Federal Register / Vol. 70, No.

239 / Wednesday, December 14, 2005 / Notices 73995

DEPARTMENT OF ENERGY (866) 208–3676 (toll free). For TTY, call ‘‘eLibrary’’ link and is available for
(202) 502–8659. review in the Commission’s Public
Federal Energy Regulatory Reference Room in Washington, DC.
Commission Magalie R. Salas,
There is an ‘‘eSubscription’’ link on the
Secretary. Web site that enables subscribers to
[Docket No. RP99–220–021] [FR Doc. E5–7308 Filed 12–13–05; 8:45 am] receive e-mail notification when a
Great Lakes Gas Transmission Limited BILLING CODE 6717–01–P document is added to a subscribed
Partnership; Notice of Negotiated Rate docket(s). For assistance with any FERC
Agreement Online service, please e-mail
DEPARTMENT OF ENERGY FERCOnlineSupport@ferc.gov, or call
December 8, 2005. (866) 208–3676 (toll free). For TTY, call
Take notice that on December 2, 2005, Federal Energy Regulatory
Commission (202) 502–8659.
Great Lakes Gas Transmission Limited
Partnership (Great Lakes) filed for [Docket No. RP99–220–020] Magalie R. Salas,
disclosure, a transportation service Secretary.
agreement pursuant to Great Lakes’ Rate Great Lakes Gas Transmission Limited [FR Doc. E5–7321 Filed 12–13–05; 8:45 am]
Schedule FT entered into by Great Lakes Partnership; Notice of Negotiated Rate BILLING CODE 6717–01–P
and WPS Energy Services, Inc. (WPS) Agreement
(FT Service Agreement). Great Lakes
states that the FT Service Agreement December 8, 2005. DEPARTMENT OF ENERGY
being filed reflects a negotiated rate Take notice that on December 2, 2005,
arrangement between Great Lakes and Great Lakes Gas Transmission Limited Federal Energy Regulatory
WPS commencing December 1, 2005. Partnership (Great Lakes) filed for Commission
Any person desiring to intervene or to disclosure, a transportation service
[Docket No. RP06–138–000]
protest this filing must file in agreement pursuant to Great Lakes’ Rate
accordance with Rules 211 and 214 of Schedule FT entered into by Great Lakes Gulf States Transmission Corporation;
the Commission’s Rules of Practice and and NJR Energy Services Company Notice of Proposed Changes in FERC
Procedure (18 CFR 385.211 and (NJR) (FT Service Agreement). Great Gas Tariff
385.214). Protests will be considered by Lakes states that the FT Service
the Commission in determining the Agreement being filed reflects a December 8, 2005.
appropriate action to be taken, but will negotiated rate arrangement between Take notice that on December 6, 2005,
not serve to make protestants parties to Great Lakes and NJR commencing Gulf States Transmission Corporation
the proceeding. Any person wishing to December 1, 2005. (Gulf States) tendered for filing as part
become a party must file a notice of Any person desiring to intervene or to of its FERC Gas Tariff, Original Volume
intervention or motion to intervene, as protest this filing must file in No. 1, the tariff Sheets listed on
appropriate. Such notices, motions, or accordance with Rules 211 and 214 of Appendix A to the filing, to become
protests must be filed in accordance the Commission’s Rules of Practice and effective December 26, 2005.
with the provisions of Section 154.210 Procedure (18 CFR 385.211 and Gulf States states that copies of this
of the Commission’s regulations (18 CFR 385.214). Protests will be considered by filing are being served on all customers
154.210). Anyone filing an intervention the Commission in determining the of Gulf States and applicable state
or protest must serve a copy of that appropriate action to be taken, but will regulatory agencies.
document on the Applicant. Anyone not serve to make protestants parties to Any person desiring to intervene or to
filing an intervention or protest on or the proceeding. Any person wishing to protest this filing must file in
before the intervention or protest date become a party must file a notice of accordance with Rules 211 and 214 of
need not serve motions to intervene or intervention or motion to intervene, as the Commission’s Rules of Practice and
protests on persons other than the appropriate. Such notices, motions, or Procedure (18 CFR 385.211 and
Applicant. protests must be filed in accordance 385.214). Protests will be considered by
The Commission encourages with the provisions of section 154.210 the Commission in determining the
electronic submission of protests and of the Commission’s regulations (18 CFR appropriate action to be taken, but will
interventions in lieu of paper using the 154.210). Anyone filing an intervention not serve to make protestants parties to
‘‘eFiling’’ link at http://www.ferc.gov. or protest must serve a copy of that the proceeding. Any person wishing to
Persons unable to file electronically document on the Applicant. Anyone become a party must file a notice of
should submit an original and 14 copies filing an intervention or protest on or intervention or motion to intervene, as
of the protest or intervention to the before the intervention or protest date appropriate. Such notices, motions, or
Federal Energy Regulatory Commission, need not serve motions to intervene or protests must be filed in accordance
888 First Street, NE., Washington, DC protests on persons other than the with the provisions of section 154.210
20426. Applicant. of the Commission’s regulations (18 CFR
This filing is accessible on-line at The Commission encourages 154.210). Anyone filing an intervention
http://www.ferc.gov, using the electronic submission of protests and or protest must serve a copy of that
‘‘eLibrary’’ link and is available for interventions in lieu of paper using the document on the Applicant. Anyone
review in the Commission’s Public ‘‘eFiling’’ link at http://www.ferc.gov. filing an intervention or protest on or
Reference Room in Washington, DC. Persons unable to file electronically before the intervention or protest date
There is an ‘‘eSubscription’’ link on the should submit an original and 14 copies need not serve motions to intervene or
Web site that enables subscribers to of the protest or intervention to the protests on persons other than the
receive e-mail notification when a Federal Energy Regulatory Commission, Applicant.
document is added to a subscribed 888 First Street, NE., Washington, DC The Commission encourages
docket(s). For assistance with any FERC 20426. electronic submission of protests and
Online service, please e-mail This filing is accessible on-line at interventions in lieu of paper using the
FERCOnlineSupport@ferc.gov, or call http://www.ferc.gov, using the ‘‘eFiling’’ link at http://www.ferc.gov.

VerDate Aug<31>2005 15:29 Dec 13, 2005 Jkt 208001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 E:\FR\FM\14DEN1.SGM 14DEN1
73996 Federal Register / Vol. 70, No. 239 / Wednesday, December 14, 2005 / Notices

Persons unable to file electronically need not serve motions to intervene or A technical conference in this
should submit an original and 14 copies protests on persons other than the proceeding was held on December 1,
of the protest or intervention to the Applicant. 2005 at the Commission’s Headquarters,
Federal Energy Regulatory Commission, The Commission encourages 888 First Street, NE., Washington, DC
888 First Street, NE., Washington, DC electronic submission of protests and 20426. The technical conference
20426. interventions in lieu of paper using the participants discussed whether the
This filing is accessible on-line at ‘‘eFiling’’ link at http://www.ferc.gov. upgrades completed by OG&E resulted
http://www.ferc.gov, using the Persons unable to file electronically in an additional 600 MWs of available
‘‘eLibrary’’ link and is available for should submit an original and 14 copies transmission capacity, as required in the
review in the Commission’s Public of the protest or intervention to the July 2004 Order. At the conclusion of
Reference Room in Washington, DC. Federal Energy Regulatory Commission, the conference, the parties agreed to
There is an ‘‘eSubscription’’ link on the 888 First Street, NE., Washington, DC answer the following questions:
Web site that enables subscribers to 20426. 1. Is an additional 600 MWs of
receive e-mail notification when a This filing is accessible on-line at Available Transfer Capability, achieved
document is added to a subscribed http://www.ferc.gov, using the by upgrading the transmission system,
docket(s). For assistance with any FERC ‘‘eLibrary’’ link and is available for created when: (a) The McClain
Online service, please e-mail review in the Commission’s Public generating units are not running; (b) the
FERCOnlineSupport@ferc.gov, or call Reference Room in Washington, DC. McClain generating units are running to
(866) 208–3676 (toll free). For TTY, call There is an ‘‘eSubscription’’ link on the serve OG&E load; or (c) the McClain
(202) 502–8659. Web site that enables subscribers to generating units are running under
receive e-mail notification when a operating conditions other than those
Magalie R. Salas, described in (a) and (b)? In other words,
document is added to a subscribed
Secretary. should the base case be McClain
docket(s). For assistance with any FERC
[FR Doc. E5–7319 Filed 12–13–05; 8:45 am]
Online service, please e-mail running with no transmission upgrades
BILLING CODE 6717–01–P
FERCOnlineSupport@ferc.gov, or call or McClain not running with no
(866) 208–3676 (toll free). For TTY, call transmission upgrades. Provide
(202) 502–8659. complete explanatory rationale and
DEPARTMENT OF ENERGY support for how the 600 MWs of
Magalie R. Salas, Available Transfer Capability is created.
Federal Energy Regulatory Secretary. 2. Explain if there are discrepancies in
Commission [FR Doc. E5–7316 Filed 12–13–05; 8:45 am] Available Transfer Capability, as
[Docket No. RP06–135–000] BILLING CODE 6717–01–P
calculated by OG&E and as calculated
by SPP, including whether the
National Fuel Gas Supply Corporation; difference (if any) is the result of the use
Notice of Proposed Changes in FERC DEPARTMENT OF ENERGY of different models (planning models vs.
Gas Tariff operational models) containing different
Federal Energy Regulatory generation dispatch pattern, different
December 8, 2005. Commission transmission system configuration,
Take notice that on December 1, 2005, different firm reservations, and different
National Fuel Gas Supply Corporation generation and transmission outages.
[Docket Nos. EC03–131–003; EC03–131–
(National Fuel) tendered for filing as 004] 3. Were there any firm reservations,
part of its FERC Gas Tariff, Fourth posted on the SPP OASIS after the July
Revised Volume No. 1, Sixth Revised Oklahoma Gas and Electric Company; 2004 Order and prior to Redbud’s
Sheet No. 12 and Eighth Revised Sheet Notice of Request for Comments transmission request in June 2005, by
No. 478, to be effective January 1, 2006. Redbud or any other party that would
National Fuel states that copies of this December 8, 2005. have reduced the Available Transfer
filing were served upon its customers On July 2, 2004, the Commission Capability from Redbud to OG&E’s
and interested state commissions. approved Oklahoma Gas and Electric transmission system?
Any person desiring to intervene or to Company’s (OG&E) Offer of Settlement 4. In addition to the previously
protest this filing must file in in this proceeding subject to certain disclosed non-firm reservation that was
accordance with Rules 211 and 214 of modifications. In the Offer of not removed from the SPP study in
the Commission’s Rules of Practice and Settlement, OG&E offered a number of response to Redbud’s June 2005 request,
Procedure (18 CFR 385.211 and permanent and interim mitigation were there any other non-firm
385.214). Protests will be considered by measures. Among these mitigation reservations which were not removed
the Commission in determining the measures was a commitment to from the ATC studies performed by
appropriate action to be taken, but will construct a 600 MW Bridge between OG&E and SPP.
not serve to make protestants parties to InterGen’s Redbud Energy Project and 5. Assuming the transmission
the proceeding. Any person wishing to OG&E’s control area that would create upgrades created an additional 600
become a party must file a notice of an additional 600 MWs of available MWs of Available Transfer Capability,
intervention or motion to intervene, as transmission capacity. See Oklahoma explain what happened to the Available
appropriate. Such notices, motions, or Gas and Electric and NRG McClain LLC, Transfer Capability from the time OG&E
protests must be filed in accordance 105 FERC ¶61,297 (2003), order placed it into service and when SPP
with the provisions of section 154.210 approving settlement, 108 FERC made it available for transmission use.
of the Commission’s regulations (18 CFR ¶61,004 (2004). On May 31, 2005, OG&E Comments in response to these
154.210). Anyone filing an intervention filed a letter informing the Commission questions are due on or before December
or protest must serve a copy of that that, as of May 19, 2005, all of the 16, 2005, and reply comments are due
document on the Applicant. Anyone facilities that OG&E committed to on or before January 20, 2006.
filing an intervention or protest on or construct under the Offer of Settlement Comments must refer to Docket Nos.
before the intervention or protest date were placed into commercial operation. EC03–131–003 and EC03–131–004, and

VerDate Aug<31>2005 15:29 Dec 13, 2005 Jkt 208001 PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 E:\FR\FM\14DEN1.SGM 14DEN1