You are on page 1of 1

Federal Register / Vol. 71, No.

121 / Friday, June 23, 2006 / Notices 36167

for the discontinuance or modification (Volume 65, Number 70; Pages 19477– By the Board, Chairman Buttrey and Vice
of the signal system or relief from the 78) or you may visit http://dms.dot.gov. Chairman Mulvey.
requirements of 49 CFR part 236 as FRA expects to be able to determine Vernon A. Williams,
detailed below. these matters without an oral hearing. Secretary.
[Docket Number FRA–2006–24646] However, if a specific request for an oral [FR Doc. E6–9943 Filed 6–22–06; 8:45 am]
Applicant: Union Pacific Railroad, hearing is accompanied by a showing BILLING CODE 4915–01–P
Mr. John C. Estes, Jr., Superintendent that the party is unable to adequately
Locomotive, 1400 Douglas Stop 1050, present his or her position by written
Omaha, Nebraska 68179. statements, an application may be set DEPARTMENT OF TRANSPORTATION
The Union Pacific Railroad Company for public hearing.
Surface Transportation Board
(UP) seeks relief from the requirements Issued in Washington, DC, on June 19,
of the Rules, Standards and Instructions, 2006.
[STB Finance Docket No. 34729 (Sub-No.
Title 49 CFR, part 236, section 236.586, Grady C. Cothen, Jr., 1)]
Daily or after trip test. Specifically, UP Deputy Associate Administrator for Safety
is seeking to change the administration Standards and Program Development. Saginaw Bay Southern Railway
of the first sentence in paragraph (a) [FR Doc. E6–9970 Filed 6–22–06; 8:45 am] Company—Acquisition and Operation
from ‘‘intervals of not more than 2 BILLING CODE 4910–06–P Exemption—In Saginaw County, MI
months’’ to ‘‘intervals of not more than
92 days’’ for all cab signal devices on Saginaw Bay Southern Railway
locomotives operated on the UP. DEPARTMENT OF TRANSPORTATION Company (SBS), a Class III rail carrier,
Applicant’s justification for relief: To has filed a verified notice of exemption
maximize overall safety by performing Surface Transportation Board under 49 CFR 1150.41 to acquire from
maintenance in the best working CSX Transportation, Inc. its contractual
environment with the highest skilled right to operate, via trackage rights, over
[STB Ex Parte No. 290 (Sub-No. 5) (2006–
and best trained personnel, which can 3)] approximately 6.84 miles of rail line
best be achieved by performing owned by Huron & Eastern Railway
maintenance in conjunction with the Quarterly Rail Cost Adjustment Factor Company, Inc. (HESR) in Saginaw
92-day periodic inspection. County, MI, extending from a point 440
Any interested party desiring to AGENCY: Surface Transportation Board. feet northeast of GTW milepost 40.96
protest the granting of an application ACTION: Approval of rail cost adjustment along the Zilwaukee Spur at the
shall set forth specifically the grounds factor. Saginaw Station to milepost CBE 7.72 at
upon which the protest is made, and the Paines Station.1
include a concise statement of the SUMMARY: The Board has approved the SBS certifies that its projected
interest of the party in the proceeding. third quarter 2006 rail cost adjustment revenues as a result of this transaction
Additionally, one copy of the protest factor (RCAF) and cost index filed by will not result in the creation of a Class
shall be furnished to the applicant at the the Association of American Railroads. II or Class I rail carrier. SBS further
address listed above. The third quarter 2006 RCAF certifies that its projected annual
All communications concerning this (Unadjusted) is 1.192. The third quarter revenues are expected to exceed $5
proceeding should be identified by the 2006 RCAF (Adjusted) is 0.566. The million. SBS has included a request in
docket number and must be submitted third quarter 2006 RCAF–5 is 0.540. its notice filed on May 26, 2006, for
to the Docket Clerk, DOT Central Docket DATES: Effective Date: July 1, 2006. waiver of the requirements of 49 CFR
Management Facility, Room PI–401, 400 1150.42(e) to permit the exemption to
FOR FURTHER INFORMATION CONTACT: Mac
7th Street, SW., Washington, DC 20590– become effective without providing the
Frampton, (202) 565–1541. [Federal
0001. Communications received within 60-day advance notice. Finding no
Information Relay Service (FIRS) for the
45 days of the date of this notice will adverse impact on the affected
hearing impaired: 1–800–877–8339.]
be considered by the FRA before final employees, by decision served on June
SUPPLEMENTARY INFORMATION: 19, 2006, the Board has granted SBS’s
action is taken. Comments received after
Additional information is contained in request and waived the requirements of
that date will be considered as far as
the Board’s decision, which is available 49 CFR 1150.42(e).2 The waiver
practicable. All written communications
on our Web site http://www.stb.dot.gov. decision has the effect of making the
concerning these proceedings are
To purchase a copy of the full decision,
available for examination during regular
write to, e-mail or call the Board’s
business hours (9 a.m.–5 p.m.) at the 1 This notice was filed pursuant to the Board’s
contractor, ASAP Document Solutions; May 5, 2006 decision directing SBS to file a new
above facility. All documents in the
9332 Annapolis Rd., Suite 103, Lanham, notice of exemption to acquire the authority sought
public docket are also available for here. See Saginaw Bay Southern Railway
MD 20706; e-mail asapdc@verizon.net;
inspection and copying on the Internet Company—Acquisition and Operation Exemption—
phone (202) 306–4004. [Assistance for
at the docket facility’s Web site at http:// Rail line of CSX Transportation, Inc., STB Finance
the hearing impaired is available Docket No. 34729 (STB served May 5, 2006). SBS
dms.dot.gov.
FRA wishes to inform all potential through FIRS: 1–800–877–8339.] had inadvertently failed to include what would
This action will not significantly have been a grant of incidental trackage rights to
commenters that anyone is able to operate over HESR’s line in its notice of exemption
search the electronic form of all affect either the quality of the human filed on September 1, 2005, and thus did not have
comments received into any of our environment or energy conservation. Board authority to operate over the subject line. See
Pursuant to 5 U.S.C. 605(b), we Saginaw Bay Southern Railway Company—
dockets by the name of the individual Acquisition and Operation Exemption—Rail line of
submitting the comment (or signing the conclude that our action will not have CSX Transportation, Inc., STB Finance Docket No.
jlentini on PROD1PC65 with NOTICES

comment, if submitted on behalf of an a significant economic impact on a 34729 (STB served and published in the Federal
association, business, labor union, etc.). substantial number of small entities Register on Sept. 27, 2005) (70 FR 56525).
You may review DOT’s complete within the meaning of the Regulatory 2 See Saginaw Bay Southern Railway Company—

Flexibility Act. Acquisition and Operation Exemption—In Saginaw


Privacy Act Statement in the Federal County, MI, STB Finance Docket No. 34729 (Sub-
Register published on April 11, 2000 Decided: June 19, 2006. No. 1) (STB served June 19, 2006).

VerDate Aug<31>2005 17:22 Jun 22, 2006 Jkt 208001 PO 00000 Frm 00115 Fmt 4703 Sfmt 4703 E:\FR\FM\23JNN1.SGM 23JNN1

You might also like