ENVIRONMENTAL MANAGEMENT PLAN

Sub-Project Title
:
Sub-Project Description :
Location
Total Approved Cost
Cost Sharing

Concreting of Barangay Road


Surplus Common Excavation, Embankment, Aggregate Sub-Base
Course, PCCP, Grouted Riprap & Project Steel Billboard
Barangay Magsaysay, Dauin, Negros Oriental
#REF!

:
:
:

Local Counterpart :
KALAHI Grant
Community
Barangay LGU
Municipal LGU
TOTAL
SPI Stage / Activities
Conducted
ITEM 102 Surplus Common
Excavation

PHP
PHP
PHP
PHP
PHP

Negative Impact

#REF!

#REF!
#REF!
Mitigating Measures

a.

Deep Excavation/Ground
Leveling

a-1.

Provide baricades and warning


signs to make aware of the
community of the on-going
activity. And Strickly follow the
desired elevation on plan.

b.

Presence of Heavy
Equipment in the project
Site

b-1.

Inform the community of the


presence of Heavy Equipment in
the area.

a.

Backfilling of Excavated
Materials

a-2.

Provide workers Dust Mask


during execution of work to
prevent workers from inhailing
dust particles.

b.

Presence of Heavy
Equipment in the project
Site

b-1.

Inform the community of the


presence of Heavy Equipment in
the area.

ITEM 200 Aggregate Sub-base a.


Course

Presence of Heavy
Equipment in the project
Site

a-1.

Inform the community of the


presence of Heavy Equipment in
the area.

ITEM 311 Portland Cement


a.
Concrete Pavement

Increase in noise level

a-1.

ITEM 104 Embankment

ITEM 505 Grouted Riprap


SPCL 1 Project Steel
Billboard

Inform the community about the


incoming activities and instruct
the workers to minimize the
noise during construction.

none

none

none

none
Reviewed by:

Prepared By:

RICKY PANOY
BSPMC Chair

Community Facilitator

CARMEN A. GAUDIANO

RODSON R. ESCORA

Municipal Engineer

Deputy Area Coordinator

Concurred by:

OFFICE OF THE BRGY SUB-PROJECT MANAGEMENT COMMITTEE (BSPMC)


Barangay of Baslay
Municipality of Dauin
Province of Negros Oriental, Region VII
SUB-PROJECT PROGRAM-OF-WORK
Project Title
Category

: Concreting of Access Road with Drainage Canal


: Public Goods

Physical Target
Total Sub-Project Cost

: 0.30 KM
PHP 2,020,890.00

Mode of Implementation

: By Community Force Account (CFA)

Project Description:

Sub-Project Duration

: 90 Calendar Days

Surplus Common Excavation, Sub-Grade Preparation, Aggregate Base


Course, PCCP, Grouted Riprap and Installation of Project Steel Billboard

Equipment/Tools Needed

Road Grader,Back Hoe, Road Roller, Concrete


Mixer and Vibrator

Technical Personnel

: Engineer, Foreman, Carpenter/Mason,


Instrument Man, Survey Aide and Riprapper

No. of Laborers

: 90 person days

Sub-Project Location:
Sub-Project Site Location is12KM away from Town Proper
Item
Scope of Work
No.

Unit

Unit Cost (P)

102

Surplus Common Excavation with Line Ditching

%(Wt)
3.17%

108.00

cu.m.

535.19

57,800.00

105

Sub - Grade Preparation

2.49%

1,200.00

sq.m.

37.83

45,400.00

201

Aggregate Base Course

6.61%

120.00

cu.m.

1,003.25

120,390.00

311

Portland Cement Conrete Pavement (PCCP)

51.04%

1200.00

sq.m.

775.21

930,255.80

500

Installation of RCPC (600mm dia)

505

Grouted Riprap (Line Ditched Canal)

SPL 1 Project Steel Billboard


Total Direct Cost

Quantity

2.87%

6.00

33.25%

216.00

0.57%

1.00

100.00%

Total (P)

l.m.

8,732.83

52,397.00

cu.m.

2,805.65

606,020.00

lot

10,425.00

10,425.00

1,047,464.65

1,822,687.80

SOURCE OF FUND
Breakdown of Estimated Project Cost

KALAHI Grant

Community

Barangay LGU

In-Kind
A.

Cash

Municipal LGU

In-Kind

Cash

Total

In-Kind

Direct Cost
Materials

1,133,781.50

216,756.30

44,333.33

8,866.67

118,750.00

169,400.00

Equipment

10,000.00

1,360,537.80

120,800.00

174,000.00

Labor
Skilled

118,750.00

Unskilled

123,800.00

45,600.00

1,420,664.83

45,600.00

Sub-Total A
B.

10,000.00

225,622.97

120,800.00

1,822,687.80

Indirect Cost
Overhead Cost

31,500.00

Handtools and Prot. Equip. (PPE)

15,162.50

Pre-engineering

Project Supervision

Environmental Metigating Cost


Administrative Cost
Materials Testing

18,195.00

1,000.00

2,000.00

4,000.00

12,500.00

600.00

3,600.00

6,666.67

40,000.00

8,333.33

1,666.67

10,000.00

7,500.00

Sub-Total ( B )

91,329.17

TOTAL ( A+ B )

1,511,994.00

45,600.00

10,000.00

1,568,584.00

27,965.83

5,000.00

125,295.00

1,000.00

253,588.80

125,800.00

1,947,982.80

16,317.20

45,600.00

10,000.00

7,500.00

1,000.00

56,590.00

1,000.00

MCC Grant
Cost Sharing to TEPC

8,500.00

31,500.00

3,000.00

Total Estimated Project Cost

33,333.33

Treasurer's Bond

ADD: Contingency

1,000.00

3,032.50

269,906.00

125,800.00

1,568,584.00

77.62%

LCC Cash

279,906.00

13.85%

LCC Inkind

172,400.00

8.53%

72,907.20

2,020,890.00

100.00%

Add: O and M (Other Amenities)


GRAND TOTAL

1,568,584.00

45,600.00

Prepared by :

10,000.00

1,000.00

269,906.00

125,800.00

2,020,890.00

Approved by :

ELSA A. TRUNO

TEMISTOCLES MONOPOLLO

MEO Staff

BSPMC Chairperson

Checked by:

Concurred by :

ENGR. RODSON R. ESCORA

EMERENCIANA BANTOTO

Deputy Area Coordinator

Barangay Captain

Recommending Approval:

ENGR. CARMEN A. GAUDIANO


Municipal Engineer - MCT DAC

HON. NEIL B. CREDO


Noted by:

Municipal Mayor

ENGR. GEORGE S. ISULAT


Regional Community Infrastructure Specialist

NAME OF SUB-PROJE: Concreting of Access Road with Drainage Ca


: Baslay, Dauin, Negros Oriental
LOCATION:

BILL OF QUANTITIES

ITEM
NO.

Quantity Derivation
Computation

ITEM DESCRIPTION

102 Surplus Common Excavation


to include Earth Canal Ditching and Reshaping

0.36*300=

A. Materials
Existing Ground Profile

QUANTI
UNIT
TY

Rate per
No. of
Day / Unit
Crew/
Cost

Add
Frieght &
Handling
Cost

Total Unit
Cost

108.00
108.00

cu.m.
cu.m.

108.00

cu.m.

2.00
3.00
2.00

Day/s
Day/s
Day/s

1.00
3.00
4.00

350.00
300.00
275.00

1.00
1.00
1.00

lot
Day/s
Day/s

1.00
1.00

15,000.00
18,800.00
14,800.00

20.00
4.00

liters
liters

Sub-Total
B. Labor
Construction Foreman
Driver / Operator
Laborer

* pls see equipment


* pls see equipment
* pls see equipment
Sub-Total

C. Equipment
Trench canal excavation
Mobilization & Demobilization
1-Backhoe (119 cu.m / day)
1-Road Grader (175 cu.m / day)

358/119 =
358/175 =

C. Fuel, Oil and Lubricants


Diesel
Oil (Engine) 15W40

60.00
600.00

60.00
600.00

Total for Item102


105 Sub-Grade Preparation
1,200.00
Total Compacted Volume =
4*300= 1,200.00
A. Labor
Construction Foreman
* pls see equipment
2.00
Driver / Operator
* pls see equipment
3.00
Laborer
* pls see equipment
2.00
Sub-Total
B. Equipment
Mobilization & Demobilization
1.00
1-Road Roller (250 cu.m/day)
210/250 =
1.00
1-Road Grader (175 cu.m / day)
210/175 =
1.00
C. Fuel, Oil and Lubricants
Diesel

sq.m.
sq.m.
Day/s
Day/s
Day/s

1.00
3.00
4.00

350.00
300.00
275.00

lot
Day/s
Day/s

1.00
1.00

10,000.00
13,800.00
14,800.00

20.00

liters

120.00

cu.m.

(0.10*4*300) =

120.00

cu.m.

(0.10*4*300*1.15) =

138.00

cu.m.

138.00

cu.m.

1.00

Day/s

60.00

60.00

Total for Item105


201

Aggregate Base Course (including 1.0m


width shouldering both sides)

Total Compacted Volume =


Total Loose Volume =

A. Materials
Aggregate Subbase Course (Balastro Class "A" Type)
Sub-Total
B. Labor
Construction Foreman
*pls see equipment

550.00

1.00

55.00

605.00

350.00

ITEM
NO.

QUANTI
UNIT
TY

Quantity Derivation
Computation

ITEM DESCRIPTION
Driver / Operator
Laborer

*pls see equipment


*pls see equipment

Rate per
No. of
Day / Unit
Crew/
Cost

2.00
1.00

Day/s
Day/s

2.00
2.00

1.00
1.00
1.00

lot
Day/s
Day/s

1.00
1.00

20.00

liters

Add
Frieght &
Handling
Cost

Total Unit
Cost
300.00
275.00

Sub-Total
C. Equipment
Mobilization & Demobilization
1-Road Roller (250 cu.m/day)
1-Road Grader (175 cu.m / day)

451.95/250 =
451.95/175 =

C. Fuel, Oil and Lubricants


Diesel

5,000.00
13,800.00
14,800.00

60.00

60.00

Total for Item 200


311 Portland Cement Concrete Pavement
1,200.00
Length of PCCP =
300.00
Width =
4.00
Area =
300*4 = 1,200.00
300*4*0.15 = 180.00
Portland Cement Concrete Pavement =
Total Volume =
180.00
A. Materials
180.00*9= 1,620.00
Portland Cement (40kgs), Type 1
180.00*0.5 = 90.00
Fine Aggregates (Approved Source)
180.00*1.0 = 180.00
Gravel 2" to 2-1/2" dia. (Approved Source)
((300/1)+1)/(6/.6)*2= 61.00
16mm dia. X 6m Def. Bars (Const. Joint)
(((2"*2"*8')/12)*40= 106.00
2"x2"x8' Coco Lumber (Formworks)
(((2"*6"*12')/12)*60= 720.00
2"x6"x12' Coco Lumber (Formworks)
((10.8/1)+1)/(6-.3)=
16mm dia. X 6.0 m Def. Bars (Formworks)
2.00
(((6*3.6)/0.2)/5)*28)/58
# 4 CWN
10.00
Hack Saw Blade
6.00
Hard Asphalt (Joint Filler)
6.00
Water (for mixing)
25.00
Sub-Total
B. Labor
Manual Cap. Crew: 2 - Mason, 2 - L.E. Operator
8 - Laborers w/ 1 bagger concrete mixer = 4.75 cu.m./day
During Installation of Forms: (150 sq.m./day)
Carpenter
4.00
Construction Foreman
38.00
Mason
38.00
Laborers
38.00
Concrete Mixer Operator
38.00
Concrete Mixer Vibrator
38.00
Sub-Total
C.Equipment
1- Concrete Mixer
38.00
1- Concrete Vibrator

sq.m.
m
m
sq.m.
cu.m.
cu.m.
bags
cu.m.
cu.m.
length
bdft
bdft
length
kgs.
pcs
bag
cu.m.

250.00
600.00
750.00
370.00
20.00
20.00
370.00
50.00
58.00
2,200.00
20.00

25.00
60.00
75.00
37.00
2.00
2.00
37.00
5.00
5.80
220.00
30.00

275.00
660.00
825.00
407.00
22.00
22.00
407.00
55.00
63.80
2,420.00
50.00

Day/s
Day/s
Day/s
Day/s
Day/s
Day/s

2.00
1.00
2.00
8.00
1.00
1.00

300.00
350.00
300.00
275.00
300.00
300.00

day

1.00

800.00

38.00

day

1.00

600.00

Sub-Total
D.Equipment FOL Consumption
Concrete Mixer Fuel

6*38=

228.00

liters

60.00

Concrete Vibrator Fuel

2*38=

76.00

liters

60.00

6.00

LM.

Pcs

3,500.00

175.00

3,675.00

shts
bdft

350.00

17.50

367.50

25.00

5.00

30.00

7.00

147.00

3.50

73.50

Sub-Total
Total for Item 311

Quantity = 6L.M.
( 1ROW ), @ 6 L.M. /
500 Item 500 RCPC (600mm dia) w/ Headwa
ROW
A.Materials
0.6 m dia RCPC
1/4" ordinary plywood
2"x2"x8' Coco Lumber (Batterboards)

6
((2"*2"*8')/12)*15*2 =

4
80.00

10mm dia x 6m RSB

16

Length

140.00

# 16 tie wire

Kg

70.00

ITEM
NO.

Quantity Derivation
Computation

ITEM DESCRIPTION
Portland Cement (40kgs), Type 1
Fine Aggregates (Approved Source)

(1.62*6)+ 4 =
2*(0.143*3)+ 0.8 =

QUANTI
UNIT
TY

Rate per
No. of
Day / Unit
Crew/
Cost

Add
Frieght &
Handling
Cost

Total Unit
Cost

14
3.00

bags
cu.m.

250.00
600.00

Cu.m.

Kgs.

6.00

Day/s

1.00

350.00

8.00

day

1.00

275.00

Mason

3.00

Day/s

2.00

300.00

Laborers

3.00

Day/s

2.00

275.00

300mm max. thickness Boulders

(0.3*2*2.5)*2*2

# 4 CWN

25.00
60.00

275.00
660.00

750.00

75.00

825.00

65.00

3.25

68.25

Sub-Total
B. Labor
Construction Foreman
Excavation Works: (1cu.m./manday)
Laborer

(1*8*1) =

Pipe Culvert Installation: 2pcs - (4man/day)

Grouted Riprap / Headwall Installation: Gang of 6 Workers (1cu.m./day)


Mason

1*0.35+(1*1*0.3*3))*2 =

3.00

days

3.00

300.00

Laborers

1*0.35+(1*1*0.3*3))*2 =

3.00

Day/s

3.00

275.00

216.00

cu.m.

Sub-Total
Total for Item 500
505 Grouted Riprap
Length =

300.00

0.36

cu.m.

(one side only)

216.00

cu.m.

(two sides)

216.00

cu.m.

972.00
44.00
11.00

bags
cu.m.
cu.m.

250.00
600.00
750.00

25.00
60.00
75.00

275.00
660.00
825.00

Class A stone

216.00

cu.m.

750.00

75.00

825.00

2"x2"x8' Coco Lumber (Batterboards)


((2"*2"*8')/12)*15 =
# 4 CWN
Water (for mixing)
Sub-Total
1.5 man lm per day

240.00
5.00
15.00

bdft
kgs.
cu.m.

20.00
50.00
20.00

2.00
5.00
30.00

22.00
55.00
50.00

Construction Foreman
Mason
Laborers

27.00
27.00
27.00

Day/s
Day/s
Day/s

1.00

lot

1.00

lot

1.00
1.00
1.00

Day/s
Day/s
Day/s

Cross-sectional Area of canal =

0.3*1.2 =

Grouted Riprap trinch canal =

(0.36*2*300)=

Total Volume =
Portland Cement (40kgs), Type 1
Fine Aggregates (Approved Source)
Gravel 2" to 2-1/2" dia. (Approved Source)

(4.5*216)
(0.1*2*216)
(0.05*216)

(600/1.5)/15=

1.00
4.00
10.00

350.00
300.00
275.00

Sub-Total
Total for Item 505
SPL - 1Billboard
Quantity: 1 unit
A. Materials
Project Billboard

9,500.00

Sub-Total
B. Labor
Contstruction Foreman
Carpenter
Laborer
Sub-Total
Total for Item SPL -1
Total Direct Cost
Direct Cost Summary
Materials
Equipment
Labor
1) Skilled

1.00
1.00
1.00

350.00
300.00
275.00

ITEM
NO.

ITEM DESCRIPTION

Quantity Derivation
Computation

QUANTI
UNIT
TY

Rate per
No. of
Day / Unit
Crew/
Cost

Add
Frieght &
Handling
Cost

Total Unit
Cost

2)Unskilled
TOTAL DIRECT COST

INDIRECT COST:
OVERHEAD COST
Foreman/Leadman

90.00

days

350.00

Sub-total
HANDTOOLS AND PROTECTIVE EQUIPMENT
Hard Hat
Empty Drums
Hand Glooves
Shovel w/ handle
Face Mask
Safety boots

10.00
10.00
10.00
10.00
10.00
10.00

pcs.
pcs.
pcs.
pcs
pairs
pcs

105.00
912.00
45.00
230.00
22.50
320.00

1.00

set

1,850.00

20.00

shts

100.00

5.00
17.00

days
days

Warning Signs

5.00

pcs.

420.00

Barricades

5.00

pcs.

300.00

Medicine kit box to include Betadine 100ml,


Agua Oxinada 100ml, cotton 5grams, bandage
5pcs, & 1st aide tape 1 roll
Sub-total
PRE-ENGINEERING
Preparation of Plans (TAF)
Reproduction of Plans
Sub-total
PROJECT SUPERVISION
Municipal Engineer
BSPMC volunteers
Sub-total
ENVIRONMENTAL IMPACT

Sub-total
ADMINISTRATIVE COST
MATERIAL TESTING
TREASURER'S BOND
TOTAL INDIRECT COST
TOTAL (A+B)
Add: Contingency
TOTAL ESTIMATED PROJECT COST (TEPC)
Add: O and M (Other Amenities)
TOTAL CONSTRUCTION COST

Prepared by:

ELSA A. TRUNO
MEO Staff

800.00
250.00

2.00

77.62%

Checked & Reviewed by:

RODSON R. ESCORA
Deputy Area Coordinator

Recommending Approval:

CARMEN A. GAUDIANO
Municipal Engineer

with Drainage Canal

QUANTITIES
COST SHARING
LGU

Total

COMMUNITY
CONTRIBUTI
ON

KALAHI
GRANT

700.00
2,700.00
2,200.00
5,600.00

15,000.00
18,800.00
14,800.00
48,600.00

700.00
2,700.00
1,600.00
5,000.00

1,200.00
2,400.00
3,600.00

1,000.00
2,000.00
3,000.00

57,800.00

8,000.00

700.00
2,700.00
2,200.00
5,600.00

700.00
2,700.00
2,200.00
5,600.00

10,000.00
13,800.00
14,800.00
38,600.00

600.00
600.00

600.00

BRGY.
CASH

IN-KIND

CASH

IN-KIND

200.00
400.00
600.00

600.00

TOTAL

MUN.

1,200.00
1,200.00

1,000.00
1,000.00

200.00
200.00

45,400.00

6,600.00

200.00

83,490.00
83,490.00

69,575.00
69,575.00

13,915.00
13,915.00

350.00

350.00

15,000.00
18,800.00
14,800.00
48,600.00

48,600.00

10,000.00
13,800.00
14,800.00
38,600.00

38,600.00

700.00
2,700.00
2,200.00
5,600.00

15,000.00
18,800.00
14,800.00
48,600.00
1,200.00
2,400.00
3,600.00
57,800.00

700.00
2,700.00
2,200.00
5,600.00
10,000.00
13,800.00
14,800.00
38,600.00
1,200.00
1,200.00
45,400.00

83,490.00
83,490.00
350.00

COST SHARING
Total
1,200.00
550.00
2,100.00
5,000.00
13,800.00
14,800.00
33,600.00

LGU
KALAHI
GRANT

1,200.00
400.00
1,950.00
-

COMMUNITY
CONTRIBUTI
ON
150.00
150.00

BRGY.

TOTAL

MUN.

200.00
200.00

14,115.00

64,250.00
9,900.00
24,750.00
4,137.83
388.67
2,640.00
135.67
91.67
63.80
2,420.00
208.33
108,985.97

5,000.00
13,800.00
14,800.00
33,600.00

1,200.00
550.00
2,100.00
5,000.00
13,800.00
14,800.00
33,600.00

1,200.00
1,200.00

1,000.00
1,000.00

120,390.00

72,525.00

445,500.00
59,400.00
148,500.00
24,827.00
2,332.00
15,840.00
814.00
550.00
382.80
14,520.00
1,250.00
713,915.80

371,250.00
49,500.00
123,750.00
20,689.17
1,943.33
13,200.00
678.33
458.33
319.00
12,100.00
1,041.67
594,929.83

2,400.00
13,300.00
22,800.00
83,600.00
11,400.00
11,400.00
144,900.00

2,400.00
13,300.00
22,800.00
60,800.00
11,400.00
11,400.00
122,100.00

30,400.00

25,333.33

22,800.00

19,000.00

53,200.00

44,333.33

13,680.00

11,400.00

2,280.00

4,560.00

3,800.00

760.00

18,240.00

15,200.00

930,255.80

776,563.17

22,050.00

18,375.00

3,675.00

22,050.00

1,470.00

1,225.00

245.00

1,470.00

2,400.00

2,000.00

400.00

2,400.00

2,352.00

1,960.00

392.00

2,352.00

147.00

122.50

24.50

147.00

150.00

10,000.00

10,000.00

33,600.00

2,400.00
13,300.00
22,800.00
83,600.00
11,400.00
11,400.00
144,900.00

5,066.67

30,400.00

3,800.00
-

22,800.00

10,000.00

8,866.67

120,390.00

445,500.00
59,400.00
148,500.00
24,827.00
2,332.00
15,840.00
814.00
550.00
382.80
14,520.00
1,250.00
713,915.80

22,800.00

22,800.00

1,200.00
1,200.00

22,800.00
-

53,200.00
13,680.00
4,560.00

3,040.00

18,240.00

120,892.63

930,255.80

COST SHARING
Total
3,850.00
1,980.00

LGU
KALAHI
GRANT

3,208.33
1,650.00

COMMUNITY
CONTRIBUTI
ON

BRGY.

TOTAL

MUN.
641.67
330.00

3,850.00
1,980.00

4,950.00

4,125.00

825.00

4,950.00

273.00

227.50

45.50

273.00

39,472.00

32,893.33

2,100.00

2,100.00

2,200.00

1,600.00

1,800.00

1,800.00

1,650.00

1,200.00

2,700.00

2,700.00

2,475.00

1,800.00

675.00

12,925.00

11,200.00

1,725.00

52,397.00

44,093.33

1,725.00

267,300.00
29,040.00
9,075.00

222,750.00
24,200.00
7,562.50

44,550.00
4,840.00
1,512.50

267,300.00
29,040.00
9,075.00

178,200.00

148,500.00

29,700.00

178,200.00

5,280.00
275.00
750.00
489,920.00

4,400.00
229.17
625.00
408,266.67

880.00
45.83
125.00
81,653.33

5,280.00
275.00
750.00
489,920.00

9,450.00
32,400.00
74,250.00
116,100.00

9,450.00
32,400.00
54,000.00
95,850.00

20,250.00
20,250.00

9,450.00
32,400.00
74,250.00
116,100.00

606,020.00

504,116.67

20,250.00

81,653.33

606,020.00

9,500.00
9,500.00

7,916.67
7,916.67

1,583.33
1,583.33

9,500.00
9,500.00

350.00
300.00
275.00
925.00

350.00
300.00
200.00
850.00

75.00
75.00

350.00
300.00
275.00
925.00

10,425.00

8,766.67

75.00

1,583.33

1,822,687.80

1,420,664.83

45,600.00

10,000.00

225,622.97

1,360,537.80

1,133,781.50

10,000.00

216,756.30

174,000.00

44,333.33

8,866.67

6,578.67

39,472.00
2,100.00

600.00

2,200.00
1,800.00

450.00

1,650.00
2,700.00

2,475.00

6,578.67

12,925.00

52,397.00

120,800.00

120,800.00

10,425.00
1,822,687.80

1,360,537.80
174,000.00
-

118,750.00

118,750.00

118,750.00

COST SHARING
Total
169,400.00

LGU
COMMUNITY
KALAHI
CONTRIBUTI
GRANT
ON
123,800.00
45,600.00
45,600.00

BRGY.
-

31,500.00
31,500.00

1,050.00
9,120.00
450.00
2,300.00
225.00
3,200.00

875.00
7,600.00
375.00
1,916.67
187.50
2,666.67

175.00
1,520.00
75.00
383.33
37.50
533.33

1,050.00
9,120.00
450.00
2,300.00
225.00
3,200.00

1,850.00

1,541.67

308.33

1,850.00

18,195.00

15,162.50

3,032.50

18,195.00

2,000.00
2,000.00
4,000.00
8,500.00
12,500.00

1,822,687.80

31,500.00
31,500.00

1,000.00
1,000.00

2,000.00
2,000.00

1,000.00
1,000.00
4,000.00

8,500.00
8,500.00

2,100.00

1,750.00

1,500.00

1,250.00

3,600.00
40,000.00
10,000.00
7,500.00
125,295.00
1,947,982.80
72,907.20
2,020,890.00

3,000.00
33,333.33
8,333.33
91,329.17
1,511,994.00
56,590.00
1,568,584.00

45,600.00

10,000.00

1,000.00
1,000.00

45,600.00

10,000.00

1,000.00

600.00
6,666.67
1,666.67
7,500.00
27,965.83
253,588.80
16,317.20
269,906.00

2,020,890.00

1,568,584.00

45,600.00

10,000.00

1,000.00

269,906.00

ARMEN A. GAUDIANO
Municipal Engineer

120,800.00

169,400.00

31,500.00
31,500.00

225,622.97

1,420,664.83

1,822,687.80

10,000.00

TOTAL

MUN.

4,000.00
8,500.00
12,500.00

4,000.00

350.00

2,100.00

250.00
-

Approved by:

TEMISTOCLES MONOPOLLO
BSPMC Chairperson

1,500.00
-

5,000.00
125,800.00
125,800.00
125,800.00

3,600.00
40,000.00
10,000.00
7,500.00
125,295.00
1,947,982.80
72,907.20
2,020,890.00
2,020,890.00

Noted by:

GEORGE S. ISULAT
RCIS

BARANGAY SUB-PROJECT WORK S


Project Title

: CONCRETING OF BARANGAY ROAD

Sub-Project duration

: 90

Physical Target

:
:
:
:
:

Region
Province
Municipality
Barangay

Calendar Days

Total Sub-Project Cost

300 L.M.
VII CENTRAL VISAYAS
NEGROS ORIENTAL
DAUIN
MAGSAYSAY

Direct Cost
Indirect Cost
Date Started
Target Completion
Mode of Implementation

I. To be filled up by Deputy Area Coordinator

ITEM
NO.

DESCRIPTION

102 Surplus Common Excavation

QTY

UNIT

#REF!

cu.m.

WEIGHT

PHYSICAL

(%)

TARGET

AMOUNT

57,800.00

3.27%

105 Emabankment

#REF!

cu.m.

45,400.00

2.56%

201 Aggregate Base Course

#REF!

cu.m.

120,390.00

6.80%

#REF!

sq.m.

930,255.80

52.55%

#REF!

cu.m.

606,020.00

34.23%

lot

10,425.00

0.59%

311

Portland Cement Conrete


Pavement (PCCP)

505 Grouted Riprap

SPL-1 Project Steel Billboard

1.00

T O T A L

1,770,290.80

100.00%

PLANNED

PHYSICAL
% PROGRESS (Actual)
PROGRESS (Planned)
FINANCIAL
PROGRESS (Actual)
Prepared by:

WEEK 2

WEEK 3

# # # # # # # # # # # # # # # # # # #

ACTUAL

ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED

# #

ACTUAL
PLANNED

# # # # # # # # # # # # # # # # # # #

ACTUAL
1

PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
Concurred by:

JOCELYN ALAS-AS
PIT Chairperson

WEEK 1

PLANNED

II. To be filled up by Deputy Area Coordinator


% PROGRESS (Planned)

MONTH 1

10

11

12

13

14

15

16

17

18

19

1.41%

0.82%

3.00%

1.41%

2.22%

5.22%

24,875.00

14,450.00

53,108.72

24,875.00

39,325.00

92,433.72

Checked by & Reviewed by:

SELVINO BULISID
MIT Team Leader

RODSON
Deputy Area

WORK SCHEDULE & PHYSICAL PROGRESS REPORT

: P

2,020,890.00

LABOR

: P 1,822,687.80
: P
198,202.20
:
:
: By Community Force Account (CFA)

No. of Days
90

SKILLED

90

UNSKILLED
TOTAL

MONTH 2
EEK 3

WEEK 4

WEEK 5

WEEK 6

MONTH 3
WEEK 7

WEEK 8

WEEK 9

WEEK 10

WEEK 11

WEEK

# # # # # # # # #

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
##########################################

###############################################################################################################

################################################

# # # # # # # # # # # # # # # #

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

43

44

45

46

47

48

49

50

51

52

53

54

55

56

64

65

66

67

68

69

70

71

72

73

74

75

76

77

85

86

87

88

89

90

91

99

100

101

102

103

104

105

106

107

.00%

1.33%

5.00%

15.00%

17.00%

18.00%

13.81%

12.00%

5.00%

3.00%

.22%

6.55%

11.55%

26.55%

43.55%

61.55%

75.36%

87.36%

92.36%

95.36%

53,108.72

23,530.00

88,514.54

265,543.62

300,949.44

318,652.34

244,477.16

212,434.90

88,514.54

53,1

92,433.72

115,963.72

204,478.26

470,021.88

770,971.32

1,089,623.66

1,334,100.82

1,546,535.72

1,635,050.26

1,688,1

ewed by:

RODSON R. ESCORA
Deputy Area Coordinator

Approved by:

CARMEN A. GAUDIANO
Municipal Engineer

Noted by:

GEORGE ALAS-AS
BSPMC

GEORG

RT
Average
Rate/Day
300.00

No. of Days
90
90

275.00

MONTH 3

MONTH 4
WEEK 12

WEEK 13

####################################

####################################

108

109

110

111

112

113

114

115

116

117

3.00%

2.00%

95.36%

97.36%

118

119

53,108.72

35,405.82

1,688,158.98

1,770,290.80

GEORGE S. ISULAT
RCIS

ENHANCED PLANNED COMMUNITY PROCUREME


Date Prepared

: Ocotber 9, 2013

Name of Proposed Sub-Project

Barangay
Municipality
Province

: Magsaysay
: Dauin
: Negros Oriental

Total Cash (Php)


Sub-project Duration
DESCRIPTION
1st Tranche (Php)
2nd Tranche (Php)
3rd Tranche (Php)
TOTAL CASH (Php)

PACKAGES

Mode of Implementation : Community Force Account (CFA)

PACKAGE ITEMS

QTY

UNIT

UNIT COST

TOTAL

PROC
METHOD

1st Tranche
KC Grant

Package 1-A

Package 1

Hardware:
0

1470

bags

275.00

16mm dia x 6.0m def. Bars

63

length

407.00

15

kg

55.00

bags

2,420.00

Sub-Total :Hardware:Package 1
Hardware:
0

1122

bags

275.00

Sub-Total: Hardware: Package 1-A

404,250.00

LOCAL
25,641.00 SHOPPING
825.00 FOR GOODS
(LSG)

343,612.50
21,794.85
701.25

14,520.00

12,342.00

445,236.00

378,450.60

LOCAL
SHOPPING
FOR GOODS
308,550.00
(LSG)

308,550.00

Package 2

Base Aggregates
0

Err:509

cu.m

138.00

cu.m

Err:509
605.00

Package 5

Package 4

Package 3-A

Package 3

Sub-Total Package 2
Aggregates
0
0

134
180

cu.m
cum

660.00
825.00

Sub-Total: Aggregates Package 3

Err:509

LOCAL
SHOPPING
83,490.00 FOR GOODS
(LSG)

66,792.00

Err:509

Err:509

LOCAL
88,440.00 SHOPPING
148,500.00 FOR GOODS
(LSG)
236,940.00

75,174.00
126,225.00
201,399.00

Aggregates
Class A Stone

216

cum

825.00

Sub-Total: Aggregates Package 3-A

346

bd.ft

22.00

720

bd.ft

22.00

Sub-Total Package 4
Water
40

Sub-total Package 5

178,200.00

Form Lumber

178,200.00

cu.m

50.00

151,470.00
151,470.00

LOCAL
SHOPPING
FOR GOODS
15,840.00
(LSG)

13,464.00

23,452.00

19,934.20

7,612.00

LOCAL
2,000.00 SHOPPING
FOR GOODS
(LSG)
2,000.00

Equipment Rental (Heavy)


Package 6

Err:509

LOCAL
SHOPPING
FOR GOODS
(LSG)

6,470.20

1,600.00
1,600.00

Package 6

lot

30,000.00

30,000.00

Backhoe
Road Grader
Road Roller

1
3
2

days
days
days

18,800.00
14,800.00
13,800.00

18,800.00 SHOPPING
FOR GOODS
44,400.00
(LSG)
27,600.00

Package 10

Package 9

Package 8

Package 7

Sub-Total Package 6

120,800.00

Equipment Rental (Light)


Concrete Mixer
38
Concrete Vibrator
38
Sub-Total Package 7
Labor
Skilled
1.00
Unskilled
1.00
Sub-Total Package 8
Project Billboard
Project Steel Billboard
1.00
Sub-Total Package 9
Total Direct Cost
Handtools & Personal Protective Equipment (PPE)
Hard Hat
10.00
Hand Glooves
10.00
Shovel w/ handle
10.00
Face Mask
10.00
Safety boots
10.00

days
days

lot
lot

Package 11

118,750.00
123,800.00

unit

9,500.00

pcs.

105.00
45.00
320.00
230.00
22.50

pairs
pcs.
pcs.
pairs

1.00

1,850.00

102,680.00
LOCAL

30,400.00 SHOPPING
22,800.00 FOR GOODS
(LSG)
53,200.00
118,750.00
123,800.00
242,550.00
9,500.00
9,500.00
Err:509

24,320.00
18,240.00
42,560.00
13,612.84
11,153.12
24,765.96
7,600.00
7,600.00
Err:509

LSG

1,050.00
450.00
3,200.00
LOCAL
2,300.00
SHOPPING
225.00 FOR GOODS

840.00
360.00
2,560.00
1,840.00
180.00

1,850.00

1,480.00

ok

9,075.00

7,260.00

Err:509

7,500.00

set

sub-total

Package 12

800.00
600.00

15,980.00
37,740.00
23,460.00

(LSG)

Package 13

25,500.00

LOCAL

BSPMC Filing Cabinet


BSPMC Filing Cabinet

1.00

pcs.

sub-total
Environmental Mitigating Cost:
Warning Sign
Barricade
sub-total
Indirect Cost:
Overhead Cost
Project Supervision
Administrative Cost
Bidding Publication
Materials Testting
Treasurer Bond

Contingency Cost
sub-total
Total Indirect Cost
GRAND TOTAL CASH

7,500.00
5.00
5.00

pcs.
pcs.

420.00
300.00

LOCAL
SHOPPING
FOR GOODS
(LSG)
LOCAL

6,000.00

2,100.00 SHOPPING
1,500.00 FOR GOODS

1,680.00
1,200.00

3,600.00

2,880.00

31,500.00
8,500.00
40,000.00
Err:509
10,000.00
7,500.00
72,907.20

(LSG)

7,491.42
CFA
8,000.00

Err:509

15,491.42

Err:509

Err:509

SAY

Err:509
Workshop Output by:

6,000.00

Err:509
Checked & Reviewed by:

31,631.42
Err:509
1,254,867.20
80.00%

AIDEAH SILVA

MARLE GRACE VENTULA

RODSON R. ESCORA

Procurement Team Head

PPT

Deputy Area Coordinator

ANCED PLANNED COMMUNITY PROCUREMENT PACKAGING


: Concreting

of Barangay Road

:
:

1,838,490.00
90 C.D

SOURCES OF FUNDS
TOTAL

.
PERCENTAGE WEIGHT
TO KC
GRANT

KC Grant:

LCC:

1,254,867.20

215,924.80

1,470,792.00

80.00%

156,858.40
156,858.40
1,568,584.00

26,990.60
26,990.60
269,906.00

183,849.00
183,849.00
1,838,490.00

10.00%
10.00%
100%

TO LCC
CASH

FUND SOURCE
LEGEND:

KC GRANT

1,568,584.00

80%

TOTAL LCC

442,306.00

10.00%
10.00%
100%

LCC - In-kind
LCC - Cash
TOTAL

172,400.00
269,906.00
2,010,890.00

REMARKS

TRANCHING SCHEDULE
TOTAL
1st Tranche

2nd Tranche

LCC Cash

KC Grant

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

LCC Cash

343,612.50

60,637.50

404,250.00

3,846.15

21,794.85

3,846.15

25,641.00

123.75

701.25

123.75

825.00

2,178.00

246,840.00

61,710.00

246,840.00

61,710.00

12,342.00

2,178.00

14,520.00

378,450.60

66,785.40

445,236.00

246,840.00

61,710.00

308,550.00

246,840.00

61,710.00

308,550.00

Err:509

Err:509

16,698.00
Err:509

66,792.00
-

13,266.00
22,275.00
35,541.00

26,730.00
-

Err:509

16,698.00

83,490.00

Err:509

Err:509

Err:509

75,174.00
126,225.00

13,266.00
22,275.00

88,440.00
148,500.00

201,399.00

35,541.00

236,940.00

26,730.00

Err:509

151,470.00

26,730.00

178,200.00

151,470.00

26,730.00

178,200.00

1,141.80

6,470.20

1,141.80

7,612.00

2,376.00

13,464.00

2,376.00

15,840.00

19,934.20
-

3,517.80
-

23,452.00
-

1,600.00

400.00

2,000.00

1,600.00

400.00

2,000.00

3,517.80

400.00
400.00

MONTHS
1

60,637.50

66,785.40

PROPOSED
IMPLEMENTATION
SCHEDULE

4,500.00

25,500.00

4,500.00

30,000.00

2,820.00
6,660.00
4,140.00

15,980.00
37,740.00
23,460.00

2,820.00
6,660.00
4,140.00

18,800.00
44,400.00
27,600.00

102,680.00

18,120.00

120,800.00

18,120.00

6,080.00
4,560.00
10,640.00

4,000.00
2,163.02
6,163.02

40,000.00
39,340.00
79,340.00

4,000.00
3,835.00
7,835.00

22,087.16
23,533.86
45,621.02

2,500.00
5,825.00
8,325.00

1,900.00
1,900.00
Err:509

326,180.00

69,545.00

45,621.02

8,325.00

24,320.00
18,240.00
42,560.00
75,700.00
74,026.98
149,726.98
7,600.00
7,600.00
Err:509

6,080.00
4,560.00
10,640.00
10,500.00
11,823.02
22,323.02
1,900.00
1,900.00
Err:509

30,400.00
22,800.00
53,200.00
86,200.00
85,850.00
172,050.00
9,500.00
9,500.00
Err:509

210.00
90.00
640.00
460.00
45.00

840.00
360.00
2,560.00
1,840.00
180.00

210.00
90.00
640.00
460.00
45.00

1,050.00
450.00
3,200.00
2,300.00
225.00

370.00

1,480.00

370.00

1,850.00

7,260.00

1,815.00

9,075.00

6,000.00

1,500.00

7,500.00

6,000.00

1,500.00

7,500.00

1,680.00
1,200.00

420.00
300.00

2,100.00
1,500.00

2,880.00

720.00

3,600.00

12,151.42
1,500.00
13,008.58
1,500.00
2,000.00
7,500.00
15,000.00

31,500.00
8,500.00
50,500.00
7,500.00
14,000.00
7,500.00
109,150.40

1,815.00

1,500.00
1,500.00
420.00
300.00
720.00

5,860.00

3,442.50

8,000.00
2,000.00
7,500.00

13,488.58
7,000.00
30,000.00
6,000.00
4,000.00

8,708.92
1,500.00
5,008.58
1,500.00

94,150.40

15,000.00

19,348.58
7,000.00
37,491.42
6,000.00
12,000.00
94,150.40

17,500.00

5,860.00

3,442.50

154,638.98

31,717.50

175,990.40

52,660.00

228,650.40

21,535.00

5,860.00

3,442.50

154,638.98

31,717.50

192,130.40

56,695.00

248,825.40

Err:509

332,040.00

72,987.50

200,260.00

40,042.50

Err:509

Err:509

Err:509

215,924.80

156,858.40

26,990.60

156,858.40

26,990.60

Err:509

Err:509

Err:509

Err:509

10.00%

(175,181.60)

10.00%

(43,401.60)

Err:509

Err:509

Recommending Approval:

Submitted by:

Noted by:

CARMEN A. GAUDIANO

VERONICA ALCORIZA

GEOGRE S. ISULAT

Municipal Engineer

BSMPC

Regional Community Infra. Specialist

AMOUNT
(PESO)
1,568,584.00
442,306.00
172,400.00
269,906.00
2,010,890.00
PROPOSED
IMPLEMENTATION
SCHEDULE

MONTHS
2

4
Err:509
Err:509
-

32,550.00
37,950.00
70,500.00
Err:509
-

(10,500.00)
Err:509
(4,000.00)
(36,243.20)
Err:509
Err:509
Err:509

unity Infra. Specialist

ACTUAL COMMUNITY PROCUREMENT PACKAGIN


Date Prepared

: Ocotber 9, 2013

Name of Proposed Sub-Project

Barangay
Municipality
Province

: Magsaysay
: Dauin
: Negros Oriental

Total Cash (Php)


Sub-project Duration

:
:
SOURCES OF FUNDS

DESCRIPTION

PACKAGES

Mode of Implementation : Community Force Account (CFA)

PACKAGE ITEMS

QTY

UNIT COST

TOTAL

KC Grant:

LCC:

1st Tranche (Php)

1,254,867.20

215,924.80

2nd Tranche (Php)


3rd Tranche (Php)
TOTAL CASH (Php)

156,858.40
156,858.40
1,568,584.00

26,990.60
26,990.60
269,906.00

PROC
METHOD

TRAN
1st Tranche
KC Grant

2nd Tranche

LCC Cash

KC Grant

Hardware:

Package 1 - A

Package 1

Portland Cement (40kgs) Type 1

1470

bags

245.00

360,150.00

306,127.50

54,022.50

16mm dia x 6.0m def. Bars

63

length

340.00

21,420.00

18,207.00

3,213.00

# 4 CWN

15

kg

Hard Asphalt (Joint Filler)

bags

46.50
1,950.00

Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
Hardware:
Portland Cement (40kgs) Type 1
1122

bags

Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)

LOCAL
697.50 SHOPPING
11,700.00 FOR GOODS
(LSG)

592.88

104.63

9,945.00

1,755.00

393,967.50

334,872.38

59,095.13

51,268.50
445,236.00

43,578.23

7,690.28

378,450.60

66,785.40
-

LOCAL
SHOPPING
- FOR GOODS
(LSG)
308,550.00

246,840.00

308,550.00

246,840.00

Package 3

Package 2

Base Aggregates
Embankment (Fill) Materials

363.15

cu.m

Aggregate Subbase Course (Balastro


Class "A" Type)

138.00

cu.m

Err:509
550.00

Sub-Total (Actual)

Err:509
75,900.00
Err:509

Savings amount determined after procurement


Sub Total for Package (Plan)
Aggregates
Fine Aggregates (Approved Source)
134
Gravel 3/4" dia. (Approve Source)
180

Err:509
LOCAL
SHOPPING
FOR GOODS
(LSG)

Err:509
Err:509
cu.m
cum

640.00
790.00

Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)

85,760.00
LOCAL
142,200.00 SHOPPING
227,960.00 FOR GOODS
(LSG)
8,980.00
236,940.00

60,720.00
Err:509

Err:509
15,180.00
Err:509

Err:509
Err:509

Err:509
Err:509

72,896.00
120,870.00

12,864.00
21,330.00

193,766.00

34,194.00

7,633.00
201,399.00

1,347.00
35,541.00

126,684.00

22,356.00

126,684.00

22,356.00

24,786.00
151,470.00

4,374.00
26,730.00

Package 3-A

Aggregates
Class A Stone

216
Sub-Total (Actual)

Savings amount determined after procurement


Sub Total for Package (Plan)

cum

690.00

LOCAL
SHOPPING
149,040.00 FOR GOODS
(LSG)
29,160.00
149,040.00

178,200.00

Package 4

Form Lumber
2"x2"x8' Coco Lumber (Formworks)

346

bd.ft

21.00

2"x6"x12' Coco Lumber (Formworks)

720

bd.ft

21.00

Sub-Total (Actual)

Package 5

Savings amount determined after procurement


Sub Total for Package (Plan)
Water
Water (for mixing)

7,266.00

6,176.10

1,089.90

15,120.00

12,852.00

2,268.00

19,028.10

3,357.90

906.10
19,934.20

159.90
3,517.80

LOCAL
SHOPPING
FOR GOODS
22,386.00
(LSG)

1,066.00
23,452.00

40

cu.m

LOCAL
SHOPPING
- FOR GOODS
(LSG)
2,000.00

Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)

2,000.00

1,600.00
1,600.00

400.00
400.00

Package 6

Equipment Rental (Heavy)


Mobilization & Demobilization

lot

45,000.00

45,000.00

38,250.00

6,750.00

Backhoe
Road Grader
Road Roller

1
3
2

days
days
days

20,000.00
15,000.00
15,000.00

20,000.00
LOCAL
45,000.00 SHOPPING
30,000.00 FOR GOODS

17,000.00
38,250.00
25,500.00

3,000.00
6,750.00
4,500.00

119,000.00

21,000.00

19,200.00
120,800.00

16,320.00
102,680.00

2,880.00
18,120.00

26,600.00
19,760.00

21,280.00
15,808.00

5,320.00
3,952.00

37,088.00

9,272.00

5,472.00
42,560.00

1,368.00
10,640.00

13,612.84
11,153.12

4,000.00
2,163.02

40,000.00
39,340.00

24,765.96

6,163.02

79,340.00

0.00
24,765.96

0.00
6,163.02

0.00
79,340.00

Sub-Total (Actual)

140,000.00

Savings amount determined after procurement


Sub Total for Package (Plan)

(LSG)

Package 10

Package 9

Package 8

Package 7

Equipment Rental (Light)


Concrete Mixer
Concrete Vibrator

38
38

days
days

700.00
520.00

Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
Labor
Skilled
1.00
Unskilled
1.00

6,840.00
53,200.00

lot
lot

118,750.00
123,800.00

Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
Project Billboard
Project Steel Billboard
1.00

unit

8,450.00

Medicine kit box to include Betadine


100ml, Agua Oxinada 100ml, cotton
5grams, bandage 5pcs, & 1st aide tape
1 roll
Sub-Total (Actual)
Savings amount determined after procurement

1.00

pcs.
pairs
pcs.
pcs.
pairs

set

118,750.00
LOCAL
123,800.00 SHOPPING
242,550.00 FOR GOODS
(LSG)
0.00
242,550.00

6,760.00

1,690.00

6,760.00

1,690.00

9,500.00
Err:509

840.00
7,600.00
Err:509

210.00
1,900.00
Err:509

85.00
35.00
225.00
8.50
280.00

850.00
350.00
2,250.00
85.00
2,800.00

680.00
280.00
1,800.00
68.00
2,240.00

170.00
70.00
450.00
17.00
560.00

1,750.00

1,750.00

1,400.00

350.00

8,085.00

6,468.00

1,617.00

990.00

792.00

198.00

Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
Total Direct Cost
Handtools & Personal Protective Equipment (PPE)
Hard Hat
10.00
Hand Glooves
10.00
Shovel w/ handle
10.00
Face Mask
10.00
Safety boots
10.00

LOCAL
SHOPPING
46,360.00 FOR GOODS
(LSG)

8,450.00

LOCAL
SHOPPING
8,450.00 FOR GOODS
(LSG)
1,050.00

LOCAL
SHOPPING
FOR GOODS
(LSG)

79,340.00

Package 13

Package 12

Package 11

Sub Total for Package (Plan)


BSPMC Filing Cabinet
BSPMC Filing Cabinet

9,075.00
1.00

pcs.

6,400.00

Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
Environmental Mitigating Cost:
Warning Sign
5.00
Barricade
5.00

7,260.00

6,400.00

LOCAL
SHOPPING
6,400.00 FOR GOODS
(LSG)
1,100.00

7,500.00
pcs.
pcs.

280.00
280.00

Sub-Total (Actual)
Savings amount determined after procurement
Sub Total for Package (Plan)
Indirect Cost:
Overhead Cost
Project Supervision
Administrative Cost
Bidding Publication

1,400.00
1,400.00

LOCAL
SHOPPING
2,800.00 FOR GOODS
(LSG)

800.00
3,600.00

31,500.00
8,500.00
40,000.00
Err:509

Materials Testting

10,000.00
7,500.00

Treasurer Bond

1,815.00

5,120.00

1,280.00

5,120.00

1,280.00

880.00
6,000.00

220.00
1,500.00

1,120.00
1,120.00

280.00
280.00

2,240.00

560.00

640.00
2,880.00

160.00
720.00
5,860.00

CFA

7,491.42

8,000.00

8,000.00

2,000.00
7,500.00

15,491.42

17,500.00

Contingency Cost
Sub-Total (Actual)

Err:509

Savings amount determined after procurement


Sub Total for Package (Plan)
Total Indirect Cost

Err:509
Err:509

0.00
15,491.42
29,319.42
Err:509

Err:509
Err:509

TOTAL SAVINGS DETERMINED AFTER PROCUREMENT

GRAND TOTAL CASH (Actual)

Err:509

GRAND TOTAL CASH (Plan)

2,403,025.00

SAY
%

Err:509
Err:509
Checked & Reviewed by:

Workshop Output by:

5,860.00

0.00
0.00
17,500.00
5,860.00
20,957.00
5,860.00
Err:509
246,840.00

Err:509

Err:509

85,200.00

1,602,080.00

320,340.00

200,260.00

102.14%

Err:509

12.77%

Recommending Approval:

FELIX ABELLANO

TEODOLO T. BULISID

RODSON R. ESCORA

Procurement Team Head

PPT

Deputy Area Coordinator

CARMEN A

Municipa

NITY PROCUREMENT PACKAGING

Concreting of Barangay Road


1,838,490.00
90 C.D
TOTAL

.
PERCENTAGE WEIGHT
TO KC
GRANT

TO LCC
CASH

AMOUNT
(PESO)

FUND SOURCE
LEGEND:

KC GRANT

1,568,584.00

1,470,792.00

80.00%

80%

TOTAL LCC

442,306.00

183,849.00
183,849.00
1,838,490.00

10.00%
10.00%
100%

10.00%
10.00%
100%

LCC - In-kind
LCC - Cash
TOTAL

172,400.00
269,906.00
2,010,890.00

REMARKS

TRANCHING SCHEDULE
TOTAL
2nd Tranche

3rd Tranche

LCC Cash

KC Grant

LCC Cash

TOTAL
KC Grant

LCC Cash
54,022.50

360,150.00

18,207.00

3,213.00

21,420.00

592.88

104.63

697.50

9,945.00

1,755.00

11,700.00

334,872.38

59,095.13

393,967.50

43,578.23

7,690.28

51,268.50

378,450.60

66,785.40

445,236.00

61,710.00

246,840.00

61,710.00

308,550.00

61,710.00

246,840.00

61,710.00

308,550.00

Err:509

Err:509

60,720.00

Err:509

15,180.00

75,900.00

Err:509

Err:509

Err:509

Err:509
Err:509
72,896.00
120,870.00

Err:509
Err:509
12,864.00
21,330.00

Err:509
Err:509
85,760.00
142,200.00

193,766.00

34,194.00

227,960.00

1,347.00
35,541.00

8,980.00
236,940.00

7,633.00
201,399.00
-

126,684.00

22,356.00

149,040.00

126,684.00

22,356.00

149,040.00

4,374.00
26,730.00

29,160.00
178,200.00

24,786.00
151,470.00

MONTHS
1

306,127.50

PROPOSED
IMPLEMENTATION
SCHEDULE

6,176.10

1,089.90

7,266.00

2,268.00

15,120.00

19,028.10

3,357.90

22,386.00

45,621.02

8,325.00

0.00
7,835.00

0.00
45,621.02

0.00
8,325.00

7,835.00

45,621.02

8,325.00

400.00
400.00
-

2,000.00
2,000.00
-

38,250.00

6,750.00

45,000.00

17,000.00
38,250.00
25,500.00

3,000.00
6,750.00
4,500.00

20,000.00
45,000.00
30,000.00

119,000.00

21,000.00

140,000.00

16,320.00
102,680.00

2,880.00
18,120.00

19,200.00
120,800.00

7,835.00

1,066.00
23,452.00
-

2,500.00
5,825.00

159.90
3,517.80
-

1,600.00
1,600.00

22,087.16
23,533.86

12,852.00
906.10
19,934.20
-

4,000.00
3,835.00

21,280.00
15,808.00

5,320.00
3,952.00

26,600.00
19,760.00

37,088.00

9,272.00

46,360.00

5,472.00
42,560.00
75,700.00
74,026.98

1,368.00
10,640.00
10,500.00
11,823.02

6,840.00
53,200.00
86,200.00
85,850.00

22,323.02

172,050.00

0.00
149,726.98

0.00
22,323.02

0.00
172,050.00

6,760.00

1,690.00

8,450.00

6,760.00

1,690.00

8,450.00

149,726.98

840.00
7,600.00
Err:509

210.00
1,900.00
Err:509

1,050.00
9,500.00
Err:509

680.00
280.00
1,800.00
68.00
2,240.00

170.00
70.00
450.00
17.00
560.00

850.00
350.00
2,250.00
85.00
2,800.00

1,400.00

350.00

1,750.00

6,468.00

1,617.00

8,085.00

792.00

198.00

990.00

7,260.00

1,815.00

5,120.00

1,280.00

6,400.00

5,120.00

1,280.00

6,400.00

880.00
6,000.00

220.00
1,500.00

13,488.58
7,000.00
30,000.00
6,000.00

8,708.92
1,500.00
5,008.58
1,500.00

4,000.00

1,100.00
7,500.00

1,120.00
1,120.00

280.00
280.00

1,400.00
1,400.00

2,240.00

560.00

2,800.00

640.00
2,880.00
3,442.50

9,075.00

160.00
720.00

800.00
3,600.00

19,348.58
7,000.00
37,491.42
6,000.00

12,151.42
1,500.00
13,008.58
1,500.00

31,500.00
8,500.00
50,500.00
7,500.00

12,000.00
-

2,000.00
7,500.00
-

14,000.00
7,500.00
-

3,442.50

60,488.58

16,717.50

81,840.00

37,660.00

119,500.00

0.00
3,442.50
3,442.50
61,710.00

94,150.40
154,638.98
60,488.58
94,150.40

15,000.00
31,717.50
16,717.50
15,000.00

94,150.40
175,990.40
95,668.00
Err:509

15,000.00
52,660.00
41,117.00
Err:509

109,150.40
228,650.40
136,785.00
Err:509

11,277.50

106,109.60

25,042.50

Err:509

Err:509

Err:509

40,042.50

200,260.00

40,042.50

1,837,292.00

371,253.00

2,403,025.00

115,060.00

12.77%

94,150.40

Err:509

Err:509

Submitted by:

Noted by:

CARMEN A. GAUDIANO

GEORGE A. ALAS-AS

GEOGRE S. ISULAT

Municipal Engineer

BSMPC

Regional Community Infra. Specialist

PROPOSED PROCUREMENT ACTIO


Sub-project Name : Concreting of Barangay Road
Location : Magsaysay, Dauin, Negros Oriental
Timeline to complete
the activity (Inclusive
Dates)

Responsible Volunteer/s and Project Staff


( Complete Name)

1. Preparation of Planned Community


Procurement Packages

March 4, 2014

George alas-as BSPMC Chair, Teodolo Bulisid


-BAC,-PT,Engr. Rodson R. Escora - DAC, Ricky
T. Panoy -CF and Name-Engr. Carmen A.
GaudianoM.E.

2. Finalization of Packages & PCPP

March 7, 2014

-do-

3. Conduct of Pre-procurement Conference

March 11, 2014

George Alas-as-BSPMC Chair, Teodolo


Bulisid ,Benadeth Tuala-BAC, Jocelyn Alas-asPIT,Felix Avellano-PT, Engr. Rodson R. Escora DAC, Ricky T. Panoy-CF and Carmen A.
Gaudiano-M.E.

4. Preparation of Minutes of Conference

March 11, 2014

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

Procurement Activities

5. Preparation of Procurement Documents

March 11-13, 2014

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

6. Serving of Canvass/Request for Qoutation

Package 1: Hardware

March 14, 2015

Package 2: Base Aggregate

March 14, 2015

Package 3: Aggregates

March 14, 2015

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

Procurement Activities

Timeline to complete
the activity (Inclusive
Dates)

Package 4: Form Lumber

March 14, 2015

Package 5: Water

March 14, 2015

Package 6: Equipment Rental (Heavy)

March 14, 2015

Responsible Volunteer/s and Project Staff


( Complete Name)

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
Package 7: Equipment Rental (Light)

March 14, 2015

Package 9: Project Steel Billboard

March 14, 2015

Package 10: Personal Protective Equipment

March 14, 2015

Pckage 11: BSPMC Filing Cabinet

March 14, 2015

Package 1A: Hardware

April 18, 2014

Package 3A: Aggregates

April 18, 2014

7: Opening of Canvass

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

Procurement Activities
Package 1: Hardware, Package 2: Base Aggregate,
Package 3: Aggregates, Package 4 Form Lumber,
Package 5: Water, Package 6: Heavy Equipment
(Heavy), Package 7: Light Equipment, Package 9:
Project Steel Billboard, Package 10: Personal
Protective Equipment; Package 11: BSPMC Filing
Cabinet, Package 12: Environmental Mitigating
Devices

Package 1A: Hardware, Package 3A: Aggregates


8. Preparation of Minutes of Opening

Timeline to complete
the activity (Inclusive
Dates)

March 17, 2014

Responsible Volunteer/s and Project Staff


( Complete Name)

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

April 21, 2014


-do-

Procurement Activities
Package 1: Hardware, Package 2: Base Aggregate,
Package 3: Aggregates, Package 4 Form Lumber,
Package 5: Water, Package 6: Heavy Equipment
(Heavy), Package 7: Light Equipment, Package 9:
Project Steel Billboard, Package 10: Personal
Protective Equipment; Package 11: BSPMC Filing
Cabinet, Package 12: Environmental Mitigating
Devices

Package 1A: Hardware, Package 3A: Aggregates


9. Evaluation of Canvass
Package 1: Hardware, Package 2: Base Aggregate,
Package 3: Aggregates, Package 4 Form Lumber,
Package 5: Water, Package 6: Heavy Equipment
(Heavy), Package 7: Light Equipment, Package 9:
Project Steel Billboard, Package 10: Personal
Protective Equipment; Package 11: BSPMC Filing
Cabinet, Package 12: Environmental Mitigating
Devices

Package 1A: Hardware, Package 3A: Aggregates


10. Preparation of Abstract of Canvass
Package 1: Hardware, Package 2: Base Aggregate,
Package 3: Aggregates, Package 4 Form Lumber,
Package 5: Water, Package 6: Heavy Equipment
(Heavy), Package 7: Light Equipment, Package 9:
Project Steel Billboard, Package 10: Personal
Protective Equipment; Package 11: BSPMC Filing
Cabinet, Package 12: Environmental Mitigating
Devices
Package 1A: Hardware, Package 3A: Aggregates

11. Preparation of Purchased Order

Package 1: Hardware, Package 2: Base Aggregate,


Package 3: Aggregates, Package 4 Form Lumber,
Package 5: Water, Package 6: Heavy Equipment
(Heavy), Package 7: Light Equipment, Package 9:
Project Steel Billboard, Package 10: Personal
Protective Equipment; Package 11: BSPMC Filing
Cabinet, Package 12: Environmental Mitigating
Devices

Timeline to complete
the activity (Inclusive
Dates)

March 17, 2014

Responsible Volunteer/s and Project Staff


( Complete Name)

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

April 21, 2014


March 27, 2014

March 17, 2014

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

April 21, 2014


March 27, 2014

-do-

March 17, 2014

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

April 21, 2014

March 27, 2014

March 18, 2014

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

Procurement Activities

Package 1A: Hardware, Package 3A: Aggregates

George Alas-as-BSPMC Chair,Felix AvellanoTimeline to complete


PT,Engr. Rodson
R. Escora
- DAC,Ricky
T.
Responsible
Volunteer/s
and
Project Staff
the activity (Inclusive Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.
( Complete Name)
Dates)
April 22, 2014
George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.
Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

12. Approving of Purchased Order


Package 1: Hardware, Package 2: Base Aggregate,
Package 3: Aggregates, Package 4 Form Lumber,
Package 5: Water, Package 6: Heavy Equipment
(Heavy), Package 7: Light Equipment, Package 9:
Project Steel Billboard, Package 10: Personal
Protective Equipment; Package 11: BSPMC Filing
Cabinet, Package 12: Environmental Mitigating
Devices

Package 1A: Hardware, Package 3A: Aggregates

13. Serving of Purchased Order to Winning


Suppliers
Package 1: Hardware, Package 2: Base Aggregate,
Package 3: Aggregates, Package 4 Form Lumber,
Package 5: Water, Package 6: Heavy Equipment
(Heavy), Package 7: Light Equipment, Package 9:
Project Steel Billboard, Package 10: Personal
Protective Equipment; Package 11: BSPMC Filing
Cabinet, Package 12: Environmental Mitigating
Devices
Package 1A: Hardware, Package 3A: Aggregates

March 18, 2014


Hazley Lanfie,Teodulo Bulisid, Bernadita Tuala

April 22, 2014

March 28, 2014

Hazley Lanfie,Teodulo Bulisid, Bernadita Tuala

March 18-19, 2014

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

April 22-23, 2014


George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.
Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

14. Delivery of Goods


Package 1: Hardware, Package 2: Base Aggregate,
Package 3: Aggregates, Package 4 Form Lumber,
Package 5: Water, Package 6: Heavy Equipment
(Heavy), Package 7: Light Equipment, Package 9:
Project Steel Billboard, Package 10: Personal
Protective Equipment; Package 11: BSPMC Filing
Cabinet, Package 12: Environmental Mitigating
Devices
Package 1A: Hardware, Package 3A: Aggregates

March 24-28, 2014

April 27-29, 2014


April 28-May 3, 2014

15. Mobilization and Start of SPI

Selvino Bulisid - MIT Chair, MIT Members, Ricky


T. Panoy- ACT-CF, Rodson Escora-ACT-DAC

Selvino Bulisid - MIT Chair, MIT Members, Ricky


T. Panoy- ACT-CF, Rodson Escora-ACT-DAC
BSPMC, Jocelyn Alas-as- PIT Chair and PIT
Members, Community Workers

Procurement Activities

Timeline to complete
the activity (Inclusive
Dates)

Responsible Volunteer/s and Project Staff


( Complete Name)

Prepared by:
Reviewed & Checked by:

PT Chairperson

ENGR. CARMEN A. GAUDIANO


MCT-DAC

ENGR. RODSON R. ESCORA


ACT-DAC

EMENT ACTION PLAN (PAP)

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Brgy. Hall/BSPMC Office

POW/Detailed
Estimates

Draft PCPP

Brgy. Hall/BSPMC Office

POW & Draft PCPP

Final PCPP

Brgy. Hall/BSPMC Office

Final PCPP

Conference Conducted

Brgy. Hall/BSPMC Office

Office supplies

Minutes of Conference

Brgy. Hall/BSPMC Office

POW & Final PCPP

Invitation to Bid/Bid
Documents

Supplier's Office,
Establishment

Supplier's: Zenith
Commercials, Golden Rule,
New Bian Yek Commercials,
Dgte. YY Trading,
Duplamilco

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Gold
Enterprises, Lucky
Enterprises, JM
Commercials

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Sugar Hills


Agricultural Corp., Solon
Construction, Lucky
Construction

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Suppliers's: Gold
Enterprises, Maureze
Construction, Duplamilco
Inc., Alagasi's Construction
Supply

Supplier's Office,
Establishment

Suppliers: Resident of
Barangay Tunga-Tunga

Supplier's Office,
Establishment

Supplier's:Uymatiao
Construction, HLJ
Construction, Big Foot,
Philsouth Contractors

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Alagasi's
Construction Supply,
Rejoice Hardware, LKC
Hardware

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Alagasi's
Welding Shop, Zamora
Welding Shop, Orient Pearl

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Rejoice
Hardware, Premium
Hardware, Gold Enterprises,
LKC Hardware

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Alice Furniture,


Lindeys Furniture, BL
Furniture

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Zipline
Commercial, I Concept,
ADS Unlimited, Sun Signs

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Zenith
Commercials, Golden Rule,
New Bian Yek Commercials,
Dgte. YY Trading,
Duplamilco

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Venue of meeting and


place/s to conduct
procurement

Brgy. Hall/BSPMC Office

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Submitted Canvass
Form/Request for
Qoutation

Abstract of Canvass

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Brgy. Hall/BSPMC Office

Office Supplies

Minutes of Opening

Brgy. Hall/BSPMC Office

Office Supplies

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Minutes of Evaluation

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Minutes of Evaluation

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Abstract of Canvass

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Abstract of Canvass

Brgy. Hall/BSPMC Office

Abstract of Canvass

Purchased Order

Venue
of meetingOffice
and
Brgy.
Hall/BSPMC
place/s to conduct
procurement

Abstract
of Canvass
Resources
Requirement

Purchased
Order
Expected
outputs/
Remarks

Brgy. Hall/BSPMC Office

Abstract of Canvass

Purchased Order

Brgy. Hall/BSPMC Office

Purchased Order

Approved Purchased
Order

Brgy. Hall/BSPMC Office

Purchased Order

Approved Purchased
Order

Supplier's Office,
Establishment

Name of Potential
Suppliers Contractors

Approved Purchased Conformed Purchased


Order
Order by Suppliers

Supplier's Office,
Establishment

Project Site

Delivery
Receipt/Delivered
Goods

Goods Received

Project Site

Delivery
Receipt/Delivered
Goods

Goods Received

Project Site

Notice to Commence

Mobilization Started

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Noted by:

Resources
Requirement

Expected outputs/
Remarks

Approved by:

ENGR. HELEN C. YBANEZ


Area Coordinator

BSPMC Chairperson

ADMINISTRATIVE COST DERIVATION


Sub-project Activities

Destination/Description

Fare/
Allowance/
Unit Price

Qty.

Unit

pesos

No of
transactions

1. TE for Opening of BSPMC LBP Bank Account of CVs


x

1 times

persons x

1 times

persons x

2 times

130.00

persons x

8 times

80.00

persons x

8 times

130.00

persons x

8 times

meals

80.00

persons x

8 times

Supplies
Snacks

50.00
20.00

12
20

meetings
persons x

15 times

130.00

persons x

15 times

80.00

persons x

15 times

130.00

persons x

30 times

80.00

persons x

30 times

350.00
300.00
2.00
1.00
30.00
685.00
50.00
35.00
20.00
3.00
20.00
30.00

x
x
x
x
x
x
x
x
x
x
x
x

6
6
2250
1190
8
1
4
1
3
40
2
1

reams
reams
sheets
pc
boxes
pc
pcs
ps
pc
pcs
box
pc

Log book

80.00

pcs

Fastener

50.00

box

DBP Initial Deposit


BSPMC office to Dgte. (vice
versa)

meals

1,500.00

130.00

80.00

Sub-Total
2. TE for procurement
transactions of CVs
BSPMC office to Dgte. (vice
versa)

Serving of Canvass

meals
Serving of PO & Payments

BSPMC office to Dgte. (vice


versa)

Sub-Total
3. Project Meetings

Sub-Total
4. MCT-Initiated Meetings
BSPMC office to MCT Office
(vice versa)

Meals
Sub-Total
5. Treasurer Payroll Processing
BSPMC office to Dauin (vice
versa)

Meals
Sub-Total
6. Forms/Supplies and Reproduction
Bondpaper long
Bondpaper short
Reproduction
Petty Cash Box
Staple Wire
Calculator
Columnar Book
Liquid Eraser
Paste/Glue
Folder long
Paper clip
Pentil pen

Sub-Total
TOTAL FOR ADMIN COST

Prepared by :

Approved by :

ELSA A. TRUNO

GEORGE ALAS-AS

MEO Staff

BSPMC Chairperson

Checked by:

Concurred by :

RODSON R. ESCORA
Deputy Area Coordinator

HON. LIBRADO TUAL


Sanggunian Barangay Mem

Recommending Approval:

ENGR. CARMEN A. GAUDIANO

HON. NEIL B. CREDO

Municipal Engineer - MCT DAC

Municipal Mayor

Noted by:

GEORGE S. ISULAT
Regional Community Infrastructure Specialist

RATIVE COST DERIVATION


No of
transactions

Amount

1,500.00

260.00

320.00
2,080.00

3,120.00

1,920.00

2,080.00

1,280.00
8,400.00

=
=

600.00
6,000.00
6,600.00

9,750.00

6,000.00
15,750.00

3,900.00

2,400.00
6,300.00

=
=
=
=
=
=
=
=
=
=
=
=

2,100.00
1,800.00
4,500.00
1,190.00
240.00
685.00
200.00
35.00
60.00
120.00
40.00
30.00

320.00

50.00
11,370.00
50,500.00

GEORGE ALAS-AS
BSPMC Chairperson

HON. LIBRADO TUALA


Sanggunian Barangay Member

HON. NEIL B. CREDO


Municipal Mayor

Department of Social Walfare and Development


KALAHI-CIDSS : MCC PROJECT
Dauin, Negros Oriental
Sub-Project :
CONCRETING OF BARANGAY ROAD
Location: MAGSAYSAY, DAUIN NEGROS ORIENTAL

Description of Work
Item No.
Location
Note
STATION
0+000
0+020
0+040
0+060
0+080
0+100
0+120
0+140
0+160
0+180
0+200
0+220
0+240
0+260
0+280
0+300
Total Area :
Ave. Area :

BARANGAY SUB-PROJECT
MANAGEMENT COMMITTEE

QUANTITY CALCULATION

Barangay Magsaysay, Dauin


Negros Oriental

: SURPLUS COMMON EXCAVATION AND EMBANKMENT


: 103 & 104
: STA. 0-000.00 - STA. 0+300.00

: Computed Areas are taken from CAD File ( Poly Line Method)
AREA
DISTANCE
VOLUME
ITEM 102
ITEM 104
(m)
ITEM 102
0.993
1.373
20.00
11.110
0.118
1.924
20.00
3.180
0.200
2.130
20.00
5.480
0.348
1.371
20.00
6.150
0.267
4.111
20.00
2.670
5.319
20.00
4.830
20.00
0.830
0.083
3.380
20.00
2.580
0.175
2.745
20.00
2.690
0.094
1.939
20.00
105.870
10.493
20.00
105.540
0.061
1.291
20.00
3.050
0.244
0.462
20.00
17.890
1.545
0.362
20.00
20.190
0.474
0.723
20.00
23.940
1.920
0.148
17.015
1.063

32.108
2.007
Add: 15% Shrinkage Factor =
Total Loose Volume =

REMARKS /
LOCATION

ITEM 104
32.970
40.540
35.010
54.820
94.300
101.490
82.100
61.250
46.840
19.390
12.910
17.530
8.240
10.850
8.710

311.170

626.950

311.170

94.043
720.993

Total Volume of Item 104 to be procured:


* Assume 100% of the Excavated Materials will be utilized for it was found out
during site validation that some portion of existing road bed as good quality of
embankment materials/ common borrow)
Total Compacted Volume of Item 104:
Total Loose Volume of Item 104 to be procured:

Submitted by:

311.17

315.780 cu.m
363.15 cu.m

FRANCIS EDWARD P. PARTOSA

Service Provider

SCHEDULE OF IN - KIND LOCAL COUNTERPART CO


Date Prepared
###
Barangay:
MAGSAYSAY
Municipality: Dauin
Province:

Name of proposed community project:Concreting of Barang


Total Estimated Cost:
Php2,440,600.00

Negros Oriental

Mode of Implementation:

Community Project Duratio90 Calendar Days


Estimated Cost1st Tranche
###
2nd Tranche 3,557.50
3rd Tranche 3,557.50
CFA

By Contract

ESTIMATED COST INVOLVED and SCHEDULE


PROC.
DELIVERY
PACKAGES

PACKAGE ITEMS

METHOD 1st Tranche2nd Tranche3rd Tranche


In - Kind

Direct Cost:
Materials
Package 1
Unskilled labor

Contract

Indirect Cost:
Hand tools/PPE
Pre-engineering
Project Supervision

CFA

In - Kind

In - Kind

25,260.00

3,157.50

3,157.50

2,000.00
3,200.00

400.00

400.00

### 3,557.50

3,557.50

TOTAL
Workshop output of:

Checked by:

Reviewed by:

FELIX AVELLANO
Procurement Team Head

CARMEN A. GAUDIANO

RODSON R. ESCORA

Municipal Engineer

DAC - Area Coordinating Team

TERPART CONTRIBUTION

ncreting of Barangay Road


0.00
LCC ( In - Kind) :Php 37,575.00

ED and SCHEDULE OF
RY

PROPOSED
IMPLEMENTATION

TOTAL

SCHEDULE

31,575.00

January, 2014 -April, 2014

2,000.00
4,000.00

January, 2014 -April, 2014


January, 2014 -April, 2014

ESCORA

ordinating Team

###
Submitted by:

GEORGE ALAS-AS
BSPMC Chairperson

1st Tranche
CHECKLIST OF DOCUMENTARY REQUIREMENTS
Barangay MAGSAYSAY
Municipality of Dauin
Sub-Project Title: Concreting of Barangay Road
Phase/Cycle: 2
RFR REVIEW SHEET
Item #

1st TRANCHE

Requirements

Comments

1. Request for Fund Release (RFR)


2. POW
3. Colored Photographs of Proposed Project
Site/Plan
4. Guide for the Technical Review
5. Certification of Review by RIE, RFA, CPS &
RPM
6. MDC/ MIBF Resolution
7. Detailed Estimates/Work Schedule &
Physical Progress Report
8. Hydraulic Analysis for Water Supply System
9. Project Proposal
10. Planned Comm. Procurement Packaging
(PCPP)
11. Procurement Action Plan (PAP)
12. LCC for SPI Monitoring Report
13. DBP Certification/Bank Snapshot
14. Schedule of In-kind LCC
15. O&M Action Plan signed by Brgy. Chairman
16. Certification from the Regional Director

17.For SPs amounting to P 1.5 million and above, submit


PSA result, approved technical plans ( for roads indicate critical sections subject for concreting) and
approved specifications

18.Barangay Council Resolution


19.Sub Project Agreement
20.Local Counterpart Contribution Plan/Admis cost
21.Certification on Local Contributions
22.Bond Premium of Treasurer
23. Economic Analysis
24.Notarized Deed of Lot Donation for Titled
Lot or Quit Claim for non Titled lots
Reviewed By: ______ Date: _____

For Further Review of :______________ Date:____________


Other Comments/ Findings/ Recommendation

Reviewed By: ________ _____


Reviewed By: ________ _____

Actions Taken
For Asec. CGG/ NPM's Signature
For regional compliance
For Transmittal to Finance Unit
Returned to Region

Date/ Date Returned


___________________
___________________
___________________
___________________

BSPMC Form No. 3


KALAHI-CIDSS: MCC PROJE
LOCAL COUNTERPART CONTRIBUT
Barangay MAGSAYSAY
Municipality of Dauin
Province of Negros Oriental, Region V
Sub-Project Title: Concreting of Barangay Road
Budget Item

Unit used

No. of
Units

Per Unit
Cost

Total Sub-Project
Cost

I. Administrative Cost
TE for opening of BSPMC DBP Account of CV's
TE for procurement transactions of CV's
Project Meetings
MCT-Initiated Meetings
Treasurer Payroll Processing
Forms/Supplies and Reproduction
Sub Total
II. Other Indirect Costs
Overhead Cost
Handtools
Pre-engineering
Project Supervisions
Bidding Publication
Environmental Mitigating Cost
BSPMC Filing Cabinet
Material Testing
Treasurer's Bond
VAT ( 7% of Total Direct Cost)
Contractors Profit (10%)
Contingency
Sub Total
III. Direct Cost
Labor
Materials
Equipment Rental
Sub Total
TOTAL PROJECT COST
IV. Operations & Maintenance
Other Amenities
Sub Total
GRAND TOTAL
Prepared by:

BERNADITA TUALA
Barangay Treasurer

2,800.00
7,140.00
5,400.00
9,900.00
6,000.00
8,760.00
40,000.00
21,000.00
3,390.00
2,000.00
12,500.00
7,500.00
3,600.00
7,500.00
10,000.00
5,253.75
133,567.97
190,811.39
95,363.05
492,486.16
198,825.00
1,526,348.84
182,940.00
1,908,113.84
2,440,600.00
0.00
0.00
2,440,600.00

BSPMC Form No. 3


ALAHI-CIDSS: MCC PROJECT
OUNTERPART CONTRIBUTION PLAN
Barangay MAGSAYSAY
Municipality of Dauin
Negros Oriental, Region VII, Philippines

Pro-posed
Amount of Grant

Mun LGU

Local Counterpart Contribution (LCC) Sources


Brgy LGU
Community
DepEd
Total of LCC

2,240.00

560.00

560.00

5,712.00
4,320.00
7,920.00
4,800.00
7,008.00
32,000.00

1,428.00
1,080.00
1,980.00
1,200.00
1,752.00
8,000.00

0.00

1,428.00
1,080.00
1,980.00
1,200.00
1,752.00
8,000.00

18,500.00
1,632.00

2,500.00
1,758.00
1,000.00
8,500.00
1,500.00
720.00
1,500.00
2,000.00
5,253.75
133,567.97

0.00

2,500.00
1,758.00
2,000.00
12,500.00
1,500.00
720.00
1,500.00
2,000.00
5,253.75
133,567.97
0.00
17,038.50
180,338.22

6,000.00
2,880.00
6,000.00
8,000.00

190,811.39
78,324.55
312,147.94

17,038.50
175,338.22

0.00

0.00

1,000.00
4,000.00

5,000.00

0.00

167,250.00
1,336,828.06
154,374.00
1,658,452.06
2,002,600.00

31,575.00
189,520.78
28,566.00
218,086.78
401,425.00

0.00
5,000.00

31,575.00
31,575.00

0.00
0.00

31,575.00
189,520.78
28,566.00
249,661.78
438,000.00

0.00
2,002,600.00

0.00
401,425.00

0.00
5,000.00

0.00
31,575.00

0.00
0.00

0.00
0.00
438,000.00

Approved by:

GEORGE ALAS-AS
BSPMC Chairperson

Target Date of
Delivery of LCC
January, 2014
January, 2014
January, 2014
January, 2014
January, 2014
January, 2014

January, 2014
January, 2014
January, 2014
January, 2014
January, 2014
January, 2014
January, 2014
January, 2014
January, 2014
January, 2014
January, 2014
January, 2014

January, 2014
January, 2014
January, 2014

Department of Social Welfare a

KALAHI-CIDSS:MCC

LCC FOR SUB-PROJECT IMPLEMENTA

As of October 31, 2

PA
C
KA
G

ES

Barangay :
MAGSAYSAY
Municipality : Dauin
Sub-Project : Concreting of Barangay Road

Package Items

Total LCC Committed

Cash
In-Kind

SCHEDULE OF LOCAL
2nd Tranche
Cash

1st Tranche
Cash
Planned

In-Kind
Actual

Planned

Actual

Planned

DIRECT COST:
I# 102-Surplus Common

I# 104-Embankment
I# 200-Aggregate Sub-ba

I# 311-PCCP
I# 505-Grouted Riprap
I# 500-Installation of RCPC
Project Steel Billboard
Unskilled Worker
TOTAL DIRECT COST
INDIRECT COST:
Overhead Cost
Bidding Publication
Administrative Cost
Package 5
Materials Testing
Treasurer's Bond
Contingency
Handtools / PPE
Package 2
Pre-Engineering
Project Supervision
Environmental Impact
Package 4
BSPMC Filing Cabinet
Package 3
VAT (7 % of Direct Cost
Package 1
TOTAL INDIRECT COST
GRAND TOTAL
Package 1

Prepared by:

11,766.00
25,013.09
35,732.85
81,221.35
53,353.50

6,000.00

1,500.00
208,586.79

31,575.00
0.00 31,575.00

0.00

6,000.00

0.00
0.00

34,042.50
34,042.50
40,042.50

1,500.00
8,000.00
2,000.00
5,253.75
1,758.00
8,500.00
720.00
1,500.00
82,521.46
111,753.21
320,340.00

2,000.00
4,000.00

0.00 6,000.00
0.00 37,575.00

Verified by:

ARLENE P. GESULGA
Municipal Financial Analyst

partment of Social Welfare and Development

ALAHI-CIDSS:MCC PROJECT

JECT IMPLEMENTATION MONITORING REPORT


As of October 31, 2013
:

438,000.00

:
:

400,425.00

Total LCC Delivered :


Cash
In-Kind

37,575.00

0.00
0.00
0.00

SCHEDULE OF LOCAL COUNTERPART CONTRIBUTION DELIVERED


2nd Tranche
3rd Tranche
Cash
In-Kind
Cash
In-Kind
Actual

Planned

Actual

Planned

Actual

Planned

TOTAL
Cash

Actual

0.00

0.00

6,000.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
1,500.00
8,000.00
2,000.00
5,253.75
17,038.50
1,758.00
0.00
8,500.00
720.00
1,500.00
133,567.96
179,838.21
400,425.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

17,038.50

0.00
0.00

0.00
0.00

Verified by:

17,004.00
0.00 34,042.50
0.00 40,042.50

0.00
0.00

0.00
0.00

Actual

11,766.00
25,013.09
35,732.85
81,221.35
65,353.50
0.00
1,500.00
0.00
220,586.79

6,000.00

0.00

Planned

Noted by:

JOEL A. EREDIANO
Area Coordinator

ANTONIO R. DOLAOTA, CPA


Regional Finance Focal Person Coordinator (RFFP-Coordinator)

TOTAL
In-Kind
Planned

Actual

0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,575.00
31,575.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,000.00
4,000.00
0.00
0.00
0.00
6,000.00
37,575.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

oordinator (RFFP-Coordinator)