Section 10 and 404 Permit, New EIS No. 20050338, ERP No. F–FHW– 14/2005, Contact: Katherine Worn
London County, CT F40428–OH, OH–823, Portsmouth 530–534–6500
Summary: EPA continues to have Bypass Project, Transportation EIS No. 20050419, Final EIS, AFS, MT,
environmental concerns about ground Improvements, Funding and U.S. Middle East Fork Hazardous Fuel
and surface water resources, impacts to Army COE Section 404 Permit, Reduction Project, Implementation of
wetlands and secondary impacts. Appalachian Development Highway, Three Alternatives, Bitterroot
However, EPA supports the selection of Scioto County, OH National Forest, Sula Ranger District,
the preferred alternative. Summary: EPA continues to have Ravalli County, MT, Wait Period
environmental concerns about Ends: 11/14/2005, Contact: Sandrah
EIS No. 20050191, ERP No. F–AFS– Mack 406–821–1251
L65470–ID, Meadows Slope Wildland ecosystem fragmentation, forest losses,
relocation impacts, and requested that EIS No. 20050420, Final EIS, IBR, NV,
Fire Protection Project, Proposes to Humboldt Project Conveyance,
Create and Maintain a Fuelbreak of these impacts be further mitigated.
Transferring 83, 530 Acres from
Reduced Crown Fire Hazard, Payette EIS No. 20050345, ERP No. FS–BLM– Federal Ownership to the Pershing
National Forest, New Meadows K67038–NV, Ruby Hill Mine County Water Conservation District
Rangers District, Adams and Valley Expansion—East Archimedes Project, (PCWCD), Pershing and Lander
Counties, ID Extension of Existing Open Pit and Counties, NV, Wait Period Ends: 11/
Summary: EPA continues to express Expansion of Two Existing Waste 14/2005, Contact: Caryn Huntt
environmental concern about water Rock Disposal Areas, Plan-of- DeCarlo 775–884–8352
quality impacts associated with Operations Permit, Eureka County, EIS No. 20050421, Draft EIS, HUD, NY,
sediment in low gradient streams. NV Ashburton Avenue Master Plan and
EIS No. 20050258, ERP No. F–AFS– Summary: EPA recommended that Urban Renewal Plan/Mulford Hope VI
L65477–OR, B&B Fire Recovery BLM analyze potential long-term heap Revitalization Plan, Development,
Project, Proposed Harvest of Fire- leach draindown scenarios and include Implementation, Yonkers City,
Killed Trees, Reduction of Fuels, the full cost of long-term treatment in Westchester County, NY, Comment
Planting of Tree, Deschutes National the reclamation/closure bond. Period Ends: 11/28/2005, Contact:
Forest, Sisters Ranger District, Dated: October 11, 2005.
Stephen Whetstone 914–337–6650
Jefferson and Deschutes Counties, OR EIS No. 20050422, Draft Supplement,
Ken Mittelholtz, COE, AR, Fourche Bayou Basin
Summary: EPA continued to have Environmental Protection Specialist, Office
environmental concerns about the long Project, 1,750 Acre Bottomland
of Federal Activities. Acquisition with Nature Appreciation
term impacts of salvage logging to water [FR Doc. 05–20615 Filed 10–13–05; 8:45 am]
quality and aquatic habitat from Facilities, Development, Funding,
sediment delivery to streams.
BILLING CODE 6560–50–P City of Little Rock, Pulaski County,
AR, Comment Period Ends: 11/28/
EIS No. 20050307, ERP No. F–IBR– 2005, Contact: Jim Ellis 501–324–5629
K64023–CA, Battle Creek Salmon and ENVIRONMENTAL PROTECTION EIS No. 20050423, Final EIS, BLM, NV,
Steelhead Restoration Project, To AGENCY Sloan Canyon National Conservation
Address New Significant Information, Area, Resource Management Plan,
Habitat Restoration in Battle Creek [ER–FRL–6668–3]
Implementation, Cities of Las Vegas
and Tributaries, License Amendment Environmental Impacts Statements; and Henderson, Clark County, NV,
Issuance, Implementation, Tehama Notice of Availability Wait Period Ends: 11/14/2005,
and Shasta Counties, CA Contact: Charles Carroll 702–515–
Summary: EPA is supportive of efforts Responsible Agency: Office of Federal 5291
to restore salmonid habitat to facilitate Activities, General Information (202) EIS No. 20050424, Draft EIS, NPS, CA,
population growth and recovery, and 564–7167 or http://www.epa.gov/ Furnace Creek Water Collection
has no objection to the proposed action. compliance/nepa/. System, Reconstruction, Death Valley
EIS No. 20050312, ERP No. F–NRC– Weekly receipt of Environmental National Park, Implementation, Inyo
B06005–CT, Generic-License Renewal Impact Statements Filed 10/03/2005 County, CA, Comment Period Ends:
of Nuclear Plants for the Millstone Through 10/07/2005 Pursuant to 40 CFR 12/12/2005, Contact: Linda Greene
Power Station, Units 2 and 3, 1506.9. 760–786–3253
Supplement 22 to NUREG–1437, EIS No. 20050410, Draft EIS, COE, FL, EIS No. 20050425, Draft EIS, BLM, CA,
Implementation, New London Central and Southern Florida Project, Southern Diablo Mountain Range and
County, CT Comprehensive Everglades Central Coast of California Resource
Restoration Plan, Implementation, Management Plan, Several Counties,
Summary: EPA continues to have Everglades Agricultural Area Storage
environmental concerns about the CA, Comment Period Ends: 01/11/
Reservoirs, Palm Beach County, FL, 2006, Contact: Sky Murphy 831–630–
entrainment and impingement of fish Comment Period Ends: 11/21/2005,
and other aquatic organisms, heat shock, 5039
Contact: Janet Cushing 904–232–2259. EIS No. 20050426, Final EIS, FTA, CA,
and the assessment of cumulative The above EIS should have appeared Mid-City/Westside Transit Corridor
environmental impacts. in FR on 10/07/05. The comment Improvements, Wilshire Bus Rapid
EIS No. 20050326, ERP No. F–AFS– period is calculated from the 10/7/ Transit and Exposition Transitway,
K65278–CA, Burlington Ridge Trails 2005 FR. Construction and Operation, Funding,
Project, To Eliminate, Reconstruct/or EIS No. 20050418, Final EIS, AFS, CA, Section 404 Permit, Los Angeles
Reroute Unsound Trail Sections, Bald Mountain Project, Proposes to County, CA, Wait Period Ends: 11/14/
Tahoe National Forest, Yuba River Harvest Trees Using Group and 2005, Contact: Ray Sukys 415–744–
Ranger District, Camptonville, Nevada Individual Trees Selection Methods, 3115
County, CA Feather River Ranger District, Plumas EIS No. 20050427, Draft Supplement,
Summary: No formal comment letter National Forest, Plumas and Butte FTA, WA, Central Link Light Rail
was sent to the preparing agency. Counties, CA, Wait Period Ends: 11/ Transit Project (Sound Transit)

VerDate Aug<31>2005 13:54 Oct 13, 2005 Jkt 208001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\14OCN1.SGM 14OCN1
60076 Federal Register / Vol. 70, No. 198 / Friday, October 14, 2005 / Notices

Construction and Operation of the Supporting Data in Risk Assessment’’ the meeting, please indicate if you
North Link Light Rail Extension, from (EPA/600/R–05/043A), which was intend to make an oral statement during
Downtown Seattle and Northgate, prepared by the National Center for the public comment period on the first
Updated Information on Refined Environmental Assessment (NCEA) day of the meeting.
Design Concepts, Funding, Right-of- within EPA’s Office of Research and FOR FURTHER INFORMATION CONTACT:
Way and US Army COE Section 404 Development. Versar, Inc. invites the Questions regarding registration and
Permits, King County, WA, Comment public to register to attend this logistics for the peer review meeting
Period Ends: 11/30/2005, Contact: workshop as observers. In addition, should be directed to Ms. Amanda
John Witmer 206–220–7954 Versar, Inc. invites the public to give Jacob, Versar, Inc., 6850 Versar Center,
EIS No. 20050428, Draft EIS, FRC, CA, oral and/or provide written comments at Springfield, VA, 22151; telephone: 703–
Long Beach Liquefied Natural Gas the workshop regarding the draft 750–3000 ext. 260; facsimile: 703–642–
(LNG) Import Project, Construction document under review. The draft 6954; e-mail: AJacob@versar.com. If you
and Operation of a LNG Receiving document and EPA’s peer-review charge have questions about the document,
Terminal and Associated Facilities, are available primarily via the Internet please contact Technical Information
US Army COE 10 and 404 Permits, on NCEA’s home page under the Recent Staff, NCEA, U.S. Environmental
Long Beach, CA, Comment Period Additions and Publications menus at Protection Agency, Washington, DC
Ends: 12/08/2005, Contact: Thomas http://www.epa.gov/ncea. In preparing a 20460; telephone: 202–564–3261;
Russo 1–866–208–3372 final report, EPA will consider Versar, facsimile: 202–565–0050; or e-mail:
Amended Notices Inc.’s report of the comments and NCEADC.Comment@epa.gov.
recommendations from the external SUPPLEMENTARY INFORMATION: On July
EIS No. 20050328, Draft EIS, FHW, LA, peer-review workshop. In addition to
US 90 Corridor, Proposed Interstate 28, 2005, EPA published a Federal
the workshop announced today, EPA Register notice (70 FR 43692) that
Highway 49 (I49 ) South Improvement previously published a Federal Register
from Raceland to the Davis Pond announced a 30-day public comment
notice (70 FR 43692) announcing a period through August 29, 2005, for
Diversion Canal, Section of separate process for public comment on
Independent Utility 1 (SIU 1), EPA’s draft report, ‘‘Approaches for the
the draft document on July 28, 2005 and Application of Physiologically-Based
Lafourche and St. Charles Parishes,
a second Federal Register notice (70 FR Pharmacokinetic (PBPK) Models and
LA, Comment Period Ends: 12/31/
48950) announcing a 45-day extension Supporting Data in Risk Assessment’’
2005, Contact: William C. Farr 225–
(closing October 14, 2005) of the public (EPA/600/R–05/043A). EPA published a
757–7615 Revision of FR Notice
comment period. second notice in the Federal Register on
Published 08/12/2005; Comment
DATES: Versar, Inc. will hold the peer- August 22, 2005 (70 FR 48950) that
Period Extended from 9/30/2005 to
12/31/2005. review workshop from November 10, extended the public comment period for
2005, to November 11, 2005. On the first 45 days from August 29, until October
Dated: October 11, 2005. day, the meeting is scheduled to begin 14, 2005. On July 28, 2005, the draft
Ken Mittelholtz, at 8:30 a.m. and end at 5 p.m., Eastern document was made publicly available
Environmental Protection Specialist, Office Daylight Time. The public may attend on NCEA’s Web site for review and
of Federal Activities. the peer-review workshop on November comment. An electronic version of the
[FR Doc. 05–20619 Filed 10–13–05; 8:45 am] 10, 2005, as observers. In addition, public docket is available through EPA’s
BILLING CODE 6560–50–U members of the public in attendance at electronic public docket and comment
the workshop will be allowed to make system, E-Docket. To view comments,
brief (no longer than five minutes) oral go to http://www.epa.gov/edocket/,
ENVIRONMENTAL PROTECTION statements at the commencement of the select ‘‘search,’’ then key in the docket
AGENCY meeting. The second day of the identification number, ORD–2005–0022.
[E–Docket ID No. ORD–2005–0022; FRL– workshop is scheduled from 8:30 a.m. to In the July 28, 2005, notice, EPA also
7983–9] 12:30 p.m., Eastern Daylight Time. This announced that a subsequent Federal
second day will be not be open to the Register notice would announce the
Notice of a Scientific Peer-Review public and is meant to provide time for date and location of a workshop for
Meeting to Review the Draft Document: the peer-reviewers to begin drafting independent external peer review of this
Approaches for the Application of their comments on the draft report. draft document. Today’s notice provides
Physiologically-Based ADDRESSES: The external peer-review information on that external peer-review
Pharmacokinetic (PBPK) Models and panel meeting will be held at the Hyatt workshop.
Supporting Data in Risk Assessment Arlington located at 1325 Wilson The purpose of the draft document is
(EPA/600/R–05/043A) Boulevard, Arlington, VA, 22209. The to describe some approaches for the use
AGENCY: Environmental Protection EPA contractor, Versar, Inc., is of physiologically-based
Agency. organizing, convening, and conducting pharmacokinetic (PBPK) models in risk
ACTION: Notice of external peer-review the peer-review panel meeting. To assessment. PBPK models represent an
panel meeting. attend the meeting, register by important class of dosimetry models
November 4, by calling Ms. Amanda that are useful for predicting internal
SUMMARY: The U.S. Environmental Jacob of Versar, Inc., 6850 Versar Center, dose at target organs for risk assessment
Protection Agency (EPA) is announcing Springfield, VA, 22151, at 703–750– applications. Dose-response
that Versar Inc., an EPA contractor for 3000 ext. 260, or via e-mail at relationships that appear unclear or
external scientific peer review, will AJacob@versar.com, or by sending a confusing at the administered dose level
convene a panel of experts and organize facsimile to 703–642–6954. Interested can become more understandable when
and conduct an independent external parties may also register on-line at: expressed on the basis of internal dose
peer-review workshop to review the http://epa.versar.com/pbpk. Space is of the chemical. To predict internal dose
draft report, ‘‘Approaches for the limited, and reservations will be level, PBPK models use
Application of Physiologically-Based accepted on a first-come, first-served pharmacokinetic data to construct
Pharmacokinetic (PBPK) Models and basis. At the time of your registration for mathematical representations of

VerDate Aug<31>2005 13:54 Oct 13, 2005 Jkt 208001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\14OCN1.SGM 14OCN1