You are on page 1of 2

4118 Federal Register / Vol. 70, No.

18 / Friday, January 28, 2005 / Notices

ACTION: Notice. identifies a comment containing (iii) Enhance the quality, utility, and
copyrighted material, EPA will provide clarity of the information to be
SUMMARY: In compliance with the a reference to that material in the collected; and
Paperwork Reduction Act (44 U.S.C. version of the comment that is placed in (iv) Minimize the burden of the
3501 et seq.), this document announces EDocket. The entire printed comment, collection of information on those who
that EPA is planning to submit a including the copyrighted material, will are to respond, including through the
proposed Information Collection be available in the public docket. use of appropriate automated electronic,
Request (ICR) to the Office of Although identified as an item in the mechanical, or other technological
Management and Budget (OMB). This is official docket, information claimed as collection techniques or other forms of
a request for a new collection. Before CBI, or whose disclosure is otherwise information technology, e.g., permitting
submitting the ICR to OMB for review restricted by statute, is not included in electronic submission of responses.
and approval, EPA is soliciting the official public docket, and will not Burden Statement. The estimated
comments on specific aspects of the be available for public viewing in burden for this survey is 30 hours per
proposed information collection as EDocket. For further information about airport respondent. The total number of
described below. the electronic docket, see EPA’s Federal airport respondents is 157, producing an
DATES: Comments must be submitted on Register notice describing the electronic approximate total burden of 4,710
or before March 29, 2005. docket at 67 FR 38102 (May 31, 2002), hours. Burden means the total time,
ADDRESSES: Submit your comments, or go to http://www.epa.gov/edocket. effort, or financial resources expended
referencing docket ID number OW– Affected entities: Entities potentially by persons to generate, maintain, retain,
2004–0038, to EPA online using affected by this action are airport or disclose or provide information to or
EDocket (our preferred method), by e- owners/operators. for a Federal agency. This includes the
mail to ow-docket@epa.gov, or by mail Title: Survey of Airport Deicing time needed to review instructions;
to: Water Docket, 4101T, Environmental Operations (Airport Questionnaire) develop, acquire, install, and utilize
Protection Agency, 1200 Pennsylvania Abstract: EPA is developing technology and systems for the purposes
Ave., NW., Washington, DC 20460. wastewater discharge standards, called of collecting, validating, and verifying
FOR FURTHER INFORMATION CONTACT: Eric ‘‘effluent guidelines,’’ for airports information, processing and
Strassler, EPA Office of Water, pursuant to the Agency’s 2004 Effluent maintaining information, and disclosing
telephone 202–566–1026, email Guidelines Plan (69 FR 53719, and providing information; adjust the
strassler.eric@epa.gov. September 2, 2004). The focus of the existing ways to comply with any
SUPPLEMENTARY INFORMATION: EPA has rulemaking is on wastewater discharges previously applicable instructions and
established a public docket for this ICR from aircraft and runway deicing requirements; train personnel to be able
under Docket ID number OW–2004– operations. EPA will send survey to respond to a collection of
0038, which is available for public questionnaires to a sample of airport information; search data sources;
viewing at the Water Docket in the EPA owners/operators to help the Agency complete and review the collection of
Docket Center (EPA/DC), EPA West, compile a national assessment of information; and transmit or otherwise
Room B102, 1301 Constitution Ave., deicing operations. The survey will disclose the information.
NW., Washington, DC. The EPA Docket include questions on the deicing Dated: January 13, 2005.
Center Public Reading Room is open technologies employed, amount of Geoffrey H. Grubbs,
from 8:30 a.m. to 4:30 p.m., Monday deicing chemicals used, wastewater Director, Office of Science and Technology.
through Friday, excluding legal collection and treatment systems used,
[FR Doc. 05–1625 Filed 1–27–05; 8:45 am]
holidays. The telephone number for the pollution prevention techniques, and
BILLING CODE 6560–50–P
Reading Room is 202–566–1744, and the economic and financial information.
telephone number for the Water Docket Completion of this one-time survey will
is 202–566–2422. An electronic version be mandatory pursuant to sec. 308 of the ENVIRONMENTAL PROTECTION
of the public docket is available through Clean Water Act. (EPA is preparing a AGENCY
EPA Dockets (EDocket) at http:// separate questionnaire for airlines. This
www.epa.gov/edocket. Use EDocket to questionnaire will be announced in a [Docket No. R10–OAR–2005–WA–001; FRL–
separate Federal Register notice.) 7864–9]
obtain a copy of the draft collection of
information, submit or view public An agency may not conduct or
sponsor, and a person is not required to Adequacy Status of the Spokane, WA
comments, access the index listing of Carbon Monoxide Maintenance Plan
the contents of the public docket, and to respond to, a collection of information
unless it displays a currently valid OMB and Redesignation Request for
access those documents in the public Transportation Conformity Purposes
docket that are available electronically. control number. The OMB control
Once in the system, select ‘‘Search,’’ numbers for EPA’s regulations in 40 AGENCY: Environmental Protection
then key in the docket ID number CFR are listed in 40 CFR part 9. Agency (EPA).
identified above. EPA would like to solicit comments ACTION: Notice of adequacy.
Any comments related to this ICR to:
should be submitted to EPA within 60 (i) Evaluate whether the proposed SUMMARY: In this notice, EPA is
days of this notice. EPA’s policy is that collection of information is necessary notifying the public that we have found
public comments, whether submitted for the proper performance of the that the motor vehicle emissions budget
electronically or in paper, will be made functions of the Agency, including contained in the submitted Spokane
available for public viewing in EDocket whether the information will have Carbon Monoxide Maintenance Plan
as EPA receives them and without practical utility; and Redesignation Request is adequate
change, unless the comment contains (ii) Evaluate the accuracy of the for transportation conformity purposes.
copyrighted material, confidential Agency’s estimate of the burden of the On March 2, 1999, the D.C. Circuit
business information (CBI), or other proposed collection of information, Court ruled that submitted State
information whose public disclosure is including the validity of the Implementation Plans (SIPs) cannot be
restricted by statute. When EPA methodology and assumptions used; used for conformity determinations

VerDate jul<14>2003 15:43 Jan 27, 2005 Jkt 205001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\28JAN1.SGM 28JAN1
Federal Register / Vol. 70, No. 18 / Friday, January 28, 2005 / Notices 4119

until EPA has found them adequate. Dated: January 20, 2005. 2005, Contact: Will Sloger (843) 820–
This affects future transportation Julie M. Hagensen, 5797.
conformity determinations prepared, Acting Regional Administrator, Region 10. EIS No. 050021, Draft EIS, NRC, WI,
reviewed and approved by the Spokane [FR Doc. 05–1632 Filed 1–27–05; 8:45 am] Generic-License Renewal for Point
Regional Transportation Council, BILLING CODE 6560–50–P
Beach Nuclear Plant, Units 1 and 2,
Washington State Department of Supplement 23, to NUREG–1437
Transportation, Federal Highway (TAC Nos. MC2049 and MC2050),
Administration and the Federal Transit ENVIRONMENTAL PROTECTION Lake Michigan, Manitowoc County,
Administration. AGENCY WI, Comment Period Ends: April 13,
DATES: This finding is effective February
2005, Contact: Stacey Imboden (301)
[ER–FRL–6659–9] 415–2462.
14, 2005.
EIS No. 050022, Draft EIS, AFS, WA,
FOR FURTHER INFORMATION CONTACT: The Environmental Impact Statements; Methow Transmission Project,
finding is available at EPA’s conformity Notice of Availability Construction of New Transmission
Web site: http://www.epa.gov/otaq/ Responsible Agency: Office of Federal Line or Reconstruction an Existing
transp.htm, (once there, click on the Activities, General Information (202) Line, Okanogan and Wenatchee
‘‘Transportation Conformity’’ button, 564–7167 or http://www.epa.gov/ National Forests, Methow Valley
then look for ‘‘Adequacy Review of SIP compliance/nepa/. Ranger District, Okanogan County,
Submissions’’). You may also contact WA, Comment Period Ends: March
Wayne Elson, U.S. EPA, Region 10, Weekly receipt of Environmental Impact
Statements 15, 2005, Contact: Jan Flatten (509)
Office of Air, Waste, and Toxics (AWT– 826–3277.
Filed January 17, 2005 through January
107), 1200 Sixth Ave, Seattle WA 98101; EIS No. 050023, Final EIS, DOE, SC,
21, 2005
(206) 553–1463 or Pursuant to 40 CFR 1506.9. Savannah River Site Construction and
elson.wayne@epa.gov. EIS No. 050017, Final EIS, NOA, ME, Operation of a Mixed Oxide (MOX)
SUPPLEMENTARY INFORMATION: MA, RI, NH, CT, Atlantic Herring Fuel Fabrication Facility, NUREG–
Fishery Management Plan, 1767, Aiken, Barnwell and Allendale
Background Minimizing Impacts on Essential Fish Counties, SC, Wait Period Ends:
Today’s notice is simply an Habitat of Any Species, Gulf of February 28, 2005, Contact: Matthew
announcement of a finding that we have Maine—Georges Bank, ME, NH, MA, Blevins (301) 415–7684.
already made. EPA Region 10 sent a CT and RI, Wait Period Ends: EIS No. 050024, Draft EIS, AFS, CO,
letter to the Washington Department of February 22, 2005, Contact: Peter D. Gold Camp Road Plan, Develop a
Ecology January 13, 2005, stating that Colosi (978) 281–3332. Feasible Plan to Manage the
the SIP is adequate for transportation The above NOA EIS should have Operation of Tunnel #3 and the 8.5
conformity purposes. appeared in the 01/21/2005 Federal mile Road Segment, Pike National
Transportation conformity is required Register. The 30 day Wait Period is Forest, Pikes Peak Ranger District,
by section 176(c) of the Clean Air Act. Calculated from 01/21/2005. Colorado Springs, El Paso County,
EPA’s conformity rule requires that CO, Comment Period Ends: March 29,
EIS No. 050018, Draft EIS, FAA, IL,
transportation plans, programs, and 2005, Contact: Frank Landis (719)
O’Hare Modernization Program,
projects conform to SIPs. Conformity to 477–4203.
Proposes Major Development, Chicago EIS No. 050025, Final EIS, UAF, TX,
a SIP means that transportation O’Hare International Airport, Airport
activities will not produce new air Relocation of the C–5 Formal Training
Layout Plan (ALP), Federal Funding, Unit from Altus Air Force Base,
quality violations, worsen existing US Army COE Section 404 Permit,
violations, or delay timely attainment of Oklahoma to Lackland Air Force Base,
City of Chicago, IL, Comment Period Bexar County, TX, Wait Period Ends:
the national ambient air quality Ends: March 23, 2005, Contact:
standards. February 28, 2005, Contact: Lt.Col.
Michael W. MacMullen (847) 294– Dee Anderson (210) 671–2907.
The criteria by which we determine 8339. EIS No. 050026, Draft EIS, BIA, WI,
whether a SIP is adequate for The above FAA EIS should have Beloit Casino Project, To Expand to
conformity purposes are outlined in 40 appeared in the 01–21–2005 Federal Tribal Governmental Revenue Base,
CFR 93.118(e)(4). Please note that an Register. St. Croix Chippewa Indians of
adequacy review is separate from EPA’s EIS No. 050019, Final EIS, AFS, AK, Wisconsin and Bad River Band of the
completeness review and it also should Shoreline Outfitter/Guide Plan, Lake Superior Tribe of Chippewa
not be used to prejudge our ultimate Commercial Permits Issuance for Indians, Rock County, WI, Comment
approval of the SIP. Even if we find a Shoreline-Based Activities on Period Ends: March 14, 2005, Contact:
SIP adequate for conformity, the SIP National Forest System Lands, Herb Nelson (612) 713–4400.
could later be disapproved. For the Admiralty Island National Monument, EIS No. 050027, Final EIS, BLM, AK,
reader’s ease, the 2002 motor vehicle Hoonah, Sitka and Juneau Ranger Northeast National Petroleum Reserve
emission budget excerpted from the Districts, Tongass National Forest, Alaska Amended Integrated Activity
Maintenance Plan is 279 tons per winter AK, Wait Period Ends: February 28, Plan, To Amend 1998 Northeast
time day of carbon monoxide. 2005, Contact: Bill Tremblay (907) Petroleum Reserve, To Consider
We have described our process for 772–5877. Opening Portions of the BLM-
determining adequacy in SIPs in EIS No. 050020, Draft EIS, USN, FL, Administrated Lands, North Slope
guidance dated May 14, 1999. This Navy Air-To-Ground Training at Avon Borough, AK, Wait Period Ends:
guidance is now reflected in the Park Air Force Range, To Conduct February 28, 2005, Contact: Susan
amended transportation conformity Air-to-Ground Ordnance Delivery and Childs (907) 271–1985.
rule, July 1, 2004 (69 FR 40004). We Training, Fleet Forces Command’s EIS No. 050028, Draft Supplement EIS,
followed this process in making our Fleet Readiness Training Program FHW, AK, Juneau Access
adequacy determination. (FRTP), Polk and Highlands Counties, Transportation Project, Improvements
Authority: 42 U.S.C. 7401–7671q. FL, Comments Period Ends: March 14, in the Lynn Canal/Taiya Inlet

VerDate jul<14>2003 15:43 Jan 27, 2005 Jkt 205001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\28JAN1.SGM 28JAN1

You might also like