Executive Summary
A project proposal is a detailed description of a series of activities aimed at solving a certain
problem. In order to be successful, the document should:
1)
2)
3)
4)
Designing a project is a process consisting of two elements, which are equally important and thus
essential to forming a solid project proposal:
1) Project planning
2) Proposal writing
The project proposal should be a detailed and directed manifestation of the project design. It is a means
of presenting the project to the outside world in a format that is immediately recognized and accepted.
1.1 INTRODUCTION:
This assignment has been prepared as a requirement of BBA program. It is challenging to work to set
up a business faculty in a University. Facing the challenge and making it successful, we proposed a
project proposal on How to set up a Business Faculty. A proposal is a request for financial assistance
to implement a project. The proposal outlines the plan of the implementing organization about the
project, giving extensive information about the intention, for implementing it, the ways to manage it
and the results to be delivered from it.
1.2 OBEJECTIVES OF THE PROJECT PROPOSAL:
The most important Objectives of the proposal are to make the best business faculty with all of its
facilities, so that it can be a role model for others. We think that our proposal is accepted and made in
future.
Objectives of the project proposal
1)
2)
3)
4)
5)
4 | Page
Project proposal is a tool not a goal. It should be followed as closely as possible. Deviation is
occurring when necessary. Proposal writing is one of the phases of project management.
5 | Page
The goal of our project is to create the best business faculty in Bangladesh competing with others, to
create a sustainable future for the faculty.
1.6 LIMITATIONS:
1) Information to get is confidential and critical, sometimes difficult to find.
2) The findings are not statistically validated.
3) Limitation of time was one of the most important factors that shortened the present study.
4) Rush hour & business was another reason that acts as an obstacle while gathering data.
1.7 METHODOLOGY:
Most of the information has been collected from different published articles, journals, brochures, web
sites and previous internship report. All the information incorporated in this report has been collected
both from the primary sources and as well as from the secondary sources. Some of the information are
SETTING
A BUSINESS
self imagined and find from
nearest UP
sources.
We take FACULTY
information from different standard business
school around the world.
IN
JAHANGIRNAGAR UNIVERSITY
2. ABOUT THE PROJECT PROPOSAL (AT A GLANCE):
Savar, Dhaka-1342, Bangladesh. Fax: 880-2-7791052
www.juniv.edu
01/SEP/2015
3. REQUIREMENT SPECIFICATION:
3.1 PRODUCT REQUIREMENTS:
The product offered by the project is service (Faculty set up). The requirements specified for the
service are;
To set up a business faculty is very much cost effective. The management requires the project to be
carried out economically with minimum unforeseen expenditures.
The project will make the faculty of business studies. So that there will be no scarcity of class rooms
and other facilities.
3.2 PROJECT REQUIREMENTS:
The project must commence on January 1st, 2016 and should wrap up the operations on or before June
30th, 2016, a period of six months to cover the entire population of the district.
One of the main requirements of the project is to maintain excellent quality. As the project is on the
construction, ensuring quality of operation is of utmost importance. The Quality vs. Time vs. Cost
prioritization of the project is shown below. As a matter of fact, cost is of least priority as the funds are
raised from student department
and government. However, the
Quality
Time
Cost
60%
20%
20%
to surpass the estimates submitted as part of the pre study. The demands put forth by the sponsor
require the project to have strict deadlines, so the factor of time is of medium priority.
3.3 Work Breakdown structure (WBS):
8 | Page
In our proposal, we think that a 5 storied building is pretty enough to make a perfect business faculty.
In area of (100x50) =5000 square feet we will make the building.
There are 2 portion of structure.
1) Inside building structure.
2) Outside the building structure.
Inside the building structure:
1st floor: In first floor we plan than there will be Library, canteen, Wifi Zone, seminar room,
Department office room, and Information Desk, Dean Office and girls common room. From here the
administrative work are taking place. Outside the entrance there will be a flower garden and a parking
lounge.
10 | P a g e
2nd floor: In the 2nd floor there will be Teachers lounge, Teachers room of their own, teachers own
library room. Architectural views of the floor and sample teachers lounge are given below.
11 | P a g e
3rd floor and 4th floor: These two floors are almost same there are 2 separate corridors and each
corridor has got 6 class rooms. There is also a students common room for each floor. 3rd floor is for the
accounting and management department. 4th floor is for the marketing and finance and banking
department.
Examination room: 5th floor is for the examination. It will be shaped round and there will be separate
examination room for each department. Only examination will be taken place here. Architectural view
and sample Examination room are given in the next page.
12 | P a g e
13 | P a g e
Timeframe in date
Project proposal
September, 01 2015
nil
Project selection
nil
Project planning
November 1, 2015
nil
Engineering procedure
December 1, 2015
nil
January 1, 2016
nil
2 weeks
2 weeks
2 weeks
3 weeks
3 weeks
10
3 weeks
11
3 weeks
12
3 weeks
13
3 weeks
14
2 weeks
15
faculty.
Number of months and weeks
6 months
26 weeks
project ending the approximate time limitation are given below. It will start from January 1, 2016 and
will end in 30, June 2016 the project will be run with 100 workers, 5 supervisors and 2 Developer
Companies will look after the project to make an end in time but maintain the standards. Each mile
stones are the WBS of the project.
14 | P a g e
Total cost
47,50,000
11,00,000
17,50,000
76,00,000
Total cost
47,50,000
10,00,000
17,50,000
75,00,000
Total cost
47,50,000
12,10,000
17,50,000
77,10,000
Total cost
47,50,000
13,30,000
17,50,000
78,30,000
Total cost
47,50,000
14,65,000
17,50,000
79,65,000
16 | P a g e
Total cost
75,00,000
76,00,000
77,10,000
78,30,000
79,65,000
Decoration
20,00,000
Multimedia
40,00,000
Furniture
40,00,000
Others cost
13,95,000
Total Budget
5,00,00,000
7. Other facilities:
Strong Wifi facilities: New proposed Jahangirnagar University, faculty of business
available here.
Lift facilities: Lift facilities will be given on 5th, 6th, 7th floor in orderly.
Information desk: Most of the time new students and guests are always get confused
for getting any information. So there will be a permanent place for the information
desk and the dean office will be in the building. So, there will be no way for getting
confused.
Common room: there is no common room in our business faculty right now. But
proposed project accomplishment will give separate common room for the ladies and
gents also.
Library: There is no library room now. But after the project we will get a wee
booked library with apiaceous space and setting facilities. There will be e-library for
the students.
Garden: a nice flower garden will be in the premises of the faculty.
Prayer room: There will be a prayer room for the students. Student from different
religion will take their prayer without any problem.
17 | P a g e
Car parking: lots of the students in FBS students have got bike or bi-cycle and some
of the teachers also have got their own car. So a car parking facilities will be
promoted.
Maintenance troops: According to the project plan there will be a group of
maintenance people who will look after the faculty building, its assets and its
surrounding.
8. CONCLUTION:
According to the planning of the project we can insure that our project will become successful if
it is granted. My hypothesis was that How to set up a business faculty. And my results do
support my hypothesis. These project activities show that it is possible to make a successful
business faculty if the conditioned fulfilled. Time and cost estimates of specific activities are
adjusted as the risks, resources, and situation particulars become more clearly defined.
Effective organizations recognize that the rolled up estimates generated from a detailed estimate
based on the WBS are just the starting point.
They factor the final assignment of resources into the project budget and schedule
9. References:
18 | P a g e
1. Andres, PD & Vallelado, E 2014, project management: The role of the board of
directors, Journal of Banking & Finance, 32 (2008) 25702580, Department of Financial
Economics and Accounting, University of Valladolid, Avenida Valle Esgueva 6, 47011
Valladolid,
Spain.
The
online
version
is
available
at
http://www.ppge.ufrgs.br/giacomo/arquivos/govcorp/andres-vallelado-2008.pdf.
(Accessed on 7January 2015).
2. Basel,
Switzerland.
The
online
version
is
available
at
RM
&
Smith,
AJ
2014,
Vol.
9,
No.
1,
pp.
65-87.
http://www.sciencebuddies.org/science-fair-projects/project_sample_conclusions.shtml
4. http://library.bcu.ac.uk/learner/writingguides/1.23.htm
5. http://www.monash.edu.au/lls/llonline/writing/engineering/technical-report/6.1.xml
6. http://www.monash.edu.au/lls/llonline/writing/engineering/technical-report/6.xml
7. http://www.bakeru.edu/spgs-current-students2/academic-tools/writing-assistance/mlastyle-guide/sample-introduction-a-conclusion
8. https://www.google.com/url?
sa=t&rct=j&q=&esrc=s&source=web&cd=11&cad=rja&uact=8&ved=0CFUQFjAKahU
KEwj5wMzYiNTHAhVBGo4KHf96CtA&url=http%3A%2F%2Fwww.ece.utah.edu
%2F~ece1270%2FCLEAR_10_Conclusions.pdf&ei=oKzkVfnwGsG0uAT_9amADQ&u
sg=AFQjCNE9mmBhxQiSufhI8HoxBMtXguQz5w
9. https://www.fhwa.dot.gov/pavement/management/pms11.cfm
10. http://writefix.com/?page_id=1591
19 | P a g e