Professional Documents
Culture Documents
Brief Note
Brief Note
Total no of Trees
As per
As per
Original
revised
alignment
alignment
467
660
Section
Table 2
TREES IN CORRIDOR LENGTH WISE
S.
NO.
Chainage
( Km )
Section
Total no of Trees
28.20
to 28.52
29.93 to
30.09
150
20
31.00 to
31.32
Saket Station
60
300
130
Total
660
CORRIDOR NAME
TYPE OF LAND TO BE
ACQUIRED (HA)
GOVERNMENT
PRIVATE
25.29
Difference
TOTAL
25.29
61.5793
0.8907
61.47
36.29
0.8907
36.18
TABLE 4
Station wise area details of Permanent Land from
Green Park to Qutub (M2)
S.
SECTION/ LOCATION/
NO.
STATION
i) Hauz Khas Station
ii)
iii)
iv)
iv)
PRIVATE
GOVERNMENT
TOTAL
--
2748
2748
---
43343
13354
4.3343
13354
8907
--
8907
--
556348
556348
624700
TABLE 5
TEMPORARY AND PROPERTY DEVELOPMENT LAND
REQUIREMENT (HA)
S.
NO.
Land for
Property
Development
CORRIDOR/ LOCATION
Temporary Land
for Construction
1.
3.5
0.61
2.
4.5
1.75
1.14
Difference
Section
Length
( Km )
Journey
Time (
Min.)
22
Central Secretariat to
10.87
Qutub Minar (Original)
2
Central Secretariat to
12.5
26
Qutub Minar (Revised)
UG; Underground, E; Elevated , AG; At Grade
Type of
Corridor
Mixed (UG,E)
Mixed (UG,E)