Professional Documents
Culture Documents
ADAMS
ISG accession
number
Draft HLWRS–ISG–01, ‘‘Review Methodology for Seismically Initiated Event Sequences’’ .............................................................. ML061170532
These documents may also be viewed For the Nuclear Regulatory Commission. techniques by using other forms of
electronically on the public computers N. King Stablein, technology. The proposed form under
located at NRC’s PDR, O–1F21, One Chief, Project Management Section B, review is summarized below.
White Flint North, 11555 Rockville Division of High-Level Waste Repository DATES: Comments must be received
Pike, Rockville, MD 20852. The PDR Safety, Office of Nuclear Material Safety and within 30 calendar days of publication
Safeguards.
reproduction contractor will copy of this Notice.
documents for a fee. Comments and [FR Doc. E6–7782 Filed 5–19–06; 8:45 am]
ADDRESSES: Copies of the subject form
questions on draft HLWRS–ISG–01 BILLING CODE 7590–01–P
and the request for review prepared for
should be directed to the NRC contact submission to OMB may be obtained
listed below by July 6, 2006. Comments from the Agency submitting officer.
received after this date will be OVERSEAS PRIVATE INVESTMENT Comments on the form should be
considered if it is practical to do so, but CORPORATION submitted to the Agency Submitting
assurance of consideration cannot be Officer.
given to comments received after this Federal Register Submission for OMB
FOR FURTHER INFORMATION CONTACT:
date. Review
OPIC Agency Submitting Officer: Essie
Contact: Mahendra Shah, Senior AGENCY: Overseas Private Investment S. Bryant, Records Management Officer,
Structural Engineer, Engineering Corporation (OPIC). Overseas Private Investment
Section, Technical Review Directorate, ACTION: Request for comments. Corporation, 1100 New York Avenue,
Division of High-Level Repository NW., Washington, DC 20527; 202–336–
Safety, Office of Nuclear Material Safety SUMMARY: Under the provision of the 8563.
and Safeguards, U.S. Nuclear Regulatory Paperwork Reduction Act (44 U.S.C. OMB Contract: Office of Information
Commission, Washington, DC 20005– Chapter 35), agencies are required to and Regulatory Affairs, U.S. Office of
0001. Comments can also be submitted publish a Notice in the Federal Register Information and Regulator Affairs,
notifying the public, that the Agency is Office of Management and Budget,
by telephone, fax, or e-mail, which are
preparing an information collection Attention: Mr. David Rostker, 725 17th
as follows: telephone: (301) 415–8537;
request for OMB review, approval, and Street, Room 10102, NW, Washington,
fax number: (301) 415–5399; or by (e-
request public review and comment on DC 20503; (202) 395–3897
mail) at mjs3@nrc.gov. the submission. Comments are being
Dated at Rockville, Maryland this 16th day solicited on the need for the Summary Form Under Review:
of May 2006. information; the accuracy of the Type of Request: Reinstatement, with
cchase on PROD1PC60 with NOTICES
VerDate Aug<31>2005 20:16 May 19, 2006 Jkt 208001 PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 E:\FR\FM\22MYN1.SGM 22MYN1