Professional Documents
Culture Documents
(*) Vendor shall furnish soft copy of all drawings in Auto Cad and all documents in
MS office as part of all post order submission and final documentation. However
filled up datasheets in purchaser format shall be submitted in PDF form.
1.0 Vendor shall submit schedule of vendor drawings and documents within
15 days after placement of order.
2.0 Data not submitted with the offer to be supplemented.
________________________________
Accepted and confirmed by the Bidder
(Signature of the Bidder)
IOC/M&I/ELECT/E/18/2012 Electrical motor operated valve actuator & Master Station Rev.-0 Page 20 of 27