Federal Register / Vol. 71, No.

9 / Friday, January 13, 2006 / Notices 2213

Power Agency et al. for Plumas-Sierra’s Description: Mystic Development, LLC eLibrary system by clicking on the
60 kV Interconnection at Quincy submits its proposed FERC Electric appropriate link in the above list. They
Substation. Tariff, Original Volume No. 2, & are also available for review in the
Filed Date: 12/29/2005. supporting cost data specifying Mystic’s Commission’s Public Reference Room in
Accession Number: 20060103–0125. revenue requirement for providing cost- Washington, DC. There is an
Comment Date: 5 p.m. eastern time on based reliability services. eSubscription link on the Web site that
Thursday, January 19, 2006. Filed Date: 12/29/2005. enables subscribers to receive e-mail
Docket Numbers: ER06–421–000. Accession Number: 20051230–0107. notification when a document is added
Applicants: ISO New England Inc. Comment Date: 5 p.m. eastern time on to a subscribed docket(s). For assistance
Description: ISO New England, Inc Thursday, January 19, 2006. with any FERC Online service, please e-
submits the Coordination Agreement Docket Numbers: ER06–428–000. mail FERCOnlineSupport@ferc.gov. or
with New York Independent System Applicants: Portland General Electric call (866) 208–3676 (toll free). For TTY,
Operator which includes a rate schedule Company. call (202) 502–8659.
for Emergency Energy Pricing. Description: Portland General Electric
Filed Date: 12/29/2005. Co submits specific revisions to its Pro Magalie R. Salas,
Accession Number: 20051230–0096. Forma OATT pursuant to the applicable Secretary.
Comment Date: 5 p.m. eastern time on tariff filing requirements. [FR Doc. E6–276 Filed 1–12–06; 8:45 am]
Thursday, January 19, 2006. Filed Date: 12/29/2005.
Accession Number: 20060103–0009. BILLING CODE 6717–01–P
Docket Numbers: ER06–422–000.
Applicants: Avista Corporation. Comment Date: 5 p.m. eastern time on
Description: Avista Corporation Thursday, January 19, 2006.
submits revisions to its OATT, FERC Any person desiring to intervene or to DEPARTMENT OF ENERGY
Electric Tariff, Volume No. 8 pursuant protest in any of the above proceedings
must file in accordance with Rules 211 Federal Energy Regulatory
to Interconnection for Wind Energy,
and 214 of the Commission’s Rules of Commission
Order No. 661–A.
Filed Date: 12/29/2005. Practice and Procedure (18 CFR 385.211
Accession Number: 20051230–0089. and 385.214) on or before 5 p.m. eastern [Docket No. PF06–1–000]
Comment Date: 5 p.m. eastern time on time on the specified comment date. It
Thursday, January 19, 2006. is not necessary to separately intervene CenterPoint Energy Gas Transmission;
Docket Numbers: ER06–423–000. again in a subdocket related to a Notice of Intent To Prepare an
Applicants: Boston Edison Company. compliance filing if you have previously Environmental Impact Statement for
Description: Boston Edison Co intervened in the same docket. Protests the Proposed Carthage to Perryville
submits executed Dewar Street will be considered by the Commission Project, Request for Comments on
Interconnection Agreement with New in determining the appropriate action to Environmental Issues, and Notice of
England Power Co and BECo dated as be taken, but will not serve to make Public Scoping Meetings
of 12/22/05, effective date of 1/1/06. protestants parties to the proceeding.
January 6, 2006.
Filed Date: 12/29/2005. Anyone filing a motion to intervene or
Accession Number: 20051230–0090. protest must serve a copy of that The staff of the Federal Energy
Comment Date: 5 p.m. eastern time on document on the Applicant. In reference Regulatory Commission (FERC or
Thursday, January 19, 2006. to filings initiating a new proceeding, Commission) will prepare an
Docket Numbers: ER06–425–000. interventions or protests submitted on environmental impact statement (EIS)
Applicants: El Segundo Power, LLC. or before the comment deadline need that will address the environmental
Description: El Segundo Power, LLC not be served on persons other than the impacts of the Carthage to Perryville
submits a Notice of Cancellation of Rate Applicant. Project proposed by CenterPoint Energy
Schedule FERC No. 2, the Must-Run The Commission encourages Gas Transmission (CEGT). The
Service Agreement with the California electronic submission of protests and Commission will use the EIS in its
Independent System Operator. interventions in lieu of paper, using the decisionmaking process to determine
Filed Date: 12/29/2005. FERC Online links at http:// whether or not to authorize the project.
Accession Number: 20051230–0063. www.ferc.gov. To facilitate electronic This notice explains the scoping process
Comment Date: 5 p.m. eastern time on service, persons with Internet access we 1 will use to gather input from the
Thursday, January 19, 2006. who will eFile a document and/or be public and interested agencies on the
Docket Numbers: ER06–426–000. listed as a contact for an intervenor project. Your input will help us
Applicants: Cabrillo Power I LLC. must create and validate an determine the issues that need to be
Description: Cabrillo Power I, LLC eRegistration account using the evaluated in the EIS. Please note that
submits revisions to the Reliability eRegistration link. Select the eFiling the scoping period will close on
Must-Run Service Agreement between link to log on and submit the February 10, 2006.
Cabrillo I and the California intervention or protests.
Independent System Operator Corp. Persons unable to file electronically Comments may be submitted in
Filed Date: 12/29/2005. should submit an original and 14 copies written form or verbally. Further details
Accession Number: 20051230–0064. of the intervention or protest to the on how to submit written comments are
Comment Date: 5 p.m. eastern time on Federal Energy Regulatory Commission, provided in the Public Participation
Tuesday, January 17, 2006. 888 First St., NE., Washington, DC section of this notice. In lieu of sending
Docket Numbers: ER06–427–000. 20426. written comments, we invite you to
hsrobinson on PROD1PC70 with NOTICES

Applicants: Mystic Development, The filings in the above proceedings attend the public scoping meetings we
LLC. are accessible in the Commission’s have scheduled as follows:

1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the

environmental staff of the FERC’s Office of Energy


Projects.

VerDate Aug<31>2005 15:41 Jan 12, 2006 Jkt 208001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\13JAN1.SGM 13JAN1
2214 Federal Register / Vol. 71, No. 9 / Friday, January 13, 2006 / Notices

Date and time Location

Tuesday, January 24, 2006, 7 p.m. to 9 p.m. (CST) ............................... Texas Country Music Hall of Fame, 300 West Panola Street, Carthage,
TX 75633. Telephone: (903) 693–3869.
Wednesday, January 25, 2006, 7 p.m. to 9 p.m. (CST) .......................... Quitman High School Auditorium, 181 Wolverine Drive, Quitman, LA
71268. Telephone: (318) 259–2698.
Thursday, January 26, 2006, 7 p.m. to 9 p.m. (CST) .............................. Delhi Civic Center, 232 Denver Street, Delhi, LA 71232. Telephone:
(318) 878–3792.

This notice is being sent to affected proposed pipeline is shown in the figure Land Requirements for Construction
landowners; Federal, State, and local included as Appendix 1.2 As proposed, the typical construction
government agencies; elected officials; The Carthage to Perryville Project right-of-way for the project pipeline
environmental and public interest facilities under FERC jurisdiction would would be 100 feet wide. Following
groups; Native American tribes; other include: construction, CEGT would retain a 60-
interested parties; and local libraries • 171.6 miles of 42-inch-diameter foot-wide permanent right-of-way for
and newspapers. We encourage natural gas pipeline in Panola County, operation of the project. Additional,
government representatives to notify Texas, and Caddo, De Soto, Red River, temporary extra workspaces beyond the
their constituents of this planned Bienville, Jackson, Ouachita, and typcial construction right-of-way limits
project and encourage them to comment Richland Parishes, Louisiana; would be required at certain feature
on their areas of concern. • Two compressor stations, the crossings (e.g., roads, railroads,
If you are a landowner receiving this Panola and Vernon Compressor wetlands, or waterbodies), in areas with
notice, you may be contacted by a CEGT Stations, located in Panola County, steep side slopes, or in association with
representative about the acquisition of Texas, and Jackson Parish, Louisiana, special construction techniques.
an easement to construct, operate, and respectively (phased construction with Based on preliminary information,
maintain the proposed project facilities. initially installed gas turbine-driven construction of the proposed project
The pipeline company would seek to compression of 10,310 horsepower (hp) facilities would affect a total of about
negotiate a mutually acceptable to be expanded to 20,620 hp at each 2,398.4 acres of land. Following
agreement. However, if the project is station by October 2008); construction, about 1,247.9 acres would
approved by the FERC, that approval • Two meter and regulator stations at be maintained as permanent right-of-
conveys with it the right of eminent receipt points with three intrastate way, and about 56.8 acres of land would
domain. Therefore, if easement pipelines, including: be maintained as new aboveground
negotiations fail to produce an —Energy Transfer Fuels Meter/ facility sites. The remaining 1,093.7
agreement, the pipeline company could Regulator Station in Panola County, acres of temporary workspace
initiate condemnation proceedings in Texas (including all temporary construction
accordance with State law. —Duke Energy Field Services-Enbridge rights-of-way, extra workspaces, and
A fact sheet prepared by the FERC Meter/Regulator Station in Panola pipe storage and contractor yards)
entitled ‘‘An Interstate Natural Gas County, Texas; would be restored and allowed to revert
Facility on My Land? What Do I Need • Four new meter and regulator to its former use.
To Know?’’ is available for viewing on stations at interconnects with existing
the FERC Internet Web site (http:// The EIS Process
interstate pipelines, including:
www.ferc.gov). This fact sheet addresses —Texas Gas Meter/Regulator Station in NEPA requires the Commission to
a number of typically asked questions, Ouachita Parish, Louisiana take into account the environmental
including the use of eminent domain —ANR Meter/Regulator Station in impacts that could result from an action
and how to participate in the FERC’s Richland Parish, Louisiana when it considers whether or not an
proceedings. —Trunkline Meter/Regulator Station in interstate natural gas pipeline should be
Summary of the Proposed Project Richland Parish, Louisiana approved. The FERC will use the EIS to
—Columbia Gulf Meter/Regulator consider the environmental impact that
CEGT proposes to construct, own, Station in Richland Parish, Louisiana; could result if the CEGT project is
operate, and maintain a natural gas and authorized under section 7 of the
pipeline to provide new pipeline Natural Gas Act. NEPA also requires us
• 10 mainline valves.
capacity to transport domestic onshore The project would be designed and to discover and address concerns the
gas supplies from the Barnett Shale and constructed to receive and transport public may have about proposals to be
Bossier Sand production areas in about 1.2 billion cubic feet of natural considered by the Commission. This
eastern Texas, as well as the Elm Grove gas per day. CEGT proposes to have the process is referred to as ‘‘scoping.’’ The
and Vernon Field production areas in project constructed and operational by main goal of the scoping process is to
Louisiana. CEGT indicates that the February 2007. focus the analysis in the EIS on the
proposed facilities would facilitate the important environmental issues. With
transport of natural gas to the Midwest 2 The appendices referenced in this notice are not this Notice of Intent, the Commission
and Northeastern regions of the United being printed in the Federal Register. Copies of all staff is requesting public comments on
States and help satisfy demand in those appendices, other than Appendix 1 (maps), are the scope of the issues to be addressed
markets. The proposed pipeline would available on the Commission’s Web site at the in the EIS. All comments received will
‘‘eLibrary’’ link or from the Commission’s Public
originate from receipt points near be considered during preparation of the
hsrobinson on PROD1PC70 with NOTICES

Reference Room, 888 First Street, NE., Washington,


Carthage in Panola County, Texas, and DC 20426, or call (202) 502–8371. For instructions EIS.
extend to a terminus at interconnections on connecting to eLibrary refer to the Public In the EIS we will discuss impacts
with four existing interstate pipelines Participation section of this notice. Copies of the that could occur as a result of the
appendices were sent to all those receiving this
located within CEGT’s Perryville Hub, notice in the mail. Requests for detailed maps of the
construction and operation of the
near Delhi in Richland Parish, proposed facilities should be made directly to proposed project under these general
Louisiana. The general location of the CEGT. headings:

VerDate Aug<31>2005 15:41 Jan 12, 2006 Jkt 208001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\13JAN1.SGM 13JAN1
Federal Register / Vol. 71, No. 9 / Friday, January 13, 2006 / Notices 2215

• Geology and soils; construction and operation of the alternatives (including alternative
• Water resources; proposed project. We have already facility sites and pipeline routes), and
• Wetlands and vegetation; identified several issues that we think measures to avoid or lessen
• Fish and wildlife; deserve attention based on a environmental impact. The more
• Threatened and endangered preliminary review of the project site specific your comments, the more useful
species; and the facility information provided by they will be. To ensure that your
• Land use, recreation, and visual CEGT. This preliminary list of issues comments are timely and properly
resources; may be changed based on your recorded, please carefully follow these
• Air quality and noise; instructions:
• Cultural resources; comments and our analysis.
• Potential effects on prime farmland • Send an original and two copies of
• Socioeconomics;
• Reliability and safety; and soils and soils with a high potential for your letter to: Magalie R. Salas,
• Cumulative impacts. compaction. Secretary, Federal Energy Regulatory
In the EIS, we will also evaluate • Potential impacts to perennial and Commission, 888 First St., NE., Room
possible alternatives to the proposed intermittent streams and waterbodies. 1A, Washington, DC 20426.
project or portions of the project, and • Potential effects on waterbodies • Label one copy of your comments
make recommendations on how to designated under Federal and/or State for the attention of Gas Branch 3, DG2E.
lessen or avoid impacts on affected programs, including Saline Bayou and • Reference Docket No. PF06–1–000
resources. Black Lake Bayou. on the original and both copies.
Our independent analysis of the • Evaluation of temporary and • Mail your comments so that they
issues will be included in a draft EIS. permanent impacts on wetlands and will be received in Washington, DC on
The draft EIS will be mailed to Federal, development of appropriate mitigation. or before February 10, 2006.
• Potential impacts to fish and Please note that we are continuing to
State, and local government agencies;
wildlife habitat, including waterbird experience delays in mail deliveries
elected officials; environmental and
nesting areas along major river from the U.S. Postal Service. As a result,
public interest groups; Native American
crossings. we will include all comments that we
tribes; affected landowners;
• Potential effect on federally and receive within a reasonable time frame
commentors; other interested parties;
State-listed species, including the red- in our environmental analysis of this
local libraries and newspapers; and the
cockaded woodpecker, bald eagle, pallid project. However, the Commission
FERC’s official service list for this
sturgeon, least tern, pine snake, and strongly encourages electronic filing of
proceeding. A 45-day comment period
Louisiana black bear. any comments in response to this Notice
will be allotted for review of the draft
• Potential impacts to existing land of Intent. For information on
EIS. We will consider all comments on
uses, including agricultural and electronically filing comments, please
the draft EIS and revise the document,
managed forested lands. see the instructions on the
as necessary, before issuing a final EIS.
• Potential visual effects of the Commission’s Web site at http://
We will consider all comments on the
aboveground facilities on surrounding www.ferc.gov under the ‘‘e-Filing’’ link
final EIS before we make our
recommendations to the Commission. areas. and the link to the User’s Guide, as well
To ensure that your comments are • Potential impacts and potential as information in 18 CFR
considered, please follow the benefits of construction workforce on 385.2001(a)(1)(iii). Before you can
instructions in the Public Participation local housing, infrastructure, public submit comments you will need to
section of this notice. services, and economy. create a free account, which can be
Although no formal application has • Potential impacts to local air and created on-line.
been filed, the FERC staff has already noise quality associated with The public scoping meetings (dates,
initiated its NEPA review under its construction and operation. times, and locations are listed above) are
NEPA Pre-filing Process. The purpose of • Assessment of potential cultural designed to provide another opportunity
the Pre-filing Process is to encourage the resources along the pipeline route. to offer comments on the proposed
early involvement of interested • Native American and tribal project. Interested groups and
stakeholders and to identify and resolve concerns. individuals are encouraged to attend the
issues before an application is filed with • Public safety and potential hazards meetings and to present comments on
the FERC. associated with the transport of natural the environmental issues they believe
With this notice, we are asking gas. should be addressed in the EIS. A
Federal, State, and local governmental • Alternative alignments for the transcript of each meeting will be
agencies with jurisdiction and/or pipeline route and alternative sites for generated so that your comments will be
special expertise with respect to the compressor stations. accurately recorded.
environmental issues, especially those • Assessment of the effect of the Once CEGT formally files its
identified in Appendix 2, to express proposed project when combined with application with the Commission, you
their interest in becoming cooperating other past, present, or reasonably may want to become an official party to
agencies for the preparation of the EIS. foreseeable future actions in the project the proceeding known as an
These agencies may choose to area. ‘‘intervenor.’’ Intervenors play a more
participate once they have evaluated the formal role in the process and are able
Public Participation to file briefs, appear at hearings, and be
proposal relative to their
responsibilities. Agencies that would You can make a difference by heard by the courts if they choose to
like to request cooperating status should providing us with your specific appeal the Commission’s final ruling.
follow the instructions for filing comments or concerns about the An intervenor formally participates in a
hsrobinson on PROD1PC70 with NOTICES

comments provided in Appendix 2. proposed project. By becoming a Commission proceeding by filing a


commentor, your concerns will be request to intervene. Instructions for
Currently Identified Environmental addressed in the EIS and considered by becoming an intervenor are included in
Issues the Commission. Your comments the User’s Guide under the ‘‘e-filing’’
The EIS will discuss impacts that should focus on the potential link on the Commission’s Web site.
could occur as a result of the environmental effects, reasonable Please note that you may not request

VerDate Aug<31>2005 15:41 Jan 12, 2006 Jkt 208001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\13JAN1.SGM 13JAN1
2216 Federal Register / Vol. 71, No. 9 / Friday, January 13, 2006 / Notices

intervenor status at this time. You must http://www.centerpointenergy.com/ them to comment on their areas of
wait until a formal application is filed carthagetoperryville/. The Web site concern.
with the Commission. includes a description of the project, a The purpose of the Project is to add
map of the proposed pipeline route, and facilities to the terminal that would
Environmental Mailing List
answers to frequently asked questions. increase the capability of the LNG
An effort is being made to send this You can also request additional import terminal to process high British
notice to all individuals, organizations, information or provide comments Thermal Unit (BTU) content LNG in
and government entities interested in directly to CEGT at 1–888–641–8326 or order to assure that the resulting natural
and/or potentially affected by the carthagetoperryville@CenterPoint gas meets the gas quality specifications.
proposed project. This includes all Energy.com. The proposed facilities would also
landowners who are potential right-of-
Magalie R. Salas, enhance the reliability of service at the
way grantors, whose property may be
Secretary. terminal and provide more flexibility to
used temporarily for project purposes,
acquire and schedule cargoes of LNG
or who own homes within distances [FR Doc. E6–286 Filed 1–12–06; 8:45 am]
from a wider variety of supply sources.
defined in the Commission’s regulations BILLING CODE 6717–01–P
of certain aboveground facilities. Dominion seeks authority to construct
If you received this notice, you are on and operate:
the environmental mailing list for this DEPARTMENT OF ENERGY • Two air separation units;
project. If you do not want to send • One 62,825 gallon liquid nitrogen
comments at this time, but still want to Federal Energy Regulatory
Commission storage tank;
remain on our mailing list, please return
the Information Request (Appendix 3). If • Two electric substations and
you do not return the Information [Docket No. CP06–26–000] associated automation and electric
Request, you will be removed from the facilities;
Commission’s environmental mailing Dominion Cove Point LNG, L.P.; Notice • One 20,500 horsepower (HP)
list. of Intent To Prepare an Environmental International Standards Organization
Assessment for the Proposed Cove (ISO) rating Solar Titan simple cycle gas
Availability of Additional Information Point Air Separation Unit Project and turbine generator;
Additional information about the Request for Comments on • One 13,800 volt, 13.2 megawatt
project is available from the Environmental Issues (MW) site rating generator;
Commission’s Office of External Affairs,
at 1–866–208–FERC (3372) or on the January 6, 2006. • Fuel gas equipment and piping;
FERC Internet Web site (http:// The staff of the Federal Energy • Associated instrumentation; and
www.ferc.gov) using the ‘‘eLibrary link.’’ Regulatory Commission (FERC or • Fiber optic and electrical duct
Click on the eLibrary link, select Commission) will prepare an banks.
‘‘General Search’’ and enter the project environmental assessment (EA) that will
discuss the environmental impacts of All construction activities would take
docket number excluding the last three place within the existing Cove Point
digits (i.e., PF06–1) in the ‘‘Docket the Cove Point Air Separation Unit
Project involving construction and Terminal. No additional land would be
Number’’ field. Be sure you have required for construction.
selected an appropriate date range. For operation of facilities by Dominion Cove
assistance, please contact FERC Online Point LNG, L.P. (Dominion) in Calvert The EA Process
Support at County, Maryland. These facilities
FERCOnlineSupport@ferc.gov or toll would consist of two air separation The National Environmental Policy
free at 1–866–208–3676, or TTY, contact units, a liquid nitrogen storage tank, a Act (NEPA) requires the Commission to
(202) 502–8659. The eLibrary link on gas turbine generator, a site rating take into account the environmental
the FERC Internet Web site also generator and associated impacts that could result from an action
provides access to the texts of formal instrumentation and equipment at the whenever it considers the issuance of a
documents issued by the Commission, existing Cove Point Liquefied Natural Certificate of Public Convenience and
such as orders, notices, and Gas (LNG) Terminal. This EA will be Necessity. NEPA also requires us to
rulemakings. used by the Commission in its decision- discover and address concerns the
In addition, the FERC now offers a making process to determine whether public may have about proposals. This
free service called eSubscription that the project is in the public convenience process is referred to as ‘‘scoping’’. The
allows you to keep track of all formal and necessity. main goal of the scoping process is to
issuances and submittals in specific This notice announces the opening of focus the analysis in the EA on the
dockets. This can reduce the amount of the scoping period that will be used to important environmental issues. By this
time you spend researching proceedings gather environmental input from the notice, the Commission staff requests
by automatically providing you with public and interested agencies on the public comments on the scope of the
notification of these filings, document project. Please note that the scoping issues to address in the EA. All
summaries, and direct links to the period will close on February 6, 2006. comments received are considered
documents. To register for this service, This notice is being sent to during the preparation of the EA. By
go to http://www.ferc.gov/ landowners within 0.5 mile of the this notice, we are also asking Federal,
esubscribenow.htm. project area; Federal, state, and local state, and local agencies with
Public meetings or site visits will be government representatives and jurisdiction and/or special expertise
hsrobinson on PROD1PC70 with NOTICES

posted on the Commission’s calendar agencies; environmental and public with respect to environmental issues to
located at http://www.ferc.gov/ interest groups; Native American tribes; formally cooperate with us in the
EventCalendar/EventsList.aspx along local libraries and newspapers in this preparation of the EA. Agencies that
with other related information. proceeding. Government representatives would like to request cooperating status
Finally, CEGT has established an are encouraged to notify their should follow the instructions for filling
Internet Web site for this project at constituents of this proposal and advise comments provided below.

VerDate Aug<31>2005 15:41 Jan 12, 2006 Jkt 208001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\13JAN1.SGM 13JAN1