You are on page 1of 3

28714 Federal Register / Vol. 71, No.

95 / Wednesday, May 17, 2006 / Notices

This certification is for the maximum Massachusetts Avenue NE., in Perry County, Kentucky. The
normal credit allowable under Section Washington, DC. petitioner requests a modification of the
3302(a) of the Code. The Federal Economic Statistics existing standard to permit approved
Advisory Committee is a technical check points 5 and 5A to be relocated
Elaine L. Chao,
committee composed of economists, in the neutral entry on the Southwest
Secretary of Labor. statisticians, and behavioral scientists Mains, and add check points 5B, 5C, 5D,
Certification of State Unemployment that are recognized for their attainments 5E, 5F, 5G, 5H, 5I, 5J, 5K, 5L, 5M, and
Compensation Laws to the Secretary of and objectivity in their respective fields. 5N which will be located in the neutral
the Treasury Pursuant to Section Committee members are called upon to entry in the Southwest Mains, due to
3303(B)(1) of the Internal Revenue Code analyze issues involved in producing hazardous roof and rib conditions. The
of 1986 Federal economic statistics and petitioner has listed specific procedures
recommend practices that will lead to in this petition that will be followed
In accordance with the provisions of optimum efficiency, effectiveness, and when the proposed alternative method
paragraph (1) of Section 3303(b) of the cooperation among the Department of is implemented. The petitioner asserts
Internal Revenue Code of 1986 (26 Labor, Bureau of Labor Statistics and the that the proposed alternative method
U.S.C. 3303(b)(1)), I hereby certify the Department of Commerce, Bureau of would provide at least the same
unemployment compensation laws of Economic Analysis and Bureau of the measure of protection as the existing
the following named states, which Census. standard.
heretofore have been certified pursuant The meeting will be held in Meeting
to paragraph (3) of Section 3303(b) of Rooms 1 and 2 of the Postal Square 2. Six M. Coal Company
the Code, to the Secretary of the Building Conference Center. The [Docket No. M–2006–010–C]
Treasury for the 12-month period schedule and agenda for the meeting are
ending on October 31, 2005: Six M Coal Company, 647 South
as follows: Street, Lykens, Pennsylvania 17048 has
Alabama Idaho 9 a.m. Opening session.
Alaska Illinois
filed a petition to modify the
9:30 a.m. New Data on the Services application of paragraph (b) of 30 CFR
Arizona Indiana
Arkansas Iowa
Sector. 49.2 (Availability of mine rescue teams)
California Kansas
1 p.m. Outliers in Data Produced and to its No. 1 Slope Mine (MSHA I.D. No.
Colorado Kentucky Used in Federal Statistical Agencies. 36–09138) located in Dauphin County,
Connecticut Louisiana 3 p.m. Priorities for future meetings. Pennsylvania. The petitioner requests a
Delaware Maine 3:30 p.m. American Time Use Survey
modification of the existing standard to
District of Columbia Maryland (ATUS) and Non-market Accounts.
permit the use of reduction of two mine
Florida Massachusetts 4:45 p.m. Conclude (approximate time).
rescue teams with three members with
Georgia Michigan The meeting is open to the public. one alternative for either team in lieu of
Hawaii Minnesota Any questions concerning the meeting
Mississippi Puerto Rico two mine rescue teams with five
should be directed to Margaret Johnson, members and one alternate each team.
Missouri Rhode Island Federal Economic Statistics Advisory
Montana South Carolina The petitioner asserts that to utilize five
Nebraska South Dakota
Committee, on Area Code (202) 691– or more rescue team members in the
Nevada Tennessee 5600. Individuals with disabilities, who mine’s confined working places would
New Hampshire Texas need special accommodations, should result in a diminution of safety to both
New Jersey Utah contact Ms. Johnson at least two days the miners at the mine and members of
New Mexico Vermont prior to the meeting date. the rescue team, and that the proposed
New York Virginia Signed at Washington, DC the 10th day of
North Carolina Virgin Islands
alternative method would provide at
May 2006. least the same measure of protection as
North Dakota Washington
Ohio West Virginia Kathleen P. Utgoff, the existing standard.
Oklahoma Wisconsin Commissioner of Labor Statistics.
3. Six M. Coal Company
Oregon Wyoming [FR Doc. E6–7509 Filed 5–16–06; 8:45 am]
Pennsylvania BILLING CODE 4510–24–P [Docket No.M–2006–011–C]
This certification is for the maximum Six M Coal Company, 647 South
additional credit allowable under Street, Lykens, Pennsylvania 17048 has
Section 3302(b) of the Code. DEPARTMENT OF LABOR filed a petition to modify the
application of 30 CFR 75.1202 and
Elaine L. Chao, Mine Safety and Health Administration 1202–1(a) (Temporary notations,
Secretary of Labor. revisions, and supplements) to its No. 1
[FR Doc. E6–7508 Filed 5–16–06; 8:45 am]
Petitions for Modification
Slope Mine (MSHA I.D. No. 36–09138)
BILLING CODE 4510–30–P The following parties have filed located in Dauphin County,
petitions to modify the application of Pennsylvania. The petitioner proposes
existing safety standards under section to revise and supplement mine maps
DEPARTMENT OF LABOR 101(c) of the Federal Mine Safety and annually instead of every 6 months as
Health Act of 1977. required, and to update maps daily by
Bureau of Labor Statistics hand notations. The petitioner also
1. Perry County Coal Corporation
Federal Economic Statistics Advisory proposes to conduct surveys prior to
[Docket No. M–2006–009–C] commencing retreat mining and
Committee; Notice of Open Meeting
mstockstill on PROD1PC61 with NOTICES

and Agenda Perry County Coal Corporation, 1845 whenever either a drilling program
S. KY Hwy.15, Hazard, Kentucky 41701 under 30 CFR 75.388 or plan for mining
The tenth meeting of the Federal has filed a petition to modify the into inaccessible areas under 30 CFR
Economic Statistics Advisory application of 30 CFR 75.364(a)(2) 75.389 is required. The petitioner
Committee will be held on June 9, 2006 (Weekly examination) to its HZ4–1 asserts that the proposed alternative
in the Postal Square Building, 2 Mine (MSHA I.D. No. 15–02085) located method would provide at least the same

VerDate Aug<31>2005 15:08 May 16, 2006 Jkt 208001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 E:\FR\FM\17MYN1.SGM 17MYN1
Federal Register / Vol. 71, No. 95 / Wednesday, May 17, 2006 / Notices 28715

measure of protection as the existing permanent support is sufficiently back downwind from the station which will
standard. from the face using a probe that extends be linked to the mine-wide atmospheric
16 feet inby the second row of bolts, and monitoring system; the temporary fuel
4. Twentymile Coal Company
a machine-mounted methane monitor storage area will be located in an area
[Docket No. M–2006–012–C] will be installed on the roof bolter using of the mine in a separate split of air
Twentymile Coal Company, Gateway the specific procedures listed in the this from any active working sections; and
Center, Suite 1340, 401 Liberty Avenue, petition. The petitioner asserts that the the temporary fuel storage area will be
Pittsburgh, Pennsylvania 15222 has proposed alternative method would vented to the return. The petitioner
filed a petition to modify the provide at least the same measure of further states that the location of the
application of 30 CFR 75.362(d)(2) (On- protection as the existing standard. storage area will have access to two
shift examination) to its Foidel Creek separate and distinct escapeways, one of
5. Twentymile Coal Company
Mine (MSHA I.D. No. 05–03836) located which contains intake air and will be
in Routt County, Colorado. The [Docket No. M–2006–013–C] either in the entry where the fuel storage
petitioner requests a modification of the Twentymile Coal Company, Gateway area is located, or one crosscut inby or
existing standard to permit an Center, Suite 1340, 401 Liberty Avenue, outby the area through an open crosscut,
alternative method of compliance to the Pittsburgh, Pennsylvania 15222 has a man-door, or equipment door. The
taking of methane tests by means of an filed a petition to modify the petitioner has listed additional specific
extendable probe. The petitioner application of 30 CFR 75.362(a)(2) (On- procedures in this petition that will be
proposes the following for use when shift examination) to its Foidel Creek followed when the proposed alternative
equipment is operated inby the last Mine (MSHA I.D. No. 05–03836) located method is implemented. The petitioner
open crosscut such as, but not limited in Routt County, Colorado. The asserts that the proposed alternative
to, spot roof-bolting and cleanup petitioner requests a modification of the method would provide at least the same
activities with a scoop or other mining existing standard to permit an measure of protection as the existing
equipment: (i) In working places before alternative method of compliance for standard.
a continuous miner is taken into the examining of dust control parameters. 7. Twentymile Coal Company
place or energized, methane tests will be The petitioner proposes to have a
taken at the face from under permanent certified person conduct the [Docket No. M–2006–015–C]
roof support or when such test is not examination as required in 30 CFR Twentymile Coal Company, Gateway
appropriate because the last row of 75.362(a)(2). The certified persons will Center, Suite 1340, 401 Liberty Avenue,
permanent roof support or when such have readily available to them pressure Pittsburgh, Pennsylvania 15222 has
test is not appropriate because the last gauges and similar devices that are filed a petition to modify the
row of permanent support is sufficiently useful in conducting the examinations. application of 30 CFR 75.324
back from the face, using a probe with The examinations will be conducted on (Intentional changes in the ventilation
a maximum extension of 16 feet inby the shift prior to the first production system) to its Foidel Creek Mine (MSHA
the second row of supports. If the probe shift within three hours of the end of the I.D. No. 05–03836) located in Routt
is used, a methane test will be taken shift by experienced personnel qualified County, Colorado. The petitioner
with an on-board methane detection to perform such examinations, and any requests a modification of the existing
system which draws a sample from the potential hazards will be identified. The standard to permit the temporary
face to be performed once the miner is petitioner asserts that the proposed reversal of the air in the belt entry
trammed to a location beyond supported alternative method would provide at during non-production work in the belt
roof; (ii) in working places before a roof least the same measure of protection as entry, or because of the necessity of
bolter, scoop or other equipment is the existing standard. emergency access for belt breakage, coal
taken into the place or energized inby 6. Twentymile Coal Company spillage, or roof conditions that require
the last open crosscut but outby the last access without having to remove
row of bolts, before the equipment it [Docket No. M–2006–014–C] persons from the mine or de-energize
taken into the place or energized, Twentymile Coal Company, Gateway power for the affected area. The
methane tests will at the face from Center, Suite 1340, 401 Liberty Avenue, petitioner has listed specific procedures
under permanent roof support or when Pittsburgh, Pennsylvania 15222 has in this petition that will be followed
such test is not appropriate because the filed a petition to modify the when the proposed alternative method
last row of permanent support is application of 30 CFR 75.1902(c) is implemented. The petitioner asserts
sufficiently back from the face, using a (Underground diesel fuel storage- that the proposed alternative method
probe 16 feet inby the second row of general requirements) to its Foidel Creek would provide at least the same
bolts. The methane tests at the last row Mine (MSHA I.D. No. 05–03836) located measure of protection as the existing
of permanent roof supports will be in Routt County, Colorado. The standard.
taken every 20 minutes with the petitioner requests a modification of the
Request for Comments
equipment as energized unless the existing standard to permit the use of
equipment is inby the face ventilation additional temporary underground Persons interested in these petitions
device. If so, a probe will be used to diesel fuel storage areas. The petitioner are encouraged to submit comments via
check for methane 16 feet inby the proposes to utilize additional temporary E-mail: zzMSHA-Comments@dol.gov;
second row of bolts; and (iii) in working underground diesel fuel storage areas, Fax: (202) 693–9441; or Regular Mail/
places before a roof bolter is taken into particularly, but not limited to, so that Hand Delivery/Courier: Mine Safety and
the place or energized inby the last open it can perform work in its tailgate such Health Administration, Office of
mstockstill on PROD1PC61 with NOTICES

crosscut and inby the last row of bolts, as removing belt structure, installing Standards, Regulations, and Variances,
before the equipment is taken into the seals, and rock dusting. The petitioner 1100 Wilson Boulevard, Room 2350,
place or energized, methane tests will be states that the temporary fuel storage Arlington, Virginia 22209. All
taken at the face from under permanent will be equipped with an automatic fire comments must be postmarked or
roof support, or when such test is not suppression system; a carbon monoxide received in that office on or before June
appropriate because the last row of sensor will be installed immediately 16, 2006.

VerDate Aug<31>2005 15:08 May 16, 2006 Jkt 208001 PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 E:\FR\FM\17MYN1.SGM 17MYN1
28716 Federal Register / Vol. 71, No. 95 / Wednesday, May 17, 2006 / Notices

Copies of these petitions are available NATIONAL SCIENCE FOUNDATION Week of May 15, 2006
for inspection at that address.
Oversight Council for the International Monday, May 15, 2006
Dated at Arlington, Virginia this 10th day
Arctic Research Center; Notice of 12:55 p.m. Affirmation Session (Public
of May 2006.
Meeting Meeting). a. Pa’ina Hawaii, LLC, LBP–
Patricia W. Silvey, 06–4, 63 NRC 99 (Jan. 24, 2006)
Acting Director, Office of Standards, In accordance with the Federal (admitting three safety contentions
Regulations, and Variances. Advisory Committee Act (Pub. L. 92– and standing); LBP–06–12, 63
[FR Doc. E6–7469 Filed 5–16–06; 8:45 am] 463, as amended), the National Science NRCl(March 24, 2006.
BILLING CODE 4510–43–P
Foundation announces the following 1 p.m Briefing on Status of
meeting: Implementation of Energy Policy Act
Name: Oversight Council for the of 2005 (Public Meeting) (Contact:
International Arctic Research Center, Scott Moore, (301) 415–7278).
NATIONAL CAPITAL PLANNING #9535. This meeting will be Web cast live at
COMMISSION Date/Time: June 5, 2006, 2 p.m. to 3 the Web address—http://www.nrc.gov.
p.m.
3:30 p.m. Discussion of Management
Senior Executive Service; Performance Place: National Science Foundation, Issues (Closed—Ex.2).
Review Board; Members 4201 Wilson Boulevard, Room 740,
Arlington, VA 22230, with participation Tuesday, May 16, 2006
AGENCY:National Capital Planning by teleconference. 9:25 a.m. Affirmation Session (Public
Commission. Type of Meeting: Closed. Meeting) (Tentative). a. Hydro
Contact Persons: Dr. Neil Swanberg, Resources, Inc. (In situ leach mining
ACTION:Notice of Members of Senior
Program Director, Arctic System Science license), 40–8968–ML, concerning
Executive Service Performance Review
Program, Room 740 S, National Science LBP–06–1 (PID—Radioactive Air
Board. Foundation, 4201 Wilson Blvd., Emissions) (Tentative).
Arlington, VA 22230. (703) 292–8029. 9:30 a.m. Briefing on Results of the
SUMMARY: Section 4314(c) of Title 5,
Purpose of Meeting: To provide Agency Action Review Meeting—
U.S.C. (as amended by the Civil Service advice and recommendations Reactors/Materials (Public Meeting)
Reform Act of 1978) requires each concerning a cooperative agreement (Contact; Mark Tonacci, (301) 415–
agency to establish, in accordance with between the National Science 4045).
regulations prescribed by the Office of Foundation and the International Arctic This meeting will be Web cast live at
Personnel Management, one or more Research Center. the Web address—http://www.nrc.gov.
Performance Review Boards (PRB) to Agenda: To evaluate and provide
review, evaluate and make a final advice on an annual research plan Week of May 22, 2006—Tentative
recommendation on performance submitted to the Arctic Science Section Wednesday, May 24, 2006
appraisals assigned to individual as part of a continuing cooperative
members of the agency’s Senior agreement for the support of the center. 9:30 a.m. Discussion of Security Issues
Executive Service. The PRB established (Closed—Ex. 1).
Reason for Closing: The annual
for the National Capital Planning 1:30 p.m. All Employees Meeting
operating plan being reviewed includes
(Public Meeting), Marriott Bethesda
Commission also makes information of a proprietary or
North Hotel, Salons, D–H, 5701
recommendations to the agency head confidential nature, including technical
Marinelli Road, Rockville, MD 20852.
regarding SES performance awards, rank information; financial data, such as
awards and bonuses. Section 4314(c)(4) salaries; and personal information Week of May 29, 2006—Tentative
requires that notice of appointment of concerning individuals associated with
Wednesday, May 31, 2006
Performance Review Board members be the proposals. These matters are exempt
published in the Federal Register. under 5 U.S.C. 552b(c), (4) and (6) of the 1 p.m. Discussion of Security Issues
Government in the Sunshine Act. (Closed—Ex. 1).
The following persons have been
appointed to serve as members of the Dated: May 12, 2006. Week of June 5, 2006—Tentative
Performance Review Board for the Susanne Bolton,
Wednesday, June 7, 2006
National Capital Planning Commission: Committee Management Officer.
Kent E. Baum, Jill Crumpacker, Patricia [FR Doc. 06–4598 Filed 5–16–06; 8:45 am] 9 a.m. Discussion of Security Issues
E. Gallagher, John Lennon, Lawrence BILLING CODE 7555–01–M
(Closed—Ex. 1 & 3).
Roffee, and Charles H. Schneider from Week of June 12, 2006—Tentative
May 11, 2006 to May 11, 2008. There are no meetings scheduled for
FOR FURTHER INFORMATION CONTACT: NUCLEAR REGULATORY the week of June 12, 2006.
Phyllis A. Vessels, Human Resources COMMISSION Week of June 19, 2006—Tentative
Specialist, National Capital Planning
Commission, 401 Ninth Street, NW., Sunshine Act; Meetings There are no meetings scheduled for
Suite 500 North, Washington, DC 20004, the week of June 19, 2006.
DATE: Weeks of May 15, 22, 29; June 5, * The schedule for Commission
(202) 482–7217.
12, 19, 2006. meetings is subject to change on short
mstockstill on PROD1PC61 with NOTICES

Dated: May 10, 2006. notice. To verify the status of meetings


PLACE: Commissioner’s Conference
Barry S. Socks, call (recording)—(301) 415–1292.
Room, 11555 Rockville Pike, Rockville,
Chief Operating Officer. Contact person for more information:
Maryland.
[FR Doc. E6–7493 Filed 5–16–06; 8:45 am] Michelle Schroll, (301) 415–1662.
STATUS: Public and closed. The NRC Commission Meeting
BILLING CODE 7520–01–P
MATTERS TO BE CONSIDERED: Schedule can be found on the Internet

VerDate Aug<31>2005 15:08 May 16, 2006 Jkt 208001 PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 E:\FR\FM\17MYN1.SGM 17MYN1

You might also like