You are on page 1of 2

Federal Register / Vol. 70, No.

10 / Friday, January 14, 2005 / Notices 2629

motion for late intervention in this and interventions may be filed A copy of the application may be
proceeding. On April 19, 2004, Puget electronically via the Internet in lieu of obtained by agencies directly from the
filed an answer in opposition to the paper. See, 18 CFR 385.2001(a)(1)(iii) Applicant. If an agency does not file
motion. and the instructions on the comments within the time specified for
3. Granting the motions to intervene Commission’s Web site under the ‘‘e- filing comments, it will be presumed to
will not unduly delay or disrupt the Filing’’ link. The Commission strongly have no comments. One copy of an
proceeding or prejudice other parties to encourages e-filings. agency’s comments must also be sent to
it. Therefore, pursuant to Rule 214, 18 k. Description of Request: Brazos the Applicant’s representatives.
CFR 385.214 (2004), all timely motions River Authority (Authority) is seeking q. Comments, protests and
to intervene filed in this amendment Commission approval to permit the interventions may be filed electronically
proceeding are granted, and the motion existing 60-slip facility and the addition via the Internet in lieu of paper. See, 18
for late intervention filed by Skagit of 24 boat slips at The Breakers Marina CFR 385.2001(a)(1)(iii) and the
County is granted, subject to the (P–1490–038). The Authority is also instructions on the Commission’s Web
Commission’s rules and regulations. seeking Commission approval to permit site at http://www.ferc.gov under the ‘‘e-
the existing 120 slip facility and the Filing’’ link.
Magalie R. Salas, addition of 76 boat slips at the Hill
Secretary. Magalie R. Salas,
Country Harbor Marina (P–1490–039).
[FR Doc. E5–140 Filed 1–13–05; 8:45 am] l. Location of the Application: The Secretary.
BILLING CODE 6717–01–P filing is available for review at the [FR Doc. E5–139 Filed 1–13–05; 8:45 am]
Commission in the Public Reference BILLING CODE 6717–01–P
Room, located at 888 First Street, NE.,
DEPARTMENT OF ENERGY Room 2A, Washington, DC 20426, or
may be viewed on the Commission’s DEPARTMENT OF ENERGY
Federal Energy Regulatory Web site at http://www.ferc.gov using
Commission Federal Energy Regulatory
the ‘‘eLibrary’’ link. Enter the docket
Commission
number excluding the last three digits in
Notice of Application for Non-Project the docket number field to access the [Docket Nos. ER04–433–000 and ER04–433–
Use of Project Lands and Soliciting document. For assistance, please contact 001, ER04–432–000 and ER04–432–001]
Comments, Motions To Intervene, and FERC Online support at
Protests FERCOnLineSupport@ferc.gov or toll New England Power Pool Bangor
free (866) 208 3676 or TTY, contact Hydro-Electric Company, et al.; Notice
January 7, 2005.
(202) 502–8659. of Technical Conference
Take notice that the following
applications have been filed with the m. Individuals desiring to be included January 7, 2005.
Commission and is available for public on the Commission’s mailing list should Take notice that on January 14, 2005,
inspection: so indicate by writing to the Secretary at 1 p.m., at the offices of the Federal
a. Application Type: Non-Project Use of the Commission. Energy Regulatory Commission, 888
of Project Lands. n. Comments, Protests, or Motions to
First Street, NE., Washington, DC 20426,
b. Project Nos: 1490–038 and 039. Intervene—Anyone may submit
a technical conference will be held, as
c. Date Filed: November 24, 2004. comments, a protest, or a motion to
requested in a January 5, 2005, motion
d. Applicant: Brazos River Authority. intervene in accordance with the
filed by the New England Transmission
e. Name of Project: Morris Sheppard requirements of Rules of Practice and
Owners and ISO New England Inc. (ISO
Project. Procedure, 18 CFR 385.210, .211, .214.
New England).
f. Location: The project is located on In determining the appropriate action to The purpose of the technical
the Possum Kingdom Reservoir on the take, the Commission will consider all conference will be to address
Brazos River in Palo Pinto County, protests or other comments filed, but compliance issues (the form and manner
Texas. This project does not occupy any only those who file a motion to of compliance) relating to the
federal or tribal lands. intervene in accordance with the Commission’s directive in these
g. Filed Pursuant to: Federal Power Commission’s Rules may become a proceedings that the New England
Act, 16 U.S.C. 791(a) 825(r) and 799 and party to the proceeding. Any comments, Transmission Owners either: (i) Amend
801. protests, or motions to intervene must their Local Tariffs to include the pro
h. Applicant Contact: Mr. Phillip J. be received on or before the specified forma Standard Large Interconnection
Ford, General Manager/CEO, Brazos comment date for the particular Procedures (LGIP) and the Standard
River Authority, 4600 Cobbs Drive, P.O. application. Large Generator Interconnection
Box 7555, Waco, TX, 76714–7555, (254) o. Filing and Service of Responsive
Agreement (LGIA); or (ii) transfer to ISO
761–3100. Documents—Any filings must bear in
New England, or its successor RTO,
i. FERC Contacts: Any questions on all capital letters the title
control over the significant aspects of
this notice should be addressed to Mrs. ‘‘COMMENTS’’,
the Local Tariff interconnection
Jean Potvin at (202) 502–8928, or e-mail ‘‘RECOMMENDATIONS FOR TERMS
process.1 Specific issues to be addressed
address: jean.potvin@ferc.gov. AND CONDITIONS’’, ‘‘PROTEST’’, OR
at the technical conference include:
j. Deadline for Filing Comments and ‘‘MOTION TO INTERVENE’’, as (1) The nature and timing of a
or Motions: February 7, 2005. applicable, and the Project Number of compliance filing proposing to include
All Documents (Original and Eight the particular application to which the the pro forma LGIP and LGIA in the
Copies) Should be Filed With: Ms. filing refers. A copy of any motion to Local Tariffs, including what burden
Magalie R. Salas, Secretary, Federal intervene must also be served upon each must be met to demonstrate that any
Energy Regulatory Commission, 888 representative of the Applicant proposed variation meets the
First Street, NE., Washington DC 20426. specified in the particular application.
Please include the project number (P– p. Agency Comments—Federal, state, 1 See New England Power Pool and Bangor Hydro
1490–038 and/or 039) on any comments and local agencies are invited to file Electric Company, 109 FERC ¶ 61,155 (2004)
or motions filed. Comments, protests, comments on the described application. (November 8 Order), reh’g pending.

VerDate jul<14>2003 14:36 Jan 13, 2005 Jkt 205001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\14JAN1.SGM 14JAN1
2630 Federal Register / Vol. 70, No. 10 / Friday, January 14, 2005 / Notices

Commission’s consistent with or 2S and 3J, Funding, West Windsor Counties, CA, Comment Period Ends:
superior to test; and Princeton Townships, Mercer March 22, 2005, Contact: Amy
(2) The nature and timing of a County, and Plainsboro Township, Schneckenberner (209) 379–1026.
compliance filing proposing to transfer Middlesex County, NJ, Wait Period EIS No. 050009, FINAL SUPPLEMENT,
to ISO New England, or its successor Ends: February 14, 2005, Contact: NOA, Monkfish Fishery Management
RTO, control over the significant aspects Young Kim (609) 637–4233. Plan (FMP) Amendment 2,
of the Local Tariff interconnection EIS No. 050002, DRAFT SUPPLEMENT, Implementation, Proposes Measures
process; NPS, WA, Elwha River Ecosystem to Address a Wide Range of
(3) The extent to which any generator Restoration Implementation Project, Management Issues, New England and
seeking to interconnect to a non-Pool Updated Information, Olympic Mid-Atlantic, Wait Period Ends:
Transmission Facility under a Local Peninsula, Challam County, WA, February 14, 2005, Contact: Paul
Tariff may be affected by the form and Comment Period Ends: March 15, Howard (978) 465–0492.
manner in which the New England 2005, Contact: Brian Winter (360) EIS No. 050010, FINAL EIS, BLM, OR,
Transmission Owners comply with the 565–1320. Upper Deschutes Resource
November 8 Order; and EIS No. 050003, FINAL EIS, AFS, MT, Management Plan, Implementation,
(4) The extent to which any other Gallatin National Forest, Main Deschutes, Klamath, Jefferson and
market participant may be affected by Boulder Fuels Reduction Project, Cook Counties, OR, Wait Period Ends:
the form and manner in which the New Implementation, Gallatin National February 14, 2005, Contact: Mollie
England Transmission Owners comply Forest, Big Timber Ranger District, Big Chaudet (541) 416–6700.
with the November 8 Order. Timber, Sweetgrass and Park
Counties, MT, Wait Period Ends: Amended Notices
Parties seeking to participate in the
technical conference should file a February 14, 2005, Contact: Barbara EIS No. 040555, DRAFT EIS, NPS, TX,
statement of position with the Ping (406) 522–2570. Big Thicket National Preserve Oil and
Commission on or before January 12, EIS No. 050004, FINAL EIS, SFW, WA, Gas Management Plan,
ID, OR, CA, Caspian Tern (sterna Implementation, Hardin, Jefferson,
2005, including therein any
caspia) Management to Reduce Orange, Liberty, Tyler, Jasper and
recommendation that party expects to
Predation of Juvenile Salmonids in Polk Counties, TX, Comment Period
make at the technical conference
the Columbia River Esturary, To Ends: March 10, 2005, Contact: Linda
regarding the above-noted issues. An
Comply with the 2002 Settlement Dansby (505) 988–6095. Revision of
electronic version of that filing must be
Agreement, Endangered Species Act FR Notice Published on 12/10/04:
e-mailed to Morris Margolis at
(ESA), Columbia River, WA, OR, ID CEQ Comment Period Ending 02/08/
morris.margolis@ferc.gov and Kent
and CA, Wait Period Ends: February 2005 has been Extended to 03/10/
Carter at kent.carter@ferc.gov.
14, 2005, Contact: Nanette Seto (503) 2005.
Magalie R. Salas, 231–6164.
EIS No. 050005, DRAFT EIS, BLM, UT, Dated: January 11, 2005.
Secretary.
Vernal Field Office Resource Robert W. Hargrove,
[FR Doc. E5–138 Filed 1–13–05; 8:45 am]
BILLING CODE 6717–01–P
Management Plan, To Revise and Director, NEPA Compliance Division, Office
Integrate the Book Cliff and Diamond of Federal Activities.
Mountain Resource Management [FR Doc. 05–818 Filed 1–13–05; 8:45 am]
Plan, Daggett, Duchesne, Uintah and BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION Grand Counties, UT, Comment Period
AGENCY Ends: April 14, 2005, Contact: Jerry
[ER–FRL–6659–5] Kenczka (435) 781–4440. ENVIRONMENTAL PROTECTION
EIS No. 050006, DRAFT EIS, FHW, MO, AGENCY
Environmental Impact Statements; Interstate 70 Corridor Improvements,
[ER–FRL–6659–6]
Notice of Availability Section of Independent Utility #4,
from Missouri Route BB Interchange Environmental Impact Statements and
Responsible Agency: Office of Federal to Eastern Columbia, Funding, Boone
Activities, General Information (202) Regulations; Availability of EPA
County, MO, Comment Period Ends: Comments
564–7167 or http://www.epa.gov/ March 28, 2005, Contact: Don
compliance/nepa/. Neumann (573) 636–7104. Availability of EPA comments
Weekly receipt of Environmental Impact EIS No. 050007, DRAFT EIS, FHW, MO, prepared pursuant to the Environmental
Statements Interstate 70 Corridor Improvements, Review Process (ERP), under Section
Filed January 3, 2005, through January Section of Independent Utility #7, a 309 of the Clean Air Act and Section
7, 2005 40-Mile Portion of the I–70 Corridor 102(2)(c) of the National Environmental
Pursuant to 40 CFR 1506.9. from just West of Route 19 (milepost Policy Act, as amended. Requests for
EIS No. 050000, DRAFT EIS, AFS, UT, 174) to Lake St. Louis Boulevard copies of EPA comments can be directed
Ogden Ranger District Travel Plan, To (milepost 214), Montgomery, Warren, to the Office of Federal Activities at
Update the Travel Management Plan, St. Charles Counties, MO, Comment (202) 564–7167.
Wasatch-Cache National Plan, Ogden Period Ends: March 28, 2005, Contact: An explanation of the ratings assigned
Ranger District, Box Elder, Cache, Don Neumann (573) 636–7104. to draft environmental impact
Morgan, Weber and Rich Counties, EIS No. 050008, DRAFT SUPPLEMENT, statements (EISs) was published in the
UT, Comment Period Ends: February NPS, CA, Merced Wild and Scenic Federal Register dated April 2, 2004 (69
28, 2005, Contact: Rick Vallejos (801) River Revised Comprehensive FR 17403).
625–5112. Management Plan, Amend and
EIS No. 050001, FINAL EIS, FHW, NJ, Supplement Information, Yosemite Draft EISs
Penns Neck Area Transportation National Park, El Portal ERP No. D–BLM–J02046–UT Rating
Service Improvements, Phase I Administrative Site, Tuolume, EC2, Castle Peak and Eightmile Flat Oil
Archeological Survey, U.S. 1, Sections Merced, Mono, Mariposa and Madera and Gas Expansion Project, Proposal to

VerDate jul<14>2003 14:36 Jan 13, 2005 Jkt 205001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\14JAN1.SGM 14JAN1

You might also like