Notice: Meetings:
Virginia Hydrogeneration and Historical Society, L.C., et al.; Appomattox River fish passage; technical workshop, 7765 [E6-2042] Federal Energy Regulatory Commission
Original Title
Notice: Meetings: Virginia Hydrogeneration and Historical Society, L.C., et al.; Appomattox River fish passage; technical workshop
Notice: Meetings:
Virginia Hydrogeneration and Historical Society, L.C., et al.; Appomattox River fish passage; technical workshop, 7765 [E6-2042] Federal Energy Regulatory Commission
Notice: Meetings:
Virginia Hydrogeneration and Historical Society, L.C., et al.; Appomattox River fish passage; technical workshop, 7765 [E6-2042] Federal Energy Regulatory Commission
DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY increase annual revenues from
$124,325,100 to $133,342,029, primarily Federal Energy Regulatory Southwestern Power Administration to recover increased expenditures in Commission operations and maintenance (O&M) and Integrated System Power Rates increased investments in the [Project No. 8657, Project No. 9840] AGENCY: Southwestern Power hydroelectric generating facilities. Administration, DOE. Additionally, the PRS indicates the Virginia Hydrogeneration and ACTION: Notice of Rate Order. need for an annual increase of $227,100 Historical Society, L.C.; Appomattox in revenues received through the L.P.; Notice on Appomattox River Fish SUMMARY: Pursuant to Delegation Order Purchased Power Adder to recover Passage Technical Workshop Nos. 00–037.00, effective December 6, increased purchased energy costs. This 2001, and 00–001–00B, effective July 28, rate proposal also includes a provision February 7, 2006. 2005, the Deputy Secretary has to continue the Administrator’s On February 22, 2006, Commission approved and placed into effect on an Discretionary Purchased Power Adder staff will be conducting a fish passage interim basis Rate Order No. SWPA–53, Adjustment, to adjust the purchased technical workshop to discuss fish which increases the power rates for the Integrated System pursuant to the power adder annually, of up to $0.0011 passage on the Appomattox River as it per kilowatthour as necessary, at his/her following Integrated System Rate relates to Commission projects, which discretion, under a formula-type rate, Schedules: include Harvell Dam Project (FERC No. Rate Schedule P–05, Wholesale Rates with notification to the FERC. 8657), Battersea Dam Project (FERC No. for Hydro Peaking Power. The Administrator has followed Title 8535) 1 and the Appomattox River Rate Schedule NFTS–05, Wholesale 10, part 903 subpart A, of the Code of Project (FERC No. 9840). The meeting Rates for Non-Federal Transmission/ Federal Regulations, ‘‘Procedures for will allow Commission staff to discuss: Interconnection Facilities Service. Public Participation in Power and (1) The status of fish passage at the Rate Schedule EE–05, Wholesale Rate Transmission Rate Adjustments and various dams on the Appomattox River, for Excess Energy. Extensions’’ in connection with the (2) associated costs incurred to date for The rate schedules supersede the proposed rate schedule. On August 16, fish passage at the various dams; and (3) existing rate schedules shown below: Rate Schedule P–04, Wholesale Rates 2005, Southwestern published notice in proposals and/or goals for any the Federal Register, (70 FR 48121), of remaining obstructions to fish passage for Hydro Peaking Power (superseded by P–05). a 90-day comment period, together with on the Appomattox River. a Public Information Forum and a Rate Schedule NFTS–04, Wholesale The meeting will specifically focus on Rates for Non-Federal Transmission/ Public Comment Form, to provide an the above topics to clarify information Interconnection Facilities Service opportunity for customers and other currently on file with the Commission. (superseded by NFTS–05). interested members of the public to Commission staff will review the record Rate Schedule EE–04, Wholesale Rate review and comment on the proposed on file and be prepared to lead a for Excess Energy (superseded by EE– rate increase for the Integrated System. discussion using information that has 05). Both public forums were canceled since been filed by the various parties DATES: The effective period for the rate no one expressed an intention to concerning fish passage, passage status schedules specified in Rate Order No. participate. Written comments were at the various dams, and the associated SWPA–53 is February 1, 2006, through accepted through November 14, 2005. costs of providing passage. Commission September 30, 2009. Comments from three entities were staff ask all parties that plan to FOR FURTHER INFORMATION CONTACT: received and are addressed in this rate participate to be prepared to support Forrest E. Reeves, Assistant proposal. statements with documented Administrator, Office of Corporate Information regarding this rate information. Operations, Southwestern Power proposal, including studies and other The meeting will be held on February Administration, Department of Energy, supporting material, is available for 22, 2006, at the Hampton Inn, 5103 Williams Center Tower I, One West public review and comment in the Plaza Drive, Hopewell, Virginia 23860, Third Street, Tulsa, Oklahoma 74103, offices of Southwestern Power at 9 a.m. (EST). Intervenors and other (918) 595–6696, gene.reeves@swpa.gov. Administration, Williams Center Tower parties interested in this issue are SUPPLEMENTARY INFORMATION: I, One West Third Street, Suite 1400, invited to participate if they so desire. Southwestern Power Administration’s Tulsa, Oklahoma 74103. (Southwestern) Administrator has Any questions about this notice Following review of Southwestern’s determined based on the 2005 should be directed to Blake Condo at proposal within the Department of Integrated System Current Power (202) 502–8914 or via e-mail at Repayment Study, that existing rates Energy, I approved, Rate Order No. blake.condo@ferc.gov or Bob Fletcher at will not satisfy cost recovery criteria SWPA–53, on an interim basis, which (202) 502–8901 or via e-mail at specified in Department of Energy Order increases the existing Integrated System robert.fletcher@ferc.gov. No. RA 6120.2 and Section 5 of the annual revenue requirement to Magalie R. Salas, Flood Control Act of 1944. The finalized $133,342,029 per year for the period 2005 Integrated System Power February 1, 2006 through September 30, Secretary. Repayment Studies (PRSs) indicate that 2009. [FR Doc. E6–2042 Filed 2–13–06; 8:45 am] an increase in annual revenue of rmajette on PROD1PC67 with NOTICES
BILLING CODE 6717–01–P $9,016,929, or 7.3 percent, beginning
February 1, 2006, will satisfy cost 1 See Order Accepting Final Surrender of License recovery criteria for the Integrated issued November 23, 2005, 113 FERC ¶ 62,153 System projects. The proposed (2005). Integrated System rate schedules would