Federal Register / Vol. 70, No.

95 / Wednesday, May 18, 2005 / Notices 28583

UL 1585 Class 2 and Class 3 Preliminary Finding on the Application DEPARTMENT OF LABOR
Transformers.
UL 164 Motor-Operated Massage and TUVAM has submitted an acceptable Occupational Safety and Health
Exercise Machines. request for expansion of its recognition Administration
UL 1662 Electric Chain Saws. as an NRTL. In connection with this
request, OSHA performed an on-site [Docket No. NRTL1–2001]
UL 1740 Industrial Robots and Robotic
review of TUVAM’s NRTL Danvers
Equipment. TUV Product Services GmbH,
facility and, in the on-site review report,
UL 1995 Heating and Cooling the assessor recommended the Application for Expansion of
Equipment. expansion for the additional standards Recognition
UL 2200 Stationary Engine Generator (see Exhibit 8). Our review of the AGENCY: Occupational Safety and Health
Assemblies. application file, the on-site review Administration (OSHA), Labor.
UL 60335–1 Safety of Household and report, and other pertinent documents ACTION: Notice.
Similar Electrical Appliances, Part indicate that TUVAM can meet the
1: General Requirements. requirements, as prescribed by 29 CFR SUMMARY: This notice announces the
UL 60335–2–8 Household and Similar 1910.7, for the expansion for the application of TUV Product Services
Electrical Appliances, Part 2; additional test standards listed above. GmbH (TUVPSG) for expansion of its
Particular Requirements for Electric This preliminary finding does not recognition to use additional test
Shavers, Hair Clippers, and Similar constitute an interim or temporary standards, and presents the Agency’s
Appliances. approval of the application. preliminary finding. This preliminary
UL 60335–2–34 Household and OSHA welcomes public comments, in finding does not constitute an interim or
Similar Electrical Appliances, Part sufficient detail, as to whether TUVAM temporary approval of this application.
2; Particular Requirements for has met the requirements of 29 CFR DATES: You must submit information or
Motor-Compressors. 1910.7 for expansion of its recognition comments, or any request for extension
UL 61010A–2–010 Electrical as a Nationally Recognized Testing of the time to comment, by the
Equipment for Laboratory Use; Part Laboratory. Your comments should following dates:
2: Particular Requirements for consist of pertinent written documents • Hard copy: Your information or
Laboratory Equipment for the and exhibits. Should you need more comments must be submitted
Heating of Materials. time to comment, you must request it in (postmarked or sent) by June 2, 2005.
UL 61010A–2–041 Electrical writing, including reasons for the • Electronic transmission or
Equipment for Laboratory Use; Part request. OSHA must receive your facsimile: Your comments must be sent
2: Particular Requirements for written request for extension at the by June 2, 2005.
Autoclaves Using Steam for the address provided above no later than ADDRESSES: You may submit
Treatment of Medical Materials for the last date for comments. OSHA will information or comments to this
Laboratory Processes. limit any extension to 30 days, unless notice—identified by docket number
UL 61010A–2–051 Electrical the requester justifies a longer period. NRTL1–2001—by any of the following
Equipment for Laboratory Use; Part We may deny a request for extension if methods:
2: Particular Requirements for it is not adequately justified. You may • Federal eRulemaking Portal: http://
Laboratory Equipment for Mixing obtain or review copies of TUVAM’s www.regulations.gov. Follow the
and Stirring. requests, the on-site review report, and instructions for submitting comments.
OSHA’s recognition of TUVAM, or all submitted comments, as received, by • OSHA Web site: http://
any NRTL, for a particular test standard contacting the Docket Office, Room ecomments.osha.gov. Follow the
is limited to equipment or materials N2625, Occupational Safety and Health instructions for submitting comments
(i.e., products) for which OSHA Administration, U.S. Department of on OSHA’s Web page.
standards require third party testing and Labor, at the above address. Docket No. • Fax: If your written comments are
certification before use in the NRTL2–2001 contains all materials in 10 pages or fewer, you may fax them to
workplace. Consequently, any NRTL’s the record concerning TUVAM’s the OSHA Docket Office at (202) 693–
scope of recognition excludes any application. 1648.
product(s) that fall within the scope of The NRTL Program staff will review • Regular mail, express delivery,
a test standard, but for which OSHA all timely comments and, after hand delivery and courier service:
standards do not require NRTL testing resolution of issues raised by these Submit three copies to the OSHA
and certification. comments, will recommend whether to Docket Office, Docket No. NRTL1–2001,
Many of the UL test standards listed grant TUVAM’s expansion request. The U.S. Department of Labor, 200
above also are approved as American Agency will make the final decision on Constitution Avenue, NW., Room N–
National Standards by the American granting the expansion and, in making 2625, Washington, DC 20210; telephone
National Standards Institute (ANSI). this decision, may undertake other (202) 693–2350. (OSHA’s TTY number
However, for convenience, we use the proceedings that are prescribed in is (877) 889–5627). OSHA Docket Office
designation of the standards developing Appendix A to 29 CFR Section 1910.7. hours of operation are 8:15 a.m. to 4:45
organization for the standard as opposed OSHA will publish a public notice of p.m., e.s.t.
to the ANSI designation. Under our this final decision in the Federal Instructions: All comments received
procedures, any NRTL recognized for an Register. will be posted without change to
ANSI-approved test standard may use http://dockets.osha.gov, including any
Signed at Washington, DC this 9th day of
either the latest proprietary version of personal information provided. OSHA
May, 2005.
the test standard or the latest ANSI cautions you about submitting personal
version of that standard. You may Jonathan L. Snare, information such as social security
contact ANSI to find out whether or not Acting Assistant Secretary. numbers and birth dates.
a test standard is currently ANSI- [FR Doc. 05–9868 Filed 5–17–05; 8:45 am] Docket: For access to the docket to
approved. BILLING CODE 4510–26–P read background documents or

VerDate jul<14>2003 14:03 May 17, 2005 Jkt 205001 PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 E:\FR\FM\18MYN1.SGM 18MYN1
28584 Federal Register / Vol. 70, No. 95 / Wednesday, May 18, 2005 / Notices

comments received, go to http:// the NRTL’s scope of recognition or to the ANSI designation. Under our
dockets.osha.gov. Contact the OSHA modifications of that scope. We procedures, any NRTL recognized for an
Docket Office for information about maintain an informational Web page for ANSI-approved test standard may use
materials not available through the each NRTL, which details its scope of either the latest proprietary version of
OSHA Web page and for assistance in recognition. These pages can be the test standard or the latest ANSI
using the Web page to locate docket accessed from our Web site at http:// version of that standard. You may
submissions. www.osha-slc.gov/dts/otpca/nrtl/ contact ANSI to find out whether or not
Extension of Comment Period: Submit index.html. a test standard is currently ANSI-
requests for extensions concerning this The most recent notice published by approved.
notice to: Office of Technical Programs OSHA for TUVPSG’s recognition
Preliminary Finding on the Application
and Coordination Activities, NRTL covered an expansion of recognition,
Program, Occupational Safety and which became effective on April 22, TUVPSG has submitted an acceptable
Health Administration, U.S. Department 2003 (68 FR 19856). request for expansion of its recognition
of Labor, Room N3653, 200 Constitution The current address of the TUVPSG as an NRTL. In connection with this
Avenue, NW., Washington, DC 20210. facility already recognized by OSHA is: request, OSHA evaluated the NRTL’s
Or fax to (202) 693–1644. TUV Product Services GmbH, capability for the standards during an
FOR FURTHER INFORMATION CONTACT: Ridlerstrasse 65, D–80339, Munich, on-site review of TUVPSG’s NRTL
Bernard Pasquet, Office of Technical Germany. facilities, and the assessor has
Programs and Coordination Activities, recommended the expansion for the
General Background on the Application
NRTL Program, Occupational Safety and additional standards (see Exhibit 11).
Health Administration, U.S. Department TUVPSG has submitted an Our review of the application file, the
of Labor, 200 Constitution Avenue, application, dated September 18, 2003 assessor’s recommendation, and other
NW., Room N3653, Washington, DC (see Exhibit 10) to expand its pertinent documents indicate that
20210, or phone (202) 693–2110. recognition to include 5 additional test TUVPSG can meet the requirements, as
standards. The NRTL Program staff has prescribed by 29 CFR 1910.7, for the
SUPPLEMENTARY INFORMATION:
determined that each of these standards expansion for the additional test
Notice of Application is an ‘‘appropriate test standard’’ within standards listed above. This preliminary
The Occupational Safety and Health the meaning of 29 CFR 1910.7(c). finding does not constitute an interim or
Administration (OSHA) hereby gives Therefore, OSHA would approve these temporary approval of the application.
notice that TUV Product Services GmbH five test standards for the expansion. OSHA welcomes public comments, in
(TUVPSG) has applied for expansion of Following review of the application, sufficient detail, as to whether TUVPSG
its current recognition as a Nationally OSHA requested certain additional has met the requirements of 29 CFR
Recognized Testing Laboratory (NRTL). information from TUVPSG and deferred 1910.7 for expansion of its recognition
TUVPSG’s expansion request covers the action on the application pending as a Nationally Recognized Testing
use of additional test standards. OSHA’s receipt of this information. The NRTL Laboratory. Your comments should
current scope of recognition for adequately responded recently to that consist of pertinent written documents
TUVPSG may be found in the following request, permitting OSHA to resume and exhibits. Should you need more
informational Web page: http:// processing of the application. time to comment, you must request it in
www.osha-slc.gov/dts/otpca/nrtl/ TUVPSG seeks recognition for testing writing, including reasons for the
tuvpsg.html. and certification of products for request. OSHA must receive your
OSHA recognition of an NRTL demonstration of conformance to the written request for extension at the
signifies that the organization has met following five test standards: address provided above no later than
the legal requirements in Section 1910.7 UL 201 Garage Equipment the last date for comments. OSHA will
of Title 29, Code of Federal Regulations UL 325 Door, Drapery, Gate, Louver limit any extension to 30 days, unless
(29 CFR 1910.7). Recognition is an and Window Operator and Systems the requester justifies a longer period.
acknowledgment that the organization UL 696 Electric Toys We may deny a request for extension if
can perform independent safety testing UL 697 Toy Transformers it is not adequately justified. You may
and certification of the specific products UL 1029 High-Intensity-Discharge obtain or review copies of TUVPSG’s
covered within its scope of recognition Lamp Ballasts requests, the on-site review report, and
and is not a delegation or grant of OSHA’s recognition of TUVPSG, or all submitted comments, as received, by
government authority. As a result of any NRTL, for a particular test standard contacting the Docket Office, Room
recognition, employers may use is limited to equipment or materials N2625, Occupational Safety and Health
products ‘‘properly certified’’ by the (i.e., products) for which OSHA Administration, U.S. Department of
NRTL to meet OSHA standards that standards require third party testing and Labor, at the above address. Docket No.
require testing and certification. certification before use in the NRTL1–2001 contains all materials in
The Agency processes applications by workplace. Consequently, any NRTL’s the record concerning TUVPSG’s
an NRTL for initial recognition or for scope of recognition excludes any application.
expansion or renewal of this recognition product(s) that fall within the scope of The NRTL Program staff will review
following requirements in Appendix A a test standard, but for which OSHA all timely comments and, after
to 29 CFR 1910.7. This appendix standards do not require NRTL testing resolution of issues raised by these
requires that the Agency publish two and certification. comments, will recommend whether to
notices in the Federal Register in A few of the UL test standards listed grant TUVPSG’s expansion request. The
processing an application. In the first above also are approved as American Agency will make the final decision on
notice, OSHA announces the National Standards by the American granting the expansion and, in making
application and provides its preliminary National Standards Institute (ANSI). this decision, may undertake other
finding and, in the second notice, the However, for convenience, we use the proceedings that are prescribed in
Agency provides its final decision on designation of the standards developing Appendix A to 29 CFR Section 1910.7.
the application. These notices set forth organization for the standard as opposed OSHA will publish a public notice of

VerDate jul<14>2003 14:03 May 17, 2005 Jkt 205001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\18MYN1.SGM 18MYN1
Federal Register / Vol. 70, No. 95 / Wednesday, May 18, 2005 / Notices 28585

this final decision in the Federal 30. The license authorizes the Licensee license in lieu of NRC pursuing
Register. to possess portable nuclear density escalated enforcement action. Mr.
Signed in Washington, DC this 9th day of gauges containing sealed sources of Wellman agreed to these actions during
May, 2005. byproduct material and maintain them the telephone call, and subsequently
Jonathan L. Snare, in storage until termination of the consented to these actions in response
license. The possession and storage-only to a letter and a copy of the
Acting Assistant Secretary.
license was originally issued March 24, Confirmatory Order containing the
[FR Doc. 05–9869 Filed 5–17–05; 8:45 am]
1995, was last modified on September proposed conditions that the NRC sent
BILLING CODE 4510–26–P
21, 1999, with an expiration date of to Mr. Wellman on February 25, 2005.
February 28, 2005. In a consent form signed on March 16,
An inspection conducted by NRC 2005, R&M Engineering Consultants
NATIONAL AERONAUTICS AND Region IV in June 2004 identified an agreed to all of the commitments
SPACE ADMINISTRATION apparent failure on the part of R&M to described in Section IV below. The
[Notice (05–090)] leak-test two portable nuclear density Licensee further agreed that this Order
gauges in accordance with the would be effective upon issuance and
Notice of Prospective Patent License conditions of the license. License that R&M waived its right to a hearing
Condition 12.D. requires, in part, that no on this Order. Implementation of these
AGENCY: National Aeronautics and sealed source or detector cell shall be commitments will ensure that licensed
Space Administration. stored for a period of more than three material is appropriately handled and
ACTION: Notice of prospective patent (3) years without being tested for disposed of.
license. leakage and/or contamination. This I find that the Licensee’s
requirement was proposed by R&M in commitments as described in Section IV
SUMMARY: NASA hereby gives notice information submitted to the NRC with below are acceptable and necessary and
that Turfgrass Management, Inc., a the 1995 license amendment request to conclude that with these commitments
Nevada corporation, has applied for a modify the license to possess and store the public health and safety are
partially exclusive license to practice byproduct material. In addition, the reasonably assured. In view of the
the inventions described and claimed in inspection identified an apparent failure foregoing, I have determined that the
U.S. Patent Numbers 5,433,766 (‘‘Slow- on the part of R&M to provide accurate public health and safety require that the
Release Fertilizer’’) and 5,451,242 information to the NRC in accordance Licensee’s commitments be confirmed
(‘‘Active Synthetic Soil’’). These patents with the requirements of 10 CFR 30.9. by this Order. Based on the above and
are assigned to the United States of Specifically, Mr. James Wellman, Licensee’s consent, this Order is
America as represented by the R&M’s President, informed the NRC in immediately effective upon issuance.
Administrator of the National a September 17, 2002, e-mail that he Accordingly, pursuant to Sections 161b,
Aeronautics and Space Administration. had performed leak tests of the gauges 161i, 161o, 182 and 186 of the Atomic
Written objections to the prospective and had sent swabs to Radiation Energy Act of 1954, as amended, and
grant of a license should be sent to the Detection Company in Sunnyvale, the Commission’s regulations in 10 CFR
Johnson Space Center. California for evaluation. The inspection 2.202 and 10 CFR Part 30, it is hereby
DATES: Responses to this Notice must be found no evidence that R&M’s portable ordered, effective immediately, that
received within 15 days from date of nuclear gauges had been leak-tested license No. 50–23220–02 is modified as
publication in the Federal Register. since the possession and storage-only follows:
FOR FURTHER INFORMATION CONTACT: license was issued in 1995. A follow-up 1. Within 30 days of the date of the
Theodore Ro, Patent Attorney, NASA investigation by the NRC’s Office of Confirmatory Order, leak test and obtain
Johnson Space Center, Mail Stop AL, Investigations (OI) concluded in the results of leak tests for all sealed
Houston, TX 77058–8452; telephone December 2004 that Mr. Wellman sources contained in portable nuclear
(281) 244–7148. willfully failed to leak-test the portable gauging devices possessed under the
gauges in accordance with the authority of License No. 50–23220–02.
Dated: May 5, 2005. requirements of the license. In addition, 2. Within 35 days of the date of the
Keith T. Sefton, based on a review of the information in Confirmatory Order, provide the
Deputy General Counsel, Administration and the investigation report, it appears that Director, Division of Nuclear Materials
Management. Mr. Wellman willfully failed to provide Safety, NRC Region IV, 611 Ryan Plaza
[FR Doc. 05–9937 Filed 5–17–05; 8:45 am] NRC accurate information in his Drive, Suite 400, Arlington, Texas
BILLING CODE 7510–13–P September 2002 e-mail. 76011, with a copy of the results of the
On February 8, 2005, representatives leak tests.
of NRC Region IV contacted Mr. 3. Within 45 days of the date of the
NUCLEAR REGULATORY Wellman by telephone to discuss the Confirmatory Order, complete the
COMMISSION results of the inspection and transfer of all portable nuclear gauging
investigation. NRC Region IV informed devices possessed under the authority of
[Docket No. 030–33802, License No. 50– Mr. Wellman that the NRC was License No. 50–23220–02 to an
23220–02, and EA–05–023] considering escalated enforcement authorized recipient.
In the Matter of R&M Engineering action, including possible monetary 4. Within 50 days of the date of the
Consultants, Fairbanks, AK; civil penalties for the apparent Confirmatory Order, provide the
Confirmatory Order Modifying License violations described above. Mr. Director, Division of Nuclear Materials
(Effective Immediately) Wellman has previously stated his Safety, NRC Region IV, 611 Ryan Plaza
intent to transfer the gauges and Drive, Suite 400, Arlington, Texas
R&M Engineering Consultants (R&M terminate the license. During the 76011, with copies of documents
or Licensee) is the holder of NRC telephonic discussion, NRC Region IV demonstrating that the transfer has
License No. 50–23220–02 issued by the asked Mr. Wellman if he would agree to taken place.
Nuclear Regulatory Commission (NRC take prompt action to transfer the gauges 5. Within 60 days of the date of the
or Commission) pursuant to 10 CFR Part and request termination of R&M’s NRC Confirmatory Order, submit to the