You are on page 1of 135

UNIT PRICE OF MATERIALS

As of April 2010
ITEM DESCRIPTION

UNIT

Acrylic Paint white

gal

Anti-Termite (e.g. solignum, )

gal

Blackboard
Blind Rivets 1/8

Sets
box

CHB 4" x 8' x 16"

Pcs

Child's chairs

Unit

Child's tables

Unit

Clear glass jalousie window W - 5, (0.60m X 0.60m) on standard aluminum housing on


150mm hard wood jamb

Sets

Clear glass jalousie window W - 1, (2.40m X 1.20m) on standard aluminum housing on


150mm hard wood jamb

Sets

Clear glass jalousie window W - 2, (1.20m X 1.20m) on standard aluminum housing on


150mm hard wood jamb

Sets

Clear glass jalousie window W - 3, (0.60m X 1.20m) on standard aluminum housing on


150mm hard wood jamb
Clear glass jalousie window W - 6, (0.40m X 0.60m) on standard aluminum housing on
150mm hard wood jamb

Sets
Sets

Coco Lumber 2" x 2" x 12'

Bd. Ft.

Cocrete Putty

Gals

Concrete Neutralizer

Gals

Corr G.I. Sheets # 26 x 10'

Shts.

Corr G.I. Sheets # 26 x 12'

Shts.

Corr G.I. Sheets # 26 x 8'


Duplex Convenience Outlet

Shts.
Pcs.

Electrical Tape (Big)

Pcs.

Entrance Cap # 1" dia.


Faucet, hosebib, brass 1/2"

Pcs.

Female Adoptor

Pcs.
Pcs.

Filling Materials

Cu.m

Flat Enamel White

Gals

Flat Latex White


Flexible tube 3/4" dia

gal
m

Flourescent Lamp, 40 watts

assy

Flush Door D - 2, (0.60m x 2.10m) with on 150mm hard wood jamb (e.g. yakal, guijo)
Gate valve 1/2" dia.

Set

Page 1

Pcs.

ITEM DESCRIPTION

UNIT

GI Pipes 2" Sched 20

pcs

GI Pipes1 1/2 Sch 40

pcs

Gravel

cu.m

Hacksaw Blade

Pcs.

hinges ( 3-1/2" x 3-1/2" ) loose pin

Sets
set

incandescent Lamp 50 watts


Junction Boxes PVC 4" x 4"

pcs.
unit

KWHR meter w/ Base


Latex Tinting Color Blue
Latex Tinting Color Green

Pints
Pints

Latex Tinting Color Rawsienna

Pints

Latex Tinting Color Red

Pints
Pints

Latex Tinting Color Yellow


Lauaan 2" x 3" x 8'
Ligthing Outlet ( 4" Porcelain Receptacle w/

Bd. Ft.
Pcs.

Lockset (high quality doorknob)

Sets

Low shelves (0.90- 3 layers)

L-m

Machine Bolt w/ Knot and washer 12mm dia. X 7"

Pcs.

Mixed and Washed Gravel

Cu.m.

Nails # 4 CW

Kgs.

NAILS #1 CW
Nails 1/2 " CW

Kgs.

Nails 2" CW

Kgs.

Nails 3" CW

Kgs.

Nails 5" CW
Nails 2 1/2" CW

Kgs.

Neutralizer

gal

Nylon # 16

rolls

Office table with chair

Unit

Water Closet

Units

Paint Brush 2"

pcs

Paint Brush 4"

pcs

Paint Thinner

Gal

Panel Door D - 1, (1.0m x 2.10m) with on 150mm hard wood jamb (e.g. yakal, guijo)

Sets

Plain GI shts# 24
Plywood 1/4" x 4' x 8' Ordinary

shts
Shts.

Portland Cement

bag

Pre-Fabricated Ridge Roll 10' # 26

Pcs.

PV Pipe 4" x 3.0m dia.

Length

PV Pipe 3" x 3.0m dia.

Length

PV Pipe 2" X 3.0m


PVC 90 deg. Bend elbow 1/2"

Length

PVC Bend Elbow 2" dia. X 900

Pcs.

PVC Bend Elbow 4" dia. X 450

Pcs.

Kgs.

Kgs.

Pcs.

Page 2

ITEM DESCRIPTION

UNIT

PVC Bend Elbow 4" dia. X 900

Pcs.

PVC Clamp

Pcs.

PVC Clean Out Plug 4" dia.

Pcs.

PVC Coupling 1/2"

Pcs.

PVC elbow 3" dia. X 90deg.


PVC female threaded adoptor 1/2"

Pcs.

PVC Floor Drain 4" x 4"


PVC pipe 1/2" x 3.0m

Sets

PVC P-Trap 2" dia.


PVC Tee 1/2"

Pcs.

PVC Wye 4" dia.x 4" dia.

Pcs.

Quick Dry Enamel Chocolate Brown

Gal

Quick Dry Enamel White

Gal

Roof Paint Baguio Green

Gals

Roof Sealant

Ltrs

RSB 10mm dia. x 6.0m

Length

RSB 12mm dia. x 6.0m

Length

RSB 16mm dia. x 6.0m

Length

RSC Pipe 3/4" dia.


Safety Switch

length
Set

Sandpaper #100

shts

Sandpaper #200

shts

Screw Insulator

pc.

Semi-Gloss Latex White

Gals

Service Drop Wire

Solvent Cement

Pint

spanish gutter

Shts.

Surface Primer (Red Oxide)

Gals
Pcs.

Pcs.
Length
Pcs.

Switch with Plate2 Gang


Switcth w/ Plate1 Gang
Teflon Tape

Pcs.
Pcs.

THW Stranded 3.5mm2

box

Tie Wire # 16 G.I.

Kgs.

Tile Trim

Pcs.

Tiles 8" x 8" Glazed

Pcs.

Tiles 8" x 8" Unglazed

Pcs.

Tinting Color Blue

pints

Tinting Color Green

pints

Tinting Color Rawshiena

pints

Tinting Color Red

pints

Tinting Color Black


umbrella nails

pints
Pcs.

Utility Boxes Pvc 2" x 4"

pcs.

Wallhung lavatory with faucet and supply pipe

Sets
Page 3

ITEM DESCRIPTION

UNIT

Washed Gravel

Cu.m.

Washed Sand

Cu.m.

White cement / Tile Groute

kls.

Welding Rod

kg

Wye 4" x 3"

Pcs.

Yakal 2" x 5" x 8'

Bd. Ft.

Equipment Rental
Welding Machine

Day

FOREMAN

Day

CARPENTER

Day

MASON

Day

LABORER

Day

BASIC AMENITIES
36" x 75" Wooden Bed
24" x 36" Wooden Table w/ Wooden Chair
Nebulizer
BP Apparatus
Medicine Cabinet
Stethoscope
Weighing Scale for adult
Weighing Scale for infant
Plastic Chair (Heavy Duty)
Dressing Kit (CART W/ TRAY)
DELIVERY TABLE

Unit
Sets
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Sets
UNIT

Shovel w/ handle
Crow Bar
Wheel Barrow
Bolo (multi-purpose) w/ handle
Sledge Hammer (5kg) w/ handle

pc
pc
pc
pc
pc

Page 4

RATE PER
DAY/
UNIT
COST
800.00
750.00
1,000.00
270.00
15.00
300.00
1,000.00
600.00
1,500.00
1,000.00
900.00
500.00
15.00
550.00
450.00
390.00
450.00
350.00
180.00
25.00
75.00
300.00
75.00
500.00
500.00
500.00
70.00
300.00
4,000.00
205.00
Page 5

RATE PER
DAY/
UNIT
COST
900.00
800.00
600.00
75.00
50.00
250.00
25.00
2,000.00
150.00
150.00
150.00
150.00
150.00
25.00
150.00
850.00
600.00
30.00
550.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
400.00
30.00
2,000.00
1,800.00
30.00
70.00
450.00
5,000.00
300.00
350.00
230.00
380.00
700.00
600.00
500.00
55.00
50.00
50.00
Page 6

RATE PER
DAY/
UNIT
COST
50.00
45.00
50.00
50.00
50.00
85.00
150.00
165.00
70.00
60.00
50.00
700.00
700.00
650.00
400.00
165.00
230.00
400.00
175.00
500.00
30.00
40.00
80.00
650.00
55.00
100.00
450.00
400.00
200.00
150.00
40.00
4,300.00
90.00
105.00
30.00
30.00
150.00
150.00
150.00
150.00
150.00
2.00
25.00
1,500.00
Page 7

RATE PER
DAY/
UNIT
COST
600.00
600.00
85.00
75.00
60.00
25.00

800.00
400.00
300.00
300.00
200.00

3,500.00
2,000.00
4,000.00
1,900.00
2,000.00
1,800.00
3,800.00
2,800.00
800.00
12,000.00
25,000.00
450.00
500.00
1,070.00
380.00
700.00

For price validation

Page 8

Page 9

Page 10

Page 11

Page 12

Republic of the Philippines


Province of Negros Oriental
Municipality of Dauin
Barangay Tugawe
OFFICE OF THE BARANGAY SUB-PROJECT MANAGEMENT COMMITTEE

SUB- PROJECT PROGRAM OF WORK


Sub-Project Tile

Construction of One(1) Unit, One(1) Classroom Pre-School Building

Category
Physical Target

Public Goods
63 sq. m.

Total Sub-Project Cost


Mode of Implementation

Php 935,830.00
: By Community Force Account (CFA)

Occupancy

(Pre-School Building)

PROJECT DESCRIPTION : Construction of 1 Unit ( 7.0m x 9.0m ) Classroom


Building with CR, ceiling, tiles, plumbing fixtures , electrical fixtures, paintings
and basic amenities.

Sub-Project Duration

Sub-Project Location:

Technical Personnel

80 Calendar Days (CD)

Equipment/ Tools Needed


DAC/ME

Item
no.

Sub-Project Site Location is 8 KM away from Town Proper

Foreman

Scope of Work ( Direct Cost )

% Wt.

Quantity

Total Amount

4.04
13.13

80.00
23.37

sq.m.
cu.m.

424.68
4,720.85

33,974.55
110,331.00

III
IV

REINFORCING STEEL BARS

14.73
2.73
14.09

2,834.10
23.00
125.44

kgs.
sq.m.
sq.m.

43.69
997.02
944.27

123,816.05
22,931.50
118,449.64

17.30
8.41

1,747.00
18.44

bd.ft
sq.m.

83.22
3,832.97

145,388.20
70,680.00

9.23
4.27

65.00
1.00

sq.m.
lot

1,193.21
35,858.10

77,558.50
35,858.10

2.83
3.60

14.56
1.00

sq.m.
lot

1,631.25
30,219.35

23,751.00
30,219.35

3.50
1.78

265.00
1.00

sq.m.
lot

110.97
15,000.00

29,406.30
15,000.00

0.38

1.00

lot

3,180.65

VIII
IX
X
XI
XII
XIII
XIV

FORMWORKS & SCAFFOLDING


MASONRY WORKS
CARPENTRY WORKS
DOORS AND WINDOWS
ROOFING
PLUMBING WORKS
TILE WORKS
ELECTRICAL WORKS
PAINTING WORKS
STEEL BILLBOARD AND ROOF SIGNAGE
BASIC AMENITIES
Total Direct Cost
Project Cost

CIDSS Grant

Labor
1) Skilled
2) Unskilled
Sub-Total ( A )

62,700.00

Administrative Cost
Material Testing

23,325.00
23,325.00

MLGU
In-Kind

10,000.00

10,000.00

Cash
-

TOTAL
In-Kind

105,574.14

62,700.00

105,574.14

84,400.00
840,544.84

21,000.00

21,000.00

1,266.67
-

2,450.00

7,600.00
2,450.00

2,708.34

541.66

9,600.00
-

12,600.00
3,250.00

20,000.00
3,333.33

32,375.00

Total (A & B)

734,020.70

Contingency 5%
Total Estimated Project Cost

16,858.30
750,879.00

23,325.00
23,325.00

10,000.00
10,000.00

3,000.00
-

666.67
3,375.00
26,850.00

12,050.00

3,000.00

132,424.14

12,050.00

914,819.84

3,000.00

4,151.86
136,576.00

12,050.00

21,010.16
935,830.00

750,879.00

80.24%

LCC Cash

146,576.00

15.66%

LCC Inkind
750,879.00

23,325.00

10,000.00

Prepared by :

20,000.00
4,000.00

3,000.00

MCC Grant

Grand Total

693,444.84
-

6,333.33
-

Treasurer's Bond
Sub-Total ( B )

Cost Sharing to TEPC

Cash
-

Indirect Cost
Overhead Cost

Project Supervision
Environmental Impact

BLGU

Community
Contribution

577,870.70

61,075.00
701,645.70

Handtools
Pre-engineering

840,544.84
SOURCE OF FUNDS

KALAHI-

Direct Cost
Materials
Equipment Rental

3,180.65

100.00

Breakdown of Estimated

B.

Unit Cost

SITE WORKS
CONCRETE WORKS

V
VI
VII

A.

Unit

I
II

3,000.00

38,375.00
136,576.00

3,375.00
74,275.00

100.00%

4.10%
12,050.00

Approved by :

ELSA A. TRUNO

REYNALDO DOMIO

Service Provider / MCT-DAC

BSPMC Chairperson

Checked & Reviewed by:

Concurred by :

RODSON R. ESCORA

JORJIC A. BAJADO

ACT-Deputy Area Coordinator (DAC)

Barangay Chairperson

Recommending Approval:

HON. NEIL B. CREDO

CARMEN A. GAUDIANO

Municipal Mayor

Municipal Engineer
Noted by :

GEORGE S. ISULAT
Regional Community Infrastructure Engineer Specialist

935,830.00

CON

DETA
QUANTITY

I. SITE WORKS
I - 1. Clearing and Lay-out
A. Materials
25- 2" x 2" x 12' Coco Lumber
Nylon # 16
3" CW Nails
I - 3. EMBANKMENT: Filling, Grading and Compaction
3.65 man-hour/cu.m
A. Materials
Filling Materials
I - 4. Gravel Bedding
Crew: 2 cu.m./man hour
A. Materials
Mixed and Washed Gravel
TOTAL MTERIALS COST FOR SITEWORKS
II. CONCRETE WORKS
wall footing, columns & footings, floor slab, lintel beams,
and septic tank
8.51 man-hour/cu.m
A. Materials
Portland Cement
Washed Sand
Washed Gravel
TOTAL MATERIALS COST FOR CONCRETE WORKS
III. REINFORCING STEEL BARS

UNIT COST

Unit

80.00

sq.m.

100.00
3.00
7.00

Bd. Ft.
rolls
Kgs.

15.00
30.00
65.00

18.00

Cu.m

500.00

5.00

Cu.m.

550.00

14.00

cu.m.

130.00
8.00
15.00

Bags
Cu.m.
Cu.m.

1,066.30

kgs.

3.00

days

97.00
35.00
55.00

Length
Length
Length

DESCRIPTION

No. of
Crew/
Labor

UNIT RATE /
RATE PER DAY

ADD:
FREIGHT
AND
HANDLING
COST

5.00

230.00
600.00
600.00

65.00

165.00
230.00
400.00

40.00
40.00
40.00

wall footing, columns & footings, floor slab, lintel beams,


and septic tank
1-foreman,1-steelman2-laborer
355.43 kg/day
say
A. Materials
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB

Page 14

QUANTITY

DESCRIPTION

Unit

# 16 G.I. Tie Wire


15.00
Kgs.
Hacksaw Blade
10.00
Pcs.
B. Materials for Ramp Railing & Hand Grab bar at CR
38mm dia. X 1m Stainless Steel Hand Grab Bar
1.00
pc
38mm dia. Stainless Steel Hand Ramp Railing
6.00
m
TOTAL MATERIALS COST FOR REINFORCING STEEL BARS
IV. FORMWORKS & SCAFFOLDING
(USABLE 2X) 23.00 sq.m.
Materials
100-2"x2"x12' Coco Lumber
400.00
Bd.Ft
20-2"x2"x10' Coco Lumber for Bracing
67.00
Bd.Ft
1/4 thk. 4'x8' Ordinary Plywood
12.00
shts.
# 4 CWN
15.00
Kgs.
#2 CWN
5.00
Kgs.

Page 15

No. of
Crew/
Labor

UNIT COST
UNIT RATE /
RATE PER DAY

90.00
75.00

ADD:
FREIGHT
AND
HANDLING
COST

5.00
2.00

1,500.00
1,500.00

50.00
5.00
5.00

15.00
15.00
350.00
65.00
65.00

50.00
5.00
5.00

QUANTITY

DESCRIPTION

Unit

#1 CWN
5.00
Kgs.
TOTAL MATERIALS COST FOR FORMWORKS AND SCAFFOLDING
V. MASONRY WORKS
125.44 sq.m.
Crew: 2men lay 100 pcs./day
V - 1. CHB Laying
A. Materials
Portland Cement
75.00
Bags
Washed Sand
5.00
Cu.m.
4" x 8' x 16" CHB
1,647.00
Pcs
10mm dia. x 6.0m RSB
60.00
Length
# 16 G.I. Tie Wire
10.00
Kgs.
V - 2. Plastering
125.44 sq.m.
Crew: 2 men plaster 8 sq.m./day
A. Materials
Bags
Portland Cement
75.00
Washed Sand
6.00
Cu.m.
TOTAL MATERIALS COST FOR MASONRY WORKS
VI. CARPENTRY WORKS
1,747.00 Bd. Ft.
VI - 1. Roof Frame
899.00 Bd. Ft.
A. Materials
2 - 2" x 5" x 12' (Yakal)
20.00
Bd. Ft.
30 - 2" x 5" x 10' (Yakal)
250.00
Bd. Ft.
32 - 2" x 5" x 8' (Yakal)
214.00
Bd. Ft.
2- 2" x 4" x 10' (Yakal)
14.00
Bd. Ft.
10 - 2" x 4" x 8' (Yakal)
54.00
Bd. Ft.
20 - 2" x 3" x 12' (Lauaan)
120.00
Bd. Ft.
13 - 2" x 3" x 10' (Lauaan)
65.00
Bd. Ft.
8 - 2" x 3" x 8' (Lauaan)
32.00
Bd. Ft.
13 - 1" x 12" x 10' (Lauaan)
130.00
Bd. Ft.
5" CW Nails
10.00
Kgs.
4" CW Nails
10.00
Kgs.
3" CW Nails
6.00
Kgs.
2 1/2" CW Nails
5.00
Kgs.
2" CW Nails
5.00
Kgs.
20.00
Pcs.
12mm dia. X 7" Machine Bolt w/ Knot and washer
3.00
gal
Anti-Termite (e.g. solignum, )
VI - 2. Ceiling
848.00 Bd. Ft.
A. Materials
162- 2" x 2" x 12' Ceiling Joist (Lauaan)
648.00
Bd. Ft.
50 - 2" x 2" x 12' Hangers (Lauaan)
200.00
Bd. Ft.
1
/4" x 4' x 8' Ordinary Plywood
35.00
Shts.
4" CW Nails
10.00
Kgs.
3" CW Nails
7.00
Kgs.
1
/2 " CW Nails
7.00
Kgs.
TOTAL MATERIALS COST FOR CARPENTRY WORKS
VII. DOORS AND WINDOWS
18.44
s-m

Page 16

No. of
Crew/
Labor
5.00

UNIT COST
UNIT RATE /
RATE PER DAY

65.00

ADD:
FREIGHT
AND
HANDLING
COST

5.00

230.00
600.00
15.00
165.00
90.00

65.00

230.00
600.00

65.00

25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
65.00
65.00
65.00
65.00
65.00
30.00

4.00
40.00
5.00

5.00
5.00
5.00
5.00
5.00

750.00

25.00
25.00
350.00
65.00
65.00
65.00

50.00
5.00
5.00
5.00

QUANTITY

DESCRIPTION

Unit

No. of
Crew/
Labor

UNIT COST
UNIT RATE /
RATE PER DAY

DOORS

ADD:
FREIGHT
AND
HANDLING
COST

D - 1, (1.0m x 2.10m) Panel Door with on 150mm hard


wood jamb (e.g. yakal, guijo)

D - 2, (0.60m x 2.10m) Flush Door with on 150mm hard


wood jamb (e.g. yakal, guijo)

Lockset (high quality doorknob)

Sets

850.00

5.00

( 3-1/2" x 3-1/2" ) loose pin hinges


WINDOWS
W - 1, (2.40m X 1.20m) Clear glass jalousie window on
standard aluminum housing on 150mm hard wood jamb

Sets

50.00

5.00

2.00

W - 2, (1.20m X 1.20m) Clear glass jalousie window on


standard aluminum housing on 150mm hard wood jamb

5.00

Page 17

Sets
Set

Sets
Sets

5,000.00
4,000.00

1,500.00
1,000.00

QUANTITY

DESCRIPTION

W - 3, (0.60m X 1.20m) Clear glass jalousie window on


standard aluminum housing on 150mm hard wood jamb
W - 5, (0.60m X 0.60m) Clear glass jalousie window on
standard aluminum housing on 150mm hard wood jamb

2.00
1.00

Unit

Sets
Sets

W - 6, (0.40m X 0.60m) Clear glass jalousie window on


Sets
standard aluminum housing on 150mm hard wood jamb
2.00
TOTAL MATERIALS COST FOR DOORS & WINDOWS
VIII. ROOFING
65.00 sq.m.
1-foreman,2-carpenter,3-laborer
13 sq.m/day
say
5.00
day
A. Materials
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)
pcs
20.00
15.00
Colorib No. 24, x 8' Pre formed Side Gutter
pcs
10.00
Colorib No. 24, x 8' Pre formed Ridgeroll
pcs
Roof Sealant
2.00
Ltrs
Tex Screw 2 1/2" (for wood)
1,300.00
Pcs.
Blind Rivets 1/8" x 2"
2.00
box
TOTAL MATERIALS COST FOR ROOFING
Lot
IX. PLUMBING WORKS
1.00
A. Materials
VII-I Plumbing Fixtuers:
Water closet
2.00
Units
4" x 4" PVC Floor Drain
2.00
Sets
VII-II Sewer Line:
4" x 3.0m dia. PV Pipe
6.00
Length
3" x 3.0m dia. PV Pipe
6.00
Length
2" X 3.0m PV Pipe
6.00
Length
Pcs.
2" dia. X 900 PVC Bend Elbow
4.00
0
Pcs.
4" dia. X 90 PVC Bend Elbow
2.00
0
Pcs.
4" dia. X 45 PVC Bend Elbow
2.00
4" x 3" Wye
2.00
Pcs.
2" dia. PVC P-Trap
3.00
Pcs.
4" dia.PVC Clean Out Plug
1.00
Pcs.
4" dia.x 4" dia. PVC Wye
2.00
Pcs.
3" dia. X 90deg. PVC elbow
12.00
Pcs.
Solvent Cement
1.00
Pint
VII-III For Water Line:
Sets
Wallhung lavatory with faucet and supply pipe
1.00
/2" x 3.0m PVC pipe

No. of
Crew/
Labor

UNIT COST
UNIT RATE /
RATE PER DAY

ADD:
FREIGHT
AND
HANDLING
COST

900.00
600.00
500.00

1,800.00
615.00
615.00
400.00
2.00
270.00

40.00
0.25
5.00

1,800.00
150.00

300.00
5.00

700.00
600.00
500.00
50.00
50.00
50.00
60.00
70.00
50.00
50.00
50.00
100.00

15.00
15.00
15.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

1,500.00

300.00

10.00

Length

165.00

15.00

/2" dia. Gate valve

1.00

Pcs.

205.00

5.00

/2" PVC Coupling

9.00

Pcs.

50.00

5.00

/2" PVC 90 deg. Bend elbow

4.00

Pcs.

55.00

5.00

/2" PVC Tee

3.00

Pcs.

60.00

5.00

/2" PVC female threaded adoptor

2.00

Pcs.

85.00

5.00

1
1
1
1
1

Page 18

/2" Faucet, hosebib, brass

Teflon Tape
IX-III For Downspouts:
3" dia. x 3.0m PVC Pipe
3" dia. x 3" PVC Tee
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement
TOTAL MATERIALS COST FOR PLUMBING WORKS
X. TILE WORKS
A. Materials
8" x 8" Glazed Tiles
8" x 8" Unglazed Tiles
White cement / Tile Grout

Unit

2.00

Pcs.

300.00

3.00

Pcs.

40.00

length
pc
pc
pint

350.00
95.00
600.00
350.00

8.00
4.00
16.00
1.00
5.00
180.00
200.00
3.00

Page 19

UNIT COST

QUANTITY

DESCRIPTION

No. of
Crew/
Labor

UNIT RATE /
RATE PER DAY

ADD:
FREIGHT
AND
HANDLING
COST

5.00

sq.m.
Pcs.
Pcs.
kls.

30.00
30.00
85.00

2.00
2.00
5.00

Tile Trim
TOTAL MATERIALS COST FOR TILEWORKS
XI. ELECTRICAL WORKS
A. Materials
Interior Rough in
2" x 4" Utility Boxes Pvc
4" x 4" Junction Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Electrical Fixtures
Flourescent Lamp, 40 watts
50 watts incandescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Ligthing Outlet ( 4" Porcelain Receptacle w/
Female Adoptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Safety Switch

QUANTITY

DESCRIPTION

Unit

3.00

Pcs.

1.00

Lot

12.00
7.00
1.00
1.00

pcs.
pcs.
length
pc.

2.00
30.00
10.00
80.00
3.00
7.00
2.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00
1.00

UNIT COST
UNIT RATE /
RATE PER DAY

105.00

ADD:
FREIGHT
AND
HANDLING
COST

5.00

25.00
25.00
175.00
80.00

5.00
5.00
15.00
5.00

box
m
Pcs.
m
Pcs.

4,300.00
55.00
45.00
70.00
25.00

60.00
2.00
2.00
2.00

assy
set
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
unit
Pcs.
Set

300.00
250.00
200.00
150.00
180.00
150.00
75.00
2,000.00
75.00
500.00

60.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

550.00
450.00
500.00
650.00
700.00
500.00
150.00
150.00
150.00
150.00
150.00
450.00
30.00
40.00

20.00
20.00
20.00
20.00
20.00
20.00
5.00
5.00
5.00
5.00
5.00
20.00
1.00
1.00

TOTAL MATERIALS COST FOR ELECTRICAL WORKS


XII. PAINTING WORKS
265.00 sq.m.
1-foreman,2-painter,3-laborer
37.86 sq.m/day
say
7.00
days
A. Materials
Cocrete Putty
3.00
Gals
Concrete Neutralizer
4.00
Gals
Flat Latex White
8.00
Gals
Semi-Gloss Latex White
8.00
Gals
Quick Dry Enamel White
6.00
Gal
Flat Enamel White
5.00
Gals
Latex Tinting Color Rawsienna
2.00
Pints
Latex Tinting Color Red
2.00
Pints
Latex Tinting Color Blue
1.00
Pints
Latex Tinting Color Yellow
1.00
Pints
Latex Tinting Color Green
1.00
Pints
Paint Thinner
4.00
Gal
Sandpaper #100
5.00
shts
Sandpaper #200
10.00
shts
TOTAL FOR PAINTING

Page 20

No. of
Crew/
Labor

QUANTITY

DESCRIPTION

Unit

No. of
Crew/
Labor

XIII. STEEL BILLBOARD AND ROOF SIGNAGE


1.00
LOT
A. Materials
Supply and Install Roof Signage
1.00
lot
Supply and Install Community Project Steel Billboard
1.00
lot
Supply and Install Bronze Building Marker
1.00
lot
TOTAL FOR STEEL BILLBOARD, ROOF SIGNAGE AND BUILDING MARKER
XIV. BASIC AMENITIES
1.00
Lot
Sets
Blackboard
1.00

UNIT COST
UNIT RATE /
RATE PER DAY

2,500.00
6,500.00
8,000.00

1,000.00

Height = 1.20m , Width = 0.025m , Length = 1.50m ; made


of
6mm thick lawanit with 25mm x 50mm wood frame with
paint.
Teacher's table with chair

1.00

Unit

2,000.00

Height = 0.82m , Width = 0.70m , Length = 0.90m ; made of


12mm thick plywood on wooden frame with atleast 1
drawer.
Children tables

5.00

Unit

1,000.00

25.00

Unit

300.00

10.00

L-m

600.00

Height = 0.50m , Width = 0.60m , Length = 1.20m made of


12 mm thick plywood with 25mm x 50mm wooden frame.
Child's chairs
Height = 0.30m , Width = 0.30m , Length = 0.30m made of
12mm thick plywood with 25mm x 44mm wooden frame.
Low shelves (0.90- 3 layers)
TOTAL FOR BASIC AMENITIES
Direct Cost Summary
Materials
Labor :
1) Skilled
2) Unskilled
Sub-Total ( A )
TOTAL DIRECT COST
B. INDIRECT COST
1. OVERHEAD COST
Foreman / Leadman

45.00

day

1.00

pc

1.00

350.00

TOTAL FOR OVERHEAD COST


2. HANDTOOLS AND PROTECTIVE EQUIPMENT (PPE)
Shovel w/ handle

Page 21

30.00

ADD:
FREIGHT
AND
HANDLING
COST

QUANTITY

DESCRIPTION

Crow Bar

Unit

No. of
Crew/
Labor

UNIT COST
UNIT RATE /
RATE PER DAY

1.00

pc

30.00

Concrete Pail

10.00

pc

35.00

Wheel Barrow

1.00

pc

600.00

Sledge Hammer (5kg) w/ handle

1.00

pc

400.00

Hard Hat

5.00

pc

350.00

10.00

pcs

35.00

1.00

set

500.00

3.1 Preparation of Plans

10.00

days

3.2 Reproduction of plans

50.00

sht

4.1 Municipal Engineer

10.00

day

1.00

800.00

4.2 BSPMC Volunteers

30.00

day

1.00

250.00

5.1 Warning Signs

5.00

pc

300.00

5.2 Barricades

5.00

pc

250.00

Hand Glooves
Medicine Kit
TOTAL FOR HANDTOOLS
3. PRE-ENGINEERING

1.00

250.00
50.00

TOTAL FOR PRE-ENGINEERING


4. PROJECT SUPERVISION

TOTAL FOR ENGINEERING SUPERVISION


5. ENVIRONMENTAL IMPACT

TOTAL FOR ENGINEERING SUPERVISION


6. ADMINISTRATIVE COST (Pls see separate calculation)
TOTAL FOR ADMINISTRATIVE COST
7. MATERIAL TESTING
TOTAL FOR MATERIAL TESTING
8. TREASURER'S BOND
TOTAL FOR MATERIAL TESTING
9. CONTINGENCY (5% of DC)
TOTAL FOR CONTINGENCY
TOTAL INDIRECT COST

TOTAL MATERIALS DIRECT COST


Prepared by :

Checked & Reviewed by:

RESTITUTO E. MIRA JR.

GERUNDIO C. BAUTSTA JR.

Municipal Engineer

Deputy Area Coordinator

Page 22

ADD:
FREIGHT
AND
HANDLING
COST

Republic of the Philippines


Department of Social Welfare and Development
KALAHI-CIDSS : KKB PROJECT
Province of Surigao Del Norte
Municipality of Gigaquit
Barangay Sico-sico
CONSTRUCTION OF 1 UNIT - 6M X 8M DAY CARE CENTER

DETAILED MATERIALS COST ESTIMATES


COST SHARING
TOTAL UNIT
COST

TOTAL

KALAHI
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

15.00
30.00
70.00

1,500.00
90.00
490.00

1,050.00
63.00
343.00

450.00
27.00
147.00

500.00

9,000.00

6,300.00

2,700.00

550.00

2,750.00
13,830.00

1,925.00
9,681.00

38,350.00
4,800.00
9,000.00
52,150.00

33,185.00
3,360.00
6,300.00
42,845.00

19,885.00
9,450.00
24,200.00

19,885.00
6,615.00
16,940.00

295.00
600.00
600.00

205.00
270.00
440.00

825.00
4,149.00

5,165.00
1,440.00
2,700.00
9,305.00

2,835.00
7,260.00

Page 23

COST SHARING
TOTAL UNIT
COST

TOTAL

KALAHI
GRANT

95.00
77.00

1,425.00
770.00

997.50
539.00

1,500.00
1,500.00

1,500.00
9,000.00
66,230.00

1,500.00
9,000.00
55,476.50

6,000.00
1,005.00
4,800.00
1,050.00
350.00

4,200.00
703.50
3,360.00
735.00
245.00

15.00
15.00
400.00
70.00
70.00

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH
427.50
231.00

10,753.50

1,800.00
301.50
1,440.00
315.00
105.00

Page 24

COST SHARING
TOTAL UNIT
COST
70.00

TOTAL

KALAHI
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

350.00
13,555.00

245.00
9,488.50

295.00
600.00
19.00
205.00
95.00

22,125.00
3,000.00
31,293.00
12,300.00
950.00

15,487.50
2,100.00
21,905.10
8,610.00
665.00

6,637.50
900.00
9,387.90
3,690.00
285.00

295.00
600.00

22,125.00
3,600.00
95,393.00

15,487.50
2,520.00
66,775.10

6,637.50
1,080.00
28,617.90

25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
70.00
70.00
70.00

500.00
6,250.00
5,350.00
350.00
1,350.00
3,000.00
1,625.00
800.00
3,250.00
700.00
700.00
420.00

350.00
4,375.00
3,745.00
245.00
945.00
2,100.00
1,137.50
560.00
2,275.00
490.00
490.00
294.00

150.00
1,875.00
1,605.00
105.00
405.00
900.00
487.50
240.00
975.00
210.00
210.00
126.00

70.00
70.00
30.00

350.00
350.00
600.00

245.00
245.00
420.00

105.00
105.00
180.00

750.00

2,250.00

1,575.00

675.00

25.00
25.00

16,200.00
5,000.00

16,200.00
5,000.00

400.00
70.00
70.00

14,000.00
700.00
490.00

14,000.00
700.00
490.00

70.00

490.00
64,725.00

490.00
56,371.50

Page 25

105.00
4,066.50

8,353.50

COST SHARING
TOTAL UNIT
COST

TOTAL

KALAHI
GRANT

COMMUNITY
INKIND

1,655.50

BLGU
CASH

MLGU
INKIND

CASH

5,000.00

10,000.00

8,344.50

4,000.00

4,000.00

4,000.00

855.00

1,710.00

1,710.00

55.00

440.00

440.00

1,500.00

3,000.00

3,000.00

1,000.00

5,000.00

5,000.00

Page 26

COST SHARING
TOTAL UNIT
COST

TOTAL

KALAHI
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

900.00

1,800.00

1,800.00

600.00

600.00

600.00

500.00

1,000.00
27,550.00

1,000.00
13,055.50

36,000.00
9,225.00
6,150.00
880.00
2,925.00
550.00
55,730.00

36,000.00
9,225.00
6,150.00
880.00
2,925.00
550.00
55,730.00

2,100.00
155.00
715.00
615.00
515.00
55.00
55.00
55.00
65.00
75.00
55.00
55.00
55.00
105.00
-

4,200.00
310.00
4,290.00
3,690.00
3,090.00
220.00
110.00
110.00
130.00
225.00
55.00
110.00
660.00
105.00
-

4,200.00
310.00
4,290.00
3,690.00
3,090.00
220.00
110.00
110.00
130.00
225.00
55.00
110.00
660.00
105.00
-

1,800.00

1,800.00

1,800.00

180.00

1,800.00

1,800.00

210.00

210.00

210.00

55.00

495.00

495.00

60.00

240.00

240.00

65.00

195.00

195.00

90.00

180.00

180.00

1,800.00
615.00
615.00
440.00
2.25
275.00

Page 27

14,494.50

COST SHARING
TOTAL UNIT
COST

TOTAL

KALAHI
GRANT

305.00

610.00

610.00

40.00

120.00

120.00

350.00
95.00
600.00
350.00

2,800.00
380.00
9,600.00
350.00
36,085.00

2,800.00
380.00
9,600.00
350.00
36,085.00

5,760.00
6,400.00
270.00

5,760.00
6,400.00
270.00

32.00
32.00
90.00

COMMUNITY
INKIND

Page 28

BLGU
CASH

MLGU
INKIND

CASH

COST SHARING
TOTAL UNIT
COST
110.00

30.00
30.00
190.00
85.00
4,360.00
57.00
47.00
72.00
25.00
360.00
255.00
205.00
155.00
185.00
155.00
80.00
2,005.00
80.00
505.00

570.00
470.00
520.00
670.00
720.00
520.00
155.00
155.00
155.00
155.00
155.00
470.00
31.00
41.00

TOTAL

KALAHI
GRANT

330.00
12,760.00

330.00
12,760.00

360.00
210.00
190.00
85.00
8,720.00
1,710.00
470.00
5,760.00
75.00
2,520.00
510.00
410.00
620.00
925.00
1,085.00
400.00
2,005.00
400.00
505.00

360.00
210.00
190.00
85.00
8,720.00
1,710.00
470.00
5,760.00
75.00
2,520.00
510.00
410.00
620.00
925.00
1,085.00
400.00
2,005.00
400.00
505.00

26,960.00

1,710.00
1,880.00
4,160.00
5,360.00
4,320.00
2,600.00
310.00
310.00
155.00
155.00
155.00
1,880.00
155.00
410.00
23,560.00

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

26,960.00

1,710.00
1,880.00
4,160.00
5,360.00
4,320.00
2,600.00
310.00
310.00
155.00
155.00
155.00
1,880.00
155.00
410.00
23,560.00

Page 29

COST SHARING
TOTAL UNIT
COST

TOTAL

KALAHI
GRANT

COMMUNITY
INKIND

2,500.00
6,500.00
8,000.00
17,000.00

2,500.00
6,500.00
8,000.00
17,000.00

1,000.00

1,000.00

1,000.00

2,000.00

2,000.00

2,000.00

1,000.00

5,000.00

5,000.00

300.00

7,500.00

7,500.00

600.00

6,000.00
21,500.00

6,000.00
21,500.00

2,500.00
6,500.00
8,000.00

BLGU
CASH

MLGU
INKIND

CASH

350.00

30.00

15,750.00

13,500.00

2,250.00

15,750.00

13,500.00

2,250.00

30.00

30.00

Page 30

COST SHARING
TOTAL UNIT
COST

TOTAL

KALAHI
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

30.00

30.00

30.00

35.00

350.00

350.00

600.00

600.00

600.00

400.00

400.00

400.00

350.00

1,750.00

1,750.00

35.00

350.00

350.00

500.00

500.00

500.00

4,010.00
250.00

2,500.00

50.00

2,500.00

8,000.00

250.00

7,500.00

2,600.00

2,500.00

7,500.00

15,500.00

7,500.00

300.00

1,500.00

1,500.00

250.00

1,250.00

60.00

2,750.00

40,000.00

1,190.00

1,560.00

35,000.00

40,000.00
4,000.00

4,000.00

4,000.00

4,000.00

3,375.00

1,190.00
5,000.00

35,000.00

5,000.00

3,375.00

3,375.00

Noted by:

1,410.00

2,500.00

5,000.00
800.00

10,473.25

10,473.25

10,473.25

10,473.25

100,858.25

27,973.25

100,858.25

447,288.10

9,750.00

3,375.00
45,035.00

1,410.00

Approved by :

6,190.00

79,739.90
Concurred by :

MACRINO L. SUMAGANG

ANGELITA J. EROLES

Regional Community Infrastructure Engineer

BSPMC Chairperson

Page 31

FERNANDO B

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND

450.00
27.00
147.00

450.00
27.00
147.00

2,700.00

2,700.00

825.00
4,149.00

825.00
4,149.00

1,500.00
90.00
490.00
9,000.00
2,750.00
13,830.00

5,165.00
1,440.00
2,700.00
9,305.00

5,165.00
1,440.00
2,700.00
9,305.00

38,350.00
4,800.00
9,000.00
52,150.00

2,835.00
7,260.00

2,835.00
7,260.00

19,885.00
9,450.00
24,200.00

Page 32

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND

427.50
231.00
10,753.50

427.50
231.00
10,753.50

1,425.00
770.00
1,500.00
9,000.00
66,230.00

1,800.00
301.50
1,440.00
315.00
105.00

1,800.00
301.50
1,440.00
315.00
105.00

6,000.00
1,005.00
4,800.00
1,050.00
350.00

Page 33

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH
-

TOTAL

INKIND

105.00
4,066.50

105.00
4,066.50

350.00
13,555.00

6,637.50
900.00
9,387.90
3,690.00
285.00

6,637.50
900.00
9,387.90
3,690.00
285.00

22,125.00
3,000.00
31,293.00
12,300.00
950.00

6,637.50
1,080.00
28,617.90

6,637.50
1,080.00
28,617.90

22,125.00
3,600.00
95,393.00

150.00
1,875.00
1,605.00
105.00
405.00
900.00
487.50
240.00
975.00
210.00
210.00
126.00

150.00
1,875.00
1,605.00
105.00
405.00
900.00
487.50
240.00
975.00
210.00
210.00
126.00

500.00
6,250.00
5,350.00
350.00
1,350.00
3,000.00
1,625.00
800.00
3,250.00
700.00
700.00
420.00

105.00
105.00
180.00

105.00
105.00
180.00

350.00
350.00
600.00

675.00

675.00

2,250.00

16,200.00
5,000.00

14,000.00
700.00
490.00

8,353.50

Page 34

8,353.50

490.00
64,725.00

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND

8,344.50

8,344.50

10,000.00

4,000.00

4,000.00

4,000.00

1,710.00

1,710.00

1,710.00

440.00

440.00

440.00

3,000.00

5,000.00

Page 35

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND
-

1,800.00

600.00

14,494.50

14,494.50

1,000.00
27,550.00

36,000.00
9,225.00
6,150.00
880.00
2,925.00
550.00
55,730.00

4,200.00
310.00
4,290.00
3,690.00
3,090.00
220.00
110.00
110.00
130.00
225.00
55.00
110.00
660.00
105.00
-

1,800.00

1,800.00

210.00

495.00

240.00

195.00

180.00

Page 36

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND
-

610.00

120.00
2,800.00
380.00
9,600.00
350.00
36,085.00

5,760.00
6,400.00
270.00

Page 37

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND
-

330.00
12,760.00

360.00
210.00
190.00
85.00
8,720.00
1,710.00
470.00
5,760.00
75.00
2,520.00
510.00
410.00
620.00
925.00
1,085.00
400.00
2,005.00
400.00
505.00

26,960.00

1,710.00
1,880.00
4,160.00
5,360.00
4,320.00
2,600.00
310.00
310.00
155.00
155.00
155.00
1,880.00
155.00
410.00
23,560.00

Page 38

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND

2,500.00
6,500.00
8,000.00
17,000.00

1,000.00

2,000.00
5,000.00
7,500.00

6,000.00
21,500.00

2,250.00

2,250.00

15,750.00

2,250.00

2,250.00

15,750.00

30.00

30.00

30.00

Page 39

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND
-

30.00

30.00

30.00

350.00

350.00

350.00

600.00

600.00

600.00

400.00

400.00

400.00

1,750.00

1,750.00

1,750.00

350.00

350.00

350.00

500.00

500.00

500.00

4,010.00

4,010.00

2,600.00

1,410.00

2,500.00

2,500.00

2,500.00

2,500.00

2,500.00

2,500.00

5,000.00

5,000.00

8,000.00

8,000.00

8,000.00

7,500.00

7,500.00

7,500.00

15,500.00

15,500.00

15,500.00

2,500.00
2,500.00

2,500.00

8,000.00
8,000.00

10,500.00

1,500.00

1,500.00

1,500.00

1,250.00

1,250.00

1,250.00

2,750.00

2,750.00

2,750.00

40,000.00

40,000.00

40,000.00

40,000.00

40,000.00

40,000.00

4,000.00

4,000.00

3,375.00

3,375.00

3,375.00

3,375.00

3,375.00

3,375.00

10,473.25

10,473.25

51,225.00

79,739.90

FERNANDO B. LOPEZ

2,500.00

21,660.00

72,885.00

100,858.25

79,739.90

100,858.25

ATTY. CARLOS M. EGAY SR.

Barangay Captain

Municipal Mayor

Page 40

CON

DESCRIPTION

I. SITE WORKS
B. Labor
Carpenter
Laborer

QUANTITY

DE

Unit

1.00
1.00

Day/s
Day/s

22.50

cu.m.

3.00

No. of
Crew/
Labor

LABOR DIRECT COST


UNIT RATE /
RATE PER DAY

1.00
2.00

300.00
200.00

Day/s

6.00

200.00

3.00

Day/s

4.00

200.00

1.00

Day/s

3.00

200.00

14.00

cu.m.

4.00
4.00

Day/s
Day/s

2.00
6.00

300.00
200.00

1,066.30

kgs.

3.00
3.00

Day/s
Day/s

1.00
2.00

300.00
200.00

2.00
2.00

300.00
200.00

Sub-Total
I - 2. Structural Excavation
6 man-hour/cu.m
Column Footing, Wall Footing & Septic Vault
A. Labor
Laborer
Sub-Total
I - 3. EMBANKMENT: Filling, Grading and Compaction
B. Labor
Laborer
Sub-Total
I - 4. Gravel Bedding
B. Labor
Laborer
Sub-Total
TOTAL LABOR COST FOR SITEWORKS
II. CONCRETE WORKS
B. Labor
Mason
Laborer
Sub-Total
TOTAL LABOR COST FOR CONCRETE WORKS
III. REINFORCING STEEL BARS
B. Labor
Mason
Laborer
Sub-Total
TOTAL LABOR COST FOR REINFORCING STEEL BARS
IV. FORMWORKS & SCAFFOLDING
(USABLE 2X)
Labor
Carpenter
Laborer
Sub-Total

23.00
2.00
2.00

Page 41

sq.m.
Day/s
Day/s

ADD: FREIGHT
AND HANDLING
COST

QUANTITY

DESCRIPTION

TOTAL LABOR COST FOR FORMWORKS AND SCAFFOLDING


V. MASONRY WORKS
125.44
B. Labor
Mason
9.00
Laborer
9.00
Sub-Total
V - 2. Plastering
125.44
B. Labor
Mason
8.00
Laborer
Sub-Total
TOTAL LABOR COST FOR MASONRY WORKS
VI. CARPENTRY WORKS
B. Labor
Carpenters
Laborer
Sub-Total
VI - 2. Ceiling
B. Labor
Carpenters
Laborer
Sub-Total
TOTAL LABOR COST FOR CARPENTRY WORKS
VII. DOORS AND WINDOWS
DOORS

Unit

No. of
Crew/
Labor

LABOR DIRECT COST


UNIT RATE /
RATE PER DAY

sq.m.
4.00
4.00

300.00
200.00

Day/s

4.00

300.00

8.00

Day/s

4.00

200.00

#REF!

Bd. Ft.

15.00
15.00

Day/s
Day/s

2.00
3.00

300.00
200.00

#REF!

Bd. Ft.

6.00
6.00

Day/s
Day/s

2.00
3.00

300.00
200.00

18.44

s-m

2
2

Days
Days

1.00
1.00

300.00
200.00

7.00
7.00

Day/s
Day/s

1.00
1.00

300.00
200.00

2.00
3.00

300.00
200.00

2.00
2.00

300.00
200.00

Day/s
Day/s
sq.m.

B. Labor ( Installation )
Carpenters
Laborer
Sub-Total
WINDOWS
B. Labor ( Installation )
Carpenters
Laborer
Sub-Total
TOTAL LABOR COST FOR DOORS & WINDOWS
VIII. ROOFING
B. Labor
Carpenters
Laborer
Sub-Total
TOTAL LABOR COST FOR ROOFING
IX. PLUMBING WORKS
B. Labor
Plumber/ Mason
Laborer

65.00
5.00
5.00

1.00
4.00
4.00

Sub-Total
TOTAL LABOR COST FOR PLUMBING WORKS
X. TILE WORKS
B. Labor

5.00

Page 42

sq.m.
Day/s
Day/s

Lot
Day/s
Day/s

sq.m.

ADD: FREIGHT
AND HANDLING
COST

Mason
Laborer
Sub-Total
TOTAL LABOR COST FOR TILEWORKS
XI. ELECTRICAL WORKS
B. Labor
Electrician
Laborer
Sub-Total
TOTAL LABOR COST FOR ELECTRICAL WORKS
XII. PAINTING WORKS
1-foreman,2-painter,3-laborer
37.86 sq.m/day
say
B. Labor
Painter
Laborer
Sub-Total
TOTAL LABOR COST FOR PAINTING

QUANTITY

DESCRIPTION

Unit

4.00
4.00

Day/s
Day/s

1.00

Lot

7.00
7.00

Day/s
Day/s

265.00

sq.m.

7.00

days

7.00
7.00

No. of
Crew/
Labor

Day/s
Day/s

LABOR DIRECT COST


UNIT RATE /
RATE PER DAY

1.00
1.00

300.00
200.00

1.00
1.00

300.00
200.00

2.00
3.00

300.00
200.00

TOTAL LABOR DIRECT COST

Prepared by :

Checked & Reviewed by:

RESTITUTO E. MIRA JR.

GERUNDIO C. BAUTSTA JR.

Municipal Engineer

Deputy Area Coordinator

Page 43

ADD: FREIGHT
AND HANDLING
COST

Republic of the Philippines


Department of Social Welfare and Development
KALAHI-CIDSS : KKB
KALAHI-CIDSS : KKB PROJECT
Province of Surigao Del Norte
Municipality of Gigaquit
Barangay Sico-sico
CONSTRUCTION OF 1 UNIT - 6M X 8M DAY CARE CENTER

DETAILED LABOR COST ESTIMATES

COST SHARING
TOTAL UNIT
COST

300.00
200.00

200.00

200.00

200.00

300.00
200.00

300.00
200.00

300.00
200.00

TOTAL

KALAHI
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

300.00
400.00
700.00

300.00
350.00
650.00

50.00
50.00

3,600.00
3,600.00

3,150.00
3,150.00

450.00
450.00

2,400.00
2,400.00

2,100.00
2,100.00

300.00
300.00

600.00
600.00
7,300.00

525.00
525.00
6,425.00

75.00
75.00
875.00

2,400.00
4,800.00
7,200.00
7,200.00

2,400.00
4,200.00
6,600.00
6,600.00

600.00
600.00
600.00

900.00
1,200.00
2,100.00
2,100.00

900.00
1,050.00
1,950.00
1,950.00

150.00
150.00
150.00

1,200.00
800.00
2,000.00

1,200.00
700.00
1,900.00

100.00
100.00

Page 44

COST SHARING
TOTAL UNIT
COST

TOTAL

KALAHI
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

2,000.00

1,900.00

100.00

10,800.00
7,200.00
18,000.00

10,800.00
6,300.00
17,100.00

900.00
900.00

300.00

9,600.00

9,600.00

200.00

6,400.00
16,000.00
34,000.00

5,600.00
15,200.00
32,300.00

800.00
800.00
1,700.00

9,000.00
9,000.00
18,000.00

9,000.00
7,875.00
16,875.00

1,125.00
1,125.00

3,600.00
3,600.00
7,200.00
25,200.00

3,600.00
3,150.00
6,750.00
23,625.00

450.00
450.00
1,575.00

600.00
400.00
1,000.00

600.00
350.00
950.00

50.00
50.00

2,100.00
1,400.00
3,500.00
4,500.00

2,100.00
1,225.00
3,325.00
4,275.00

175.00
175.00
225.00

3,000.00
3,000.00
6,000.00
6,000.00

3,000.00
2,625.00
5,625.00
5,625.00

375.00
375.00
375.00

2,400.00
1,600.00
4,000.00
4,000.00

2,400.00
1,400.00
3,800.00
3,800.00

200.00
200.00
200.00

300.00
200.00

300.00
200.00

300.00
200.00

300.00
200.00

300.00
200.00

300.00
200.00

300.00
200.00

Page 45

COST SHARING
TOTAL UNIT
COST
300.00
200.00

300.00
200.00

300.00
200.00

TOTAL

KALAHI
GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

1,200.00
800.00
2,000.00
2,000.00

1,200.00
700.00
1,900.00
1,900.00

100.00
100.00
100.00

2,100.00
1,400.00
3,500.00

2,100.00
1,225.00
3,325.00

175.00
175.00

3,500.00

3,325.00

175.00

4,200.00
4,200.00
8,400.00
8,400.00

4,200.00
3,675.00
7,875.00
7,875.00

525.00
525.00
525.00

106,200.00

99,600.00
53,400.00
46,200.00

6,600.00

Noted by:

6,600.00
Approved by :

MACRINO L. SUMAGANG

ANGELITA J. EROLES

Regional Community Infrastructure Engineer

BSPMC Chairperson

Page 46

Concurred by :

FERNANDO B

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND

50.00
50.00

50.00
50.00

300.00
400.00
700.00
-

450.00
450.00

450.00
450.00

300.00
300.00

300.00
300.00

75.00
75.00
875.00

75.00
75.00
875.00

3,600.00
3,600.00
2,400.00
2,400.00
600.00
600.00
7,300.00

600.00
600.00
600.00

600.00
600.00
600.00

2,400.00
4,800.00
7,200.00
7,200.00

150.00
150.00
150.00

150.00
150.00
150.00

900.00
1,200.00
2,100.00
2,100.00

100.00
100.00

100.00
100.00

1,200.00
800.00
2,000.00

Page 47

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND

100.00

100.00

2,000.00

900.00
900.00

900.00
900.00

10,800.00
7,200.00
18,000.00

9,600.00

800.00
800.00
1,700.00

800.00
800.00
1,700.00

6,400.00
16,000.00
34,000.00

1,125.00
1,125.00

1,125.00
1,125.00

9,000.00
9,000.00
18,000.00

450.00
450.00
1,575.00

450.00
450.00
1,575.00

3,600.00
3,600.00
7,200.00
25,200.00

50.00

50.00

600.00
400.00
1,000.00

175.00
175.00
175.00

175.00
175.00
175.00

2,100.00
1,400.00
3,500.00
4,500.00

375.00
375.00
375.00

3,000.00
3,000.00
6,000.00
6,000.00

200.00
200.00
200.00

2,400.00
1,600.00
4,000.00
4,000.00

375.00
375.00
375.00

200.00
200.00
200.00

Page 48

NG

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC
MLGU
INKIND

CASH

TOTAL

INKIND

100.00
100.00
100.00

100.00
100.00
100.00

1,200.00
800.00
2,000.00
2,000.00

175.00
175.00

175.00
175.00

2,100.00
1,400.00
3,500.00

175.00

175.00

3,500.00

6,025.00

6,025.00

4,200.00
4,200.00
8,400.00
8,400.00

106,200.00

FERNANDO B. LOPEZ

ATTY. CARLOS M. EGAY SR.

Barangay Captain

Municipal Mayor

Page 49

Departm
KALA
K

CONSTRUCTIO

DESCRIPTION

B. INDIRECT COST
1. OVERHEAD COST
Foreman / Leadman
TOTAL INDIRECT COST FOR OVERHEAD COST
2. HANDTOOLS
Shovel w/ handle
Crow Bar
Wheel Barrow
Bolo (multi-purpose) w/ handle
Sledge Hammer (5kg) w/ handle
Concrete Pail
TOTAL INDIRECT COST FOR HANDTOOLS
3. PRE-ENGINEERING
3.1 Preparation of Plans
TOTAL INDIRECT COST FOR PRE-ENGINEERING
4. ENGINEERING SUPERVISION
4.1 Municipal Engineer
TAL INDIRECT COST FOR ENGINEERING SUPERVISION
5. PERMITS AND LICENSES
TOTAL INDIRECT COST FOR PERMITS AND LICENSES
6. ADMINISTRATIVE COST
TOTAL INDIRECT COST FOR ADMINISTRATIVE COST
7. MATERIAL TESTING
TOTAL INDIRECT COST FOR MATERIAL TESTING
8. TREASURER'S BOND
TOTAL INDIRECT COST FOR TREASURER'S BOND
9. CONTINGENCY (5% of DC)
TOTAL INDIRECT COSTFOR CONTINGENCY

QUANTITY

DETAILED

Unit

56

Days

3.00
1.00
1.00
1.00
1.00
10.00

pc
pc
pc
pc
pc
pc

10.00

days

20.00

Days

No. of
Crew/
Labor

1.00

UNIT COST
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLING
COST

400.00

450.00
500.00
1,070.00
380.00
700.00
100.00

10.00

TOTAL
UNIT COST

400.00

450.00
500.00
1,070.00
380.00
700.00
100.00

250.00

250.00

800.00

800.00

5,000.00

TOTAL INDIRECT COST


TOTAL CONSTRUCTION COST
Prepared by :

Checked & Reviewed by:

Page 50

Noted by:

QUANTITY

DESCRIPTION

Unit

No. of
Crew/
Labor

UNIT COST
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLING
COST

RESTITUTO E. MIRA JR.

GERUNDIO C. BAUTSTA JR.

Municipal Engineer

Deputy Area Coordinator

Page 51

TOTAL
UNIT COST

MACRINO

Regional Commun

Republic of the Philippines


Department of Social Welfare and Development
KALAHI-CIDSS : MAKAMASANG TUGON
KALAHI-CIDSS : KKB PROJECT
Province of Surigao Del Norte
Municipality of Gigaquit
Barangay Sico-sico

TRUCTION OF 1 UNIT - 6M X 8M DAY CARE CENTER

AILED INDIRECT COST ESTIMATES


COST SHARING
TOTAL

22,444.44
22,444.44
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
5,000.00
2,500.00
2,500.00
16,000.00
16,000.00
5,000.00
5,000.00
20,000.00
20,000.00
4,000.00
4,000.00
3,375.00
3,375.00
21,010.16
21,010.16

99,329.61
99,329.61

COMMU
NITY
INKIND

KALAHI
GRANT

20,250.00
20,250.00

BLGU
CASH

MLGU
INKIND

CASH

1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
5,000.00

Err:509
-

4,000.00
4,000.00

21,010.16
21,010.16

45,260.16
45,260.16

SUB-TOTAL LC

5,000.00
5,000.00

Approved by :

INKIND

2,194.44
2,194.44

5,000.00
5,000.00
Err:509
3,375.00
3,375.00
-

10,569.44
10,569.44
Concurred by :

Page 52

CASH

2,500.00
2,500.00
16,000.00
16,000.00
-

18,500.00
18,500.00

2,194.44
2,194.44
5,000.00
5,000.00
Err:509
Err:509
3,375.00
3,375.00
-

Err:509
Err:509

COST SHARING
TOTAL

KALAHI
GRANT

MACRINO L. SUMAGANG

al Community Infrastructure Engineer

COMMU
NITY
INKIND

SUB-TOTAL LC

BLGU
CASH

MLGU
INKIND

ANGELITA J. EROLES
BSPMC Chairperson

Page 53

CASH

INKIND

CASH

FERNANDO B. LOPEZ
Barangay Captain

TOTAL LCC
(CASH &
INKIND)

SUB-TOTAL LCC

TOTAL

INKIND

2,194.44
2,194.44

22,444.44
22,444.44

1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
5,000.00

1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
5,000.00

2,500.00
2,500.00

2,500.00
2,500.00

1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
5,000.00
0.00
2,500.00
2,500.00

16,000.00
16,000.00
-

16,000.00
16,000.00
5,000.00
5,000.00
Err:509
Err:509
3,375.00
3,375.00
-

16,000.00
16,000.00
5,000.00
5,000.00
Err:509
Err:509
4,000.00
4,000.00
3,375.00
3,375.00
21,010.16
21,010.16

23,500.00
23,500.00

Err:509
Err:509

Err:509
Err:509

Page 54

SUB-TOTAL LCC

TOTAL LCC
(CASH &
INKIND)

TOTAL

INKIND

ATTY. CARLOS M. EGAY SR.


Municipal Mayor

Page 55

BARANGAY SUB-PROJECT WORK SCHEDULE & PHYSICAL PROGRESS REP


Name of Sub-Project

: Construction of One(1) Unit Pre-School Classroom Building

Sub-Project duration

: 80

Physical Target

:
:
:
:
:

Region
Province
Municipality
Barangay

Calendar Days

63 Sq. M.
VII-VISAYAS
Negros Oriental
Dauin
Tugawe

Total Sub-Project Cost

: P

935,830.00

Direct Cost
Indirect Cost
Date Started
Target Completion
Mode of Implementation

: P
840,544.84
: P
95,285.16
:
:
: Community Force Account/Local Shopping for Goods

I. To be filled up by Deputy Area Coordinator


ITEM
NO.
I

DESCRIPTION

SITE WORKS

II

CONCRETE WORKS

III

REINFORCING STEEL
BARS

QTY

UNIT

80.00 sq.m.

23.37 cu.m.

2,834.10

kgs.

AMOUNT

33,974.55

WEIGHT

PHYSICAL

(%)

TARGET

4.04%

110,331.00

13.13%

123,816.05

14.73%

IV

FORMWORKS AND
SCAFOLDING

23.00 sq.m.

22,931.50

2.73%

MASONRY WORKS

125.44 sq.m.

118,449.64

14.09%

VI

CARPENTRY WORKS

VII DOORS AND WINDOWS

VIII ROOFING

IX

PLUMBING WORKS

TILE WORKS

XI

ELECTRICAL WORKS

XII PAINTING WORKS

XIII

STEEL BILLBOARD AND


ROOF SIGNAGES

1,747.00 bd.ft.

145,388.20

17.30%

18.44 sq.m.

70,680.00

8.41%

65.00 sq.m.

1.00

lot.

14.56 sq.m.

1.00

lot.

265.00 sq.m.

1.00

lot.

77,558.50

9.23%

35,858.10

4.27%

23,751.00

2.83%

30,219.35

3.60%

29,406.30

3.50%

15,000.00

1.78%

PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED

1ST MONTH
WEEK 1

WEEK 2

WEEK 3

2ND MONTH
WEEK 4

WEEK 5

WEEK 6

WEEK 7

WEEK 8

WEEK 9

XIII

STEEL BILLBOARD AND


ROOF SIGNAGES

XIV BASIC AMINITIES

1.00

lot.

15,000.00

1.78%

1.00

lot.

3,180.65

0.38%

T O T A L

840,544.84

100.00%

ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL

II. To be filled up by Deputy Area Coordinator

% PROGRESS (Planned)
PHYSICAL
% PROGRESS (Actual)
PROGRESS (Planned)
FINANCIAL
PROGRESS (Actual)
Prepared by:

PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
Concurred by:

PIT Chairperson

MIT Team Leader

5%

6%

8%

9%

10%

12%

14%

11%

10%

5%

11%

19%

28%

38%

50%

64%

75%

85%

42,027.24

50,432.69

67,243.59

75,649.04

84,054.48

100,865.38

117,676.28

92,459.93

84,054.

42,027.24

92,459.93

159,703.52

235,352.56

319,407.04

420,272.42

537,948.70

630,408.63

714,463

Checked by & Reviewed by:

RODSON R. ESCORA
Deputy Area Coordinator

CARMEN A. GAUDIANO
Municipal Engineer

WORK SCHEDULE & PHYSICAL PROGRESS REPORT

LABOR
SKILLED
UNSKILLED

unity Force Account/Local Shopping for Goods

TOTAL

STATUS

No. of Days

Male
Female
Male
Female
Male
Female

80
80

3RD MONTH
WEEK 9

WEEK 10

WEEK 11

Average
Rate/Day
300.00
200.00

4TH MONTH
WEEK 12

WEEK 13

WEEK 14

WEEK 15

WEEK 16

10%

8%

4%

3%

85%

93%

97%

100%

84,054.48

67,243.59

33,621.79

25,216.35

714,463.11

781,706.70

815,328.49

840,544.84

Approved by:

Noted by:

BSPMC

GEORGE S. ISULAT
Regional Infra. Engineer

Republic of the Philippines


Department of Social Welfare and Development
KALAHI-CIDSS : MCC PROJECT
Province of Negros Oriental
Municipality of Dauin
Barangay Tugawe
CONSTRUCTION OF 1 UNIT, ONE (1) CLASSROOM PRE-SCHOOL BUILDING

QUANTITY

BILL OF QUANTITIES

DESCRIPTION

I. SITE WORKS
I - 1. Clearing and Lay-out
A. Materials
25- 2" x 2" x 12' Coco Lumber
Nylon # 16
3" CW Nails

UNIT COST
Unit

80.00

sq.m.

100.00
2.00
7.00

Bd. Ft.
Kgs.
Kgs.

1.00
1.00

Day/s
Day/s

No. of
Crew/
Labor

COST SHARING

ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST

25.00
350.00
65.00

0.25
3.50
0.65

TOTAL UNIT
COST

1.00
2.00

300.00
275.00

2,525.00
707.00
459.55
3,691.55

2,104.17
589.17
382.96
3,076.29

300.00
275.00

300.00
550.00
850.00

300.00
400.00
700.00

Sub-Total
I - 2. Structural Excavation
6 man-hour/cu.m
Column Footing, Wall Footing & Septic Vault
A. Labor
Laborer

22.50

KALAHI GRANT

25.25
353.50
65.65

Sub-Total
B. Labor
Carpenter
Laborer

SUB-TOTAL LCC
TOTAL

COMMUNITY
INKIND

150.00
150.00

BLGU
CASH

TOTAL LCC
(CASH &
INKIND)

MLGU
INKIND

CASH

INKIND

420.83
117.83
76.59
615.26

CASH

TOTAL

INKIND

420.83
117.83
76.59
615.26
-

150.00
150.00

420.83
117.83
76.59
615.26

2,525.00
707.00
459.55
3,691.55

150.00
150.00

300.00
550.00
850.00

cu.m.
-

4.00

Sub-Total
I - 3. EMBANKMENT: Filling, Grading and Compaction
3.65 man-hour/cu.m
A. Materials
Filling Materials
Sub-Total
B. Labor
Laborer
Sub-Total
I - 4. Gravel Bedding
Crew: 2 cu.m./man hour
A. Materials
Mixed and Washed Gravel
Sub-Total
B. Labor
Laborer
Sub-Total
TOTAL FOR SITEWORKS
II. CONCRETE WORKS

Day/s

20.00

Cu.m

4.00

Day/s

6.00

3.00

23.37

wall footing, columns & footings, floor slab, lintel beams,


and septic tank
8.51 man-hour/cu.m
A. Materials
Portland Cement
250.00
Washed Sand
20.00
Washed Gravel
27.00
Sub-Total
B. Labor
Mason
5.00
Laborer
5.00
Sub-Total
TOTAL FOR CONCRETE WORKS
2,834.10
III. REINFORCING STEEL BARS

6.00

550.00

4.00

3.00

275.00

5.50

275.00

800.00

Cu.m.

Day/s

275.00

8.00

275.00

6,600.00
6,600.00

4,800.00
4,800.00

555.50

11,110.00
11,110.00

9,258.33
9,258.33

275.00

4,400.00
4,400.00

3,200.00
3,200.00

4,848.00
4,848.00

4,040.00
4,040.00

2,475.00
2,475.00
33,974.55

1,800.00
1,800.00
26,874.63

252.50
707.00
808.00

63,125.00
14,140.00
21,816.00
99,081.00

52,604.17
11,783.33
18,180.00
82,567.50

300.00
275.00

3,000.00
8,250.00
11,250.00
110,331.00

3,000.00
6,000.00
9,000.00
91,567.50

151.50
222.20
373.70
656.50
3,076.10
1,212.00
60.60

40,450.50
1,555.40
41,107.00
24,947.00
4,614.15
3,636.00
606.00
116,916.05

33,708.75
1,296.17
34,255.83
20,789.17
3,845.13
3,030.00
505.00
97,430.04

300.00
275.00

3,600.00
3,300.00
6,900.00
123,816.05

3,600.00
2,400.00
6,000.00
103,430.04

25.25
25.25
353.50
65.65
65.65
65.65

10,100.00
1,691.75
4,242.00
984.75
656.50
656.50
18,331.50

8,416.67
1,409.79
3,535.00
820.63
547.08
547.08
15,276.25

300.00
275.00

2,400.00
2,200.00
4,600.00
22,931.50

2,400.00
1,600.00
4,000.00
19,276.25

252.50
707.00
12.12
151.50
70.70

21,462.50
4,949.00
19,961.64
9,090.00
707.00
56,170.14

17,885.42
4,124.17
16,634.70
7,575.00
589.17
46,808.45

300.00
275.00

10,800.00
9,900.00
20,700.00

10,800.00
7,200.00
18,000.00

18,937.50
4,242.00
23,179.50

15,781.25
3,535.00
19,316.25

9,600.00
8,800.00
18,400.00
118,449.64

9,600.00
6,400.00
16,000.00
100,124.70

808.00

275.00

1,800.00
1,800.00

1,200.00
1,200.00

675.00
675.00
3,825.00

1,851.67
1,851.67

1,851.67
1,851.67
-

808.00
808.00

808.00
808.00

3,274.93

3,274.93

10,520.83
2,356.67
3,636.00
16,513.50

16,513.50

1,800.00
1,800.00

1,200.00
1,200.00

675.00
675.00
3,825.00

675.00
675.00
7,099.93

6,600.00
6,600.00
11,110.00
11,110.00
4,400.00
4,400.00
4,848.00
4,848.00
2,475.00
2,475.00
33,974.55

10,520.83
2,356.67
3,636.00
16,513.50

63,125.00
14,140.00
21,816.00
99,081.00

2,250.00
2,250.00
18,763.50

3,000.00
8,250.00
11,250.00
110,331.00

6,741.75
259.23
6,851.17
4,157.83
769.03
606.00
101.00
19,486.01

40,450.50
1,555.40
41,107.00
24,947.00
4,614.15
3,636.00
606.00
116,916.05

900.00
900.00
20,386.01

3,600.00
3,300.00
6,900.00
123,816.05

1,683.33
281.96
707.00
164.13
109.42
109.42
3,055.25

10,100.00
1,691.75
4,242.00
984.75
656.50
656.50
18,331.50

600.00
600.00
3,655.25

2,400.00
2,200.00
4,600.00
22,931.50

3,577.08
824.83
3,326.94
1,515.00
117.83
9,361.69

21,462.50
4,949.00
19,961.64
9,090.00
707.00
56,170.14

2,700.00
2,700.00

10,800.00
9,900.00
20,700.00

3,156.25
707.00
3,863.25

18,937.50
4,242.00
23,179.50

2,400.00
2,400.00
18,324.94

9,600.00
8,800.00
18,400.00
118,449.64

1,800.00
1,800.00

1,851.67
1,851.67
1,200.00
1,200.00

808.00
808.00

cu.m.

250.00
700.00
800.00

Bags
Cu.m.
Cu.m.

Day/s
Day/s

2.00
6.00

2.50
7.00
8.00

300.00
275.00

6,000.00

2,250.00
2,250.00
2,250.00

6,000.00

4,520.83
2,356.67
3,636.00
10,513.50

6,000.00

10,513.50

4,000.00

2,741.75
259.23
6,851.17
4,157.83
769.03
606.00
101.00
15,486.01

6,741.75
259.23
6,851.17
4,157.83
769.03
606.00
101.00
19,486.01

4,000.00

15,486.01

19,486.01

1,683.33
281.96
707.00
164.13
109.42
109.42
3,055.25

1,683.33
281.96
707.00
164.13
109.42
109.42
3,055.25

3,055.25

3,055.25

3,577.08
824.83
3,326.94
1,515.00
117.83
9,361.69

3,577.08
824.83
3,326.94
1,515.00
117.83
9,361.69

3,156.25
707.00
3,863.25

3,156.25
707.00
3,863.25

13,224.94

13,224.94

2,250.00
2,250.00
2,250.00

kgs.

wall footing, columns & footings, floor slab, lintel beams,


and septic tank
1-foreman,1-steelman2-laborer
350 kg/day
say
A. Materials
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
20mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
1-1/2" G.I. Pipe
Hacksaw Blade

3.00

days

267.00
7.00
110.00
38.00
1.50
3.00
10.00

Length
Length
Length
Length
rolls
Pcs.
Pcs.

3.00
3.00

Day/s
Day/s

150.00
220.00
370.00
650.00
3,046.00
1,200.00
60.00

1.50
2.20
3.70
6.50
30.10
12.00
0.60

Sub-Total
B. Labor
Steelman
Laborer

Sub-Total
TOTAL FOR REINFORCING STEEL BARS
IV. FORMWORKS & SCAFFOLDING
(USABLE 2X) 23.00 sq.m.
Materials
100-2"x2"x12' Coco Lumber
400.00
Bd.Ft
20-2"x2"x10' Coco Lumber for Bracing
67.00
Bd.Ft
1/4 thk. 4'x8' Ordinary Plywood
12.00
shts.
# 4 CWN
15.00
Kgs.
#2 CWN
10.00
Kgs.
#2-1/2 CWN
10.00
Kgs.
Sub-Total
Labor
Carpenter
4.00
Day/s
Laborer
4.00
Day/s
Sub-Total
TOTAL FOR FORMWORKS AND SCAFFOLDING
V. MASONRY WORKS
125.44 sq.m.
Crew: 2men lay 100 pcs./day
V - 1. CHB Laying
A. Materials
Portland Cement
85.00
Bags
Washed Sand
7.00
Cu.m.
4" x 8' x 16" CHB
1,647.00
Pcs
10mm dia. x 6.0m RSB
60.00
Length
# 16 G.I. Tie Wire
10.00
Kgs.
Sub-Total
B. Labor
Mason
9.00
Day/s
Laborer
9.00
Day/s
Sub-Total
V - 2. Plastering
125.44 sq.m.
Crew: 2 men plaster 8 sq.m./day
A. Materials
Bags
Portland Cement
75.00
Washed Sand
6.00
Cu.m.
Sub-Total
B. Labor
Mason
8.00
Day/s
Laborer
8.00
Day/s
Sub-Total
TOTAL FOR MASONRY WORKS
VI. CARPENTRY WORKS
1,747.00 Bd. Ft.
VI - 1. Roof Frame
899.00 Bd. Ft.
A. Materials
2 - 2" x 5" x 12' (Good Lumber)
20.00
Bd. Ft.
30 - 2" x 5" x 10' (Good Lumber)
250.00
Bd. Ft.
32 - 2" x 5" x 8' (Good Lumber)
214.00
Bd. Ft.
2- 2" x 4" x 10' (Good Lumber)
14.00
Bd. Ft.
10 - 2" x 4" x 8' (Good Lumber)
54.00
Bd. Ft.
20 - 2" x 3" x 12' (Good Lumber)
120.00
Bd. Ft.
13 - 2" x 3" x 10' (Good Lumber)
65.00
Bd. Ft.
8 - 2" x 3" x 8' (Good Lumber)
32.00
Bd. Ft.
12mm thk. x 1200mm x 2400mm Fiber Cement Board
4.00
shts.
(Fascia Board)
4" CW Nails
20.00
Kgs.
3" CW Nails
6.00
Kgs.
2 1/2" CW Nails
5.00
Kgs.
2" CW Nails
5.00
Kgs.
20.00
Pcs.
12mm dia. X 7" Machine Bolt w/ Knot and washer

4.00
4.00

300.00
275.00

25.00
25.00
350.00
65.00
65.00
65.00

2.00
2.00

300.00
275.00

250.00
700.00
12.00
150.00
70.00

4.00
4.00

2.50
7.00
0.12
1.50
0.70

300.00
275.00

250.00
700.00

4.00
4.00

0.25
0.25
3.50
0.65
0.65
0.65

2.50
7.00

300.00
275.00

252.50
707.00

300.00
275.00

4,000.00

900.00
900.00
900.00

600.00
600.00
600.00

2,700.00
2,700.00

2,400.00
2,400.00
5,100.00

900.00
900.00
900.00

600.00
600.00
600.00

2,700.00
2,700.00

2,400.00
2,400.00
5,100.00

40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

40.40
40.40
40.40
40.40
40.40
40.40
40.40
40.40

808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80

673.33
8,416.67
7,204.67
471.33
1,818.00
4,040.00
2,188.33
1,077.33

134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47

134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47

134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47

808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80

1,200.00

12.00

1,212.00

4,848.00

4,040.00

808.00

808.00

808.00

4,848.00

65.00
65.00
65.00
65.00
50.00

0.65
0.65

65.65
65.65

1,313.00
393.90

1,094.17
328.25

218.83
65.65

218.83
65.65

218.83
65.65

1,313.00
393.90

0.65
0.65
0.50

65.65
65.65
50.50

328.25
328.25
1,010.00

273.54
273.54
841.67

54.71
54.71
168.33

54.71
54.71
168.33

54.71
54.71
168.33

328.25
328.25
1,010.00

Anti-Termite (e.g. solignum, )

UNIT COST

QUANTITY

DESCRIPTION

Unit

3.00

gal

No. of
Crew/
Labor

COST SHARING

ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
750.00
7.50

TOTAL UNIT
COST

757.50

Sub-Total
B. Labor
Carpenters
Laborer

15.00
15.00

Day/s
Day/s

2.00
3.00

300.00
275.00

300.00
275.00

Sub-Total
VI - 2. Ceiling
A. Materials
162- 2" x 2" x 12' Ceiling Joist (Good Lumber)
50 - 2" x 2" x 12' Hangers (Good Lumber)
1
/4" x 4' x 8' Ordinary Plywood
4" CW Nails
3" CW Nails
1
/2 " CW Nails

848.00

Bd. Ft.

648.00
200.00
35.00
10.00
7.00
7.00

Bd. Ft.
Bd. Ft.
Shts.
Kgs.
Kgs.
Kgs.

6.00
6.00

Day/s
Day/s

70.00
70.00
350.00
65.00
65.00
65.00

2.00
3.00

KALAHI GRANT
2,272.50
41,561.50

1,893.75
34,634.58

9,000.00
12,375.00
21,375.00

9,000.00
9,000.00
18,000.00

COMMUNITY
INKIND

3,375.00
3,375.00

BLGU
CASH

TOTAL LCC
(CASH &
INKIND)

MLGU
INKIND

CASH

INKIND

378.75
6,926.92

CASH
-

TOTAL

INKIND

378.75
6,926.92
-

3,375.00
3,375.00

378.75
6,926.92

2,272.50
41,561.50

3,375.00
3,375.00

9,000.00
12,375.00
21,375.00

0.70
0.70

70.70
70.70

45,813.60
14,140.00

38,178.00
11,783.33

7,635.60
2,356.67

7,635.60
2,356.67

7,635.60
2,356.67

45,813.60
14,140.00

3.50
0.65
0.65

353.50
65.65
65.65

12,372.50
656.50
459.55

10,310.42
547.08
382.96

2,062.08
109.42
76.59

2,062.08
109.42
76.59

2,062.08
109.42
76.59

12,372.50
656.50
459.55

65.65

459.55
73,901.70

382.96
61,584.75

76.59
12,316.95

76.59
12,316.95

459.55
73,901.70

300.00
275.00

3,600.00
4,950.00
8,550.00
145,388.20

3,600.00
3,600.00
7,200.00
121,419.33

19,243.87

1,350.00
1,350.00
23,968.87

3,600.00
4,950.00
8,550.00
145,388.20

0.65

Sub-Total
B. Labor
Carpenters
Laborer

SUB-TOTAL LCC
TOTAL

300.00
275.00

1,350.00
1,350.00
4,725.00

18.44

s-m

sets

7,000.00

70.00

7,070.00

14,140.00

11,783.33

2,356.67

2,356.67

2,356.67

14,140.00

0.80 x 2.10m Flush Type Plastic Door w/ door jambs

sets

2,900.00

29.00

2,929.00

5,858.00

4,881.67

976.33

976.33

976.33

5,858.00

3-1/2"x3-1/2" Loose pin Hinges (quality brand)


Door knob (QUALITY BRAND)

12

pc

pc

100.00
1,500.00

1.00
15.00

101.00
1,515.00

1,212.00
6,060.00

1,010.00
5,050.00

202.00
1,010.00

202.00
1,010.00

202.00
1,010.00

1,212.00
6,060.00

0.60m x 15 blades jalousie glass with alluminum frame


(INSTALLED)
0.60m x 5 blades jalousie glass with alum.frame
(INSTALLED)

sets

1,500.00

15.00

1,515.00

9,090.00

7,575.00

1,515.00

1,515.00

1,515.00

9,090.00

sets

500.00

5.00

505.00

1,010.00

841.67

168.33

168.33

168.33

1,010.00

37,370.00

31,141.67

6,228.33

6,228.33

37,370.00

2,100.00
1,925.00
4,025.00

2,100.00
1,400.00
3,500.00

525.00

2,100.00
1,925.00
4,025.00

19,243.87

1,350.00
1,350.00
4,725.00

Transom on 50mm x 150mm Wood Jambs/Frames (Tugas


or Narra) INSTALLED

76.59
12,316.95

Sub-Total
TOTAL FOR CARPENTRY WORKS
VII. DOORS AND WINDOWS
DOORS
0.9
x2.10m Hard Panel Door Hinge Type w/ Fixed Glass

Sub-Total

6,228.33

B. Labor ( Installation )
Carpenters
Laborer

7
7

Days
Days

1.00
1.00

300.00
275.00

300.00
275.00

Sub-Total

525.00
525.00

525.00

WINDOWS
2"x6" wooden jamb assembly for W-1 w/ a dimension of
2.5m x 1.5m to include mollion partition at 0.60m interval
and transom.

2.00

Sets

3,000.00

30.00

3,030.00

6,060.00

5,050.00

1,010.00

1,010.00

1,010.00

6,060.00

2"x6" wooden jamb assembly for W-2 w/ a dimension of


1.225m x 1.5m to include mollion partition at 0.60m interval
and transom.

5.00

Sets

1,700.00

17.00

1,717.00

8,585.00

7,154.17

1,430.83

1,430.83

1,430.83

8,585.00

Window Grills (fabricated & installed)

2.00

Sets

2,700.00

20.00

2,720.00

5,440.00

4,533.33

906.67

906.67

906.67

5,440.00

20,085.00

16,737.50

3,347.50

20,085.00

4,800.00
4,400.00
9,200.00
70,680.00

4,800.00
3,200.00
51,379.17

1,200.00
1,200.00
10,775.83

4,800.00
4,400.00
9,200.00
70,680.00

2,525.00
656.50
656.50
505.00
2.02
505.00

50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50

42,083.33
8,206.25
5,470.83
841.67
2,188.33
841.67
59,632.08

8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42

50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50

300.00
200.00

3,000.00
3,000.00
6,000.00
77,558.50

3,000.00
1,875.00
4,875.00
64,507.08

1,125.00
1,125.00
13,051.42

3,000.00
3,000.00
6,000.00
77,558.50

2,525.00
84.17
3,030.00
2,525.00
1,515.00
168.33
151.50
117.83
252.50
202.00
58.92
252.50
505.00
378.75
-

505.00
16.83
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
-

505.00
16.83

505.00
16.83

3,030.00
101.00

606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75

606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75

3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50

Sub-Total
B. Labor ( Installation )
Carpenters
Laborer

8.00
8.00

Day/s
Day/s

2.00
2.00

300.00
275.00

300.00
275.00

Sub-Total
TOTAL FOR DOORS & WINDOWS
VIII. ROOFING
1-foreman,2-carpenter,3-laborer
13 sq.m/day

65.00

1,200.00
1,200.00
1,725.00

3,347.50

3,347.50

9,575.83

9,575.83

8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42

8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42

11,926.42

1,200.00
1,200.00
1,200.00

sq.m.

say
5.00
day
A. Materials
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)
20.00
pcs
15.00
Colorib No. 24, x 8' Pre formed Side Gutter
pcs
10.00
Colorib No. 24, x 8' Pre formed Ridgeroll
pcs
Roof Sealant
2.00
Ltrs
Tex Screw 2 1/2" (for wood)
1,300.00
Pcs.
Blind Rivets 1/8" x 2"
2.00
box
Sub-Total
B. Labor
Carpenters
5.00
Day/s
Laborer
5.00
Day/s
Sub-Total
TOTAL FOR ROOFING
IX. PLUMBING WORKS
1.00
Lot
A. Materials
VII-I Plumbing Fixtuers:
Water closet
2.00
Units
4" x 4" PVC Floor Drain
2.00
Sets
VII-II Sewer Line:
4" x 3.0m dia. PV Pipe
6.00
Length
3" x 3.0m dia. PV Pipe
6.00
Length
2" X 3.0m PV Pipe
6.00
Length
Pcs.
2" dia. X 900 PVC Bend Elbow
4.00
0
Pcs.
4" dia. X 90 PVC Bend Elbow
2.00
Pcs.
4" dia. X 450 PVC Bend Elbow
2.00
4" x 3" Wye
2.00
Pcs.
2" dia. PVC P-Trap
3.00
Pcs.
4" dia.PVC Clean Out Plug
1.00
Pcs.
4" dia.x 4" dia. PVC Wye
2.00
Pcs.
3" dia. X 90deg. PVC elbow
12.00
Pcs.
Solvent Cement
1.00
Pint
VII-III For Water Line:
Sets
Wallhung lavatory with faucet and supply pipe
1.00

2,500.00
650.00
650.00
500.00
2.00
500.00

2.00
3.00

25.00
6.50
6.50
5.00
0.02
5.00

300.00
200.00

1,500.00
50.00
600.00
500.00
300.00
50.00
90.00
70.00
150.00
80.00
70.00
150.00
50.00
450.00

15.00
0.50
6.00
5.00
3.00
0.50
0.90
0.70
1.50
0.80
0.70
1.50
0.50
4.50
-

1,515.00
50.50

3,030.00
101.00

606.00
505.00
303.00
50.50
90.90
70.70
151.50
80.80
70.70
151.50
50.50
454.50

3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50

1,125.00
1,125.00
1,125.00

11,926.42

1,125.00
1,125.00
1,125.00

1,500.00

15.00

1,515.00

1,515.00

1,262.50

252.50

252.50

252.50

1,515.00

/2" x 3.0m PVC pipe

5.00

Length

60.00

0.60

60.60

303.00

252.50

50.50

50.50

50.50

303.00

/2" dia. Gate valve

1.00

Pcs.

400.00

4.00

404.00

404.00

336.67

67.33

67.33

67.33

404.00

/2" PVC Coupling

9.00

Pcs.

10.00

0.10

10.10

90.90

75.75

15.15

15.15

15.15

90.90

/2" PVC 90 deg. Bend elbow

2.00

Pcs.

20.00

0.20

20.20

40.40

33.67

6.73

6.73

6.73

40.40

/2" PVC Tee

3.00

Pcs.

20.00

0.20

20.20

60.60

50.50

10.10

10.10

10.10

/2" PVC female threaded adoptor

1.00

Pcs.

20.00

0.20

20.20

20.20

16.83

3.37

3.37

3.37

20.20

/2" Faucet, hosebib, brass

1.00

Pcs.

200.00

2.00

202.00

202.00

168.33

33.67

33.67

33.67

202.00

3.00

Pcs.

30.00

90.90

15.15

90.90

353.50
95.95
606.00
353.50

2,828.00
383.80
9,696.00
353.50
30,108.10

75.75
2,356.67
319.83
8,080.00
294.58
25,090.08

15.15

350.00
95.00
600.00
350.00

0.30
3.50
0.95
6.00
3.50

30.30

length
pc
pc
pint

471.33
63.97
1,616.00
58.92
5,018.02

471.33
63.97
1,616.00
58.92
5,018.02

2,828.00
383.80
9,696.00
353.50
30,108.10

300.00
275.00

3,000.00
2,750.00
5,750.00
35,858.10

3,000.00
2,000.00
5,000.00
30,090.08

5,018.02

750.00
750.00
5,768.02

3,000.00
2,750.00
5,750.00
35,858.10

25.25
20.20
101.00
252.50
707.00

3,030.00
9,292.00
1,515.00
5,050.00
1,414.00
20,301.00

2,525.00
7,743.33
1,262.50
4,208.33
1,178.33
16,917.50

505.00
1,548.67
252.50
841.67
235.67
3,383.50

3,030.00
9,292.00
1,515.00
5,050.00
1,414.00
20,301.00

300.00
275.00

1,800.00
1,650.00
3,450.00
23,751.00

1,800.00
1,200.00
3,000.00
19,917.50

450.00
450.00
3,833.50

1,800.00
1,650.00
3,450.00
23,751.00

303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00

252.50
147.29
126.25
67.33
7,238.33
757.50
84.17
4,713.33

50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67

303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00

Teflon Tape
IX-III For Downspouts:
3" dia. x 3.0m PVC Pipe
3" dia. x 3" PVC Tee
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement

8.00
4.00
16.00
1.00
Sub-Total

B. Labor
Plumber/ Mason
Laborer

5.00
5.00

Day/s
Day/s

2.00
2.00

300.00
275.00

Sub-Total
TOTAL FOR PLUMBING WORKS
X. TILE WORKS
A. Materials
8" x 8" Glazed Tiles
8" x 8" Unglazed Tiles
tile grout
tile frame
Washed Sand

14.56

Pcs.
Pcs.
bags
length
Cu.m.

3.00
3.00

Day/s
Day/s

25.00
20.00
100.00
250.00
700.00

0.25
0.20
1.00
2.50
7.00

2.00
2.00

300.00
275.00

Sub-Total
TOTAL FOR TILEWORKS
XI. ELECTRICAL WORKS
A. Materials
Interior Rough in
2" x 4" Utility Boxes Pvc
4" x 4" Junction Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia

750.00
750.00
750.00

5,018.02

505.00
1,548.67
252.50
841.67
235.67
3,383.50

505.00
1,548.67
252.50
841.67
235.67
3,383.50

3,383.50

3,383.50

750.00
750.00
750.00

sq.m.

120.00
460.00
15.00
20.00
2.00
Sub-Total

B. Labor
Mason
Laborer

15.15
471.33
63.97
1,616.00
58.92
5,018.02

60.60

1.00

Lot

12.00
7.00
1.00
1.00

pcs.
pcs.
length
pc.

2.00
30.00
10.00
80.00

box
m
Pcs.
m

25.00
25.00
150.00
80.00

0.25
0.25
1.50
0.80

25.25
25.25
151.50
80.80

4,300.00
30.00
10.00
70.00

43.00
0.30
0.10
0.70

4,343.00
30.30
10.10
70.70

450.00
450.00
450.00

50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67

50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67

450.00
450.00
450.00

QUANTITY

DESCRIPTION

Electrical Tape (Big)


Electrical Fixtures
Flourescent Lamp, 40 watts
50 watts incandescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Ligthing Outlet ( 4" Porcelain Receptacle w/
Female Adoptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Safety Switch

UNIT COST
Unit

3.00

Pcs.

7.00
2.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00
1.00

assy
set
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
unit
Pcs.
Set

7.00
7.00

Day/s
Day/s

No. of
Crew/
Labor

COST SHARING
TOTAL UNIT
COST

35.35

106.05

3.50
2.50
1.00
1.00
3.00
1.50
0.75
25.00
0.90
5.00

353.50
252.50
101.00
101.00
303.00
151.50
75.75
2,525.00
90.90
505.00

2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00
26,194.35

88.38
2,062.08
420.83
168.33
336.67
1,262.50
883.75
315.63
2,104.17
378.75
420.83
21,828.63

300.00
275.00

2,100.00
1,925.00
4,025.00

2,100.00
1,400.00
3,500.00

525.00
525.00

30,219.35

25,328.63

525.00

4,365.73

303.00
202.00
505.00
606.00
656.50
606.00
50.50
50.50
50.50
50.50
50.50
410.00
20.20
20.20
75.00
70.70
25.00
151.50

909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,640.00
101.00
202.00
300.00
282.80
100.00
303.00
20,856.30

757.50
673.33
3,366.67
4,040.00
3,282.50
2,525.00
84.17
84.17
42.08
42.08
42.08
1,366.67
84.17
168.33
250.00
235.67
83.33
252.50
17,380.25

300.00
275.00

3,600.00
4,950.00
8,550.00
29,406.30

3,600.00
3,600.00
7,200.00
24,580.25

5,000.00
10,000.00
15,000.00

4,166.67
8,333.33
12,500.00

880.00
315.00
90.00
65.65
65.00
880.00
240.00
120.00
75.00
80.00
205.00
140.00
25.00
3,180.65
3,180.65

733.33
262.50
75.00
54.71
54.17
733.33
200.00
100.00
62.50
66.67
170.83
116.67
20.83
2,650.54
2,650.54

693,444.84

577,870.70

62,700.00
84,400.00
840,544.84
840,544.84

62,700.00
61,075.00
701,645.70
701,645.70

350.00
250.00
100.00
100.00
300.00
150.00
75.00
2,500.00
90.00
500.00

Sub-Total
B. Labor
Electrician
Laborer

1.00
1.00

300.00
275.00

Sub-Total
TOTAL FOR ELECTRICAL WORKS
XII. PAINTING WORKS
265.00 sq.m.
1-foreman,2-painter,3-laborer
37.86 sq.m/day
say
7.00
days
A. Materials
Cocrete Putty
3.00
Gals
Concrete Neutralizer
4.00
Gals
Flat Latex White
8.00
Gals
Semi-Gloss Latex White
8.00
Gals
Quick Dry Enamel White
6.00
Gal
Flat Enamel White
5.00
Gals
Latex Tinting Color Rawsienna
2.00
Pints
Latex Tinting Color Red
2.00
Pints
Latex Tinting Color Blue
1.00
Pints
Latex Tinting Color Yellow
1.00
Pints
Latex Tinting Color Green
1.00
Pints
Paint Thinner
4.00
Gal
Sandpaper #100
5.00
shts
Sandpaper #200
10.00
shts
Paint Brush 4"
4.00
pcs
Roller Paint Brush 8" (with tray)
4.00
set
Putty Pallet
4.00
pcs
Body Filler
2.00
Ltrs
Sub-Total
B. Labor
Painter
6.00
Day/s
Laborer
6.00
Day/s
Sub-Total
TOTAL FOR PAINTING
XIII. STEEL BILLBOARD AND ROOF SIGNAGE
1.00
LOT
A. Materials
Supply and Install Roof Signage
1.00
lot
Supply and Install Community Project Steel Billboard
1.00
lot
TOTAL FOR STEEL BILLBOARD, ROOF SIGNAGE AND BUILDING MARKER
XIV. BASIC AMENITIES
Black Board
" thk. X 4' x 8' Marine Plywood
2.00
shts
1" x 2" x 8' s4s Wood Lumber
7.00
bd. ft.
Conc. Nails 4"
1.00
kg
CW Nails 2"
1.00
kg
CW Nails 1"
1.00
kg
Lawanet 6mm thk 4'x8'
2.00
pcs
Painting: Area = 6.71sq.m.
Slating Paint (Premium Quality)
1.50
liters
Flat White QDE (Premium Quality)
1.00
liters
Paint Brush 4"
1.00
pc
Paint Brush 2"
2.00
pcs
Paint Thinner
0.50
gal
Abrassive Paper
4.00
pads
Putty Pallet
1.00
pair
Sub-Total
TOTAL FOR BASIC AMENITIES
Direct Cost Summary
Materials
Labor :
1) Skilled
2) Unskilled
Sub-Total ( A )
TOTAL DIRECT COST
1. OVERHEAD COST
Foreman / Leadman

60

TOTAL FOR OVERHEAD COST


2. HANDTOOLS AND PROTECTIVE EQUIPMENTS
Shovel w/ handle
Crow Bar
Wheel Barrow
Bolo (multi-purpose) w/ handle
Sledge Hammer (5kg) w/ handle
Concrete Pail
Hard hat
Hand gloves
Medicine kit
TOTAL FOR HANDTOOLS
3. PRE-ENGINEERING
3.1 Preparation of Plans
3.1 Reproduction of plans
TOTAL FOR PRE-ENGINEERING
PROJECT SUPERVISION
4.1 Municipal Engineer
4.2 BSPMC Volunteer
TOTAL FOR PROJECT SUPERVISION
5. ENVIRONMENTAL IMPACT
5.1 Warning signs
5.2 Barricades
TOTAL FOR ENVIRONMENTAL IMPACT
6. ADMINISTRATIVE COST
TOTAL INDIRECT COST FOR ADMINISTRATIVE COST
7. MATERIAL TESTING
TOTAL INDIRECT COST FOR MATERIAL TESTING
8. TREASURER'S BOND
TOTAL INDIRECT COST FOR TREASURER'S BOND
9. CONTINGENCY (2.5% of DC)
TOTAL FOR CONTINGENCY
TOTAL INDIRECT COST

Days

3.00
1.00
1.00
1.00
1.00
10.00
5.00
10.00
1.00

pc
pc
pc
pc
pc
pc
pc
pc
Sets

7.00
14.00

days
sht

12.00
12.00

10.00
5.00

Days
Days

300.00
200.00
500.00
600.00
650.00
600.00
50.00
50.00
50.00
50.00
50.00
410.00
20.00
20.00
75.00
70.00
25.00
150.00

2.00
3.00

3.00
2.00
5.00
6.00
6.50
6.00
0.50
0.50
0.50
0.50
0.50
0.20
0.20
0.70
1.50

300.00
275.00

5,000.00
10,000.00

440.00
45.00
90.00
65.00
65.00
440.00

5,000.00
10,000.00

0.65

160.00
120.00
75.00
40.00
410.00
35.00
25.00

1.00

10.00
10.00

1.00
1.00

pc
pc

440.00
45.00
90.00
65.65
65.00
440.00
160.00
120.00
75.00
40.00
410.00
35.00
25.00

350.00

350.00

TOTAL
KALAHI GRANT

21,000.00
21,000.00

COMMUNITY
INKIND

1,350.00
1,350.00
1,350.00

23,325.00
23,325.00
23,325.00

CASH

4,890.73

30,219.35

3,476.05

3,476.05

3,600.00
4,950.00
8,550.00
29,406.30

833.33
1,666.67
2,500.00

833.33
1,666.67
2,500.00

833.33
1,666.67
2,500.00

5,000.00
10,000.00
15,000.00

146.67
52.50
15.00
10.94
10.83
146.67
40.00
20.00
12.50
13.33
34.17
23.33
4.17
530.11
530.11

146.67
52.50
15.00
10.94
10.83
146.67
40.00
20.00
12.50
13.33
34.17
23.33
4.17
530.11
530.11

146.67
52.50
15.00
10.94
10.83
146.67
40.00
20.00
12.50
13.33
34.17
23.33
4.17
530.11
530.11

880.00
315.00
90.00
65.65
65.00
880.00
240.00
120.00
75.00
80.00
205.00
140.00
25.00
3,180.65
3,180.65

10,000.00

105,574.14

115,574.14

115,574.14

693,444.84

10,000.00
10,000.00

0.00

105,574.14
105,574.14

115,574.14
115,574.14

23,325.00
138,899.14
138,899.14

62,700.00
84,400.00
840,544.84
840,544.84

21,000.00
21,000.00

21,000.00
21,000.00

21,000.00
21,000.00

21,000.00
21,000.00

225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
1,266.67

225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
1,266.67

225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
1,266.67

Recommending Approval:

525.00

3,476.05

Checked & Reviewed by:

2,100.00
1,925.00
4,025.00

3,000.00
3,000.00

1,750.00
700.00
2,450.00

1,750.00
700.00
2,450.00

9,600.00
-

9,600.00

9,600.00
3,000.00
12,600.00

9,600.00
3,000.00
12,600.00

9,600.00
3,000.00
12,600.00
2,000.00
1,250.00
3,250.00
20,000.00
20,000.00
4,000.00
4,000.00
3,375.00
3,375.00
21,010.16
21,010.16
95,285.16
935,830.00

3,000.00

136,576.00

10,000.00

1,750.00
700.00
2,450.00

3,000.00

23,325.00
23,325.00
23,325.00

1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
7,600.00
0.00
1,750.00
700.00
2,450.00

333.33
208.33
541.66
666.67
666.67
3,375.00
3,375.00
4,151.86
4,151.86
31,001.86

23,325.00

525.00
525.00

750,879.00

525.00
525.00

935,830.00

106.05
2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00
26,194.35

9,600.00
3,000.00
12,600.00

16,858.30
16,858.30
49,233.30

17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
4,365.73

909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,640.00
101.00
202.00
300.00
282.80
100.00
303.00
20,856.30

80.24%

151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
273.33
16.83
33.67
50.00
47.13
16.67
50.50
3,476.05

1,666.67
1,041.67
2,708.34
20,000.00
20,000.00
3,333.33
3,333.33

17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
4,365.73

2,000.00
1,250.00
3,250.00
20,000.00
20,000.00
4,000.00
4,000.00
3,375.00
3,375.00
21,010.16
21,010.16
95,285.16

TOTAL

INKIND

151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
273.33
16.83
33.67
50.00
47.13
16.67
50.50
3,476.05

1,750.00
700.00
2,450.00

200.00
250.00

17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
4,365.73

CASH

151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
273.33
16.83
33.67
50.00
47.13
16.67
50.50
3,476.05

250.00
50.00

200.00
250.00

INKIND

4,365.73

250.00
50.00

800.00
250.00

CASH

1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
7,600.00

TOTAL LCC
(CASH &
INKIND)

MLGU
INKIND

450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00

800.00
250.00

1,125.00
416.67
891.67
316.67
583.33
833.33
1,458.33
291.67
416.67
6,333.33

BLGU

450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00

TOTAL CONSTRUCTION COST

Prepared by :

SUB-TOTAL LCC

ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
0.35
35.00

Approved by :

12,050.00

333.33
208.33
541.67
666.67
666.67
3,375.00
3,375.00
4,151.86
4,151.86
31,001.86

15,050.00

333.33
208.33
541.67
666.67
666.67
3,375.00
3,375.00
4,151.86
4,151.86
46,051.86

12,050.00

146,576.00

38,375.00

184,951.00

Noted by:

ELSA A. TRUNO

RODSON R. ESCORA

CARMEN A. GAUDIANO

REYNALDO DOMIO

GEORGE S. ISULAT

MEO Staff

ACT-Deputy Area Coordinator (DAC)

Municipal Engineer

BSPMC Chairperson

Regional Community Infrastructure Specialist

QUANTITY

DESCRIPTION

UNIT COST
Unit

No. of
Crew/
Labor

ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST

COST SHARING
TOTAL UNIT
COST

SUB-TOTAL LCC
TOTAL
KALAHI GRANT

COMMUNITY
INKIND

BLGU
CASH

MLGU
INKIND

CASH

INKIND

CASH

INKIND

TOTAL LCC
(CASH &
INKIND)

TOTAL

PLANNED COMMUNITY PRO


Date Prepared

July 10, 2014

Name of Proposed Sub-Project

Barangay

Tugawe

Total Cash (Php)

Municipality

DAUIN

Sub-project Duration

Province

NEGROS ORIENTAL

SOURCES OF FUNDS
DESCRIPTION

KC Grant:

1st Tranche (Php)

525,615.30

2nd Tranche (Php)

150,175.80

3rd Tranche (Php)

PACKAGES

Mode of Implementation : Community Force Account (CFA)

PACKAGE ITEMS

75,087.90

TOTAL

QTY

UNIT

TOTAL UNIT
COST

750,879.00

PROC
METHOD

TOTAL

1st Tranche
KC Grant
PACKAGE 1 : HARDWARE
Materials:
Nylon # 16

2.00

Kgs.

353.50

707.00

589.17

Portland Cement

410.00

Bags

252.50

103,525.00

86,270.83

10mm dia. x 6.0m RSB

327.00

Length

151.50

49,540.50

41,283.75

12mm dia. x 6.0m RSB

7.00

Length

222.20

1,555.40

1,296.17

16mm dia. x 6.0m RSB

110.00

Length

373.70

41,107.00

34,255.83

20mm dia. x 6.0m RSB

38.00

Length

656.50

24,947.00

20,789.17
3,845.13

# 16 G.I. Tie Wire

1.50

rolls

3,076.10

4,614.15

# 16 G.I. Tie Wire

10.00

Kgs.

70.70

707.00

589.17

1-1/2" G.I. Pipe

3.00

Pcs.

1,212.00

3,636.00

3,030.00

Hacksaw Blade

10.00

Pcs.

60.60

606.00

505.00

1/4 thk. 4'x8' Ordinary Plywood

47.00

shts.

353.50

16,614.50

13,845.42

" thk. X 4' x 8' Marine Plywood

2.00

shts

440.00

880.00

733.33

Lawanet 6mm thk 4'x8'

2.00

pcs

440.00

880.00

733.33

Conc. Nails 4"

1.00

kg

90.00

90.00

75.00

# 4 CWN

45.00

Kgs.

65.65

2,954.25

2,461.88

3" CW Nails

20.00

Kgs.

65.65

1,313.00

1,094.17

#2 CWN

16.00

Kgs.

65.65

1,050.40

875.33

#2-1/2 CWN

15.00

Kgs.

65.65

984.75

820.63

1.00

kg

65.00

65.00

54.17

7.00

Kgs.

65.65

459.55

382.96

4.00

shts.

1,212.00

4,848.00

4,040.00

20.00

Pcs.

50.50

1,010.00

841.67

CW Nails 1"
1/2 " CW Nails
12mm thk. x 1200mm x 2400mm Fiber Cement Board (Fascia Board)
12mm dia. X 7" Machine Bolt w/ Knot and washer
Anti-Termite (e.g. solignum, )

3.00

gal

757.50

2,272.50

1,893.75

0.80 x 2.10m Flush Type Plastic Door w/ door jambs

2.00

sets

2,929.00

5,858.00

4,881.67

12.00

pc

101.00

1,212.00

1,010.00

4.00

pc

1,515.00

6,060.00

5,050.00

25.25

3,030.00

2,525.00

3-1/2"x3-1/2" Loose pin Hinges (quality brand)


Door knob (QUALITY BRAND)
TILEWORKS

8x8 ceramic unglazed tiles

120.00

8x8 ceramic glazed tiles

Pcs.

460.00

Pcs.

20.20

9,292.00

7,743.33

tile grout

15.00

bags

101.00

1,515.00

1,262.50

tile frame

20.00

length

252.50

5,050.00

4,208.33

2.00

Units

1,515.00

3,030.00

2,525.00

Water closet

Page 64 of 135

S (LSG)

PLUMBING WORKS

PACKAGES

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

PROC
METHOD

TOTAL

1st Tranche
4" x 4" PVC Floor Drain

2.00

Sets

50.50

101.00

84.17

4" x 3.0m dia. PV Pipe

6.00

Length

606.00

3,636.00

3,030.00

3" x 3.0m dia. PV Pipe

6.00

Length

505.00

3,030.00

2" X 3.0m PV Pipe

6.00

Length

303.00

1,818.00

2" dia. X 900 PVC Bend Elbow

4.00

Pcs.

50.50

202.00

4" dia. X 900 PVC Bend Elbow

2.00

Pcs.

90.90

181.80

4" dia. X 450 PVC Bend Elbow

2.00

Pcs.

70.70

141.40

4" x 3" Wye

2.00

Pcs.

151.50

303.00

2" dia. PVC P-Trap

3.00

Pcs.

80.80

242.40

4" dia.PVC Clean Out Plug

1.00

Pcs.

70.70

70.70

4" dia.x 4" dia. PVC Wye

2.00

Pcs.

151.50

303.00

Page 65 of 135

LOCAL SHOPPING FOR GOODS (LSG)

PACKAGE 1

KC Grant

2,525.00
1,515.00
168.33
151.50
117.83
252.50
202.00
58.92
252.50

QTY

3" dia. X 90deg. PVC elbow

UNIT

TOTAL UNIT
COST

LOCAL SHOPPING FOR GOODS (LSG)

PACKAGES
PACKAGE 1

PACKAGE ITEMS

PROC
METHOD

TOTAL

1st Tranche
KC Grant

12.00

Pcs.

50.50

606.00

Solvent Cement

1.00

Pint

454.50

454.50

378.75

Wallhung lavatory with faucet and supply pipe

1.00

Sets

1,515.00

1,515.00

1,262.50

1/2" x 3.0m PVC pipe

5.00

Length

60.60

303.00

252.50

1/2" dia. Gate valve

1.00

Pcs.

404.00

404.00

336.67

1/2" PVC Coupling

9.00

Pcs.

10.10

90.90

75.75

1/2" PVC 90 deg. Bend elbow

2.00

Pcs.

20.20

40.40

33.67

1/2" PVC Tee

3.00

Pcs.

20.20

60.60

50.50

1/2" PVC female threaded adoptor

1.00

Pcs.

20.20

20.20

16.83

1/2" Faucet, hosebib, brass

1.00

Pcs.

202.00

202.00

168.33

Teflon Tape

3.00

Pcs.

30.30

90.90

75.75

3" dia. x 3.0m PVC Pipe

8.00

length

353.50

2,828.00

2,356.67

3" dia. x 3" PVC Tee

4.00

pc

95.95

383.80

319.83

16.00

pc

606.00

9,696.00

8,080.00

1.00

pint

353.50

353.50

294.58

12.00

pcs.

25.25

303.00

252.50

4" x 4" Junction Boxes PVC

7.00

pcs.

25.25

176.75

147.29

3/4" dia. RSC Pipe

1.00

length

151.50

151.50

126.25

Screw Insulator

1.00

pc.

80.80

80.80

67.33

2.00

box

4,343.00

8,686.00

7,238.33

3" dia. X 90 deg. bend PVC Elbow


Solvent Cement

505.00

ELECTRICAL WORKS

2" x 4" Utility Boxes Pvc

Electrical Wires

3.5mm2 THW Stranded


Service Drop Wire

30.00

30.30

909.00

757.50

PVC Clamp

10.00

Pcs.

10.10

101.00

84.17

Flexible tube 3/4" dia

80.00

70.70

5,656.00

4,713.33

Electrical Tape (Big)

3.00

Pcs.

35.35

106.05

88.38

Flourescent Lamp, 40 watts

7.00

assy

353.50

2,474.50

2,062.08

50 watts incandescent Lamp

2.00

set

252.50

505.00

420.83

2 Gang Switch with Plate

2.00

Pcs.

101.00

202.00

168.33

1 Gang Switcth w/ Plate

4.00

Pcs.

101.00

404.00

336.67

Duplex Convenience Outlet

5.00

Pcs.

303.00

1,515.00

1,262.50

Ligthing Outlet ( 4" Porcelain Receptacle w/

7.00

Pcs.

151.50

1,060.50

883.75

Female Adoptor

5.00

Pcs.

75.75

378.75

315.63

KWHR meter w/ Base

1.00

unit

2,525.00

2,525.00

2,104.17

Entrance Cap # 1" dia.

5.00

Pcs.

90.90

454.50

378.75

Safety Switch

1.00

Set

505.00

505.00

Electrical Fixtures

Sub-Total

420.83

352,686.45

Cocrete Putty

3.00

Gals

303.00

Concrete Neutralizer

4.00

Gals

202.00

808.00

Flat Latex White

8.00

Gals

505.00

4,040.00

Semi-Gloss Latex White

8.00

Gals

606.00

4,848.00

Quick Dry Enamel White

6.00

Gal

656.50

3,939.00

Flat Enamel White

5.00

Gals

606.00

3,030.00

Latex Tinting Color Rawsienna

2.00

Pints

50.50

101.00

Latex Tinting Color Red

2.00

Pints

50.50

101.00

Latex Tinting Color Blue

1.00

Pints

50.50

50.50

Latex Tinting Color Yellow

1.00

Pints

50.50

50.50

Page 66 of 135

909.00

HOPPING FOR GOODS (LSG)

PACKAGE 2

PACKAGE 2 : PAINTING WORKS

293,905.39

QTY

UNIT

TOTAL UNIT
COST

PROC
METHOD

TOTAL

Latex Tinting Color Green

1.00

Pints

50.50

50.50

Paint Thinner

4.50

Gal

410.00

1,845.00

Sandpaper #100

5.00

shts

20.20

101.00

Sandpaper #200

10.00

shts

20.20

202.00

5.00

pcs

75.00

375.00

2.00

pcs

40.00

80.00

Roller Paint Brush 8" (with tray)

4.00

set

70.70

282.80

Putty Pallet

5.00

pcs

25.00

125.00

Body Filler

2.00

Ltrs

151.50

303.00

Slating Paint (Premium Quality)

1.50

liters

160.00

240.00

Flat White QDE (Premium Quality)

1.00

liters

120.00

120.00

Abrassive Paper

4.00

pads

35.00

Paint Brush 4"


Paint Brush 2"

Sub-Total

1st Tranche
KC Grant

140.00
21,741.30

Page 67 of 135

LOCAL SHOPPING FOR GOODS (LSG)

PACKAGES
PACKAGE 2

PACKAGE ITEMS

PACKAGES

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

TOTAL

PROC
METHOD
1st Tranche
KC Grant

PACKAGE 3: LUMBER
Materials
25- 2" x 2" x 12' Coco Lumber

100.00

Bd. Ft.

25.25

2,525.00

2,104.17

100-2"x2"x12' Coco Lumber

400.00

Bd.Ft

25.25

10,100.00

8,416.67

67.00

Bd.Ft

25.25

1,691.75

1,409.79

1" x 2" x 8' s4s Wood Lumber

7.00

bd. ft.

45.00

315.00

262.50

2 - 2" x 5" x 12' (Good Lumber)

20.00

Bd. Ft.

40.40

808.00

673.33

30 - 2" x 5" x 10' (Good Lumber)

250.00

Bd. Ft.

40.40

10,100.00

32 - 2" x 5" x 8' (Good Lumber)

214.00

Bd. Ft.

40.40

8,645.60

2- 2" x 4" x 10' (Good Lumber)

14.00

Bd. Ft.

40.40

565.60

471.33

10 - 2" x 4" x 8' (Good Lumber)

54.00

Bd. Ft.

40.40

2,181.60

1,818.00

20 - 2" x 3" x 12' (Good Lumber)

120.00

Bd. Ft.

40.40

4,848.00

4,040.00

13 - 2" x 3" x 10' (Good Lumber)

65.00

Bd. Ft.

40.40

2,626.00

2,188.33

PACKAGE-3

20-2"x2"x10' Coco Lumber for Bracing

8 - 2" x 3" x 8' (Good Lumber)


162- 2" x 2" x 12' Ceiling Joist (Good Lumber)
50 - 2" x 2" x 12' Hangers (Good Lumber)

8,416.67
LSG

7,204.67

32.00

Bd. Ft.

40.40

1,292.80

1,077.33

648.00

Bd. Ft.

70.70

45,813.60

38,178.00

200.00

Bd. Ft.

70.70

Sub-Total

14,140.00

11,783.33

105,652.95

88,044.12

9,258.33

PACKAGE 4: AGGREGATES

PACKAGE-4

Materials:
Filling Materials

20.00

Cu.m

555.50

11,110.00

6.00

Cu.m.

808.00

4,848.00

4,040.00

Washed Sand

35.00

Cu.m.

707.00

24,745.00

20,620.83

Washed Gravel

27.00

Cu.m.

808.00

21,816.00

Pcs

12.12

19,961.64

16,634.70

82,480.64

68,733.86

Mixed and Washed Gravel

4" x 8' x 16" CHB

1,647.00
Sub-Total

LSG

18,180.00

PACKAGE 5: ROOFING

PACKAGE-5

Materials:
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)

20.00

pcs

2,525.00

50,500.00

Colorib No. 24, x 8' Pre formed Side Gutter

15.00

pcs

656.50

9,847.50

Colorib No. 24, x 8' Pre formed Ridgeroll

10.00

pcs

656.50

6,565.00

2.00

Ltrs

505.00

1,010.00

1,300.00

Pcs.

2.02

2,626.00

2.00

box

505.00

Roof Sealant
Tex Screw 2 1/2" (for wood)
Blind Rivets 1/8" x 2"
Sub-Total

LSG

1,010.00
71,558.50

PACKAGE 6: FURNITURE
Materials:

PACKAGE-6

0.9 x2.10m Hard Panel Door Hinge Type w/ Fixed Glass Transom on
50mm x 150mm Wood Jambs/Frames (Tugas or Narra) INSTALLED

sets

7,070.00

14,140.00

2"x6" wooden jamb assembly for W-1 w/ a dimension of 2.5m x 1.5m to


include mollion partition at 0.60m interval and transom.

2.00

Sets

3,030.00

6,060.00

2"x6" wooden jamb assembly for W-2 w/ a dimension of 1.225m x 1.5m


to include mollion partition at 0.60m interval and transom.

5.00

Sets

1,717.00

8,585.00

7,154.17

28,785.00

23,987.50

Sub-Total

Page 68 of 135

11,783.33

LSG

5,050.00

PACKAGES

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

PROC
METHOD

TOTAL

1st Tranche
KC Grant

PACKAGE-7

PACKAGE 7: GLASS
Materials:
0.60m x 15 blades jalousie glass with alluminum frame (INSTALLED)

sets

1,515.00

9,090.00

0.60m x 5 blades jalousie glass with alum.frame (INSTALLED)

sets

505.00

1,010.00

Sub-Total

LSG

10,100.00

P-8

PACKAGE 8: WINDOW GRILLS


Window Grills (fabricated & installed)

Sets

2,720.00

Sub-Total

5,440.00
5,440.00

LSG

P-9

PACKAGE 9: ROOF SIGNAGE


Supply and Install Roof Signage

1.00

lot

5,000.00

Sub-Total

5,000.00

LSG

5,000.00

P-10

PACKAGE 10: PROJECT BILLBOARD


Supply and Install Community Project Steel Billboard

1.00

lot

10,000.00

10,000.00

Sub-Total

10,000.00

Total Materials Cost

693,444.84

8,333.33

LSG

8,333.33
-

483,004.20

CFA

P-11

PACKAGE 11: LABOR


Skilled

62,700.00

unskilled

61,075.00

15,569.43

Sub-Total

123,775.00

31,569.43

Total Direct Cost (cash)

1,720,223.63

817,219.84

16,000.00

514,573.63

PACKAGE-12

PACKAGE 11: HANDTOOLS AND PERSONAL PROTECTIVE EQUIPMENTS


Shovel w/ handle

3.00

pc

450.00

1,350.00

1,125.00

Crow Bar

1.00

pc

500.00

500.00

416.67

Wheel Barrow

1.00

pc

1,070.00

1,070.00

891.67

Bolo (multi-purpose) w/ handle

1.00

pc

380.00

380.00

Sledge Hammer (5kg) w/ handle

1.00

pc

700.00

700.00

Concrete Pail

10.00

pc

100.00

1,000.00

833.33

Hard hat

5.00

pc

350.00

1,750.00

1,458.33

Hand gloves

10.00

pc

35.00

350.00

291.67

1.00

Sets

500.00

Medicine kit

PACKAGE-13

Sub-Total

316.67
583.33

LSG

500.00

416.67

7,600.00

6,333.34

PACKAGE 13: ENVIRONMENTAL MITIGITING COST


Warning signs (Tarpulin Printing)
Barricades

10.00

pc

200.00

2,000.00

5.00

pc

250.00

1,250.00

Sub-Total

1,666.67

LSG

1,041.66

3,250.00

2,708.33

Overhead

21,000.00

Administrative Cost

20,000.00

Material Testing

4,000.00

Treasurers Bond

2,000.00
CFA

PACKAGE-14

j. Indirect Cost

3,375.00

Contingency

21,010.16

Sub-Total

69,385.16

Total Indirect Cost (cash)

GRAND TOTAL CASH

2,000.00

80,235.16

11,041.67

897,455.00

525,615.30

897,455.00
(0.00)

SAY
%

525,615.30
70.00%
(0.00)

Page 69 of 135

PACKAGES

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

TOTAL

PROC
METHOD
1st Tranche
KC Grant

Workshop output of:

Checked by:

ANGELITA BRIONES

DOMINGA RODQUILLO

CARMEN A. GAUDIANO

Procurement Team Head

PPT

Municipal Engineer

Page 70 of 135

MMUNITY PROCUREMENT PACKAGING


: Construction of 1 Unit, One(1) Classroom Pre-School Building

oposed Sub-Project

: 897,455.00
: 80 C.D.

OURCES OF FUNDS

PERCENTAGE WEIGHT
TOTAL

LCC:

TO KC GRANT

AMOUNT

FUND SOURCE

TO LCC CASH

LEGEND:

KC Cost

750,87

TOTAL LCC :

184,95

102,603.20

628,218.50

70.00

70.00

29,315.20

179,491.00

20.00

20.00

In-kind:

38,37

14,657.60

89,745.50

10.00

10.00

Cash:

146,57

146,576.00

897,455.00

100.00

100.00

TOTAL

935,83

1st Tranche

2nd Tranche

LCC Cash

KC Grant

LCC Cash

REMARKS

ESTIMATED COST INVOLED

3rd Tranche
KC Grant

LCC Cash

TOTAL
KC Grant
-

MONTH

TOTAL

LCC Cash
-

1
-

117.83

589.17

117.83

707.00

17,254.17

86,270.83

17,254.17

103,525.00

8,256.75

41,283.75

8,256.75

49,540.50

259.23

1,296.17

259.23

1,555.40

6,851.17

34,255.83

6,851.17

41,107.00

4,157.83

20,789.17

4,157.83

24,947.00

769.03

3,845.13

769.03

4,614.15

117.83

589.17

117.83

707.00

606.00

3,030.00

606.00

3,636.00

101.00

505.00

101.00

606.00

2,769.08

13,845.42

2,769.08

16,614.50

146.67

733.33

146.67

880.00

146.67

733.33

146.67

880.00

15.00

75.00

15.00

90.00

492.38

2,461.88

492.38

2,954.25

218.83

1,094.17

218.83

1,313.00

175.07

875.33

175.07

1,050.40

164.13

820.63

164.13

984.75

10.83

54.17

10.83

65.00

76.59

382.96

76.59

459.55

808.00

4,040.00

808.00

4,848.00

168.33

841.67

168.33

1,010.00

378.75

1,893.75

378.75

2,272.50

976.33

4,881.67

976.33

5,858.00

202.00

1,010.00

202.00

1,212.00

1,010.00

5,050.00

1,010.00

6,060.00

505.00

2,525.00

505.00

3,030.00

1,548.67

7,743.33

1,548.67

9,292.00

252.50

1,262.50

252.50

1,515.00

841.67

4,208.33

841.67

5,050.00

505.00

2,525.00

Page 71 of 135

505.00

PROPOSED
IMPLEMENTATI
SCHEDULE

3,030.00

1st Tranche

2nd Tranche

LCC Cash

KC Grant

LCC Cash

REMARKS

ESTIMATED COST INVOLED

3rd Tranche
KC Grant

LCC Cash

TOTAL
KC Grant

LCC Cash

MONTH

TOTAL

16.83

84.17

16.83

101.00

606.00

3,030.00

606.00

3,636.00

505.00

2,525.00

505.00

3,030.00

303.00

1,515.00

303.00

1,818.00

33.67

168.33

33.67

202.00

30.30

151.50

30.30

181.80

23.57

117.83

23.57

141.40

50.50

252.50

50.50

303.00

40.40

202.00

40.40

242.40

11.78

58.92

11.78

70.70

50.50

252.50

50.50

303.00

Page 72 of 135

PROPOSED
IMPLEMENTATI
SCHEDULE

1st Tranche

2nd Tranche

LCC Cash

KC Grant

REMARKS

ESTIMATED COST INVOLED

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

MONTH

TOTAL

LCC Cash

101.00

505.00

101.00

606.00

75.75

378.75

75.75

454.50

252.50

1,262.50

252.50

1,515.00

50.50

252.50

50.50

303.00

67.33

336.67

67.33

404.00

15.15

75.75

15.15

90.90

6.73

33.67

6.73

40.40

10.10

50.50

10.10

60.60

3.37

16.83

3.37

20.20

33.67

168.33

33.67

202.00

15.15

75.75

15.15

90.90

471.33

2,356.67

471.33

2,828.00

63.97

319.83

63.97

383.80

1,616.00

8,080.00

1,616.00

9,696.00

58.92

294.58

58.92

353.50

50.50

252.50

50.50

303.00

29.46

147.29

29.46

176.75

25.25

126.25

25.25

151.50

13.47

67.33

13.47

80.80

1,447.67

7,238.33

1,447.67

8,686.00

151.50

757.50

151.50

909.00

16.83

84.17

16.83

101.00

942.67

4,713.33

942.67

5,656.00

17.68

88.38

17.68

106.05

412.42

2,062.08

412.42

2,474.50

84.17

420.83

84.17

505.00

33.67

168.33

33.67

202.00

67.33

336.67

67.33

404.00

252.50

1,262.50

252.50

1,515.00

176.75

883.75

176.75

1,060.50

63.13

315.63

63.13

378.75

420.83

2,104.17

420.83

2,525.00

75.75

378.75

75.75

454.50

84.17

420.83

84.17

505.00

293,905.39

58,781.06

352,686.45

58,781.06

757.50

151.50

757.50

151.50

909.00

673.33

134.67

673.33

134.67

808.00

3,366.67

673.33

3,366.67

673.33

4,040.00

4,040.00

808.00

4,040.00

808.00

4,848.00

3,282.50

656.50

3,282.50

656.50

3,939.00

2,525.00

505.00

2,525.00

505.00

3,030.00

84.17

16.83

84.17

16.83

101.00

84.17

16.83

84.17

16.83

101.00

42.08

8.42

42.08

8.42

50.50

42.08

8.42

42.08

8.42

50.50

Page 73 of 135

PROPOSED
IMPLEMENTATI
SCHEDULE

1st Tranche

2nd Tranche

LCC Cash

KC Grant

REMARKS

ESTIMATED COST INVOLED

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

MONTH

TOTAL

LCC Cash

42.08

8.42

42.08

8.42

50.50

1,537.50

307.50

1,537.50

307.50

1,845.00

84.17

16.83

84.17

16.83

101.00

168.33

33.67

168.33

33.67

202.00

312.50

62.50

312.50

62.50

375.00

66.67

13.33

66.67

13.33

80.00

235.67

47.13

235.67

47.13

282.80

104.17

20.83

104.17

20.83

125.00

252.50

50.50

252.50

50.50

303.00

200.00

40.00

200.00

40.00

240.00

100.00

20.00

100.00

20.00

120.00

116.67

23.33

116.67

23.33

140.00

18,117.75

3,623.55

18,117.75

3,623.55

21,741.30

Page 74 of 135

PROPOSED
IMPLEMENTATI
SCHEDULE

1st Tranche

2nd Tranche

LCC Cash

KC Grant

REMARKS

ESTIMATED COST INVOLED

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

MONTH

TOTAL

LCC Cash

420.83

2,104.17

420.83

2,525.00

1,683.33

8,416.67

1,683.33

10,100.00

281.96

1,409.79

281.96

1,691.75

52.50

262.50

52.50

315.00

134.67

673.33

134.67

808.00

1,683.33

8,416.67

1,683.33

10,100.00

1,440.93

7,204.67

1,440.93

8,645.60

94.27

471.33

94.27

565.60

363.60

1,818.00

363.60

2,181.60

808.00

4,040.00

808.00

4,848.00

437.67

2,188.33

437.67

2,626.00

215.47

1,077.33

215.47

1,292.80

7,635.60

38,178.00

7,635.60

45,813.60

2,356.67

11,783.33

2,356.67

14,140.00

88,044.12

17,608.83

105,652.95

1,851.67

9,258.33

1,851.67

11,110.00

808.00

4,040.00

808.00

4,848.00

4,124.17

20,620.83

4,124.17

24,745.00

3,636.00

18,180.00

3,636.00

21,816.00

3,326.94

16,634.70

3,326.94

19,961.64

68,733.86

13,746.78

82,480.64

17,608.83

13,746.78

42,083.33

8,416.67

42,083.33

8,416.67

50,500.00

8,206.25

1,641.25

8,206.25

1,641.25

9,847.50

5,470.83

1,094.17

5,470.83

1,094.17

6,565.00

841.67

168.33

841.67

168.33

1,010.00

2,188.33

437.67

2,188.33

437.67

2,626.00

841.67

168.33

59,632.08

11,926.42

841.67

168.33

1,010.00

59,632.08

11,926.42

71,558.50

2,356.67

11,783.33

2,356.67

14,140.00

1,010.00

5,050.00

1,010.00

6,060.00

1,430.83

7,154.17

1,430.83

8,585.00

23,987.50

4,797.50

28,785.00

4,797.50

Page 75 of 135

PROPOSED
IMPLEMENTATI
SCHEDULE

1st Tranche

2nd Tranche

LCC Cash

KC Grant

3rd Tranche

LCC Cash

REMARKS

ESTIMATED COST INVOLED

KC Grant

TOTAL

LCC Cash

KC Grant

96,600.84

77,749.83

15,549.97

1,515.00

7,575.00

1,515.00

9,090.00

841.67

168.33

841.67

168.33

1,010.00

8,416.67

1,683.33

8,416.67

1,683.33

10,100.00

4,533.33

906.67

4,533.33

906.67

5,440.00

4,533.33

906.67

4,533.33

906.67

5,440.00

4,166.67

833.33

4,166.67

833.33

5,000.00

4,166.67

833.33

4,166.67

833.33

5,000.00

8,333.33

1,666.67

10,000.00

8,333.33

1,666.67

10,000.00

577,870.70

115,574.14

693,444.84

17,116.67

3,423.33

26,000.00

20,700.00

25,092.64
96,600.84

51,092.64
128,842.47

20,412.93
15,549.97

7,575.00

1,666.67
1,666.67

MONTH

TOTAL

LCC Cash

41,112.93
58,229.60

3,423.33

62,700.00

62,700.00

61,075.00

61,075.00

123,775.00

123,775.00

701,645.70

115,574.14

817,219.84

225.00

1,125.00

225.00

1,350.00

83.33

416.67

83.33

500.00

178.33

891.67

178.33

1,070.00

63.33

316.67

63.33

380.00

116.67

583.33

116.67

700.00

166.67

833.33

166.67

1,000.00

291.67

1,458.33

291.67

1,750.00

58.33

291.67

58.33

350.00

83.33
1,266.66

333.33
208.34
541.67

152.36
666.67

13,765.23

7082.41

83.33

500.00

1,266.66

7,600.00

1,666.67

333.33

2,000.00

1,041.66

208.34

1,250.00

2,708.33

541.67

3,250.00

21,000.00

21,000.00

20,000.00

3,333.33

3,333.33

3,375.00
4,194.03

416.67
6,333.34

18,000.00

666.67

20,000.00
4,000.00

3,375.00

3,375.00

16,858.30

4,151.86

16,858.30

4,151.86

21,010.16

11,234.27

40,191.63

29,193.53

69,385.16

21,333.33

13,765.23

16,858.30

6,002.36

21,333.33

13,765.23

16,858.30

11,234.27

49,233.30

31,001.86

80,235.16

102,603.20

150,175.80

29,315.20

75,087.90

14,657.60

750,879.00

146,576.00

897,455.00

102,603.20

150,175.80

29,315.20

75,087.90

14,657.60

750,879.00

146,576.00

897,455.00

(0.00)

(0.00)

20.00%
-

(0.00)

10.00%
0.00

0.00

Page 76 of 135

PROPOSED
IMPLEMENTATI
SCHEDULE

1st Tranche
LCC Cash

2nd Tranche
KC Grant

Reviewed by:

LCC Cash

REMARKS

ESTIMATED COST INVOLED

3rd Tranche
KC Grant

TOTAL

LCC Cash

Submitted by:

KC Grant

LCC Cash

TOTAL

PROPOSED
IMPLEMENTATI
SCHEDULE
MONTH
1

Noted by:

RODSON R. ESCORA

REYNALDO DOMIO

GEORGE S. ISULAT

Deputy Area Coordinator

BSMPC

Regional Community Infra. Engineer

Page 77 of 135

AMOUNT
(PESO)
750,879.00
184,951.00
38,375.00
146,576.00
935,830.00

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 78 of 135

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 79 of 135

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 80 of 135

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 81 of 135

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 82 of 135

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Page 83 of 135

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2

Regional Community Infra. Engineer

Page 84 of 135

ACTUAL COMMUNITY PROC


Date Prepared

:
:

October 13, 2014


Tugawe

Name of Proposed Sub-Project

Barangay
Municipality

DAUIN

Sub-project Duration

Province

NEGROS ORIENTAL

Total Cash (Php)

SOURCES OF FUNDS
DESCRIPTION

PACKAGES

Mode of Implementation : Community Force Account (CFA)

PACKAGE ITEMS

KC Grant:

1st Tranche (Php)

525,615.30

2nd Tranche (Php)

150,175.80

3rd Tranche (Php)

75,087.90

TOTAL

QTY

UNIT

TOTAL UNIT
COST

750,879.00

PROC
METHOD

TOTAL

1st Tranche
KC Grant
PACKAGE 1 : HARDWARE
Materials:
Nylon # 16

2.00

Kgs.

285.00

570.00

475.00

Portland Cement

410.00

Bags

250.00

102,500.00

85,416.67

10mm dia. x 6.0m RSB

327.00

Length

128.00

41,856.00

34,880.00

12mm dia. x 6.0m RSB

7.00

Length

185.00

1,295.00

1,079.17

16mm dia. x 6.0m RSB

110.00

Length

324.50

35,695.00

29,745.83

20mm dia. x 6.0m RSB

38.00

Length

520.00

19,760.00

16,466.67

# 16 G.I. Tie Wire

1.50

rolls

1,530.00

2,295.00

1,912.50

# 16 G.I. Tie Wire

10.00

Kgs.

50.00

500.00

416.67

1-1/2" G.I. Pipe

3.00

Pcs.

1,095.00

3,285.00

2,737.50

Hacksaw Blade

10.00

Pcs.

40.00

400.00

333.33

1/4 thk. 4'x8' Ordinary Plywood

47.00

shts.

356.00

16,732.00

13,943.33

" thk. X 4' x 8' Marine Plywood

2.00

shts

425.00

850.00

708.33

Lawanet 6mm thk 4'x8'

2.00

pcs

210.00

420.00

350.00

Conc. Nails 4"

1.00

kg

85.00

85.00

70.83

# 4 CWN

45.00

Kgs.

44.00

1,980.00

1,650.00

3" CW Nails

20.00

Kgs.

45.00

900.00

750.00

#2 CWN

16.00

Kgs.

48.00

768.00

640.00

#2-1/2 CWN

15.00

Kgs.

48.00

720.00

600.00

1.00

kg

52.00

52.00

43.33

CW Nails 1"
1/2 " CW Nails
12mm thk. x 1200mm x 2400mm Fiber Cement Board (Fascia Board)
12mm dia. X 7" Machine Bolt w/ Knot and washer

7.00

Kgs.

50.00

350.00

291.67

4.00

shts.

350.00

1,400.00

1,166.67

20.00

Pcs.

35.00

700.00

583.33

Anti-Termite (e.g. solignum, )

3.00

gal

1,065.00

3,195.00

2,662.50

0.80 x 2.10m Flush Type Plastic Door w/ door jambs

2.00

sets

1,850.00

3,700.00

3,083.33

3-1/2"x3-1/2" Loose pin Hinges (quality brand)


Door knob (QUALITY BRAND)

12.00

pc

50.00

600.00

500.00

4.00

pc

850.00

3,400.00

2,833.33

Pcs.

15.50

1,860.00

1,550.00

TILEWORKS

8x8 ceramic unglazed tiles

120.00

8x8 ceramic glazed tiles

460.00

Pcs.

16.00

7,360.00

6,133.33

tile grout

15.00

bags

55.00

825.00

687.50

tile frame

20.00

length

30.00

600.00

500.00

2.00

Units

3,140.00

6,280.00

5,233.33

PLUMBING WORKS
Water closet

2.00

Sets

10.00

20.00

16.67

4" x 3.0m dia. PV Pipe

6.00

Length

540.00

3,240.00

2,700.00

3" x 3.0m dia. PV Pipe

6.00

Length

410.00

2,460.00

2" X 3.0m PV Pipe

6.00

Length

185.00

1,110.00

GOODS (LSG)

4" x 4" PVC Floor Drain

2,050.00
925.00

4.00

Pcs.

20.40

81.60

4" dia. X 900 PVC Bend Elbow

2.00

Pcs.

61.20

122.40

4" dia. X 450 PVC Bend Elbow

2.00

Pcs.

46.90

93.80

4" x 3" Wye

2.00

Pcs.

90.00

180.00

2" dia. PVC P-Trap

3.00

Pcs.

63.25

189.75

4" dia.PVC Clean Out Plug

1.00

Pcs.

47.95

47.95

4" dia.x 4" dia. PVC Wye

LOCAL SHOPPING FOR GOODS (

PACKAGE 1

2" dia. X 900 PVC Bend Elbow

68.00
102.00
78.17
150.00
158.13
39.96

2.00

Pcs.

97.95

195.90

12.00

Pcs.

36.75

441.00

Solvent Cement

1.00

Pint

172.85

172.85

144.04

Wallhung lavatory with faucet and supply pipe

1.00

Sets

1,485.00

1,485.00

1,237.50

1/2" x 3.0m PVC pipe

5.00

Length

53.20

266.00

221.67

1/2" dia. Gate valve

1.00

Pcs.

200.00

200.00

166.67

1/2" PVC Coupling

9.00

Pcs.

4.00

36.00

30.00

1/2" PVC 90 deg. Bend elbow

2.00

Pcs.

6.75

13.50

11.25

1/2" PVC Tee

3.00

Pcs.

9.25

27.75

23.13

1/2" PVC female threaded adoptor

1.00

Pcs.

7.85

7.85

6.54

1/2" Faucet, hosebib, brass

1.00

Pcs.

135.00

135.00

112.50

Teflon Tape

3.00

Pcs.

13.50

40.50

33.75

3" dia. x 3.0m PVC Pipe

8.00

length

410.00

3,280.00

2,733.33

3" dia. X 90deg. PVC elbow

3" dia. x 3" PVC Tee


3" dia. X 90 deg. bend PVC Elbow
Solvent Cement

163.25
367.50

4.00

pc

65.00

260.00

216.67

16.00

pc

36.75

588.00

490.00

1.00

pint

172.85

172.85

144.04

ELECTRICAL WORKS

2" x 4" Utility Boxes Pvc

12.00

pcs.

22.50

270.00

225.00

4" x 4" Junction Boxes PVC

7.00

pcs.

27.50

192.50

160.42

3/4" dia. RSC Pipe

1.00

length

60.00

60.00

50.00

Screw Insulator

1.00

pc.

16.50

16.50

13.75

Electrical Wires

3.5mm2 THW Stranded

2.00

box

3,400.00

6,800.00

5,666.67

Service Drop Wire

30.00

20.00

600.00

500.00

PVC Clamp

10.00

Pcs.

1.50

15.00

12.50

Flexible tube 3/4" dia

80.00

8.50

680.00

566.67

Electrical Tape (Big)

3.00

Pcs.

22.50

67.50

56.25

Electrical Fixtures

Flourescent Lamp, 40 watts

7.00

assy

265.00

1,855.00

50 watts incandescent Lamp

2.00

set

46.50

93.00

77.50

2 Gang Switch with Plate

2.00

Pcs.

87.50

175.00

145.83

1 Gang Switcth w/ Plate

4.00

Pcs.

58.00

232.00

193.33

Duplex Convenience Outlet

5.00

Pcs.

87.50

437.50

364.58

Ligthing Outlet ( 4" Porcelain Receptacle w/

7.00

Pcs.

30.00

210.00

175.00

Female Adoptor

5.00

Pcs.

22.50

112.50

93.75

KWHR meter w/ Base

1.00

unit

1,300.00

1,300.00

1,083.33

Entrance Cap # 1" dia.

5.00

Pcs.

35.00

175.00

145.83

Safety Switch

1.00

Set

345.00

345.00

Sub-Total

1,545.83

287.50

289,437.20

Savings amount determined after procurement

63,249.25

52,707.71

Sub Total for Package (Plan)

352,686.45

293,905.39

Cocrete Putty

3.00

Gals

310.00

930.00

Concrete Neutralizer

4.00

Gals

195.00

780.00

Flat Latex White

8.00

Gals

415.00

3,320.00

Semi-Gloss Latex White

8.00

Gals

580.00

4,640.00

Quick Dry Enamel White

6.00

Gal

565.00

3,390.00

Flat Enamel White

5.00

Gals

510.00

2,550.00

Latex Tinting Color Rawsienna

2.00

Pints

50.00

100.00

Latex Tinting Color Red

2.00

Pints

60.00

120.00

Latex Tinting Color Blue

1.00

Pints

55.00

55.00

Latex Tinting Color Yellow

1.00

Pints

65.00

65.00

Latex Tinting Color Green

1.00

Pints

55.00

55.00

HOPPING FOR GOODS (LSG)

PACKAGE 2

PACKAGE 2 : PAINTING WORKS

241,197.68

4.50

Gal

294.50

Sandpaper #100

5.00

shts

16.50

82.50

Sandpaper #200

10.00

shts

16.50

165.00

5.00

pcs

65.00

325.00

2.00

pcs

30.00

60.00

Roller Paint Brush 8" (with tray)

4.00

set

80.00

320.00

Putty Pallet

5.00

pcs

25.00

125.00

Body Filler

2.00

Ltrs

160.00

320.00

Slating Paint (Premium Quality)

1.50

liters

214.00

321.00

Flat White QDE (Premium Quality)

1.00

liters

565.00

565.00

Abrassive Paper

4.00

pads

8.50

Paint Brush 4"


Paint Brush 2"

Sub-Total

1,325.25

LOCAL SHOPPING F

PACKAGE

Paint Thinner

34.00
19,647.75

Savings amount determined after procurement

2,093.55

Sub Total for Package (Plan)

21,741.30

PACKAGE 3: LUMBER
Materials
25- 2" x 2" x 12' Coco Lumber

100.00

Bd. Ft.

17.50

1,750.00

1,458.33

100-2"x2"x12' Coco Lumber

400.00

Bd.Ft

17.50

7,000.00

5,833.33

67.00

Bd.Ft

17.50

1,172.50

977.08

1" x 2" x 8' s4s Wood Lumber

7.00

bd. ft.

50.00

350.00

291.67

2 - 2" x 5" x 12' (Good Lumber)

20.00

Bd. Ft.

30 - 2" x 5" x 10' (Good Lumber)

250.00

Bd. Ft.

32 - 2" x 5" x 8' (Good Lumber)

214.00

Bd. Ft.

2- 2" x 4" x 10' (Good Lumber)

14.00

Bd. Ft.

10 - 2" x 4" x 8' (Good Lumber)

54.00

Bd. Ft.

20 - 2" x 3" x 12' (Good Lumber)

120.00

Bd. Ft.

13 - 2" x 3" x 10' (Good Lumber)

65.00

Bd. Ft.

8 - 2" x 3" x 8' (Good Lumber)

32.00

Bd. Ft.

162- 2" x 2" x 12' Ceiling Joist (Good Lumber)

648.00

Bd. Ft.

36.20

23,457.60

50 - 2" x 2" x 12' Hangers (Good Lumber)

200.00

Bd. Ft.

36.20

7,240.00

6,033.33

Sub-Total

40,970.10

34,141.74

Savings amount determined after procurement

64,682.85

53,902.38

Sub Total for Package (Plan)

105,652.95

88,044.12

PACKAGE-3

20-2"x2"x10' Coco Lumber for Bracing

LSG

19,548.00

PACKAGE 4: AGGREGATES

PACKAGE-4

Materials:
Filling Materials

20.00

Cu.m

225.00

4,500.00

3,750.00

6.00

Cu.m.

600.00

3,600.00

3,000.00

Washed Sand

35.00

Cu.m.

400.00

14,000.00

Washed Gravel

27.00

Cu.m.

600.00

16,200.00

7.50

12,352.50

Mixed and Washed Gravel

4" x 8' x 16" CHB

1,647.00

Pcs

11,666.67

LSG

13,500.00
10,293.75

Sub-Total

50,652.50

Savings amount determined after procurement

31,828.14

42,210.41
26,523.45

Sub Total for Package (Plan)

82,480.64

68,733.86

PACKAGE 5: ROOFING

PACKAGE-5

Materials:
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)

20.00

pcs

1,330.00

26,600.00

Colorib No. 24, x 8' Pre formed Side Gutter

15.00

pcs

510.00

7,650.00

Colorib No. 24, x 8' Pre formed Ridgeroll

10.00

pcs

510.00

5,100.00

2.00

Ltrs

395.00

790.00

1,300.00

Pcs.

1.50

1,950.00

2.00

box

275.00

550.00

Roof Sealant
Tex Screw 2 1/2" (for wood)
Blind Rivets 1/8" x 2"

LSG

Sub-Total

42,640.00

Savings amount determined after procurement

28,918.50

Sub Total for Package (Plan)

71,558.50

PACKAGE 6: FURNITURE
Materials:

KAGE-6

0.9 x2.10m Hard Panel Door Hinge Type w/ Fixed Glass Transom on
50mm x 150mm Wood Jambs/Frames (Tugas or Narra) INSTALLED

sets

7,800.00

15,600.00

13,000.00

LSG

PACKAGE-6

2"x6" wooden jamb assembly for W-1 w/ a dimension of 2.5m x 1.5m to


include mollion partition at 0.60m interval and transom.

2.00

Sets

2,550.00

5,100.00

2"x6" wooden jamb assembly for W-2 w/ a dimension of 1.225m x 1.5m


to include mollion partition at 0.60m interval and transom.

5.00

Sets

1,600.00

8,000.00

LSG

4,250.00

6,666.67

Sub-Total

28,700.00

Savings amount determined after procurement

85.00

23,916.67
70.83

Sub Total for Package (Plan)

28,785.00

23,987.50

PACKAGE-7

PACKAGE 7: GLASS
Materials:
0.60m x 15 blades jalousie glass with alluminum frame (INSTALLED)

sets

796.60

4,779.60

0.60m x 5 blades jalousie glass with alum.frame (INSTALLED)

sets

590.00

1,180.00

LSG

Sub-Total

5,959.60

Savings amount determined after procurement

4,140.40

Sub Total for Package (Plan)

10,100.00

P-8

PACKAGE 8: WINDOW GRILLS


Window Grills (fabricated & installed)

Sets

2,720.00

Sub-Total

5,440.00
5,440.00

Savings amount determined after procurement

LSG

Sub Total for Package (Plan)

5,440.00

P-9

PACKAGE 9: ROOF SIGNAGE


Supply and Install Roof Signage

1.00

lot

5,000.00

Sub-Total

5,000.00

LSG

5,000.00

Savings amount determined after procurement

Sub Total for Package (Plan)

5,000.00

PACKAGE 10: PROJECT BILLBOARD

Variation Order

P-10

Supply and Install Community Project Steel Billboard

1.00

lot

8,500.00

8,500.00

LSG

7,083.33

Sub-Total

8,500.00

Savings amount determined after procurement

1,500.00

7,083.33
1,250.00

Sub Total for Package (Plan)

10,000.00

8,333.33

Aggregates
Sand (Approved Source)

5.00

Cu.m.

500.00

Sub-Total

2,500.00

LSG

2,500.00

Hardware
Materials:

Variation Order

10mm dia. x 6.0m RSB

25.00

length

145.00

3,625.00

#16 Tie Wire

5.00

kgs

75.00

375.00

2" dia. PVC P-Trap

2.00

pcs

80.00

160.00

zinchromite yellow paint

5.00

gal.

885.00

4,425.00

Steel Brush

5.00

pcs

35.00

175.00

4" Paint Brush

4.00

pcs

65.00

260.00

4 holes Panel Board

1.00

unit

450.00

450.00

15A Circuit Breaker

2.00

pcs

265.00

530.00

20A Circuit Breaker

1.00

pcs

265.00

Sub-Total

LSG

265.00
10,265.00

Trusses
Materials:
a.) Trusses: (7 units)
1.5mmx2"x6"x6m Cee-Purlins

12.00

lght

795.00

9,540.00

10mm sag rod

8.00

pcs

135.00

1,080.00

#16 turn buckle

8.00

pcs

85.00

680.00

1/8" x 3/4" blind rivets

2.00

boxes

350.00

700.00

Variation Order

1/8" x 1/2" blind rivets

2.00

boxes

265.00

530.00

10.00

kilo

130.00

1,300.00

zinchromite yellow paint

3.00

gal

775.00

2,325.00

rust converter

2.00

gal

325.00

650.00

lacquer thinner

1.00

gal

410.00

410.00

Welding Rod

LSG

Variat

b.) Purlins

2"x3"x1.5mm cee purlin

26.00

lgth

525.00

13,650.00

1.00

lgth

975.00

975.00

3.00

lgth

975.00

2,925.00

2"x2"x1/4 angle bar


c.) Ridge girt

2"x2"x1/4 angle bar


d.) Facia Frame & Facia Board

2"x4"x1.5mm cee purlin

6.00

lght

665.00

2"x 1/4' flat bar

3.00

lght

420.00

3,990.00
1,260.00

Sub-Total

40,015.00

Total Materials Cost

496,947.15

348,549.83

Skilled

62,700.00

unskilled

61,075.00

Sub-Total

123,775.00
Savings amount determined after procurement

CFA

P-11

PACKAGE 11: LABOR


15,569.43
31,569.43

Sub Total for Package (Plan)


Total Direct Cost (cash)

16,000.00

123,775.00

31,569.43

1,720,223.63

620,722.15

380,119.26

PACKAGE-12

PACKAGE 11: HANDTOOLS AND PERSONAL PROTECTIVE EQUIPMENTS


Shovel w/ handle

3.00

pc

250.00

750.00

625.00

Crow Bar

1.00

pc

325.00

325.00

270.83

Wheel Barrow

1.00

pc

1,945.00

1,945.00

1,620.83

Bolo (multi-purpose) w/ handle

1.00

pc

320.00

320.00

Sledge Hammer (5kg) w/ handle

1.00

pc

1,350.00

1,350.00

Concrete Pail

10.00

pc

45.00

450.00

375.00

Hard hat

5.00

pc

90.00

450.00

375.00

Hand gloves

10.00

pc

16.00

160.00

133.33

1.00

Sets

1,750.00

1,750.00

1,458.33

PACKAGE-13

Medicine kit

266.67
1,125.00

LSG

Sub-Total

7,500.00

Savings amount determined after procurement

100.00

6,250.00
83.34

Sub Total for Package (Plan)

7,600.00

6,333.34

PACKAGE 13: ENVIRONMENTAL MITIGITING COST


Warning signs (Tarpulin Printing)

10.00

pc

216.00

2,160.00

Barricades

5.00

pc

216.00

1,080.00

Sub-Total

1,800.00

LSG

899.99

3,240.00

2,708.33

Savings amount determined after procurement

10.00

Sub Total for Package (Plan)

3,250.00

2,708.33

Overhead

21,000.00

Administrative Cost

20,000.00

Material Testing

4,000.00

BSPMC Filing Cabinet

6,000.00

Treasurers Bond

3,375.00

2,000.00
CFA

PACKAGE-14

j. Indirect Cost

4,800.00

Contingency
Sub-Total

54,375.00

Total Indirect Cost (cash)

6,800.00

65,115.00

Savings amount determined after procurement

15,120.16

(4,716.66)

Sub Total for Package (Plan)

80,235.16

11,041.67

TOTAL SAVINGS DETERMINED AFTER PROCUREMENT

143,827.69

134,537.71

GRAND TOTAL CASH (Actual)

685,837.15

395,877.60

GRAND TOTAL CASH (Plan)

897,455.00

SAY

211,617.85

Workshop output of:

15,758.33

525,615.30
70.00%

Checked by:

ANGELITA BRIONES

DOMINGA RODQUILLO

CARMEN A. GAUDIANO

Procurement Team Head

PPT

Municipal Engineer

NITY PROCUREMENT PACKAGING


: Construction of 1 Unit, One(1) Classroom Pre-School Building

sed Sub-Project

: 897,455.00
: 80 C.D.

RCES OF FUNDS

PERCENTAGE WEIGHT
TOTAL

LCC:

TO KC GRANT

AMOUNT
(PESO)

FUND SOURCE

TO LCC CASH

LEGEND:

KC Cost

750,879.00

102,603.20

628,218.50

70.00

70.00

29,315.20

179,491.00

20.00

20.00

TOTAL LCC :
In-kind:

184,951.00

38,375.00

14,657.60

89,745.50

10.00

10.00

Cash:

146,576.00

146,576.00

897,455.00

100.00

100.00

TOTAL

935,830.00

1st Tranche

2nd Tranche

LCC Cash

KC Grant

LCC Cash

REMARKS

ESTIMATED COST INVOLED

3rd Tranche
KC Grant

LCC Cash

TOTAL
KC Grant
-

MONTH

TOTAL

LCC Cash
-

1
-

95.00

475.00

95.00

570.00

17,083.33

85,416.67

17,083.33

102,500.00

6,976.00

34,880.00

6,976.00

41,856.00

215.83

1,079.17

215.83

1,295.00

5,949.17

29,745.83

5,949.17

35,695.00

3,293.33

16,466.67

3,293.33

19,760.00

382.50

1,912.50

382.50

2,295.00

83.33

416.67

83.33

500.00

547.50

2,737.50

547.50

3,285.00

66.67

333.33

66.67

400.00

2,788.67

13,943.33

2,788.67

16,732.00

141.67

708.33

141.67

850.00

70.00

350.00

70.00

420.00

14.17

70.83

14.17

85.00

330.00

1,650.00

330.00

1,980.00

150.00

750.00

150.00

900.00

128.00

640.00

128.00

768.00

120.00

600.00

120.00

720.00

8.67

43.33

8.67

52.00

58.33

291.67

58.33

350.00

233.33

1,166.67

233.33

1,400.00

116.67

583.33

116.67

700.00

532.50

2,662.50

532.50

3,195.00

616.67

3,083.33

616.67

3,700.00

100.00

500.00

100.00

600.00

566.67

2,833.33

566.67

3,400.00

310.00

1,550.00

310.00

1,860.00

1,226.67

6,133.33

1,226.67

7,360.00

137.50

687.50

137.50

825.00

100.00

500.00

100.00

600.00

1,046.67

5,233.33

1,046.67

PROPOSED
IMPLEMENTATION
SCHEDULE

6,280.00

3.33

16.67

3.33

20.00

540.00

2,700.00

540.00

3,240.00

410.00

2,050.00

410.00

2,460.00

185.00

925.00

185.00

1,110.00

13.60

68.00

13.60

81.60

20.40

102.00

20.40

122.40

15.63

78.17

15.63

93.80

30.00

150.00

30.00

180.00

31.63

158.13

31.63

189.75

7.99

39.96

7.99

47.95

32.65

163.25

32.65

195.90

73.50

367.50

73.50

441.00

28.81

144.04

28.81

172.85

247.50

1,237.50

247.50

1,485.00

44.33

221.67

44.33

266.00

33.33

166.67

33.33

200.00

6.00

30.00

6.00

36.00

2.25

11.25

2.25

13.50

4.63

23.13

4.63

27.75

1.31

6.54

1.31

7.85

22.50

112.50

22.50

135.00

6.75

33.75

6.75

40.50

546.67

2,733.33

546.67

3,280.00

43.33

216.67

43.33

260.00

98.00

490.00

98.00

588.00

28.81

144.04

28.81

172.85

45.00

225.00

45.00

270.00

32.08

160.42

32.08

192.50

10.00

50.00

10.00

60.00

2.75

13.75

2.75

16.50

1,133.33

5,666.67

1,133.33

6,800.00

100.00

500.00

100.00

600.00

2.50

12.50

2.50

15.00

113.33

566.67

113.33

680.00

11.25

56.25

11.25

67.50

309.17

1,545.83

309.17

15.50

77.50

15.50

1,855.00
93.00

29.17

145.83

29.17

175.00

38.67

193.33

38.67

232.00

72.92

364.58

72.92

437.50

35.00

175.00

35.00

210.00

18.75

93.75

18.75

112.50

216.67

1,083.33

216.67

1,300.00

29.17

145.83

29.17

175.00

57.50

287.50

57.50

345.00

241,197.68

48,239.51

289,437.20

48,239.51

10,541.54

52,707.71

10,541.54

63,249.25

58,781.06

293,905.39

58,781.06

352,686.45

775.00

155.00

775.00

155.00

930.00

650.00

130.00

650.00

130.00

780.00

2,766.67

553.33

2,766.67

553.33

3,320.00

3,866.67

773.33

3,866.67

773.33

4,640.00

2,825.00

565.00

2,825.00

565.00

3,390.00

2,125.00

425.00

2,125.00

425.00

2,550.00

83.33

16.67

83.33

16.67

100.00

100.00

20.00

100.00

20.00

120.00

45.83

9.17

45.83

9.17

55.00

54.17

10.83

54.17

10.83

65.00

45.83

9.17

45.83

9.17

55.00

1,104.38

220.88

1,104.38

220.88

1,325.25

68.75

13.75

68.75

13.75

82.50

137.50

27.50

137.50

27.50

165.00

270.83

54.17

270.83

54.17

325.00

50.00

10.00

50.00

10.00

60.00

266.67

53.33

266.67

53.33

320.00

104.17

20.83

104.17

20.83

125.00

266.67

53.33

266.67

53.33

320.00

267.50

53.50

267.50

53.50

321.00

470.83

94.17

470.83

94.17

565.00

28.33

5.67

28.33

5.67

34.00

16,373.13

3,274.63

16,373.13

3,274.63

19,647.75

1,744.63

348.93

1,744.63

348.93

2,093.55

18,117.75

3,623.55

18,117.75

3,623.55

21,741.30

291.67

1,458.33

291.67

1,750.00

1,166.67

5,833.33

1,166.67

7,000.00

195.42

977.08

195.42

1,172.50

58.33

291.67

58.33

350.00

3,909.60

19,548.00

3,909.60

1,206.67

6,033.33

1,206.67

23,457.60
7,240.00

6,828.35

34,141.74

6,828.35

40,970.10

10,780.48

53,902.38

10,780.48

64,682.85

17,608.83

88,044.12

17,608.83

105,652.95

750.00

3,750.00

750.00

4,500.00

600.00

3,000.00

600.00

3,600.00

2,333.33

11,666.67

2,333.33

14,000.00

2,700.00

13,500.00

2,700.00

16,200.00

2,058.75

10,293.75

2,058.75

12,352.50

8,442.09

42,210.41

8,442.09

50,652.50

5,304.69

26,523.45

5,304.69

31,828.14

13,746.78

68,733.86

13,746.78

82,480.64

22,166.67

4,433.33

22,166.67

4,433.33

26,600.00

6,375.00

1,275.00

6,375.00

1,275.00

7,650.00

4,250.00

850.00

4,250.00

850.00

5,100.00

658.33

131.67

658.33

131.67

790.00

1,625.00

325.00

1,625.00

325.00

1,950.00

458.33

91.67

458.33

91.67

550.00

35,533.33

7,106.67

35,533.33

7,106.67

42,640.00

24,098.75

4,819.75

24,098.75

4,819.75

28,918.50

59,632.08

11,926.42

59,632.08

11,926.42

71,558.50

2,600.00

13,000.00

2,600.00

15,600.00

850.00

4,250.00

850.00

5,100.00

1,333.33

6,666.67

1,333.33

8,000.00
28,700.00

4,783.33

23,916.67

4,783.33

14.17

70.83

14.17

85.00

4,797.50

23,987.50

4,797.50

28,785.00

3,983.00

796.60

3,983.00

796.60

4,779.60

983.33

196.67

983.33

196.67

1,180.00

4,966.33

993.27

4,966.33

993.27

5,959.60

3,450.33

690.07

3,450.33

690.07

4,140.40

8,416.67

1,683.33

8,416.67

1,683.33

10,100.00

4,533.33

906.67

4,533.33

906.67

5,440.00

4,533.33

906.67

4,533.33

906.67

5,440.00

4,533.33

906.67

4,533.33

906.67

5,440.00

4,166.67

833.33

4,166.67

833.33

5,000.00

4,166.67

833.33

4,166.67

833.33

5,000.00

4,166.67

833.33

1,416.67

4,166.67

833.33

5,000.00

7,083.33

1,416.67

8,500.00
8,500.00

1,416.67

7,083.33

1,416.67

250.00

1,250.00

250.00

1,500.00

1,666.67

8,333.33

1,666.67

10,000.00

2,083.33

416.67

2,083.33

416.67

2,500.00

2,083.33

416.67

2,083.33

416.67

2,500.00

3,020.83

604.17

3,020.83

604.17

3,625.00

312.50

62.50

312.50

62.50

375.00

133.33

26.67

133.33

26.67

160.00

3,687.50

737.50

3,687.50

737.50

4,425.00

145.83

29.17

145.83

29.17

175.00

216.67

43.33

216.67

43.33

260.00

375.00

75.00

375.00

75.00

450.00

441.67

88.33

441.67

88.33

530.00

220.83

44.17

220.83

44.17

265.00

8,554.17

1,710.83

8,554.17

1,710.83

10,265.00

7,950.00

1,590.00

7,950.00

1,590.00

9,540.00

900.00

180.00

900.00

180.00

1,080.00

566.67

113.33

566.67

113.33

680.00

583.33

116.67

583.33

116.67

700.00

441.67

88.33

441.67

88.33

530.00

1,083.33

216.67

1,083.33

216.67

1,300.00

1,937.50

387.50

1,937.50

387.50

2,325.00

541.67

108.33

541.67

108.33

650.00

341.67

68.33

341.67

68.33

410.00

UDIANO

69,709.97

51,906.46

10,381.29

11,375.00

2,275.00

13,650.00

162.50

812.50

162.50

975.00

487.50

2,437.50

487.50

69,709.97

665.00

3,325.00

665.00

1,050.00

210.00

1,050.00

210.00

1,260.00

33,345.83

6,669.17

33,345.83

6,669.17

40,015.00

13,666.33

2,733.27

414,122.63

82,824.53

496,947.15

3,990.00

26,000.00

20,700.00

62,700.00

25,092.64

20,412.93

61,075.00

61,075.00

123,775.00

123,775.00

51,092.64

2,925.00

3,325.00

2,275.00

812.50
2,437.50

11,375.00
-

51,092.64
102,999.10

41,112.93

10,381.29

41,112.93
54,779.26

2,733.27

123,775.00

62,700.00

123,775.00

537,897.63

82,824.53

620,722.15

125.00

625.00

125.00

750.00

54.17

270.83

54.17

325.00

324.17

1,620.83

324.17

1,945.00

53.33

266.67

53.33

320.00

225.00

1,125.00

225.00

1,350.00

75.00

375.00

75.00

450.00

75.00

375.00

75.00

450.00

26.67

133.33

26.67

160.00

1,458.33

291.67

1,750.00

1,250.00

291.67
-

6,250.00

1,250.00

7,500.00

16.66

83.34

16.66

100.00

1,266.66

6,333.34

1,266.66

7,600.00

360.00

1,800.00

360.00

2,160.00

180.01

899.99

180.01

1,080.00

2,708.33

541.67

3,240.00

541.67
541.67

152.36
666.67

13,765.23

2,708.33

7082.41

10.00

541.67

3,250.00

21,000.00

21,000.00

18,000.00

20,000.00

3,333.33

3,333.33

666.67

4,000.00

4,800.00

1,200.00

6,000.00

1,200.00
3,375.00

20,000.00

3,375.00

3,375.00

16,858.30

4,151.86

16,858.30

4,151.86

21,010.16

5,394.03

21,333.33

13,765.23

16,858.30

11,234.27

44,991.63

30,393.53

75,385.16

6,002.36

21,333.33

13,765.23

16,858.30

11,234.27

53,949.96

32,185.20

86,125.16

(4,716.66)

(1,183.34)

(5,890.00)

6,002.36

21,333.33

13,765.23

16,858.30

11,234.27

49,233.30

31,001.86

80,235.16

26,907.53

25,843.38

5,168.68

3,450.33

690.07

163,831.42

32,766.28

196,607.69

75,712.33

124,332.43

24,146.52

71,637.57

13,967.53

591,847.58

115,009.73

706,847.31

102,603.20

150,175.80

29,315.20

75,087.90

14,657.60

750,879.00

146,576.00

897,455.00

20.00%

10.00%

Reviewed by:

Submitted by:

RODSON R. ESCORA

REYNALDO DOMIO

Deputy Area Coordinator

BSMPC

AMOUNT
(PESO)
750,879.00
184,951.00
38,375.00
146,576.00
935,830.00

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
3

BSPMC Form No. 3


KALAHI-CIDSS: MCC PROJECT
LOCAL COUNTERPART CONTRIBUTIO
Barangay Tugawe
Municipality of Dauin
Province of Negros Oriental, Region VII, P
Sub-Project Title: Construction of One(1) Unit, One(1) Classroom Pre-School Building
Budget Item
I. Administrative Cost
TE for opening of BSPMC DBP Account of CV's
TE for procurement transactions of CV's
Project Meetings
MCT-Initiated Meetings
Treasurer Payroll Processing
Forms/Supplies and Reproduction
BSPMC Filing Cabinet
Sub Total
II. Other Indirect Costs
Overhead Cost
Handtools
Pre-engineering
Project Supervisions
Environmental Mitigating Cost
Material Testing
Treasurer's Bond
Contingency
Sub Total
III. Direct Cost
Labor
Materials
Sub Total
TOTAL PROJECT COST
IV. Operations & Maintenance
Other Amenities
Sub Total
GRAND TOTAL
Prepared by:

MARIBEL MAGALSO
Barangay Treasurer

Unit
used

No. of
Units

Per Unit
Cost

Total Sub-Project
Pro-posed
Cost
Amount of Grant
1,380.00
2,600.00
4,600.00
1,750.00
630.00
3,040.00
6,000.00
20,000.00

1,380.00
2,600.00
4,600.00
1,750.00
630.00
3,040.00
6,000.00
20,000.00

21,000.00
7,600.00
2,450.00
12,600.00
3,250.00
4,000.00
3,375.00
21,010.16
75,285.16

16,858.30
29,233.31

147,100.00
693,444.84
840,544.84
935,830.00

123,775.00
577,870.70
701,645.70
750,879.01

0.00
0.00
935,830.00

0.00
750,879.01

6,333.33

2,708.34
3,333.33

MC Form No. 3
DSS: MCC PROJECT
PART CONTRIBUTION PLAN
angay Tugawe
cipality of Dauin
Oriental, Region VII, Philippines

Mun LGU

Local Counterpart Contribution (LCC) Sources


Brgy LGU
Community
DepEd
Total of LCC

0.00
21,000.00
1,266.67
2,450.00
9,600.00
541.66
666.67
3,375.00
4,151.86
43,051.85

0.00

0.00

0.00

0.00 August-December 2014


0.00 August-December 2014
0.00 August-December 2014
0.00 August-December 2014
0.00 August-December 2014
0.00 August-December 2014
0.00 August-December 2014
0.00

0.00

21,000.00 August-December 2014


1,266.67 August-December 2014
2,450.00 August-December 2014
12,600.00 August-December 2014
541.66 August-December 2014
666.67 August-December 2014
3,375.00 August-December 2014
4,151.86 August-December 2014
46,051.85

3,000.00

3,000.00

0.00

Target Date of Delivery


of LCC

105,574.14
105,574.14
148,625.99

10,000.00
10,000.00
13,000.00

23,325.00
23,325.00
23,325.00

0.00
0.00

23,325.00 August-December 2014


115,574.14 August-December 2014
138,899.14
184,950.99

0.00
148,625.99

0.00
13,000.00

0.00
23,325.00

0.00
0.00

0.00
0.00
184,950.99

Approved by:

REYNALDO DOMIO
BSPMC Chairperson

PROPOSED PROCUREMENT ACTIO


Sub-project Name : Construction of Barangay Health Station
Location : Bagacay, Dauin, Negros Oriental
Timeline to complete
the activity (Inclusive
Dates)

Responsible Volunteer/s and Project Staff


( Complete Name)

1. Preparation of Planned Community


Procurement Packages

June 4, 2014

George alas-as BSPMC Chair, Teodolo Bulisid


-BAC,-PT,Engr. Rodson R. Escora - DAC, Ricky
T. Panoy -CF and Name-Engr. Carmen A.
GaudianoM.E.

2. Finalization of Packages & PCPP

June 7, 2014

-do-

3. Conduct of Pre-procurement Conference

June 11, 2014

George Alas-as-BSPMC Chair, Teodolo


Bulisid ,Benadeth Tuala-BAC, Jocelyn Alas-asPIT,Felix Avellano-PT, Engr. Rodson R. Escora DAC, Ricky T. Panoy-CF and Carmen A.
Gaudiano-M.E.

4. Preparation of Minutes of Conference

June 12, 2014

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

Procurement Activities

5. Preparation of Procurement Documents

June 12-14, 2014

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

6. Serving of Canvass/Request for Qoutation


6.1 Serving of Canvass/Request for Qoutation
(for 1st tranche)

Package 1: Hardware

June 15, 2014

Package 3: Form Lumber

June 15, 2014

Package 4: Aggregates

June 15, 2014

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

Procurement Activities

Timeline to complete
the activity (Inclusive
Dates)

Package 6: Furniture

June 15, 2014

Package 10: Project Billboard

June 15, 2014

Pckage 12: Handtools and Personal Protective


Equipment

June 15, 2014

Pckage 13: Environmental Mitigating Cost

June 15, 2014

Responsible Volunteer/s and Project Staff


( Complete Name)

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

6.2 Serving of Canvass/Request for Qoutation


(for 2nd tranche)

Package 2: Painting Works

July 7, 2014
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

Package 5: Roofing

July 7, 2014

6.3 Serving of Canvass/Request for Qoutation


(for 3rd tranche)

Package 7: Glass

July 27, 2014

Package 8: Window Grills

July 7, 2014

Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF

Procurement Activities

Package 9: Roof Signage

Timeline to complete
the activity (Inclusive
Dates)

July 27, 2014

7: Opening of Canvass

-do-

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 10: Project Billboard, Package 12:
Handtools & Personal Protective Equipment;
Package 13: Environmental Mitigating Cost

June 17, 2014

Package 2: Painting Works, Package 5: Roofing,

July 9, 2014

Package 7: Glass, Package 8: Window Grills,


Package 9: Roof Signage

July 29, 2014

8. Preparation of Minutes of Opening

Felix Savillano, Erick Adora, Cristituta Rigon Responsible


Volunteer/s
Project Staff
PT, Ricky
T. Panoy-and
ACT-CF
( Complete Name)

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

-do-

Procurement Activities

Timeline to complete
the activity (Inclusive
Dates)

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 10: Project Billboard, Package 12:
Handtools & Personal Protective Equipment;
Package 13: Environmental Mitigating Cost

June 18, 2014

Package 2: Painting Works, Package 5: Roofing,

July 10, 2014

Package 7: Glass, Package 8: Window Grills,


Package 9: Roof Signage

July 30, 2014

9. Evaluation of Canvass

June 17, 2014

Package 2: Painting Works, Package 5: Roofing,

July 9, 2014

Package 7: Glass, Package 8: Window Grills,


Package 9: Roof Signage

July 29, 2014

10. Preparation of Abstract of Canvass

June 17, 2014


-doJuly 9, 2014

Package 7: Glass, Package 8: Window Grills,


Package 9: Roof Signage

July 29, 2014

11. Preparation of Purchased Order

Package 2: Painting Works, Package 5: Roofing,


Package 7: Glass, Package 8: Window Grills,
Package 9: Roof Signage

-do-

June 19, 2014


-doJuly 11, 2014
July 31, 2014

12. Approving of Purchased Order


Package 1: Hardware, Package 3: Form Lumber,
Package 4: Aggregates, Package 6: Furniture,
Package 10: Project Billboard, Package 12:
Handtools & Personal Protective Equipment;
Package 13: Environmental Mitigating Cost

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

-do-

Package 2: Painting Works, Package 5: Roofing,

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 10: Project Billboard, Package 12:
Handtools & Personal Protective Equipment;
Package 13: Environmental Mitigating Cost

George Alas-as-BSPMC Chair,Felix AvellanoPT,Engr. Rodson R. Escora - DAC,Ricky T.


Panoy-CF and -Engr. Carmen A. Gaudiano-M.E.

-do-

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 10: Project Billboard, Package 12:
Handtools & Personal Protective Equipment;
Package 13: Environmental Mitigating Cost

Package 1: Hardware, Package 3: Form Lumber,


Package 4: Aggregates, Package 6: Furniture,
Package 10: Project Billboard, Package 12:
Handtools & Personal Protective Equipment;
Package 13: Environmental Mitigating Cost

Responsible Volunteer/s and Project Staff


( Complete Name)

-do-

June 20, 2014


Hazley Lanfie,Teodulo Bulisid, Bernadita Tuala

Procurement Activities
Package 2: Painting Works, Package 5: Roofing,
Package 7: Glass, Package 8: Window Grills,
Package 9: Roof Signage

Timeline to complete
the activity (Inclusive
Dates)
July 12, 2014
August 1, 2014

13. Serving of Purchased Order to Winning


Suppliers
Package 1: Hardware, Package 3: Form Lumber,
Package 4: Aggregates, Package 6: Furniture,
Package 10: Project Billboard, Package 12:
Handtools & Personal Protective Equipment;
Package 13: Environmental Mitigating Cost
Package 2: Painting Works, Package 5: Roofing,
Package 7: Glass, Package 8: Window Grills,
Package 9: Roof Signage

Responsible Volunteer/s and Project Staff


( Complete Name)
Hazley Lanfie,Teodulo Bulisid, Bernadita Tuala

Hazley Lanfie,Teodulo Bulisid, Bernadita Tuala

June 21-22, 2014


-doJuly 13-14, 2014
August 2-3,2014

14. Delivery of Goods


Package 1: Hardware, Package 3: Form Lumber,
Package 4: Aggregates, Package 6: Furniture,
Package 10: Project Billboard, Package 12:
Handtools & Personal Protective Equipment;
Package 13: Environmental Mitigating Cost
Package 2: Painting Works, Package 5: Roofing,
Package 7: Glass, Package 8: Window Grills,
Package 9: Roof Signage

15. Mobilization and Start of SPI

-do-

June 23 - July 3, 2014


Selvino Bulisid - MIT Chair, MIT Members, Ricky
T. Panoy- ACT-CF, Rodson Escora-ACT-DAC
July 15-25, 2014
August 4-14, 2014
July 5 - September 23, Selvino Bulisid - MIT Chair, MIT Members, Ricky
2014
T. Panoy- ACT-CF, Rodson Escora-ACT-DAC
BSPMC, Jocelyn Alas-as- PIT Chair and PIT
Members, Community Workers

Prepared by:
Reviewed & Checked by:

ANGELITA BRIONES
PT Chairperson

ENGR. CARMEN A. GAUDIANO


MCT-DAC

ENGR. RODSON R. ESCORA


ACT-DAC

EMENT ACTION PLAN (PAP)

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Brgy. Hall/BSPMC Office

POW/Detailed
Estimates

Draft PCPP

Brgy. Hall/BSPMC Office

POW & Draft PCPP

Final PCPP

Brgy. Hall/BSPMC Office

Final PCPP

Conference Conducted

Brgy. Hall/BSPMC Office

Office supplies

Minutes of Conference

Brgy. Hall/BSPMC Office

POW & Final PCPP

Invitation to Bid/Bid
Documents

Supplier's Office,
Establishment

Supplier's: Zenith
Commercials, Golden Rule,
Octagon Hardware

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Gold
Enterprises, Lucky
Enterprises, JM
Commercials

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Sugar Hills


Agricultural Corp., Solon
Construction, Lucky
Construction

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Supplier's Office,
Establishment

Supplier's: Alice Furniture,


BL Furniture, Elloren
Furniture

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Alagasi's
Welding Shop, Zamora
Welding Shop, Orient Pearl

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: New Bian Yek


Commercials, Dgte. YY
Trading, Duplamilco

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Ziplink Graphix,


I Concept, ADS Unlimited,
Sun Signs

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Earthworks,
Dumaguete Painthaus, JB
Marketing

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Suppliers: DN Steel, Union


Galvasteel, Uy Matiao
Trading Corp., Sm & Mst
Construction

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Reman Glass


and Aluminum, RJ Glass
and Aluminum, ESJ Glass,
Ong Ming Glass

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Supplier's Office,
Establishment

Supplier's: Alagasi's
Welding Shop, Zamora
Welding Shop, Orient Pearl

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Venue of meeting and


place/s to conduct
procurement

Supplier's Office,
Establishment

Brgy. Hall/BSPMC Office

Name of Potential
Suppliers Contractors

Supplier's: Qsigns, Ziplink


Graphics, Ads Unlimited,
Iconcept

Resources
Requirement

Expected outputs/
Remarks

Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt

Canvass Form/Request
for Qoutation Served,
Signed AR

Submitted Canvass
Form/Request for
Qoutation

Abstract of Canvass

Venue of meeting and


place/s to conduct
procurement

Name of Potential
Suppliers Contractors

Resources
Requirement

Expected outputs/
Remarks

Brgy. Hall/BSPMC Office

Office Supplies

Minutes of Opening

Brgy. Hall/BSPMC Office

Office Supplies

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Minutes of Evaluation

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Minutes of Evaluation

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Abstract of Canvass

Brgy. Hall/BSPMC Office

Submitted Canvass
Form/Request for
Quotation

Abstract of Canvass

Brgy. Hall/BSPMC Office

Abstract of Canvass

Purchased Order

Brgy. Hall/BSPMC Office

Abstract of Canvass

Purchased Order

Brgy. Hall/BSPMC Office

Purchased Order

Approved Purchased
Order

Venue of meeting and


place/s to conduct
procurement
Brgy. Hall/BSPMC Office

Name of Potential
Suppliers Contractors

Brgy. Hall/BSPMC Office

Supplier's Office,
Establishment

Resources
Requirement
Purchased Order

Expected outputs/
Remarks
Approved Purchased
Order

Purchased Order

Approved Purchased
Order

Approved Purchased Conformed Purchased


Order
Order by Suppliers

Supplier's Office,
Establishment

Project Site

Delivery
Receipt/Delivered
Goods

Goods Received

Project Site

Delivery
Receipt/Delivered
Goods

Goods Received

Project Site

Notice to Commence

Mobilization Started

Noted by:

Approved by:

ENGR. HELEN C. YBANEZ


Area Coordinator

REYNALDO DOMIO
BSPMC Chairperson

ENVIRONMENTAL MANAGEMENT REPORT


Sub-Project Title
:
Sub-Project Description :
Location
Total Approved Cost
Cost Sharing

Construction of One(1) Unit, One(1) Classroom Pre-School Bu

Construction of 1 Unit ( 7.0m x 9.0m ) Classroom Building w


plumbing fixtures , electrical fixtures, paintings and basic am

:
:

Barangay Tugawe, Dauin, Negros Oriental


PHP 935,830.00

:
Local Counterpart :
KALAHI Grant
Community
Barangay LGU
Municipal LGU
TOTAL

SPI Stage / Activities Conducted


I.

II

III

Siteworks

STRUCTURAL CONCRETE

REINFORCING STEEL BARS

PHP
PHP
PHP
PHP
PHP

Negative Impact

Mitigati

a.

Deep Excavation/Ground
Leveling

a-1.

b.

Backfilling of Excavated
Materials

b-1.

c.

Cutting down of affected


c-1.
trees inside construction site

a.

Increase in noise level

a-1.

b.

Construction Waste

b-1.

a.

Increase in noise level during a-1.


cutting of Steel bars

SPI Stage / Activities Conducted

Negative Impact

Mitigati

IV

MASONRY WORKS

a.

Hazard to Falling Debris and a-1.


Sharp Objects such as CW
Nails and other Carpentry
Handtools

CEMENT PLASTERING FINISH

a.

Increased Dust Particles

a-1.

VI

CARPENTRY AND JOINERY WORKS

a.

Increase in noise level

a-1.

VII

TILEWORKS

a.

VIII
IX
X
XI

DOOR AND WINDOWS


CORRUGATED METAL ROOFING
PLUMBING WORKS
ELECTRICAL WORKS

XII
XIII

AMENITIES AND FACILITIES


PAINTING AND VARNISHING
WORKS
STEEL BILLBOARD and ROOF
SIGNAGES

XIV

a.

none

a-1.

none
none
none
Increase Hazard due to live
and high voltage current

a-1.

none
none
none
Reviewed by:

Prepared By:

REYNALDO DOMIO
BSPMC Chair
Concurred by:

CARMEN A. GAUDIANO
Municipal Engineer

NTAL MANAGEMENT REPORT

truction of One(1) Unit, One(1) Classroom Pre-School Building

struction of 1 Unit ( 7.0m x 9.0m ) Classroom Building with CR, ceiling, tiles,
bing fixtures , electrical fixtures, paintings and basic amenities.

ngay Tugawe, Dauin, Negros Oriental

750,879.00
23,325.00
13,000.00
148,626.00
935,830.00
Mitigating Measures
Provide baricades and warning signs
to make aware of the community of
the on-going activity. And Strickly
follow the desired elevation on plan.
Provide workers Dust Mask during
execution of work to prevent workers
from inhailing dust particles.
Replace cut-down trees with new tree
seedlings within the vicinity

Inform the community about the


incoming activities and instruct the
workers to minimize the noise and
dust during the construction.
Observe proper disposal or segration
of construction waste e.g.
Biodegradable, Non-Biodegradable
and Hazardous Waste
Inform the community about the
incoming activities and instruct the
workers to minimize the noise and
dust during the construction.

Mitigating Measures
Workers must wear Hardhats and
Safety Boots on Site, removal of
scaffoldings must be placed on
designated areas to prevent workers
from injuries.
Provide workers Dust Mask during
execution of work to prevent workers
from inhailing dust particles.

Inform the community about the


incoming activities and instruct the
workers to minimize the noise and
dust during the construction.
none

none
none
none
Provide safety equipment and
appropriate warning signs along the
construction sites.
none
none
none

SIMPLICIO SUAYBAGUIO
Community Facilitator

RODSON R. ESCORA
Deputy Area Coordinator

ADMINISTRATIVE COST DERIVATION


Sub-project Activities

Destination/Description

Fare/
Allowance/
Unit Price

Qty.

Unit

pesos

No of
transactions

1. TE for Opening of BSPMC LBP Bank Account of CVs


1,000.00

1 times

40.00

persons x

1 times

30.00
60.00

x
x

2
2

persons x
persons x

1 times
2 times

=
=

BSPMC office to Dgte. City (vice


versa)

40.00

persons x

4 times

Dgte. transport
meals

30.00
60.00

x
x

3
3

persons x
persons x

4 times
4 times

=
=

BSPMC office to Dgte. City (vice


versa)

40.00

persons x

4 times

Dgte. transport
meals

30.00
60.00

x
x

2
2

persons x
persons x

4 times
4 times

=
=

100.00
20.00

8
19

meetings
persons x

10 times

=
=

BSPMC office to ACT/MCT office


(vice versa)

30.00

persons x

5 times

Meals

40.00

persons x

5 times

BSPMC office to ACT/MCT office


(vice versa)

30.00

persons x

9 times

Meals

40.00

persons x

9 times

350.00
5.00
2.00
945.00
50.00
50.00
50.00
100.00
15.00
30.00
350.00
50.00
35.00
20.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
5
325
1
1
1
1
1
1
2
1
2
1
1

LBP Initial Deposit


BSPMC office to Dgte. (vice
versa)

Dgte. transport
meals
Sub-Total
2. TE for procurement transactions of CVs
Serving of Canvass

Serving of PO & Payments

Sub-Total
3. Project Meetings
Supplies
Snacks
Sub-Total
4. ACT-initiated Meetings

Sub-Total
5. Treasurer Payroll Processing

Sub-Total
6. Forms/Supplies and Reproduction
Bondpaper long
Ballpens
Reproduction
Petty cash box w/ padlock
Rubber Stamp
Stampad
Stamping Ink
Stapler
Stapler Remover
Staple Wire
Calculator
Columnar Book
Liquid Eraser
Paste/Glue

reams
pcs
sheets
set
pc
pc
pc
pc
pc
boxes
pc
pcs
ps
pc

=
=
=
=
=
=
=
=
=
=
=
=
=
=

Folder long
Paper clip
Pentil pen
Log book
Sub-Total
TOTAL for Items 1-4
7. Filing Cabinet
SUPPLY & INSTALL OF BSPMC
FILING CABINET
TOTAL for Filing Cabinet
Total for Admin Cost

3.00
20.00
30.00
80.00

Qty

unit
1

UNIT

Prepared by :

x
x
x
x

10
1
1
2

pcs
box
pc
pcs

=
=
=
=

Unit Cost
6,000.00

Approved by :

ELSA A. TRUNO

REYNALDO DOMIO

MEO Staff

BSPMC Chairperson

Checked by:

Concurred by :

RODSON R. ESCORA

JORJIC A. BAJADO

Deputy Area Coordinator

Barangay Captain

ENGR. CARMEN A. GAUDIANO

HON. NEIL B. CREDO

Municipal Engineer - MCT DAC

Municipal Mayor

Recommending Approval:

Noted by:

TIVE COST DERIVATION


Amount

1,000.00
80.00
60.00
240.00
1,380.00
480.00
360.00
720.00
320.00
240.00
480.00
2,600.00
800.00
3,800.00
4,600.00
750.00
1,000.00
1,750.00
270.00
360.00
630.00

350.00
25.00
650.00
945.00
50.00
50.00
50.00
100.00
15.00
60.00
350.00
100.00
35.00
20.00

30.00
20.00
30.00
160.00
3,040.00
14,000.00
Total Amount
6,000.00
6,000.00
20,000.00

REYNALDO DOMIO
BSPMC Chairperson

JORJIC A. BAJADO
Barangay Captain

HON. NEIL B. CREDO


Municipal Mayor

Republic of the Philippines


Department of Social Welfare and Development
KALAHI-CIDSS : MCC PROJECT
Province of Negros Oriental
Municipality of Dauin
Barangay Tugawe
CONSTRUCTION OF 1 UNIT, ONE (1) CLASSROOM PRE-SCHOOL BUILDING
BILL OF QUANTITIES

I. SITE WORKS
Nylon # 16
Portland Cement
Portland Cement
Portland Cement
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
20mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
# 16 G.I. Tie Wire
1-1/2" G.I. Pipe
Hacksaw Blade
1/4 thk. 4'x8' Ordinary Plywood
" thk. X 4' x 8' Marine Plywood
Lawanet 6mm thk 4'x8'
Conc. Nails 4"
# 4 CWN
4" CW Nails
4" CW Nails
3" CW Nails
3" CW Nails
3" CW Nails
#2 CWN
#2-1/2 CWN
2 1/2" CW Nails
CW Nails 1"
1
/2 " CW Nails
12mm thk. x 1200mm x 2400mm Fiber Cement Board
(Fascia Board)
12mm dia. X 7" Machine Bolt w/ Knot and washer
Anti-Termite (e.g. solignum, )
0.80 x 2.10m Flush Type Plastic Door w/ door jambs
3-1/2"x3-1/2" Loose pin Hinges (quality brand)
Door knob (QUALITY BRAND)
IX. PLUMBING WORKS
A. Materials
VII-I Plumbing Fixtuers:
Water closet
4" x 4" PVC Floor Drain
VII-II Sewer Line:
4" x 3.0m dia. PV Pipe
3" x 3.0m dia. PV Pipe
2" X 3.0m PV Pipe
2" dia. X 900 PVC Bend Elbow
4" dia. X 900 PVC Bend Elbow
4" dia. X 450 PVC Bend Elbow
4" x 3" Wye
2" dia. PVC P-Trap
4" dia.PVC Clean Out Plug
4" dia.x 4" dia. PVC Wye
3" dia. X 90deg. PVC elbow
Solvent Cement
VII-III For Water Line:
Wallhung lavatory with faucet and supply pipe
1
/2" x 3.0m PVC pipe
1
/2" dia. Gate valve
1
/2" PVC Coupling
1
/2" PVC 90 deg. Bend elbow
1
/2" PVC Tee
1
/2" PVC female threaded adoptor
1
/2" Faucet, hosebib, brass
Teflon Tape
IX-III For Downspouts:
3" dia. x 3.0m PVC Pipe
3" dia. x 3" PVC Tee
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement
X. TILE WORKS
8" x 8" Glazed Tiles
8" x 8" Unglazed Tiles
tile grout
tile frame
XI. ELECTRICAL WORKS
A. Materials
Interior Rough in
2" x 4" Utility Boxes Pvc
4" x 4" Junction Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Electrical Fixtures
Flourescent Lamp, 40 watts
50 watts incandescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Ligthing Outlet ( 4" Porcelain Receptacle w/
Female Adoptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Safety Switch
XII. PAINTING WORKS
A. Materials
Cocrete Putty
Concrete Neutralizer
Flat Latex White
Semi-Gloss Latex White
Quick Dry Enamel White
Flat Enamel White
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Sandpaper #100
Sandpaper #200
Paint Brush 4"
Paint Brush 2"
Roller Paint Brush 8" (with tray)
Putty Pallet
Body Filler
Slating Paint (Premium Quality)
Flat White QDE (Premium Quality)

UNIT COST

COST SHARING

QUANTITY

DESCRIPTION

Unit

2.00
410.00
85.00
75.00
327.00
7.00
110.00
38.00
1.50
10.00
3.00
10.00
47.00
2.00
2.00
1.00
45.00
10.00
20.00
6.00
7.00
7.00
16.00
10.00
5.00
1.00
7.00

Kgs.
Bags
Bags
Bags
Length
Length
Length
Length
rolls
Kgs.
Pcs.
Pcs.
shts.
shts
pcs
kg
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
kg
Kgs.

350.00
250.00
250.00
250.00
150.00
220.00
370.00
560.00
3,046.00
70.00
1,200.00
60.00
350.00
440.00
440.00
90.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00

3.50
2.50
2.50
2.50
1.50
2.20
3.70
5.60
30.10
0.70
12.00
0.60
3.50

4.00

shts.

1,200.00

20.00
3.00
2
12
4
1.00

Pcs.
gal
sets
pc
pc
Lot

2.00
2.00

Units
Sets

6.00
6.00
6.00
4.00
2.00
2.00
2.00
3.00
1.00
2.00
12.00
1.00

Length
Length
Length
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pint

600.00
500.00
300.00
50.00
90.00
70.00
150.00
80.00
70.00
150.00
50.00
450.00

1.00
5.00
1.00
9.00
2.00
3.00
1.00
1.00
3.00

Sets
Length
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.

1,500.00
60.00
400.00
10.00
20.00
20.00
20.00
200.00
30.00

8.00 length
4.00
pc
16.00
pc
1.00
pint
9.00
sq.m.
120.00
Pcs.
460.00
Pcs.
15.00
bags
20.00
length
1.00
Lot

No. of
Crew/
Labor

ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST

TOTAL UNIT
COST

SUB-TOTAL LCC
TOTAL
KALAHI GRANT

0.65

353.50
252.50
252.50
252.50
151.50
222.20
373.70
565.60
3,076.10
70.70
1,212.00
60.60
353.50
440.00
440.00
90.00
65.65
65.65
65.65
65.65
65.65
65.65
65.65
65.65
65.65
65.00
65.65

707.00
103,525.00
21,462.50
18,937.50
49,540.50
1,555.40
41,107.00
21,492.80
4,614.15
707.00
3,636.00
606.00
16,614.50
880.00
880.00
90.00
2,954.25
656.50
1,313.00
393.90
459.55
459.55
1,050.40
656.50
328.25
65.00
459.55

589.17
86,270.83
17,885.42
15,781.25
41,283.75
1,296.17
34,255.83
17,910.67
3,845.13
589.17
3,030.00
505.00
13,845.42
733.33
733.33
75.00
2,461.88
547.08
1,094.17
328.25
382.96
382.96
875.33
547.08
273.54
54.17
382.96

12.00

1,212.00

4,848.00

50.00
750.00
6,000.00
100.00
1,500.00

0.50
7.50
60.00
1.00
15.00

50.50
757.50
6,060.00
101.00
1,515.00

1,010.00
2,272.50
12,120.00
1,212.00
6,060.00

1,500.00
50.00

1,515.00
50.50

3,030.00
101.00

606.00
505.00
303.00
50.50
90.90
70.70
151.50
80.80
70.70
151.50
50.50
454.50

3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50

1,515.00
60.60
404.00
10.10
20.20
20.20
20.20
202.00
30.30

1,515.00
303.00
404.00
90.90
40.40
60.60
20.20
202.00
90.90

350.00
95.00
600.00
350.00

15.00
0.50
6.00
5.00
3.00
0.50
0.90
0.70
1.50
0.80
0.70
1.50
0.50
4.50
15.00
0.60
4.00
0.10
0.20
0.20
0.20
2.00
0.30
3.50
0.95
6.00
3.50

353.50
95.95
606.00
353.50

25.00
20.00
100.00
250.00

0.25
0.20
1.00
2.50

25.00
25.00
150.00
80.00

CASH

TOTAL LCC
(CASH &
INKIND)

MLGU
INKIND

CASH

INKIND

CASH

TOTAL

INKIND

117.83
17,254.17
3,577.08
3,156.25
8,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
109.42
218.83
65.65
76.59
76.59
175.07
109.42
54.71
10.83
76.59

117.83
17,254.17
3,577.08
3,156.25
8,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
109.42
218.83
65.65
76.59
76.59
175.07
109.42
54.71
10.83
76.59

707.00
103,525.00
21,462.50
18,937.50
49,540.50
1,555.40
41,107.00
21,492.80
4,614.15
707.00
3,636.00
606.00
16,614.50
880.00
880.00
90.00
2,954.25
656.50
1,313.00
393.90
459.55
459.55
1,050.40
656.50
328.25
65.00
459.55

4,040.00

808.00

808.00

808.00

4,848.00

841.67
1,893.75
10,100.00
1,010.00
5,050.00

168.33
378.75
2,020.00
202.00
1,010.00

168.33
378.75
2,020.00
202.00
1,010.00

168.33
378.75
2,020.00
202.00
1,010.00

1,010.00
2,272.50
12,120.00
1,212.00
6,060.00

505.00
16.83
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15
471.33
63.97
1,616.00
58.92

505.00
16.83

505.00
16.83

3,030.00
101.00

606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75

606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75

3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50

252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15

252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15

1,515.00
303.00
404.00
90.90
40.40
60.60
20.20
202.00
90.90

2,828.00
383.80
9,696.00
353.50

2,525.00
84.17
3,030.00
2,525.00
1,515.00
168.33
151.50
117.83
252.50
202.00
58.92
252.50
505.00
378.75
1,262.50
252.50
336.67
75.75
33.67
50.50
16.83
168.33
75.75
2,356.67
319.83
8,080.00
294.58

471.33
63.97
1,616.00
58.92

471.33
63.97
1,616.00
58.92

2,828.00
383.80
9,696.00
353.50

25.25
20.20
101.00
252.50

3,030.00
9,292.00
1,515.00
5,050.00

2,525.00
7,743.33
1,262.50
4,208.33

505.00
1,548.67
252.50
841.67

505.00
1,548.67
252.50
841.67

505.00
1,548.67
252.50
841.67

3,030.00
9,292.00
1,515.00
5,050.00

0.25
0.25
1.50
0.80

25.25
25.25
151.50
80.80

50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17

50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17

50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17

303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00
106.05
2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00

151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00

151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00

151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00

909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,845.00
101.00
202.00
375.00
80.00
282.80
125.00
303.00
240.00
120.00

0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65

pcs.
pcs.
length
pc.

2.00
30.00
10.00
80.00
3.00

box
m
Pcs.
m
Pcs.

4,300.00
30.00
10.00
70.00
35.00

43.00
0.30
0.10
0.70
0.35

4,343.00
30.30
10.10
70.70
35.35

303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00
106.05

7.00
assy
2.00
set
2.00
Pcs.
Pcs.
4.00
5.00
Pcs.
7.00
Pcs.
5.00
Pcs.
1.00
unit
5.00
Pcs.
1.00
Set
265.00 sq.m.

350.00
250.00
100.00
100.00
300.00
150.00
75.00
2,500.00
90.00
500.00

3.50
2.50
1.00
1.00
3.00
1.50
0.75
25.00
0.90
5.00

353.50
252.50
101.00
101.00
303.00
151.50
75.75
2,525.00
90.90
505.00

2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00

252.50
147.29
126.25
67.33
7,238.33
757.50
84.17
4,713.33
88.38
2,062.08
420.83
168.33
336.67
1,262.50
883.75
315.63
2,104.17
378.75
420.83

300.00
200.00
500.00
600.00
650.00
600.00
50.00
50.00
50.00
50.00
50.00
410.00
20.00
20.00
75.00
40.00
70.00
25.00
150.00
160.00
120.00

3.00
2.00
5.00
6.00
6.50
6.00
0.50
0.50
0.50
0.50
0.50

303.00
202.00
505.00
606.00
656.50
606.00
50.50
50.50
50.50
50.50
50.50
410.00
20.20
20.20
75.00
40.00
70.70
25.00
151.50
160.00
120.00

909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,845.00
101.00
202.00
375.00
80.00
282.80
125.00
303.00
240.00
120.00

757.50
673.33
3,366.67
4,040.00
3,282.50
2,525.00
84.17
84.17
42.08
42.08
42.08
1,537.50
84.17
168.33
312.50
66.67
235.67
104.17
252.50
200.00
100.00

Gals
Gals
Gals
Gals
Gal
Gals
Pints
Pints
Pints
Pints
Pints
Gal
shts
shts
pcs
pcs
set
pcs
Ltrs
liters
liters

BLGU

117.83
11,254.17
3,577.08
3,156.25
4,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
109.42
218.83
65.65
76.59
76.59
175.07
109.42
54.71
10.83
76.59

12.00
7.00
1.00
1.00

3.00
4.00
8.00
8.00
6.00
5.00
2.00
2.00
1.00
1.00
1.00
4.50
5.00
10.00
5.00
2.00
4.00
5.00
2.00
1.50
1.00

COMMUNITY
INKIND

0.20
0.20

0.70
1.50

6,000.00

4,000.00

QUANTITY

DESCRIPTION

Abrassive Paper

4.00
Sub-Total
2. HANDTOOLS AND PROTECTIVE EQUIPMENTS
Shovel w/ handle
3.00
Crow Bar
1.00
Wheel Barrow
1.00
Bolo (multi-purpose) w/ handle
1.00
Sledge Hammer (5kg) w/ handle
1.00
Concrete Pail
10.00
5.00
Hard hat
10.00
Hand gloves
1.00
Medicine kit
Sub-Total
I - 3. EMBANKMENT: Filling, Grading and Compaction
A. Materials
Filling Materials
20.00
Mixed and Washed Gravel
6.00
Washed Sand
35.00
Washed Gravel
27.00
4" x 8' x 16" CHB
1,647.00
Sub-Total
VI - 1. Roof Frame
899.00
A. Materials
25- 2" x 2" x 12' Coco Lumber
100.00
100-2"x2"x12' Coco Lumber
400.00
20-2"x2"x10' Coco Lumber for Bracing
67.00
1" x 2" x 8' s4s Wood Lumber
7.00
2 - 2" x 5" x 12' (Good Lumber)
20.00
30 - 2" x 5" x 10' (Good Lumber)
250.00
32 - 2" x 5" x 8' (Good Lumber)
214.00
2- 2" x 4" x 10' (Good Lumber)
14.00
10 - 2" x 4" x 8' (Good Lumber)
54.00
20 - 2" x 3" x 12' (Good Lumber)
120.00
13 - 2" x 3" x 10' (Good Lumber)
65.00
8 - 2" x 3" x 8' (Good Lumber)
32.00
162- 2" x 2" x 12' Ceiling Joist (Good Lumber)
648.00
50 - 2" x 2" x 12' Hangers (Good Lumber)
200.00
Sub-Total
VII.
0.9 DOORS
x2.10m AND
Hard WINDOWS
Panel Door Hinge Type w/ Fixed Glass 18.44
Furniture
Transom on 50mm x 150mm Wood Jambs/Frames (Tugas
or Narra) INSTALLED
2
2"x6" wooden jamb assembly for W-1 w/ a dimension of
2.5m x 1.5m to include mollion partition at 0.60m interval
2.00
and transom.
2"x6" wooden jamb assembly for W-2 w/ a dimension of
1.225m x 1.5m to include mollion partition at 0.60m interval
5.00
and transom.
Sub-Total
WINDOWS
0.60m x 15 blades jalousie glass with alluminum frame
6
(INSTALLED)
0.60m x 5 blades jalousie glass with alum.frame
(INSTALLED)

UNIT COST
Unit

pads

No. of
Crew/
Labor

COST SHARING

ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
35.00

pc
pc
pc
pc
pc
pc
pc
pc
Sets

450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00

Cu.m
Cu.m.
Cu.m.
Cu.m.
Pcs

550.00
800.00
700.00
800.00
12.00

TOTAL UNIT
COST

35.00

450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00

5.50
8.00
7.00
8.00
0.12

555.50
808.00
707.00
808.00
12.12

Bd. Ft.
Bd.Ft
Bd.Ft
bd. ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.

140.00
419,605.05

116.67
223,242.38

1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
7,600.00

1,125.00
416.67
891.67
316.67
583.33
833.33
1,458.33
291.67
416.67
243,826.75

11,110.00
4,848.00
24,745.00
21,816.00
19,961.64
82,480.64

9,258.33
4,040.00
20,620.83
18,180.00
16,634.70
9,258.33

2,525.00
10,100.00
1,691.75
315.00
808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80
45,813.60
14,140.00
105,652.95

2,104.17
8,416.67
1,409.79
262.50
673.33
8,416.67
7,204.67
471.33
1,818.00
4,040.00
2,188.33
1,077.33
38,178.00
11,783.33
25,889.67

BLGU
CASH

INKIND

10,000.00

10,000.00

TOTAL LCC
(CASH &
INKIND)

MLGU

CASH
-

23.33
34,648.48

225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
38,765.35

1,851.67
808.00
4,124.17
3,636.00
3,326.94
1,851.67

420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93

INKIND

CASH

TOTAL

INKIND

23.33
44,648.48

23.33
44,648.48

140.00
267,890.85

225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
48,765.35

225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
48,765.35

1,851.67
808.00
4,124.17
3,636.00
3,326.94
1,851.67

1,851.67
808.00
4,124.17
3,636.00
3,326.94
1,851.67

1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
292,592.10
11,110.00
4,848.00
24,745.00
21,816.00
19,961.64
11,110.00

25.00
25.00
25.00
45.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
70.00
70.00

0.25
0.25
0.25
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.70
0.70

25.25
25.25
25.25
45.00
40.40
40.40
40.40
40.40
40.40
40.40
40.40
40.40
70.70
70.70

420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93

420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93

2,525.00
10,100.00
1,691.75
315.00
808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80
45,813.60
14,140.00
31,067.60

s-m
sets

8,000.00

80.00

8,080.00

16,160.00

13,466.67

2,693.33

2,693.33

2,693.33

16,160.00

Sets

3,000.00

30.00

3,030.00

6,060.00

5,050.00

1,010.00

1,010.00

1,010.00

6,060.00

Sets

1,700.00

17.00

1,717.00

8,585.00

7,154.17

1,430.83

1,430.83

1,430.83

8,585.00

30,805.00
sets

sets

2.00

Sets

Sub-Total
Roofing
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)
20.00
pcs
Colorib No. 24, x 8' Pre formed Side Gutter
15.00
pcs
Colorib No. 24, x 8' Pre formed Ridgeroll
10.00
pcs
Roof Sealant
2.00
Ltrs
Tex Screw 2 1/2" (for wood)
1,300.00
Pcs.
Blind Rivets 1/8" x 2"
2.00
box
Sub-Total
XIII. STEEL BILLBOARD AND ROOF SIGNAGE
1.00
LOT
A. Materials
Supply and Install Roof Signage
1.00
lot
TOTAL FOR STEEL BILLBOARD, ROOF SIGNAGE AND BUILDING MARKER
Supply and Install Community Project Steel Billboard
1.00
lot
TOTAL FOR BASIC AMENITIES
5. ENVIRONMENTAL IMPACT
5.1 Warning signs
10.00
pc
5.2 Barricades
5.00
pc
TOTAL FOR BASIC AMENITIES

Prepared by :

KALAHI GRANT

COMMUNITY
INKIND

Bd. Ft.

Err:522

Err:522

Err:522

Err:522

Err:522

Err:522

Err:522

Err:522

Err:522

1,500.00

15.00

1,515.00

9,090.00

7,575.00

1,515.00

1,515.00

1,515.00

500.00

5.00

505.00

20.00

2,720.00

841.67
Err:522
4,533.33

168.33
Err:522
906.67
#REF!

168.33
Err:522
906.67
#REF!

2,700.00

1,010.00
10,100.00
5,440.00
5,440.00

168.33
Err:522
906.67
#REF!

2,500.00
650.00
650.00
500.00
2.00
500.00

25.00
6.50
6.50
5.00
0.02
5.00

2,525.00
656.50
656.50
505.00
2.02
505.00

50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50

42,083.33
8,206.25
5,470.83
841.67
2,188.33
841.67
59,632.08

5,000.00
5,000.00
10,000.00
10,000.00

4,166.67
Err:522
8,333.33
8,333.33

2,000.00
1,250.00
3,250.00

1,666.67
1,041.67
1,041.67

Sub-Total
Window Grills (fabricated & installed)

SUB-TOTAL LCC
TOTAL

5,000.00

5,000.00

10,000.00

10,000.00

200.00
250.00

200.00
250.00

Checked & Reviewed by:

Err:522

Err:522

#REF!

Recommending Approval:

Err:522

#REF!

Err:522
-

#REF!

Err:522
-

8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42

833.33
Err:522
1,666.67
1,666.67

333.33
208.33
208.33

Err:522

Approved by :

Err:522
#REF!

8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42

833.33
Err:522
1,666.67
1,666.67

333.33
208.33
208.33

Err:522

Err:522
#REF!
-

Err:522
-

Err:522

9,090.00
1,010.00
Err:522
5,440.00
#REF!

8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42

50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50

833.33
Err:522
1,666.67
1,666.67

5,000.00
Err:522
10,000.00
10,000.00

333.33
208.33
208.33

2,000.00
1,250.00
1,250.00

Noted by:

ELSA A. TRUNO

RODSON R. ESCORA

CARMEN A. GAUDIANO

REYNALDO DOMIO

GEORGE S. ISULAT

MEO Staff

ACT-Deputy Area Coordinator (DAC)

Municipal Engineer

BSPMC Chairperson

Regional Community Infrastructure Specialist

Republic of the Philippines


Department of Social Welfare and Development
KALAHI-CIDSS : MCC PROJECT
Province of Negros Oriental
Municipality of Dauin
Barangay Tugawe
CONSTRUCTION OF 1 UNIT, ONE (1) CLASSROOM PRE-SCHOOL BUILDING
BILL OF QUANTITIES

I. SITE WORKS
Nylon # 16
Portland Cement
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
20mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
# 16 G.I. Tie Wire
1-1/2" G.I. Pipe
Hacksaw Blade
1/4 thk. 4'x8' Ordinary Plywood
" thk. X 4' x 8' Marine Plywood
Lawanet 6mm thk 4'x8'
Conc. Nails 4"
# 4 CWN
3" CW Nails
#2 CWN
#2-1/2 CWN
CW Nails 1"
1
/2 " CW Nails
12mm thk. x 1200mm x 2400mm Fiber Cement Board
(Fascia Board)
12mm dia. X 7" Machine Bolt w/ Knot and washer
Anti-Termite (e.g. solignum, )
0.80 x 2.10m Flush Type Plastic Door w/ door jambs
3-1/2"x3-1/2" Loose pin Hinges (quality brand)
Door knob (QUALITY BRAND)
X. TILE WORKS
8" x 8" Glazed Tiles
8" x 8" Unglazed Tiles
tile grout
tile frame
IX. PLUMBING WORKS
Water closet
4" x 4" PVC Floor Drain
4" x 3.0m dia. PV Pipe
3" x 3.0m dia. PV Pipe
2" X 3.0m PV Pipe
2" dia. X 900 PVC Bend Elbow
4" dia. X 900 PVC Bend Elbow
4" dia. X 450 PVC Bend Elbow
4" x 3" Wye
2" dia. PVC P-Trap
4" dia.PVC Clean Out Plug
4" dia.x 4" dia. PVC Wye
3" dia. X 90deg. PVC elbow
Solvent Cement
Wallhung lavatory with faucet and supply pipe
1
/2" x 3.0m PVC pipe
1
/2" dia. Gate valve
1
/2" PVC Coupling
1
/2" PVC 90 deg. Bend elbow
1
/2" PVC Tee
1
/2" PVC female threaded adoptor
1
/2" Faucet, hosebib, brass
Teflon Tape
3" dia. x 3.0m PVC Pipe
3" dia. x 3" PVC Tee
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement
XI. ELECTRICAL WORKS
2" x 4" Utility Boxes Pvc
4" x 4" Junction Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Electrical Fixtures
Flourescent Lamp, 40 watts
50 watts incandescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Ligthing Outlet ( 4" Porcelain Receptacle w/
Female Adoptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Safety Switch
XII. PAINTING WORKS
Cocrete Putty
Concrete Neutralizer
Flat Latex White
Semi-Gloss Latex White
Quick Dry Enamel White
Flat Enamel White
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Sandpaper #100
Sandpaper #200
Paint Brush 4"
Paint Brush 2"
Roller Paint Brush 8" (with tray)
Putty Pallet
Body Filler
Slating Paint (Premium Quality)
Flat White QDE (Premium Quality)
Abrassive Paper
Sub-Total
2. HANDTOOLS AND PROTECTIVE EQUIPMENTS
Shovel w/ handle
Crow Bar
Wheel Barrow
Bolo (multi-purpose) w/ handle
Sledge Hammer (5kg) w/ handle
Concrete Pail
Hard hat
Hand gloves
Medicine kit
Sub-Total
I - 3. EMBANKMENT: Filling, Grading and Compaction
A. Materials
Filling Materials

UNIT COST

COST SHARING

QUANTITY

DESCRIPTION

Unit

2.00
410.00
327.00
7.00
110.00
38.00
1.50
10.00
3.00
10.00
47.00
2.00
2.00
1.00
45.00
20.00
16.00
15.00
1.00
7.00

Kgs.
Bags
Length
Length
Length
Length
rolls
Kgs.
Pcs.
Pcs.
shts.
shts
pcs
kg
Kgs.
Kgs.
Kgs.
Kgs.
kg
Kgs.

350.00
250.00
150.00
220.00
370.00
560.00
3,046.00
70.00
1,200.00
60.00
350.00
440.00
440.00
90.00
65.00
65.00
65.00
65.00
65.00
65.00

3.50
2.50
1.50
2.20
3.70
5.60
30.10
0.70
12.00
0.60
3.50

4.00

shts.

1,200.00

20.00
3.00
2
12
4
9.00
120.00
460.00
15.00
20.00
1.00
2.00
2.00
6.00
6.00
6.00
4.00
2.00
2.00
2.00
3.00
1.00
2.00
12.00
1.00
1.00
5.00
1.00
9.00
2.00
3.00
1.00
1.00
3.00
8.00
4.00
16.00
1.00
1.00
12.00
7.00
1.00
1.00

Pcs.
gal
sets
pc
pc
sq.m.
Pcs.
Pcs.
bags
length
Lot
Units
Sets
Length
Length
Length
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pint
Sets
Length
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
length
pc
pc
pint
Lot
pcs.
pcs.
length
pc.

2.00
30.00
10.00
80.00
3.00

No. of
Crew/
Labor

ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST

TOTAL UNIT
COST

SUB-TOTAL LCC
TOTAL
KALAHI GRANT

0.65

353.50
252.50
151.50
222.20
373.70
565.60
3,076.10
70.70
1,212.00
60.60
353.50
440.00
440.00
90.00
65.65
65.65
65.65
65.65
65.00
65.65

707.00
103,525.00
49,540.50
1,555.40
41,107.00
21,492.80
4,614.15
707.00
3,636.00
606.00
16,614.50
880.00
880.00
90.00
2,954.25
1,313.00
1,050.40
984.75
65.00
459.55

589.17
86,270.83
41,283.75
1,296.17
34,255.83
17,910.67
3,845.13
589.17
3,030.00
505.00
13,845.42
733.33
733.33
75.00
2,461.88
1,094.17
875.33
820.63
54.17
382.96

12.00

1,212.00

4,848.00

50.00
750.00
6,000.00
100.00
1,500.00

0.50
7.50
60.00
1.00
15.00

50.50
757.50
6,060.00
101.00
1,515.00

1,010.00
2,272.50
12,120.00
1,212.00
6,060.00

25.00
20.00
100.00
250.00

0.25
0.20
1.00
2.50

25.25
20.20
101.00
252.50

1,500.00
50.00
600.00
500.00
300.00
50.00
90.00
70.00
150.00
80.00
70.00
150.00
50.00
450.00
1,500.00
60.00
400.00
10.00
20.00
20.00
20.00
200.00
30.00
350.00
95.00
600.00
350.00

15.00
0.50
6.00
5.00
3.00
0.50
0.90
0.70
1.50
0.80
0.70
1.50
0.50
4.50
15.00
0.60
4.00
0.10
0.20
0.20
0.20
2.00
0.30
3.50
0.95
6.00
3.50

25.00
25.00
150.00
80.00

box
m
Pcs.
m
Pcs.

7.00
2.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00
1.00

COMMUNITY
INKIND

BLGU
CASH

TOTAL LCC
(CASH &
INKIND)

MLGU
INKIND

CASH

INKIND

CASH

TOTAL

INKIND

117.83
11,254.17
4,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
218.83
175.07
164.13
10.83
76.59

117.83
17,254.17
8,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
218.83
175.07
164.13
10.83
76.59

117.83
17,254.17
8,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
218.83
175.07
164.13
10.83
76.59

707.00
103,525.00
49,540.50
1,555.40
41,107.00
21,492.80
4,614.15
707.00
3,636.00
606.00
16,614.50
880.00
880.00
90.00
2,954.25
1,313.00
1,050.40
984.75
65.00
459.55

4,040.00

808.00

808.00

808.00

4,848.00

841.67
1,893.75
10,100.00
1,010.00
5,050.00

168.33
378.75
2,020.00
202.00
1,010.00

168.33
378.75
2,020.00
202.00
1,010.00

168.33
378.75
2,020.00
202.00
1,010.00

1,010.00
2,272.50
12,120.00
1,212.00
6,060.00

3,030.00
9,292.00
1,515.00
5,050.00

2,525.00
7,743.33
1,262.50
4,208.33

505.00
1,548.67
252.50
841.67

505.00
1,548.67
252.50
841.67

505.00
1,548.67
252.50
841.67

3,030.00
9,292.00
1,515.00
5,050.00

1,515.00
50.50
606.00
505.00
303.00
50.50
90.90
70.70
151.50
80.80
70.70
151.50
50.50
454.50
1,515.00
60.60
404.00
10.10
20.20
20.20
20.20
202.00
30.30
353.50
95.95
606.00
353.50

3,030.00
101.00
3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50
1,515.00
303.00
404.00
90.90
40.40
60.60
20.20
202.00
90.90
2,828.00
383.80
9,696.00
353.50

2,525.00
84.17
3,030.00
2,525.00
1,515.00
168.33
151.50
117.83
252.50
202.00
58.92
252.50
505.00
378.75
1,262.50
252.50
336.67
75.75
33.67
50.50
16.83
168.33
75.75
2,356.67
319.83
8,080.00
294.58

505.00
16.83
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15
471.33
63.97
1,616.00
58.92

505.00
16.83
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15
471.33
63.97
1,616.00
58.92

505.00
16.83
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15
471.33
63.97
1,616.00
58.92

3,030.00
101.00
3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50
1,515.00
303.00
404.00
90.90
40.40
60.60
20.20
202.00
90.90
2,828.00
383.80
9,696.00
353.50

0.25
0.25
1.50
0.80

25.25
25.25
151.50
80.80

4,300.00
30.00
10.00
70.00
35.00

43.00
0.30
0.10
0.70
0.35

4,343.00
30.30
10.10
70.70
35.35

303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00
106.05

assy
set
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
unit
Pcs.
Set

350.00
250.00
100.00
100.00
300.00
150.00
75.00
2,500.00
90.00
500.00

3.50
2.50
1.00
1.00
3.00
1.50
0.75
25.00
0.90
5.00

353.50
252.50
101.00
101.00
303.00
151.50
75.75
2,525.00
90.90
505.00

2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00

252.50
147.29
126.25
67.33
7,238.33
757.50
84.17
4,713.33
88.38
2,062.08
420.83
168.33
336.67
1,262.50
883.75
315.63
2,104.17
378.75
420.83

50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17

50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17

50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17

303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00
106.05
2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00

3.00
4.00
8.00
8.00
6.00
5.00
2.00
2.00
1.00
1.00
1.00
4.50
5.00
10.00
5.00
2.00
4.00
5.00
2.00
1.50
1.00
4.00

Gals
Gals
Gals
Gals
Gal
Gals
Pints
Pints
Pints
Pints
Pints
Gal
shts
shts
pcs
pcs
set
pcs
Ltrs
liters
liters
pads

300.00
200.00
500.00
600.00
650.00
600.00
50.00
50.00
50.00
50.00
50.00
410.00
20.00
20.00
75.00
40.00
70.00
25.00
150.00
160.00
120.00
35.00

3.00
2.00
5.00
6.00
6.50
6.00
0.50
0.50
0.50
0.50
0.50

303.00
202.00
505.00
606.00
656.50
606.00
50.50
50.50
50.50
50.50
50.50
410.00
20.20
20.20
75.00
40.00
70.70
25.00
151.50
160.00
120.00
35.00

909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,845.00
101.00
202.00
375.00
80.00
282.80
125.00
303.00
240.00
120.00
140.00
377,235.55

757.50
673.33
3,366.67
4,040.00
3,282.50
2,525.00
84.17
84.17
42.08
42.08
42.08
1,537.50
84.17
168.33
312.50
66.67
235.67
104.17
252.50
200.00
100.00
116.67
189,575.71

151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00
23.33
27,915.14

151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00
23.33
37,915.14

151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00
23.33
37,915.14

909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,845.00
101.00
202.00
375.00
80.00
282.80
125.00
303.00
240.00
120.00
140.00
227,490.85

3.00
1.00
1.00
1.00
1.00
10.00
5.00
10.00
1.00

pc
pc
pc
pc
pc
pc
pc
pc
Sets

450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00

450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00

1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
7,600.00

1,125.00
416.67
891.67
316.67
583.33
833.33
1,458.33
291.67
416.67
208,518.83

225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
31,703.77

225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
41,703.77

225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
41,703.77

11,110.00

9,258.33

1,851.67

1,851.67

1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
250,222.60
11,110.00

20.00

Cu.m

550.00

0.65
0.65
0.65
0.65

0.20
0.20

0.70
1.50

5.50

555.50

6,000.00
4,000.00

10,000.00

10,000.00

1,851.67

Mixed and Washed Gravel


Washed Sand
Washed Gravel
4" x 8' x 16" CHB

UNIT COST

QUANTITY

DESCRIPTION

Unit

6.00
35.00
27.00
1,647.00

Cu.m.
Cu.m.
Cu.m.
Pcs

899.00

Bd. Ft.

100.00
400.00
67.00
7.00
20.00
250.00
214.00
14.00
54.00
120.00
65.00
32.00
648.00
200.00

Bd. Ft.
Bd.Ft
Bd.Ft
bd. ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.

18.44

s-m

No. of
Crew/
Labor

COST SHARING

ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
800.00
8.00
700.00
7.00
800.00
8.00
12.00
0.12

TOTAL UNIT
COST

808.00
707.00
808.00
12.12

Sub-Total
VI - 1. Roof Frame
A. Materials
25- 2" x 2" x 12' Coco Lumber
100-2"x2"x12' Coco Lumber
20-2"x2"x10' Coco Lumber for Bracing
1" x 2" x 8' s4s Wood Lumber
2 - 2" x 5" x 12' (Good Lumber)
30 - 2" x 5" x 10' (Good Lumber)
32 - 2" x 5" x 8' (Good Lumber)
2- 2" x 4" x 10' (Good Lumber)
10 - 2" x 4" x 8' (Good Lumber)
20 - 2" x 3" x 12' (Good Lumber)
13 - 2" x 3" x 10' (Good Lumber)
8 - 2" x 3" x 8' (Good Lumber)
162- 2" x 2" x 12' Ceiling Joist (Good Lumber)
50 - 2" x 2" x 12' Hangers (Good Lumber)
Sub-Total
VII. DOORS
0.9
x2.10m AND
Hard WINDOWS
Panel Door Hinge Type w/ Fixed Glass
Furniture on 50mm x 150mm Wood Jambs/Frames (Tugas
Transom
or Narra) INSTALLED
2"x6" wooden jamb assembly for W-1 w/ a dimension of
2.5m x 1.5m to include mollion partition at 0.60m interval
and transom.
2"x6" wooden jamb assembly for W-2 w/ a dimension of
1.225m x 1.5m to include mollion partition at 0.60m interval
and transom.
Sub-Total
WINDOWS
0.60m x 15 blades jalousie glass with alluminum frame
(INSTALLED)
0.60m x 5 blades jalousie glass with alum.frame
(INSTALLED)

25.00
25.00
25.00
45.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
70.00
70.00

0.25
0.25
0.25
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.70
0.70

25.25
25.25
25.25
45.00
40.40
40.40
40.40
40.40
40.40
40.40
40.40
40.40
70.70
70.70

4,848.00
24,745.00
21,816.00
19,961.64
82,480.64

4,040.00
20,620.83
18,180.00
16,634.70
9,258.33

2,525.00
10,100.00
1,691.75
315.00
808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80
45,813.60
14,140.00
105,652.95

2,104.17
8,416.67
1,409.79
262.50
673.33
8,416.67
7,204.67
471.33
1,818.00
4,040.00
2,188.33
1,077.33
38,178.00
11,783.33
25,889.67

BLGU
CASH

INKIND

TOTAL LCC
(CASH &
INKIND)

MLGU

CASH

808.00
4,124.17
3,636.00
3,326.94
1,851.67

420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93

INKIND

CASH

TOTAL

INKIND

808.00
4,124.17
3,636.00
3,326.94
1,851.67

808.00
4,124.17
3,636.00
3,326.94
1,851.67

4,848.00
24,745.00
21,816.00
19,961.64
11,110.00

420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93

420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93

2,525.00
10,100.00
1,691.75
315.00
808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80
45,813.60
14,140.00
31,067.60

sets

8,000.00

80.00

8,080.00

16,160.00

13,466.67

2,693.33

2,693.33

2,693.33

16,160.00

Sets

3,000.00

30.00

3,030.00

6,060.00

5,050.00

1,010.00

1,010.00

1,010.00

6,060.00

5.00

Sets

1,700.00

17.00

1,717.00

1,430.83

8,585.00

8,585.00
30,805.00

sets

sets

2.00

Sets

Sub-Total
Roofing
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)
20.00
pcs
Colorib No. 24, x 8' Pre formed Side Gutter
15.00
pcs
Colorib No. 24, x 8' Pre formed Ridgeroll
10.00
pcs
Roof Sealant
2.00
Ltrs
Tex Screw 2 1/2" (for wood)
1,300.00
Pcs.
Blind Rivets 1/8" x 2"
2.00
box
Sub-Total
1.00
LOT
XIII. STEEL BILLBOARD AND ROOF SIGNAGE
A. Materials
Supply and Install Roof Signage
1.00
lot
TOTAL FOR STEEL BILLBOARD, ROOF SIGNAGE AND BUILDING MARKER
Supply and Install Community Project Steel Billboard
1.00
lot
TOTAL FOR BASIC AMENITIES
5. ENVIRONMENTAL IMPACT
5.1 Warning signs
10.00
pc
5.2 Barricades
5.00
pc
TOTAL FOR BASIC AMENITIES

Prepared by :

KALAHI GRANT

COMMUNITY
INKIND

2.00

7,154.17
Err:522

1,430.83
Err:522

Err:522

Err:522

Err:522

1,430.83
Err:522

Err:522

Err:522

Err:522

1,500.00

15.00

1,515.00

9,090.00

7,575.00

1,515.00

1,515.00

1,515.00

500.00

5.00

505.00

20.00

2,720.00

841.67
Err:522
4,533.33

168.33
Err:522
906.67
#REF!

168.33
Err:522
906.67
#REF!

2,700.00

1,010.00
10,100.00
5,440.00
5,440.00

168.33
Err:522
906.67
#REF!

2,500.00
650.00
650.00
500.00
2.00
500.00

25.00
6.50
6.50
5.00
0.02
5.00

2,525.00
656.50
656.50
505.00
2.02
505.00

50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50

42,083.33
8,206.25
5,470.83
841.67
2,188.33
841.67
59,632.08

5,000.00
5,000.00
10,000.00
10,000.00

4,166.67
Err:522
8,333.33
8,333.33

2,000.00
1,250.00
3,250.00

1,666.67
1,041.67
1,041.67

Sub-Total
Window Grills (fabricated & installed)

SUB-TOTAL LCC
TOTAL

5,000.00

5,000.00

10,000.00

10,000.00

200.00
250.00

200.00
250.00

Checked & Reviewed by:

Err:522

Err:522

#REF!

Recommending Approval:

Err:522

#REF!

Err:522
-

#REF!

Err:522
-

8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42

833.33
Err:522
1,666.67
1,666.67

333.33
208.33
208.33

Err:522

Approved by :

Err:522
#REF!

8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42

833.33
Err:522
1,666.67
1,666.67

333.33
208.33
208.33

Err:522

Err:522
#REF!
-

Err:522
-

Err:522

9,090.00
1,010.00
Err:522
5,440.00
#REF!

8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42

50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50

833.33
Err:522
1,666.67
1,666.67

5,000.00
Err:522
10,000.00
10,000.00

333.33
208.33
208.33

2,000.00
1,250.00
1,250.00

Noted by:

ELSA A. TRUNO

RODSON R. ESCORA

CARMEN A. GAUDIANO

REYNALDO DOMIO

GEORGE S. ISULAT

MEO Staff

ACT-Deputy Area Coordinator (DAC)

Municipal Engineer

BSPMC Chairperson

Regional Community Infrastructure Specialist

ENHANCED PLANNED C
Date Prepared

October 9, 2013

Barangay

Baslay

Municipality

Dauin

Province

Negros Oriental
DESCRIPTION

1st Tranche (Php)


2nd Tranche (Php)
3rd Tranche (Php)

PACKAGE-1

PACKAGES

Mode of Implementation : Community Force Account (CFA)

TOTAL

PACKAGE ITEMS

QTY

UNIT

Filling Materials

18.00

Cu.m

4" x 8' x 16" CHB

TOTAL UNIT
COST

404.00

7,272.00

1,647.00

Pcs

12.12

19,961.64

Mixed and Washed Gravel

6.00

Cu.m.

808.00

4,848.00

Washed Sand

10.00

Cu.m.

707.00

7,070.00

Washed Gravel

16.00

Cu.m.

808.00

12,928.00

Washed Sand

5.00

Cu.m.

707.00

3,535.00

Washed Sand

6.00

Cu.m.

707.00

Sub-Total

4,242.00
59,856.64

Portland Cement

280.00

Bags

252.50

70,700.00

10mm dia. x 6.0m RSB

157.00

Length

181.80

28,542.60

12mm dia. x 6.0m RSB

35.00

Length

232.30

8,130.50

16mm dia. x 6.0m RSB

55.00

Length

404.00

22,220.00

# 16 G.I. Tie Wire

25.00

Kgs.

70.70

1,767.50

Hacksaw Blade

10.00

Pcs.

60.60

606.00

4" CW Nails

30.00

Kgs.

65.65

1,969.50

3" CW Nails

13.00

Kgs.

65.65

853.45

2 1/2" CW Nails

5.00

Kgs.

65.65

328.25

2" CW Nails

5.00

Kgs.

65.65

328.25

Nylon # 16

3.00

rolls

505.00

1,515.00

3" CW Nails

7.00

Kgs.

65.65

459.55

1/4 thk. 4'x8' Ordinary Plywood

12.00

shts.

353.50

4,242.00

# 4 CWN

15.00

Kgs.

65.65

984.75

#2 CWN

5.00

Kgs.

65.65

328.25

#1 CWN

5.00

Kgs.

65.65

328.25

1/4" x 4' x 8' Ordinary Plywood

35.00

Shts.

353.50

12,372.50

1/2 " CW Nails

7.00

Kgs.

65.65

459.55

Lockset (high quality doorknob)

Sets

858.50

1,717.00

( 3-1/2" x 3-1/2" ) loose pin hinges

Sets

50.50

404.00

12mm dia. X 7" Machine Bolt w/ Knot and washer

20.00

Pcs.

50.50

1,010.00

Anti-Termite (e.g. solignum, )

3.00

gal

757.50

2,272.50

Roof Sealant

2.00

Ltrs

505.00

1,010.00

1,300.00

Pcs.

2.02

2,626.00

2.00

box

505.00

1,010.00

Texscrew 2 1/2" (for wood)


Blind Rivets 1/8

Page 124 of 135


AGE-2

TOTAL

PROC
METHOD

LSG

PACKAGES

PACKAGE ITEMS

TOTAL UNIT
COST

PROC
METHOD

QTY

UNIT

TOTAL

1.00

Units

1,515.00

1,515.00

1.00

Sets

50.50

50.50

4" x 3.0m dia. PV Pipe

6.00

Length

606.00

3,636.00

3" x 3.0m dia. PV Pipe

6.00

Length

505.00

3,030.00

2" X 3.0m PV Pipe

6.00

Length

303.00

1,818.00

2" dia. X 900 PVC Bend Elbow

4.00

Pcs.

50.50

202.00

4" dia. X 900 PVC Bend Elbow

2.00

Pcs.

90.90

181.80

4" dia. X 450 PVC Bend Elbow

2.00

Pcs.

70.70

141.40

4" x 3" Wye

2.00

Pcs.

151.50

303.00

2" dia. PVC P-Trap

3.00

Pcs.

80.80

242.40

4" dia.PVC Clean Out Plug

1.00

Pcs.

70.70

70.70

4" dia.x 4" dia. PVC Wye

2.00

Pcs.

151.50

303.00

3" dia. X 90deg. PVC elbow

12.00

Pcs.

50.50

606.00

Solvent Cement

1.00

Pint

454.50

454.50

VII-I Plumbing Fixtuers:


Water closet
PACKAGE-2

4" x 4" PVC Floor Drain


VII-II Sewer Line:

VII-III For Water Line:

Wallhung lavatory with faucet and supply pipe

1.00

Sets

1,515.00

1,515.00

1/2" x 3.0m PVC pipe

5.00

Length

60.60

303.00

1/2" dia. Gate valve

1.00

Pcs.

404.00

404.00

1/2" PVC Coupling

9.00

Pcs.

10.10

90.90

1/2" PVC 90 deg. Bend elbow

2.00

Pcs.

20.20

40.40

1/2" PVC Tee

3.00

Pcs.

20.20

60.60

1/2" PVC female threaded adoptor

1.00

Pcs.

20.20

20.20

1/2" Faucet, hosebib, brass

1.00

Pcs.

202.00

202.00

Teflon Tape

3.00

Pcs.

30.30

90.90

8" x 8" Glazed Tiles

180.00

Pcs.

25.25

4,545.00

8" x 8" Unglazed Tiles

200.00

Pcs.

20.20

4,040.00
303.00

White cement / Tile Grout

3.00

kls.

101.00

Tile Trim

3.00

Pcs.

90.90

272.70

3" dia. x 3.0m PVC Pipe

8.00

length

353.50

2,828.00

3" dia. x 3" PVC Tee

4.00

pc

95.95

383.80

3" dia. X 90 deg. bend

16.00

pc

606.00

9,696.00

Solvent Cement

1.00

pint

353.50

353.50

25- 2" x 2" x 12' Coco Lumber

100.00

Bd. Ft.

25.25

2,525.00

100-2"x2"x12' Coco Lumber

400.00

Bd.Ft

25.25

10,100.00

20-2"x2"x10' Coco Lumber for Bracing

67.00

Bd.Ft

25.25

1,691.75

2 - 2" x 5" x 12' (Good Lumber)

20.00

Bd. Ft.

40.40

808.00

30 - 2" x 5" x 10' (Good Lumber)

250.00

Bd. Ft.

40.40

10,100.00

32 - 2" x 5" x 8' (Good Lumber)

214.00

Bd. Ft.

40.40

8,645.60

2- 2" x 4" x 10' (Good Lumber)

14.00

Bd. Ft.

40.40

565.60

10 - 2" x 4" x 8' (Good Lumber)

54.00

Bd. Ft.

40.40

2,181.60

20 - 2" x 3" x 12' (Good Lumber)

120.00

Bd. Ft.

40.40

4,848.00

13 - 2" x 3" x 10' (Lauaan)

65.00

Bd. Ft.

40.40

2,626.00

8 - 2" x 3" x 8' (Lauaan)

32.00

Bd. Ft.

40.40

1,292.80

13 - 1" x 12" x 10' (Lauaan)

130.00

Bd. Ft.

40.40

5,252.00

162- 2" x 2" x 12' Ceiling Joist (Lauaan)

648.00

Bd. Ft.

70.70

45,813.60

50 - 2" x 2" x 12' Hangers (Lauaan)

200.00

Bd. Ft.

70.70

14,140.00

Sub-Total

PACKAGE-4

LSG

203,888.70

Page 125 of 135

LSG

LSG

PACKAGE-4
PACKAGES

LSG

PACKAGE ITEMS

QTY

UNIT

TOTAL UNIT
COST

PACKAGE-5

Sub-Total

110,589.95

W - 1, (2.40m X 1.20m) Clear glass jalousie window on standard


aluminum housing on 150mm hard wood jamb

2.00

Sets

1,515.00

3,030.00

W - 2, (1.20m X 1.20m) Clear glass jalousie window on standard


aluminum housing on 150mm hard wood jamb

5.00

Sets

1,010.00

5,050.00

W - 3, (0.60m X 1.20m) Clear glass jalousie window on standard


aluminum housing on 150mm hard wood jamb

2.00

Sets

909.00

1,818.00

W - 5, (0.60m X 0.60m) Clear glass jalousie window on standard


aluminum housing on 150mm hard wood jamb

1.00

Sets

606.00

606.00

W - 6, (0.40m X 0.60m) Clear glass jalousie window on standard


aluminum housing on 150mm hard wood jamb

2.00

Sets

505.00

1,010.00

Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)

20.00

pcs

2,525.00

50,500.00

Colorib No. 24, x 8' Pre formed Side Gutter

15.00

pcs

656.50

9,847.50

Colorib No. 24, x 8' Pre formed Ridgeroll

10.00

pcs

656.50

6,565.00

Sub-Total

P-6

PROC
METHOD

TOTAL

LSG

11,514.00

Sub-Total

LSG

66,912.50

Interior Rough in
2" x 4" Utility Boxes Pvc

12.00

4" x 4" Junction Boxes PVC

7.00

3/4" dia. RSC Pipe

1.00

Screw Insulator

1.00

3.5mm2 THW Stranded

pcs.

25.25

303.00

pcs.

25.25

176.75

length

151.50

151.50

pc.

80.80

80.80

2.00

box

4,343.00

8,686.00

Service Drop Wire

30.00

30.30

909.00

PVC Clamp

10.00

Pcs.

10.10

101.00

Flexible tube 3/4" dia

80.00

70.70

5,656.00

Electrical Tape (Big)

3.00

Pcs.

35.35

106.05

Flourescent Lamp, 40 watts

7.00

assy

353.50

2,474.50

50 watts incandescent Lamp

2.00

set

252.50

505.00

2 Gang Switch with Plate

2.00

Pcs.

101.00

202.00

1 Gang Switcth w/ Plate

4.00

Pcs.

101.00

404.00

Duplex Convenience Outlet

5.00

Pcs.

303.00

1,515.00

Ligthing Outlet ( 4" Porcelain Receptacle w/

7.00

Pcs.

151.50

1,060.50

Female Adoptor

5.00

Pcs.

75.75

378.75

KWHR meter w/ Base

1.00

unit

2,525.00

2,525.00

Entrance Cap # 1" dia.

5.00

Pcs.

90.90

454.50

Safety Switch

1.00

Set

505.00

PACKAGE-7

Electrical Wires

Electrical Fixtures

Sub-Total

505.00
26,194.35

PACKAGE-8

A. Materials
Cocrete Putty

3.00

Gals

303.00

Concrete Neutralizer

4.00

Gals

202.00

808.00

Flat Latex White

8.00

Gals

505.00

4,040.00

Semi-Gloss Latex White

8.00

Gals

606.00

4,848.00

Quick Dry Enamel White

6.00

Gal

656.50

3,939.00

Flat Enamel White

5.00

Gals

606.00

3,030.00

Latex Tinting Color Rawsienna

2.00

Pints

50.50

101.00

Latex Tinting Color Red

2.00

Pints

50.50

101.00

Latex Tinting Color Blue

1.00

Pints

50.50

50.50

Page 126 of 135

909.00

LSG

TOTAL UNIT
COST

UNIT

Latex Tinting Color Yellow

1.00

Pints

Latex Tinting Color Green

1.00

Pints

50.50

50.50

Paint Thinner

4.00

Gal

303.00

1,212.00

Sandpaper #100

5.00

shts

20.20

101.00

Sandpaper #200

10.00

shts

20.20

202.00

Paint Brush 4"

4.00

pcs

101.00

404.00

Roller Paint Brush 8" (with tray)

4.00

set

70.70

282.80

Putty Pallet

4.00

pcs

20.20

80.80

Body Filler

2.00

Ltrs

151.50

303.00

P-9

Supply and Install Roof Signage

lot

5,000.00

Sub-Total
P-10

50.50

LSG

20,513.10
1.00

Supply and Install Community Project Steel Billboard

TOTAL

50.50

Sub-Total

PACKAGE-11

PROC
METHOD

QTY

LSG

5,000.00
1.00

lot

10,000.00

Sub-Total

LSG

10,000.00

D - 1, (1.0m x 2.10m) Panel Door with on 150mm hard wood jamb (e.g.
yakal, guijo)

Sets

5,050.00

10,100.00

D - 2, (0.60m x 2.10m) Flush Door with on 150mm hard wood jamb


(e.g. yakal, guijo)

Set

4,040.00

4,040.00

Sub-Total

14,140.00

Total Materials Cost

528,609.24

LSG

PACKAGE-8
PACKAGES

PACKAGE ITEMS

Skilled

62,700.00

unskilled

73,447.50

Sub-Total

136,147.50

Total Direct Cost (cash)

664,756.74

CFA

P-12

Labor:

Handtools

7,600.00

Environmental impact

3,250.00

Material Testing

4,000.00

Administrative Cost

20,000.00

Treasurers Bond

CFA

PACKAGE-13

j. Indirect Cost

3,375.00

Contingency

21,010.16

Sub-Total

59,235.16
GRAND TOTAL CASH

723,991.90

SAY
897,455.00

-173,463.10
Workshop output of:

Checked by:

LUCY DAYOT

TEODOCIO LARANJO

CARMEN A. GAUDIANO

Procurement Team Head

PPT

Municipal Engineer

Page 127 of 135

ENHANCED PLANNED COMMUNITY PROCUREMENT PACKAGING


Name of Proposed Sub-Project

: Construction of One(1) Unit Pre School Classroom Building

Total Cash (Php)

: 723,991.90

Sub-project Duration

: 75 C.D

SOURCES OF FUNDS

PERCENTAGE WEIGHT

FUND SOURCE

TOTAL
KC Grant:

LEGEND:

LCC:

TO KC GRANT

TO LCC CASH

600,703.20

117,260.80

717,964.00

80.00

80.00

75,087.90

14,657.60

89,745.50

10.00

10.00

75,087.90

14,657.60

89,745.50

10.00

10.00

750,879.00

146,576.00

897,455.00

100.00

100.00

1st Tranche
KC Grant

2nd Tranche

LCC Cash

KC Grant

KC Cost
TOTAL LCC :

In-kind

Cash
TOTAL

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

LCC Cash

TOTAL

5,817.60

1,454.40

5,817.60

1,454.40

7,272.00

15,969.31

3,992.33

15,969.31

3,992.33

19,961.64

3,878.40

969.60

3,878.40

969.60

4,848.00

5,656.00

1,414.00

5,656.00

1,414.00

7,070.00

10,342.40

2,585.60

10,342.40

2,585.60

12,928.00

2,828.00

707.00

2,828.00

707.00

3,535.00

3,393.60

848.40

3,393.60

848.40

4,242.00

47,885.31

11,971.33

47,885.31

11,971.33

59,856.64

56,560.00

14,140.00

56,560.00

14,140.00

70,700.00

22,834.08

5,708.52

22,834.08

5,708.52

28,542.60

6,504.40

1,626.10

6,504.40

1,626.10

8,130.50

17,776.00

4,444.00

17,776.00

4,444.00

22,220.00

1,414.00

353.50

1,414.00

353.50

1,767.50

484.80

121.20

484.80

121.20

606.00

1,575.60

393.90

1,575.60

393.90

1,969.50

682.76

170.69

682.76

170.69

853.45

262.60

65.65

262.60

65.65

328.25

262.60

65.65

262.60

65.65

328.25

1,212.00

303.00

1,212.00

303.00

1,515.00

367.64

91.91

367.64

91.91

459.55

3,393.60

848.40

3,393.60

848.40

4,242.00

787.80

196.95

787.80

196.95

984.75

262.60

65.65

262.60

65.65

328.25

262.60

65.65

262.60

65.65

328.25

9,898.00

2,474.50

9,898.00

2,474.50

12,372.50

367.64

91.91

367.64

91.91

459.55

1,373.60

343.40

1,373.60

343.40

1,717.00

323.20

80.80

323.20

80.80

404.00

808.00

202.00

808.00

202.00

1,010.00

1,818.00

454.50

1,818.00

454.50

2,272.50

808.00

202.00

808.00

202.00

1,010.00

2,100.80

525.20

2,100.80

525.20

2,626.00

808.00

202.00

808.00

202.00

1,010.00

Page 128 of 135

1st Tranche
KC Grant

2nd Tranche

LCC Cash
-

KC Grant

3rd Tranche

LCC Cash

KC Grant

TOTAL

LCC Cash

KC Grant

TOTAL

LCC Cash
-

1,212.00

303.00

1,212.00

303.00

1,515.00

40.40

10.10

40.40

10.10

50.50

2,908.80

727.20

2,908.80

727.20

3,636.00

2,424.00

606.00

2,424.00

606.00

3,030.00

1,454.40

363.60

1,454.40

363.60

1,818.00

161.60

40.40

161.60

40.40

202.00

145.44

36.36

145.44

36.36

181.80

113.12

28.28

113.12

28.28

141.40

242.40

60.60

242.40

60.60

303.00

193.92

48.48

193.92

48.48

242.40

56.56

14.14

56.56

14.14

70.70

242.40

60.60

242.40

60.60

303.00

484.80

121.20

484.80

121.20

606.00

363.60

90.90

363.60

90.90

454.50

1,212.00

303.00

1,212.00

303.00

1,515.00

242.40

60.60

242.40

60.60

303.00

323.20

80.80

323.20

80.80

404.00

72.72

18.18

72.72

18.18

90.90

32.32

8.08

32.32

8.08

40.40

48.48

12.12

48.48

12.12

60.60

16.16

4.04

16.16

4.04

20.20

161.60

40.40

161.60

40.40

202.00

72.72

18.18

72.72

18.18

90.90

3,636.00

909.00

3,636.00

909.00

4,545.00

3,232.00

808.00

3,232.00

808.00

4,040.00

242.40

60.60

242.40

60.60

303.00

218.16

54.54

218.16

54.54

272.70

2,262.40

565.60

2,262.40

565.60

2,828.00

307.04

76.76

307.04

76.76

383.80

7,756.80

1,939.20

7,756.80

1,939.20

9,696.00

282.80

70.70

282.80

70.70

353.50

163,110.96

40,777.74

163,110.96

40,777.74

203,888.70

2,020.00

505.00

2,020.00

505.00

2,525.00

8,080.00

2,020.00

8,080.00

2,020.00

10,100.00

1,353.40

338.35

1,353.40

338.35

1,691.75

646.40

161.60

646.40

161.60

808.00

8,080.00

2,020.00

8,080.00

2,020.00

10,100.00

6,916.48

1,729.12

6,916.48

1,729.12

8,645.60

452.48

113.12

452.48

113.12

565.60

1,745.28

436.32

1,745.28

436.32

2,181.60

3,878.40

969.60

3,878.40

969.60

4,848.00

2,100.80

525.20

2,100.80

525.20

2,626.00

1,034.24

258.56

1,034.24

258.56

1,292.80

4,201.60

1,050.40

4,201.60

1,050.40

5,252.00

36,650.88

9,162.72

36,650.88

9,162.72

45,813.60

11,312.00

2,828.00

11,312.00

2,828.00

14,140.00

Page 129 of 135

1st Tranche
KC Grant

2nd Tranche

LCC Cash

88,471.96

KC Grant

22,117.99

3rd Tranche

LCC Cash
-

KC Grant
-

KC Grant
-

TOTAL

LCC Cash

88,471.96

22,117.99

110,589.95

2,424.00

606.00

2,424.00

606.00

3,030.00

4,040.00

1,010.00

4,040.00

1,010.00

5,050.00

1,454.40

363.60

1,454.40

363.60

1,818.00

484.80

121.20

484.80

121.20

606.00

808.00

202.00

808.00

202.00

1,010.00

9,211.20

2,302.80

9,211.20

2,302.80

11,514.00

40,400.00

10,100.00

40,400.00

10,100.00

50,500.00

7,878.00

1,969.50

7,878.00

1,969.50

9,847.50

5,252.00

1,313.00

5,252.00

1,313.00

6,565.00

53,530.00

13,382.50

53,530.00

13,382.50

66,912.50

TOTAL

LCC Cash

60.60

242.40

60.60

303.00

141.40

35.35

141.40

35.35

176.75

121.20

30.30

121.20

30.30

151.50

64.64

16.16

64.64

16.16

80.80

6,948.80

1,737.20

6,948.80

1,737.20

8,686.00

727.20

181.80

727.20

181.80

909.00

80.80

20.20

80.80

20.20

101.00

4,524.80

1,131.20

4,524.80

1,131.20

5,656.00

84.84

21.21

84.84

21.21

106.05

242.40

1,979.60

494.90

1,979.60

494.90

2,474.50

404.00

101.00

404.00

101.00

505.00

161.60

40.40

161.60

40.40

202.00

323.20

80.80

323.20

80.80

404.00

1,212.00

303.00

1,212.00

303.00

1,515.00

848.40

212.10

848.40

212.10

1,060.50

303.00

75.75

303.00

75.75

378.75

2,020.00

505.00

2,020.00

505.00

2,525.00

363.60

90.90

363.60

90.90

454.50

404.00

101.00

404.00

101.00

505.00

20,955.48

5,238.87

20,955.48

5,238.87

26,194.35

727.20

181.80

727.20

181.80

909.00

646.40

161.60

646.40

161.60

808.00

3,232.00

808.00

3,232.00

808.00

4,040.00

3,878.40

969.60

3,878.40

969.60

4,848.00

3,151.20

787.80

3,151.20

787.80

3,939.00

2,424.00

606.00

2,424.00

606.00

3,030.00

80.80

20.20

80.80

20.20

101.00

80.80

20.20

80.80

20.20

101.00

40.40

10.10

40.40

10.10

50.50

Page 130 of 135

1st Tranche
KC Grant

MEN A. GAUDIANO

nicipal Engineer

2nd Tranche

LCC Cash

KC Grant

3rd Tranche

LCC Cash

KC Grant
40.40

8,000.00

2,000.00

8,000.00

2,000.00

360,998.23

90,249.56

TOTAL

LCC Cash

KC Grant

10.10

40.40

10.10

40.40

10.10

40.40

10.10

50.50

242.40

969.60

242.40

1,212.00

80.80

20.20

80.80

20.20

101.00

161.60

40.40

161.60

40.40

202.00

323.20

80.80

323.20

80.80

404.00

226.24

56.56

226.24

56.56

282.80

64.64

16.16

64.64

16.16

80.80

242.40

60.60

242.40

60.60

303.00

16,410.48

4,102.62

16,410.48

4,102.62

20,513.10

4,000.00

1,000.00

4,000.00

1,000.00

5,000.00

4,000.00

1,000.00

4,000.00

1,000.00

5,000.00

8,000.00

2,000.00

10,000.00

8,000.00

2,000.00

10,000.00

8,080.00

2,020.00

8,080.00

2,020.00

10,100.00

3,232.00

808.00

3,232.00

808.00

4,040.00

11,312.00

2,828.00

11,312.00

2,828.00

14,140.00

32,267.48

8,066.87

422,887.39

105,721.85

528,609.24

29,621.68

7,405.42

62,700.00

88,882.22

449,880.45

90,249.56

6,080.00

1,520.00

2,600.00

650.00

50.50

969.60

62,700.00
26,182.22

TOTAL

LCC Cash

27,202.52

1,749.05

18,313.71

27,202.52

1,749.05

18,313.71

59,470.00

9,815.92

47,935.39

71,698.45
7,405.42

62,700.00

1,749.05

73,447.50

134,398.45

1,749.05

136,147.50

557,285.84

107,470.90

664,756.74

6,080.00

1,520.00

7,600.00

650.00

3,250.00

2,600.00
2,336.58
18,574.56

1,663.42

1,425.44

18,574.56

3,375.00

16,858.30
-

4,151.86

16,858.30

4,000.00

4,000.00

1,425.44

20,000.00

3,375.00

3,375.00

4,151.86

21,010.16

27,254.56

6,970.44

2,336.58

16,858.30

5,815.28

44,112.86

15,122.30

59,235.16

477,135.01

97,220.00

59,470.00

12,152.50

64,793.69

13,220.70

601,398.71

122,593.20

723,991.90

600,703.20

117,260.80

75,087.90

14,657.60

75,087.90

14,657.60

750,879.00

146,576.00

897,455.00

80.00

123,568.19

10.00

15,617.90

10.00

10,294.21

20,040.80
Reviewed by:

2,505.10

1,436.90
Submitted by:

Noted by:

GERUNDIO C. BAUTISTA JR.

MARISSA PALANG-AT

Deputy Area Coordinator

BSMPC

Page 131 of 135

GEORGE S.

Regional Community

AMOUNT
(PESO)
750,879.00
184,951.00
In-kind:

38,375.00

Cash:

146,576.00
935,830.00

REMARKS

TOTAL

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
1

Page 132 of 135

REMARKS

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
1

Page 133 of 135

REMARKS

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
1

Page 134 of 135

REMARKS

PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
1

GEORGE S. ISULAT
Regional Community Infra. Engineer

Page 135 of 135

You might also like