and had a total of profit of $75 million.
9 10 11
-100.00
Cumulative Cash
Position
-150.00
-200.00
-250.00
-300.00
-350.00