As of April 2010
ITEM DESCRIPTION
UNIT
gal
gal
Blackboard
Blind Rivets 1/8
Sets
box
Pcs
Child's chairs
Unit
Child's tables
Unit
Sets
Sets
Sets
Sets
Sets
Bd. Ft.
Cocrete Putty
Gals
Concrete Neutralizer
Gals
Shts.
Shts.
Shts.
Pcs.
Pcs.
Pcs.
Female Adoptor
Pcs.
Pcs.
Filling Materials
Cu.m
Gals
gal
m
assy
Flush Door D - 2, (0.60m x 2.10m) with on 150mm hard wood jamb (e.g. yakal, guijo)
Gate valve 1/2" dia.
Set
Page 1
Pcs.
ITEM DESCRIPTION
UNIT
pcs
pcs
Gravel
cu.m
Hacksaw Blade
Pcs.
Sets
set
pcs.
unit
Pints
Pints
Pints
Pints
Pints
Bd. Ft.
Pcs.
Sets
L-m
Pcs.
Cu.m.
Nails # 4 CW
Kgs.
NAILS #1 CW
Nails 1/2 " CW
Kgs.
Nails 2" CW
Kgs.
Nails 3" CW
Kgs.
Nails 5" CW
Nails 2 1/2" CW
Kgs.
Neutralizer
gal
Nylon # 16
rolls
Unit
Water Closet
Units
pcs
pcs
Paint Thinner
Gal
Panel Door D - 1, (1.0m x 2.10m) with on 150mm hard wood jamb (e.g. yakal, guijo)
Sets
Plain GI shts# 24
Plywood 1/4" x 4' x 8' Ordinary
shts
Shts.
Portland Cement
bag
Pcs.
Length
Length
Length
Pcs.
Pcs.
Kgs.
Kgs.
Pcs.
Page 2
ITEM DESCRIPTION
UNIT
Pcs.
PVC Clamp
Pcs.
Pcs.
Pcs.
Pcs.
Sets
Pcs.
Pcs.
Gal
Gal
Gals
Roof Sealant
Ltrs
Length
Length
Length
length
Set
Sandpaper #100
shts
Sandpaper #200
shts
Screw Insulator
pc.
Gals
Solvent Cement
Pint
spanish gutter
Shts.
Gals
Pcs.
Pcs.
Length
Pcs.
Pcs.
Pcs.
box
Kgs.
Tile Trim
Pcs.
Pcs.
Pcs.
pints
pints
pints
pints
pints
Pcs.
pcs.
Sets
Page 3
ITEM DESCRIPTION
UNIT
Washed Gravel
Cu.m.
Washed Sand
Cu.m.
kls.
Welding Rod
kg
Pcs.
Bd. Ft.
Equipment Rental
Welding Machine
Day
FOREMAN
Day
CARPENTER
Day
MASON
Day
LABORER
Day
BASIC AMENITIES
36" x 75" Wooden Bed
24" x 36" Wooden Table w/ Wooden Chair
Nebulizer
BP Apparatus
Medicine Cabinet
Stethoscope
Weighing Scale for adult
Weighing Scale for infant
Plastic Chair (Heavy Duty)
Dressing Kit (CART W/ TRAY)
DELIVERY TABLE
Unit
Sets
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Sets
UNIT
Shovel w/ handle
Crow Bar
Wheel Barrow
Bolo (multi-purpose) w/ handle
Sledge Hammer (5kg) w/ handle
pc
pc
pc
pc
pc
Page 4
RATE PER
DAY/
UNIT
COST
800.00
750.00
1,000.00
270.00
15.00
300.00
1,000.00
600.00
1,500.00
1,000.00
900.00
500.00
15.00
550.00
450.00
390.00
450.00
350.00
180.00
25.00
75.00
300.00
75.00
500.00
500.00
500.00
70.00
300.00
4,000.00
205.00
Page 5
RATE PER
DAY/
UNIT
COST
900.00
800.00
600.00
75.00
50.00
250.00
25.00
2,000.00
150.00
150.00
150.00
150.00
150.00
25.00
150.00
850.00
600.00
30.00
550.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
400.00
30.00
2,000.00
1,800.00
30.00
70.00
450.00
5,000.00
300.00
350.00
230.00
380.00
700.00
600.00
500.00
55.00
50.00
50.00
Page 6
RATE PER
DAY/
UNIT
COST
50.00
45.00
50.00
50.00
50.00
85.00
150.00
165.00
70.00
60.00
50.00
700.00
700.00
650.00
400.00
165.00
230.00
400.00
175.00
500.00
30.00
40.00
80.00
650.00
55.00
100.00
450.00
400.00
200.00
150.00
40.00
4,300.00
90.00
105.00
30.00
30.00
150.00
150.00
150.00
150.00
150.00
2.00
25.00
1,500.00
Page 7
RATE PER
DAY/
UNIT
COST
600.00
600.00
85.00
75.00
60.00
25.00
800.00
400.00
300.00
300.00
200.00
3,500.00
2,000.00
4,000.00
1,900.00
2,000.00
1,800.00
3,800.00
2,800.00
800.00
12,000.00
25,000.00
450.00
500.00
1,070.00
380.00
700.00
Page 8
Page 9
Page 10
Page 11
Page 12
Category
Physical Target
Public Goods
63 sq. m.
Php 935,830.00
: By Community Force Account (CFA)
Occupancy
(Pre-School Building)
Sub-Project Duration
Sub-Project Location:
Technical Personnel
Item
no.
Foreman
% Wt.
Quantity
Total Amount
4.04
13.13
80.00
23.37
sq.m.
cu.m.
424.68
4,720.85
33,974.55
110,331.00
III
IV
14.73
2.73
14.09
2,834.10
23.00
125.44
kgs.
sq.m.
sq.m.
43.69
997.02
944.27
123,816.05
22,931.50
118,449.64
17.30
8.41
1,747.00
18.44
bd.ft
sq.m.
83.22
3,832.97
145,388.20
70,680.00
9.23
4.27
65.00
1.00
sq.m.
lot
1,193.21
35,858.10
77,558.50
35,858.10
2.83
3.60
14.56
1.00
sq.m.
lot
1,631.25
30,219.35
23,751.00
30,219.35
3.50
1.78
265.00
1.00
sq.m.
lot
110.97
15,000.00
29,406.30
15,000.00
0.38
1.00
lot
3,180.65
VIII
IX
X
XI
XII
XIII
XIV
CIDSS Grant
Labor
1) Skilled
2) Unskilled
Sub-Total ( A )
62,700.00
Administrative Cost
Material Testing
23,325.00
23,325.00
MLGU
In-Kind
10,000.00
10,000.00
Cash
-
TOTAL
In-Kind
105,574.14
62,700.00
105,574.14
84,400.00
840,544.84
21,000.00
21,000.00
1,266.67
-
2,450.00
7,600.00
2,450.00
2,708.34
541.66
9,600.00
-
12,600.00
3,250.00
20,000.00
3,333.33
32,375.00
Total (A & B)
734,020.70
Contingency 5%
Total Estimated Project Cost
16,858.30
750,879.00
23,325.00
23,325.00
10,000.00
10,000.00
3,000.00
-
666.67
3,375.00
26,850.00
12,050.00
3,000.00
132,424.14
12,050.00
914,819.84
3,000.00
4,151.86
136,576.00
12,050.00
21,010.16
935,830.00
750,879.00
80.24%
LCC Cash
146,576.00
15.66%
LCC Inkind
750,879.00
23,325.00
10,000.00
Prepared by :
20,000.00
4,000.00
3,000.00
MCC Grant
Grand Total
693,444.84
-
6,333.33
-
Treasurer's Bond
Sub-Total ( B )
Cash
-
Indirect Cost
Overhead Cost
Project Supervision
Environmental Impact
BLGU
Community
Contribution
577,870.70
61,075.00
701,645.70
Handtools
Pre-engineering
840,544.84
SOURCE OF FUNDS
KALAHI-
Direct Cost
Materials
Equipment Rental
3,180.65
100.00
Breakdown of Estimated
B.
Unit Cost
SITE WORKS
CONCRETE WORKS
V
VI
VII
A.
Unit
I
II
3,000.00
38,375.00
136,576.00
3,375.00
74,275.00
100.00%
4.10%
12,050.00
Approved by :
ELSA A. TRUNO
REYNALDO DOMIO
BSPMC Chairperson
Concurred by :
RODSON R. ESCORA
JORJIC A. BAJADO
Barangay Chairperson
Recommending Approval:
CARMEN A. GAUDIANO
Municipal Mayor
Municipal Engineer
Noted by :
GEORGE S. ISULAT
Regional Community Infrastructure Engineer Specialist
935,830.00
CON
DETA
QUANTITY
I. SITE WORKS
I - 1. Clearing and Lay-out
A. Materials
25- 2" x 2" x 12' Coco Lumber
Nylon # 16
3" CW Nails
I - 3. EMBANKMENT: Filling, Grading and Compaction
3.65 man-hour/cu.m
A. Materials
Filling Materials
I - 4. Gravel Bedding
Crew: 2 cu.m./man hour
A. Materials
Mixed and Washed Gravel
TOTAL MTERIALS COST FOR SITEWORKS
II. CONCRETE WORKS
wall footing, columns & footings, floor slab, lintel beams,
and septic tank
8.51 man-hour/cu.m
A. Materials
Portland Cement
Washed Sand
Washed Gravel
TOTAL MATERIALS COST FOR CONCRETE WORKS
III. REINFORCING STEEL BARS
UNIT COST
Unit
80.00
sq.m.
100.00
3.00
7.00
Bd. Ft.
rolls
Kgs.
15.00
30.00
65.00
18.00
Cu.m
500.00
5.00
Cu.m.
550.00
14.00
cu.m.
130.00
8.00
15.00
Bags
Cu.m.
Cu.m.
1,066.30
kgs.
3.00
days
97.00
35.00
55.00
Length
Length
Length
DESCRIPTION
No. of
Crew/
Labor
UNIT RATE /
RATE PER DAY
ADD:
FREIGHT
AND
HANDLING
COST
5.00
230.00
600.00
600.00
65.00
165.00
230.00
400.00
40.00
40.00
40.00
Page 14
QUANTITY
DESCRIPTION
Unit
Page 15
No. of
Crew/
Labor
UNIT COST
UNIT RATE /
RATE PER DAY
90.00
75.00
ADD:
FREIGHT
AND
HANDLING
COST
5.00
2.00
1,500.00
1,500.00
50.00
5.00
5.00
15.00
15.00
350.00
65.00
65.00
50.00
5.00
5.00
QUANTITY
DESCRIPTION
Unit
#1 CWN
5.00
Kgs.
TOTAL MATERIALS COST FOR FORMWORKS AND SCAFFOLDING
V. MASONRY WORKS
125.44 sq.m.
Crew: 2men lay 100 pcs./day
V - 1. CHB Laying
A. Materials
Portland Cement
75.00
Bags
Washed Sand
5.00
Cu.m.
4" x 8' x 16" CHB
1,647.00
Pcs
10mm dia. x 6.0m RSB
60.00
Length
# 16 G.I. Tie Wire
10.00
Kgs.
V - 2. Plastering
125.44 sq.m.
Crew: 2 men plaster 8 sq.m./day
A. Materials
Bags
Portland Cement
75.00
Washed Sand
6.00
Cu.m.
TOTAL MATERIALS COST FOR MASONRY WORKS
VI. CARPENTRY WORKS
1,747.00 Bd. Ft.
VI - 1. Roof Frame
899.00 Bd. Ft.
A. Materials
2 - 2" x 5" x 12' (Yakal)
20.00
Bd. Ft.
30 - 2" x 5" x 10' (Yakal)
250.00
Bd. Ft.
32 - 2" x 5" x 8' (Yakal)
214.00
Bd. Ft.
2- 2" x 4" x 10' (Yakal)
14.00
Bd. Ft.
10 - 2" x 4" x 8' (Yakal)
54.00
Bd. Ft.
20 - 2" x 3" x 12' (Lauaan)
120.00
Bd. Ft.
13 - 2" x 3" x 10' (Lauaan)
65.00
Bd. Ft.
8 - 2" x 3" x 8' (Lauaan)
32.00
Bd. Ft.
13 - 1" x 12" x 10' (Lauaan)
130.00
Bd. Ft.
5" CW Nails
10.00
Kgs.
4" CW Nails
10.00
Kgs.
3" CW Nails
6.00
Kgs.
2 1/2" CW Nails
5.00
Kgs.
2" CW Nails
5.00
Kgs.
20.00
Pcs.
12mm dia. X 7" Machine Bolt w/ Knot and washer
3.00
gal
Anti-Termite (e.g. solignum, )
VI - 2. Ceiling
848.00 Bd. Ft.
A. Materials
162- 2" x 2" x 12' Ceiling Joist (Lauaan)
648.00
Bd. Ft.
50 - 2" x 2" x 12' Hangers (Lauaan)
200.00
Bd. Ft.
1
/4" x 4' x 8' Ordinary Plywood
35.00
Shts.
4" CW Nails
10.00
Kgs.
3" CW Nails
7.00
Kgs.
1
/2 " CW Nails
7.00
Kgs.
TOTAL MATERIALS COST FOR CARPENTRY WORKS
VII. DOORS AND WINDOWS
18.44
s-m
Page 16
No. of
Crew/
Labor
5.00
UNIT COST
UNIT RATE /
RATE PER DAY
65.00
ADD:
FREIGHT
AND
HANDLING
COST
5.00
230.00
600.00
15.00
165.00
90.00
65.00
230.00
600.00
65.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
65.00
65.00
65.00
65.00
65.00
30.00
4.00
40.00
5.00
5.00
5.00
5.00
5.00
5.00
750.00
25.00
25.00
350.00
65.00
65.00
65.00
50.00
5.00
5.00
5.00
QUANTITY
DESCRIPTION
Unit
No. of
Crew/
Labor
UNIT COST
UNIT RATE /
RATE PER DAY
DOORS
ADD:
FREIGHT
AND
HANDLING
COST
Sets
850.00
5.00
Sets
50.00
5.00
2.00
5.00
Page 17
Sets
Set
Sets
Sets
5,000.00
4,000.00
1,500.00
1,000.00
QUANTITY
DESCRIPTION
2.00
1.00
Unit
Sets
Sets
No. of
Crew/
Labor
UNIT COST
UNIT RATE /
RATE PER DAY
ADD:
FREIGHT
AND
HANDLING
COST
900.00
600.00
500.00
1,800.00
615.00
615.00
400.00
2.00
270.00
40.00
0.25
5.00
1,800.00
150.00
300.00
5.00
700.00
600.00
500.00
50.00
50.00
50.00
60.00
70.00
50.00
50.00
50.00
100.00
15.00
15.00
15.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
1,500.00
300.00
10.00
Length
165.00
15.00
1.00
Pcs.
205.00
5.00
9.00
Pcs.
50.00
5.00
4.00
Pcs.
55.00
5.00
3.00
Pcs.
60.00
5.00
2.00
Pcs.
85.00
5.00
1
1
1
1
1
Page 18
Teflon Tape
IX-III For Downspouts:
3" dia. x 3.0m PVC Pipe
3" dia. x 3" PVC Tee
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement
TOTAL MATERIALS COST FOR PLUMBING WORKS
X. TILE WORKS
A. Materials
8" x 8" Glazed Tiles
8" x 8" Unglazed Tiles
White cement / Tile Grout
Unit
2.00
Pcs.
300.00
3.00
Pcs.
40.00
length
pc
pc
pint
350.00
95.00
600.00
350.00
8.00
4.00
16.00
1.00
5.00
180.00
200.00
3.00
Page 19
UNIT COST
QUANTITY
DESCRIPTION
No. of
Crew/
Labor
UNIT RATE /
RATE PER DAY
ADD:
FREIGHT
AND
HANDLING
COST
5.00
sq.m.
Pcs.
Pcs.
kls.
30.00
30.00
85.00
2.00
2.00
5.00
Tile Trim
TOTAL MATERIALS COST FOR TILEWORKS
XI. ELECTRICAL WORKS
A. Materials
Interior Rough in
2" x 4" Utility Boxes Pvc
4" x 4" Junction Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Electrical Fixtures
Flourescent Lamp, 40 watts
50 watts incandescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Ligthing Outlet ( 4" Porcelain Receptacle w/
Female Adoptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Safety Switch
QUANTITY
DESCRIPTION
Unit
3.00
Pcs.
1.00
Lot
12.00
7.00
1.00
1.00
pcs.
pcs.
length
pc.
2.00
30.00
10.00
80.00
3.00
7.00
2.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00
1.00
UNIT COST
UNIT RATE /
RATE PER DAY
105.00
ADD:
FREIGHT
AND
HANDLING
COST
5.00
25.00
25.00
175.00
80.00
5.00
5.00
15.00
5.00
box
m
Pcs.
m
Pcs.
4,300.00
55.00
45.00
70.00
25.00
60.00
2.00
2.00
2.00
assy
set
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
unit
Pcs.
Set
300.00
250.00
200.00
150.00
180.00
150.00
75.00
2,000.00
75.00
500.00
60.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
550.00
450.00
500.00
650.00
700.00
500.00
150.00
150.00
150.00
150.00
150.00
450.00
30.00
40.00
20.00
20.00
20.00
20.00
20.00
20.00
5.00
5.00
5.00
5.00
5.00
20.00
1.00
1.00
Page 20
No. of
Crew/
Labor
QUANTITY
DESCRIPTION
Unit
No. of
Crew/
Labor
UNIT COST
UNIT RATE /
RATE PER DAY
2,500.00
6,500.00
8,000.00
1,000.00
1.00
Unit
2,000.00
5.00
Unit
1,000.00
25.00
Unit
300.00
10.00
L-m
600.00
45.00
day
1.00
pc
1.00
350.00
Page 21
30.00
ADD:
FREIGHT
AND
HANDLING
COST
QUANTITY
DESCRIPTION
Crow Bar
Unit
No. of
Crew/
Labor
UNIT COST
UNIT RATE /
RATE PER DAY
1.00
pc
30.00
Concrete Pail
10.00
pc
35.00
Wheel Barrow
1.00
pc
600.00
1.00
pc
400.00
Hard Hat
5.00
pc
350.00
10.00
pcs
35.00
1.00
set
500.00
10.00
days
50.00
sht
10.00
day
1.00
800.00
30.00
day
1.00
250.00
5.00
pc
300.00
5.2 Barricades
5.00
pc
250.00
Hand Glooves
Medicine Kit
TOTAL FOR HANDTOOLS
3. PRE-ENGINEERING
1.00
250.00
50.00
Municipal Engineer
Page 22
ADD:
FREIGHT
AND
HANDLING
COST
TOTAL
KALAHI
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
15.00
30.00
70.00
1,500.00
90.00
490.00
1,050.00
63.00
343.00
450.00
27.00
147.00
500.00
9,000.00
6,300.00
2,700.00
550.00
2,750.00
13,830.00
1,925.00
9,681.00
38,350.00
4,800.00
9,000.00
52,150.00
33,185.00
3,360.00
6,300.00
42,845.00
19,885.00
9,450.00
24,200.00
19,885.00
6,615.00
16,940.00
295.00
600.00
600.00
205.00
270.00
440.00
825.00
4,149.00
5,165.00
1,440.00
2,700.00
9,305.00
2,835.00
7,260.00
Page 23
COST SHARING
TOTAL UNIT
COST
TOTAL
KALAHI
GRANT
95.00
77.00
1,425.00
770.00
997.50
539.00
1,500.00
1,500.00
1,500.00
9,000.00
66,230.00
1,500.00
9,000.00
55,476.50
6,000.00
1,005.00
4,800.00
1,050.00
350.00
4,200.00
703.50
3,360.00
735.00
245.00
15.00
15.00
400.00
70.00
70.00
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
427.50
231.00
10,753.50
1,800.00
301.50
1,440.00
315.00
105.00
Page 24
COST SHARING
TOTAL UNIT
COST
70.00
TOTAL
KALAHI
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
350.00
13,555.00
245.00
9,488.50
295.00
600.00
19.00
205.00
95.00
22,125.00
3,000.00
31,293.00
12,300.00
950.00
15,487.50
2,100.00
21,905.10
8,610.00
665.00
6,637.50
900.00
9,387.90
3,690.00
285.00
295.00
600.00
22,125.00
3,600.00
95,393.00
15,487.50
2,520.00
66,775.10
6,637.50
1,080.00
28,617.90
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
70.00
70.00
70.00
500.00
6,250.00
5,350.00
350.00
1,350.00
3,000.00
1,625.00
800.00
3,250.00
700.00
700.00
420.00
350.00
4,375.00
3,745.00
245.00
945.00
2,100.00
1,137.50
560.00
2,275.00
490.00
490.00
294.00
150.00
1,875.00
1,605.00
105.00
405.00
900.00
487.50
240.00
975.00
210.00
210.00
126.00
70.00
70.00
30.00
350.00
350.00
600.00
245.00
245.00
420.00
105.00
105.00
180.00
750.00
2,250.00
1,575.00
675.00
25.00
25.00
16,200.00
5,000.00
16,200.00
5,000.00
400.00
70.00
70.00
14,000.00
700.00
490.00
14,000.00
700.00
490.00
70.00
490.00
64,725.00
490.00
56,371.50
Page 25
105.00
4,066.50
8,353.50
COST SHARING
TOTAL UNIT
COST
TOTAL
KALAHI
GRANT
COMMUNITY
INKIND
1,655.50
BLGU
CASH
MLGU
INKIND
CASH
5,000.00
10,000.00
8,344.50
4,000.00
4,000.00
4,000.00
855.00
1,710.00
1,710.00
55.00
440.00
440.00
1,500.00
3,000.00
3,000.00
1,000.00
5,000.00
5,000.00
Page 26
COST SHARING
TOTAL UNIT
COST
TOTAL
KALAHI
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
900.00
1,800.00
1,800.00
600.00
600.00
600.00
500.00
1,000.00
27,550.00
1,000.00
13,055.50
36,000.00
9,225.00
6,150.00
880.00
2,925.00
550.00
55,730.00
36,000.00
9,225.00
6,150.00
880.00
2,925.00
550.00
55,730.00
2,100.00
155.00
715.00
615.00
515.00
55.00
55.00
55.00
65.00
75.00
55.00
55.00
55.00
105.00
-
4,200.00
310.00
4,290.00
3,690.00
3,090.00
220.00
110.00
110.00
130.00
225.00
55.00
110.00
660.00
105.00
-
4,200.00
310.00
4,290.00
3,690.00
3,090.00
220.00
110.00
110.00
130.00
225.00
55.00
110.00
660.00
105.00
-
1,800.00
1,800.00
1,800.00
180.00
1,800.00
1,800.00
210.00
210.00
210.00
55.00
495.00
495.00
60.00
240.00
240.00
65.00
195.00
195.00
90.00
180.00
180.00
1,800.00
615.00
615.00
440.00
2.25
275.00
Page 27
14,494.50
COST SHARING
TOTAL UNIT
COST
TOTAL
KALAHI
GRANT
305.00
610.00
610.00
40.00
120.00
120.00
350.00
95.00
600.00
350.00
2,800.00
380.00
9,600.00
350.00
36,085.00
2,800.00
380.00
9,600.00
350.00
36,085.00
5,760.00
6,400.00
270.00
5,760.00
6,400.00
270.00
32.00
32.00
90.00
COMMUNITY
INKIND
Page 28
BLGU
CASH
MLGU
INKIND
CASH
COST SHARING
TOTAL UNIT
COST
110.00
30.00
30.00
190.00
85.00
4,360.00
57.00
47.00
72.00
25.00
360.00
255.00
205.00
155.00
185.00
155.00
80.00
2,005.00
80.00
505.00
570.00
470.00
520.00
670.00
720.00
520.00
155.00
155.00
155.00
155.00
155.00
470.00
31.00
41.00
TOTAL
KALAHI
GRANT
330.00
12,760.00
330.00
12,760.00
360.00
210.00
190.00
85.00
8,720.00
1,710.00
470.00
5,760.00
75.00
2,520.00
510.00
410.00
620.00
925.00
1,085.00
400.00
2,005.00
400.00
505.00
360.00
210.00
190.00
85.00
8,720.00
1,710.00
470.00
5,760.00
75.00
2,520.00
510.00
410.00
620.00
925.00
1,085.00
400.00
2,005.00
400.00
505.00
26,960.00
1,710.00
1,880.00
4,160.00
5,360.00
4,320.00
2,600.00
310.00
310.00
155.00
155.00
155.00
1,880.00
155.00
410.00
23,560.00
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
26,960.00
1,710.00
1,880.00
4,160.00
5,360.00
4,320.00
2,600.00
310.00
310.00
155.00
155.00
155.00
1,880.00
155.00
410.00
23,560.00
Page 29
COST SHARING
TOTAL UNIT
COST
TOTAL
KALAHI
GRANT
COMMUNITY
INKIND
2,500.00
6,500.00
8,000.00
17,000.00
2,500.00
6,500.00
8,000.00
17,000.00
1,000.00
1,000.00
1,000.00
2,000.00
2,000.00
2,000.00
1,000.00
5,000.00
5,000.00
300.00
7,500.00
7,500.00
600.00
6,000.00
21,500.00
6,000.00
21,500.00
2,500.00
6,500.00
8,000.00
BLGU
CASH
MLGU
INKIND
CASH
350.00
30.00
15,750.00
13,500.00
2,250.00
15,750.00
13,500.00
2,250.00
30.00
30.00
Page 30
COST SHARING
TOTAL UNIT
COST
TOTAL
KALAHI
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
30.00
30.00
30.00
35.00
350.00
350.00
600.00
600.00
600.00
400.00
400.00
400.00
350.00
1,750.00
1,750.00
35.00
350.00
350.00
500.00
500.00
500.00
4,010.00
250.00
2,500.00
50.00
2,500.00
8,000.00
250.00
7,500.00
2,600.00
2,500.00
7,500.00
15,500.00
7,500.00
300.00
1,500.00
1,500.00
250.00
1,250.00
60.00
2,750.00
40,000.00
1,190.00
1,560.00
35,000.00
40,000.00
4,000.00
4,000.00
4,000.00
4,000.00
3,375.00
1,190.00
5,000.00
35,000.00
5,000.00
3,375.00
3,375.00
Noted by:
1,410.00
2,500.00
5,000.00
800.00
10,473.25
10,473.25
10,473.25
10,473.25
100,858.25
27,973.25
100,858.25
447,288.10
9,750.00
3,375.00
45,035.00
1,410.00
Approved by :
6,190.00
79,739.90
Concurred by :
MACRINO L. SUMAGANG
ANGELITA J. EROLES
BSPMC Chairperson
Page 31
FERNANDO B
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
450.00
27.00
147.00
450.00
27.00
147.00
2,700.00
2,700.00
825.00
4,149.00
825.00
4,149.00
1,500.00
90.00
490.00
9,000.00
2,750.00
13,830.00
5,165.00
1,440.00
2,700.00
9,305.00
5,165.00
1,440.00
2,700.00
9,305.00
38,350.00
4,800.00
9,000.00
52,150.00
2,835.00
7,260.00
2,835.00
7,260.00
19,885.00
9,450.00
24,200.00
Page 32
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
427.50
231.00
10,753.50
427.50
231.00
10,753.50
1,425.00
770.00
1,500.00
9,000.00
66,230.00
1,800.00
301.50
1,440.00
315.00
105.00
1,800.00
301.50
1,440.00
315.00
105.00
6,000.00
1,005.00
4,800.00
1,050.00
350.00
Page 33
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
-
TOTAL
INKIND
105.00
4,066.50
105.00
4,066.50
350.00
13,555.00
6,637.50
900.00
9,387.90
3,690.00
285.00
6,637.50
900.00
9,387.90
3,690.00
285.00
22,125.00
3,000.00
31,293.00
12,300.00
950.00
6,637.50
1,080.00
28,617.90
6,637.50
1,080.00
28,617.90
22,125.00
3,600.00
95,393.00
150.00
1,875.00
1,605.00
105.00
405.00
900.00
487.50
240.00
975.00
210.00
210.00
126.00
150.00
1,875.00
1,605.00
105.00
405.00
900.00
487.50
240.00
975.00
210.00
210.00
126.00
500.00
6,250.00
5,350.00
350.00
1,350.00
3,000.00
1,625.00
800.00
3,250.00
700.00
700.00
420.00
105.00
105.00
180.00
105.00
105.00
180.00
350.00
350.00
600.00
675.00
675.00
2,250.00
16,200.00
5,000.00
14,000.00
700.00
490.00
8,353.50
Page 34
8,353.50
490.00
64,725.00
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
8,344.50
8,344.50
10,000.00
4,000.00
4,000.00
4,000.00
1,710.00
1,710.00
1,710.00
440.00
440.00
440.00
3,000.00
5,000.00
Page 35
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
-
1,800.00
600.00
14,494.50
14,494.50
1,000.00
27,550.00
36,000.00
9,225.00
6,150.00
880.00
2,925.00
550.00
55,730.00
4,200.00
310.00
4,290.00
3,690.00
3,090.00
220.00
110.00
110.00
130.00
225.00
55.00
110.00
660.00
105.00
-
1,800.00
1,800.00
210.00
495.00
240.00
195.00
180.00
Page 36
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
-
610.00
120.00
2,800.00
380.00
9,600.00
350.00
36,085.00
5,760.00
6,400.00
270.00
Page 37
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
-
330.00
12,760.00
360.00
210.00
190.00
85.00
8,720.00
1,710.00
470.00
5,760.00
75.00
2,520.00
510.00
410.00
620.00
925.00
1,085.00
400.00
2,005.00
400.00
505.00
26,960.00
1,710.00
1,880.00
4,160.00
5,360.00
4,320.00
2,600.00
310.00
310.00
155.00
155.00
155.00
1,880.00
155.00
410.00
23,560.00
Page 38
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
2,500.00
6,500.00
8,000.00
17,000.00
1,000.00
2,000.00
5,000.00
7,500.00
6,000.00
21,500.00
2,250.00
2,250.00
15,750.00
2,250.00
2,250.00
15,750.00
30.00
30.00
30.00
Page 39
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
-
30.00
30.00
30.00
350.00
350.00
350.00
600.00
600.00
600.00
400.00
400.00
400.00
1,750.00
1,750.00
1,750.00
350.00
350.00
350.00
500.00
500.00
500.00
4,010.00
4,010.00
2,600.00
1,410.00
2,500.00
2,500.00
2,500.00
2,500.00
2,500.00
2,500.00
5,000.00
5,000.00
8,000.00
8,000.00
8,000.00
7,500.00
7,500.00
7,500.00
15,500.00
15,500.00
15,500.00
2,500.00
2,500.00
2,500.00
8,000.00
8,000.00
10,500.00
1,500.00
1,500.00
1,500.00
1,250.00
1,250.00
1,250.00
2,750.00
2,750.00
2,750.00
40,000.00
40,000.00
40,000.00
40,000.00
40,000.00
40,000.00
4,000.00
4,000.00
3,375.00
3,375.00
3,375.00
3,375.00
3,375.00
3,375.00
10,473.25
10,473.25
51,225.00
79,739.90
FERNANDO B. LOPEZ
2,500.00
21,660.00
72,885.00
100,858.25
79,739.90
100,858.25
Barangay Captain
Municipal Mayor
Page 40
CON
DESCRIPTION
I. SITE WORKS
B. Labor
Carpenter
Laborer
QUANTITY
DE
Unit
1.00
1.00
Day/s
Day/s
22.50
cu.m.
3.00
No. of
Crew/
Labor
1.00
2.00
300.00
200.00
Day/s
6.00
200.00
3.00
Day/s
4.00
200.00
1.00
Day/s
3.00
200.00
14.00
cu.m.
4.00
4.00
Day/s
Day/s
2.00
6.00
300.00
200.00
1,066.30
kgs.
3.00
3.00
Day/s
Day/s
1.00
2.00
300.00
200.00
2.00
2.00
300.00
200.00
Sub-Total
I - 2. Structural Excavation
6 man-hour/cu.m
Column Footing, Wall Footing & Septic Vault
A. Labor
Laborer
Sub-Total
I - 3. EMBANKMENT: Filling, Grading and Compaction
B. Labor
Laborer
Sub-Total
I - 4. Gravel Bedding
B. Labor
Laborer
Sub-Total
TOTAL LABOR COST FOR SITEWORKS
II. CONCRETE WORKS
B. Labor
Mason
Laborer
Sub-Total
TOTAL LABOR COST FOR CONCRETE WORKS
III. REINFORCING STEEL BARS
B. Labor
Mason
Laborer
Sub-Total
TOTAL LABOR COST FOR REINFORCING STEEL BARS
IV. FORMWORKS & SCAFFOLDING
(USABLE 2X)
Labor
Carpenter
Laborer
Sub-Total
23.00
2.00
2.00
Page 41
sq.m.
Day/s
Day/s
ADD: FREIGHT
AND HANDLING
COST
QUANTITY
DESCRIPTION
Unit
No. of
Crew/
Labor
sq.m.
4.00
4.00
300.00
200.00
Day/s
4.00
300.00
8.00
Day/s
4.00
200.00
#REF!
Bd. Ft.
15.00
15.00
Day/s
Day/s
2.00
3.00
300.00
200.00
#REF!
Bd. Ft.
6.00
6.00
Day/s
Day/s
2.00
3.00
300.00
200.00
18.44
s-m
2
2
Days
Days
1.00
1.00
300.00
200.00
7.00
7.00
Day/s
Day/s
1.00
1.00
300.00
200.00
2.00
3.00
300.00
200.00
2.00
2.00
300.00
200.00
Day/s
Day/s
sq.m.
B. Labor ( Installation )
Carpenters
Laborer
Sub-Total
WINDOWS
B. Labor ( Installation )
Carpenters
Laborer
Sub-Total
TOTAL LABOR COST FOR DOORS & WINDOWS
VIII. ROOFING
B. Labor
Carpenters
Laborer
Sub-Total
TOTAL LABOR COST FOR ROOFING
IX. PLUMBING WORKS
B. Labor
Plumber/ Mason
Laborer
65.00
5.00
5.00
1.00
4.00
4.00
Sub-Total
TOTAL LABOR COST FOR PLUMBING WORKS
X. TILE WORKS
B. Labor
5.00
Page 42
sq.m.
Day/s
Day/s
Lot
Day/s
Day/s
sq.m.
ADD: FREIGHT
AND HANDLING
COST
Mason
Laborer
Sub-Total
TOTAL LABOR COST FOR TILEWORKS
XI. ELECTRICAL WORKS
B. Labor
Electrician
Laborer
Sub-Total
TOTAL LABOR COST FOR ELECTRICAL WORKS
XII. PAINTING WORKS
1-foreman,2-painter,3-laborer
37.86 sq.m/day
say
B. Labor
Painter
Laborer
Sub-Total
TOTAL LABOR COST FOR PAINTING
QUANTITY
DESCRIPTION
Unit
4.00
4.00
Day/s
Day/s
1.00
Lot
7.00
7.00
Day/s
Day/s
265.00
sq.m.
7.00
days
7.00
7.00
No. of
Crew/
Labor
Day/s
Day/s
1.00
1.00
300.00
200.00
1.00
1.00
300.00
200.00
2.00
3.00
300.00
200.00
Prepared by :
Municipal Engineer
Page 43
ADD: FREIGHT
AND HANDLING
COST
COST SHARING
TOTAL UNIT
COST
300.00
200.00
200.00
200.00
200.00
300.00
200.00
300.00
200.00
300.00
200.00
TOTAL
KALAHI
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
300.00
400.00
700.00
300.00
350.00
650.00
50.00
50.00
3,600.00
3,600.00
3,150.00
3,150.00
450.00
450.00
2,400.00
2,400.00
2,100.00
2,100.00
300.00
300.00
600.00
600.00
7,300.00
525.00
525.00
6,425.00
75.00
75.00
875.00
2,400.00
4,800.00
7,200.00
7,200.00
2,400.00
4,200.00
6,600.00
6,600.00
600.00
600.00
600.00
900.00
1,200.00
2,100.00
2,100.00
900.00
1,050.00
1,950.00
1,950.00
150.00
150.00
150.00
1,200.00
800.00
2,000.00
1,200.00
700.00
1,900.00
100.00
100.00
Page 44
COST SHARING
TOTAL UNIT
COST
TOTAL
KALAHI
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
2,000.00
1,900.00
100.00
10,800.00
7,200.00
18,000.00
10,800.00
6,300.00
17,100.00
900.00
900.00
300.00
9,600.00
9,600.00
200.00
6,400.00
16,000.00
34,000.00
5,600.00
15,200.00
32,300.00
800.00
800.00
1,700.00
9,000.00
9,000.00
18,000.00
9,000.00
7,875.00
16,875.00
1,125.00
1,125.00
3,600.00
3,600.00
7,200.00
25,200.00
3,600.00
3,150.00
6,750.00
23,625.00
450.00
450.00
1,575.00
600.00
400.00
1,000.00
600.00
350.00
950.00
50.00
50.00
2,100.00
1,400.00
3,500.00
4,500.00
2,100.00
1,225.00
3,325.00
4,275.00
175.00
175.00
225.00
3,000.00
3,000.00
6,000.00
6,000.00
3,000.00
2,625.00
5,625.00
5,625.00
375.00
375.00
375.00
2,400.00
1,600.00
4,000.00
4,000.00
2,400.00
1,400.00
3,800.00
3,800.00
200.00
200.00
200.00
300.00
200.00
300.00
200.00
300.00
200.00
300.00
200.00
300.00
200.00
300.00
200.00
300.00
200.00
Page 45
COST SHARING
TOTAL UNIT
COST
300.00
200.00
300.00
200.00
300.00
200.00
TOTAL
KALAHI
GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
1,200.00
800.00
2,000.00
2,000.00
1,200.00
700.00
1,900.00
1,900.00
100.00
100.00
100.00
2,100.00
1,400.00
3,500.00
2,100.00
1,225.00
3,325.00
175.00
175.00
3,500.00
3,325.00
175.00
4,200.00
4,200.00
8,400.00
8,400.00
4,200.00
3,675.00
7,875.00
7,875.00
525.00
525.00
525.00
106,200.00
99,600.00
53,400.00
46,200.00
6,600.00
Noted by:
6,600.00
Approved by :
MACRINO L. SUMAGANG
ANGELITA J. EROLES
BSPMC Chairperson
Page 46
Concurred by :
FERNANDO B
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
50.00
50.00
50.00
50.00
300.00
400.00
700.00
-
450.00
450.00
450.00
450.00
300.00
300.00
300.00
300.00
75.00
75.00
875.00
75.00
75.00
875.00
3,600.00
3,600.00
2,400.00
2,400.00
600.00
600.00
7,300.00
600.00
600.00
600.00
600.00
600.00
600.00
2,400.00
4,800.00
7,200.00
7,200.00
150.00
150.00
150.00
150.00
150.00
150.00
900.00
1,200.00
2,100.00
2,100.00
100.00
100.00
100.00
100.00
1,200.00
800.00
2,000.00
Page 47
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
100.00
100.00
2,000.00
900.00
900.00
900.00
900.00
10,800.00
7,200.00
18,000.00
9,600.00
800.00
800.00
1,700.00
800.00
800.00
1,700.00
6,400.00
16,000.00
34,000.00
1,125.00
1,125.00
1,125.00
1,125.00
9,000.00
9,000.00
18,000.00
450.00
450.00
1,575.00
450.00
450.00
1,575.00
3,600.00
3,600.00
7,200.00
25,200.00
50.00
50.00
600.00
400.00
1,000.00
175.00
175.00
175.00
175.00
175.00
175.00
2,100.00
1,400.00
3,500.00
4,500.00
375.00
375.00
375.00
3,000.00
3,000.00
6,000.00
6,000.00
200.00
200.00
200.00
2,400.00
1,600.00
4,000.00
4,000.00
375.00
375.00
375.00
200.00
200.00
200.00
Page 48
NG
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
MLGU
INKIND
CASH
TOTAL
INKIND
100.00
100.00
100.00
100.00
100.00
100.00
1,200.00
800.00
2,000.00
2,000.00
175.00
175.00
175.00
175.00
2,100.00
1,400.00
3,500.00
175.00
175.00
3,500.00
6,025.00
6,025.00
4,200.00
4,200.00
8,400.00
8,400.00
106,200.00
FERNANDO B. LOPEZ
Barangay Captain
Municipal Mayor
Page 49
Departm
KALA
K
CONSTRUCTIO
DESCRIPTION
B. INDIRECT COST
1. OVERHEAD COST
Foreman / Leadman
TOTAL INDIRECT COST FOR OVERHEAD COST
2. HANDTOOLS
Shovel w/ handle
Crow Bar
Wheel Barrow
Bolo (multi-purpose) w/ handle
Sledge Hammer (5kg) w/ handle
Concrete Pail
TOTAL INDIRECT COST FOR HANDTOOLS
3. PRE-ENGINEERING
3.1 Preparation of Plans
TOTAL INDIRECT COST FOR PRE-ENGINEERING
4. ENGINEERING SUPERVISION
4.1 Municipal Engineer
TAL INDIRECT COST FOR ENGINEERING SUPERVISION
5. PERMITS AND LICENSES
TOTAL INDIRECT COST FOR PERMITS AND LICENSES
6. ADMINISTRATIVE COST
TOTAL INDIRECT COST FOR ADMINISTRATIVE COST
7. MATERIAL TESTING
TOTAL INDIRECT COST FOR MATERIAL TESTING
8. TREASURER'S BOND
TOTAL INDIRECT COST FOR TREASURER'S BOND
9. CONTINGENCY (5% of DC)
TOTAL INDIRECT COSTFOR CONTINGENCY
QUANTITY
DETAILED
Unit
56
Days
3.00
1.00
1.00
1.00
1.00
10.00
pc
pc
pc
pc
pc
pc
10.00
days
20.00
Days
No. of
Crew/
Labor
1.00
UNIT COST
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLING
COST
400.00
450.00
500.00
1,070.00
380.00
700.00
100.00
10.00
TOTAL
UNIT COST
400.00
450.00
500.00
1,070.00
380.00
700.00
100.00
250.00
250.00
800.00
800.00
5,000.00
Page 50
Noted by:
QUANTITY
DESCRIPTION
Unit
No. of
Crew/
Labor
UNIT COST
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLING
COST
Municipal Engineer
Page 51
TOTAL
UNIT COST
MACRINO
Regional Commun
22,444.44
22,444.44
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
5,000.00
2,500.00
2,500.00
16,000.00
16,000.00
5,000.00
5,000.00
20,000.00
20,000.00
4,000.00
4,000.00
3,375.00
3,375.00
21,010.16
21,010.16
99,329.61
99,329.61
COMMU
NITY
INKIND
KALAHI
GRANT
20,250.00
20,250.00
BLGU
CASH
MLGU
INKIND
CASH
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
5,000.00
Err:509
-
4,000.00
4,000.00
21,010.16
21,010.16
45,260.16
45,260.16
SUB-TOTAL LC
5,000.00
5,000.00
Approved by :
INKIND
2,194.44
2,194.44
5,000.00
5,000.00
Err:509
3,375.00
3,375.00
-
10,569.44
10,569.44
Concurred by :
Page 52
CASH
2,500.00
2,500.00
16,000.00
16,000.00
-
18,500.00
18,500.00
2,194.44
2,194.44
5,000.00
5,000.00
Err:509
Err:509
3,375.00
3,375.00
-
Err:509
Err:509
COST SHARING
TOTAL
KALAHI
GRANT
MACRINO L. SUMAGANG
COMMU
NITY
INKIND
SUB-TOTAL LC
BLGU
CASH
MLGU
INKIND
ANGELITA J. EROLES
BSPMC Chairperson
Page 53
CASH
INKIND
CASH
FERNANDO B. LOPEZ
Barangay Captain
TOTAL LCC
(CASH &
INKIND)
SUB-TOTAL LCC
TOTAL
INKIND
2,194.44
2,194.44
22,444.44
22,444.44
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
5,000.00
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
5,000.00
2,500.00
2,500.00
2,500.00
2,500.00
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
5,000.00
0.00
2,500.00
2,500.00
16,000.00
16,000.00
-
16,000.00
16,000.00
5,000.00
5,000.00
Err:509
Err:509
3,375.00
3,375.00
-
16,000.00
16,000.00
5,000.00
5,000.00
Err:509
Err:509
4,000.00
4,000.00
3,375.00
3,375.00
21,010.16
21,010.16
23,500.00
23,500.00
Err:509
Err:509
Err:509
Err:509
Page 54
SUB-TOTAL LCC
TOTAL LCC
(CASH &
INKIND)
TOTAL
INKIND
Page 55
Sub-Project duration
: 80
Physical Target
:
:
:
:
:
Region
Province
Municipality
Barangay
Calendar Days
63 Sq. M.
VII-VISAYAS
Negros Oriental
Dauin
Tugawe
: P
935,830.00
Direct Cost
Indirect Cost
Date Started
Target Completion
Mode of Implementation
: P
840,544.84
: P
95,285.16
:
:
: Community Force Account/Local Shopping for Goods
DESCRIPTION
SITE WORKS
II
CONCRETE WORKS
III
REINFORCING STEEL
BARS
QTY
UNIT
80.00 sq.m.
23.37 cu.m.
2,834.10
kgs.
AMOUNT
33,974.55
WEIGHT
PHYSICAL
(%)
TARGET
4.04%
110,331.00
13.13%
123,816.05
14.73%
IV
FORMWORKS AND
SCAFOLDING
23.00 sq.m.
22,931.50
2.73%
MASONRY WORKS
125.44 sq.m.
118,449.64
14.09%
VI
CARPENTRY WORKS
VIII ROOFING
IX
PLUMBING WORKS
TILE WORKS
XI
ELECTRICAL WORKS
XIII
1,747.00 bd.ft.
145,388.20
17.30%
18.44 sq.m.
70,680.00
8.41%
65.00 sq.m.
1.00
lot.
14.56 sq.m.
1.00
lot.
265.00 sq.m.
1.00
lot.
77,558.50
9.23%
35,858.10
4.27%
23,751.00
2.83%
30,219.35
3.60%
29,406.30
3.50%
15,000.00
1.78%
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
1ST MONTH
WEEK 1
WEEK 2
WEEK 3
2ND MONTH
WEEK 4
WEEK 5
WEEK 6
WEEK 7
WEEK 8
WEEK 9
XIII
1.00
lot.
15,000.00
1.78%
1.00
lot.
3,180.65
0.38%
T O T A L
840,544.84
100.00%
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
% PROGRESS (Planned)
PHYSICAL
% PROGRESS (Actual)
PROGRESS (Planned)
FINANCIAL
PROGRESS (Actual)
Prepared by:
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
PERIODIC
COMMULATIVE
Concurred by:
PIT Chairperson
5%
6%
8%
9%
10%
12%
14%
11%
10%
5%
11%
19%
28%
38%
50%
64%
75%
85%
42,027.24
50,432.69
67,243.59
75,649.04
84,054.48
100,865.38
117,676.28
92,459.93
84,054.
42,027.24
92,459.93
159,703.52
235,352.56
319,407.04
420,272.42
537,948.70
630,408.63
714,463
RODSON R. ESCORA
Deputy Area Coordinator
CARMEN A. GAUDIANO
Municipal Engineer
LABOR
SKILLED
UNSKILLED
TOTAL
STATUS
No. of Days
Male
Female
Male
Female
Male
Female
80
80
3RD MONTH
WEEK 9
WEEK 10
WEEK 11
Average
Rate/Day
300.00
200.00
4TH MONTH
WEEK 12
WEEK 13
WEEK 14
WEEK 15
WEEK 16
10%
8%
4%
3%
85%
93%
97%
100%
84,054.48
67,243.59
33,621.79
25,216.35
714,463.11
781,706.70
815,328.49
840,544.84
Approved by:
Noted by:
BSPMC
GEORGE S. ISULAT
Regional Infra. Engineer
QUANTITY
BILL OF QUANTITIES
DESCRIPTION
I. SITE WORKS
I - 1. Clearing and Lay-out
A. Materials
25- 2" x 2" x 12' Coco Lumber
Nylon # 16
3" CW Nails
UNIT COST
Unit
80.00
sq.m.
100.00
2.00
7.00
Bd. Ft.
Kgs.
Kgs.
1.00
1.00
Day/s
Day/s
No. of
Crew/
Labor
COST SHARING
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
25.00
350.00
65.00
0.25
3.50
0.65
TOTAL UNIT
COST
1.00
2.00
300.00
275.00
2,525.00
707.00
459.55
3,691.55
2,104.17
589.17
382.96
3,076.29
300.00
275.00
300.00
550.00
850.00
300.00
400.00
700.00
Sub-Total
I - 2. Structural Excavation
6 man-hour/cu.m
Column Footing, Wall Footing & Septic Vault
A. Labor
Laborer
22.50
KALAHI GRANT
25.25
353.50
65.65
Sub-Total
B. Labor
Carpenter
Laborer
SUB-TOTAL LCC
TOTAL
COMMUNITY
INKIND
150.00
150.00
BLGU
CASH
TOTAL LCC
(CASH &
INKIND)
MLGU
INKIND
CASH
INKIND
420.83
117.83
76.59
615.26
CASH
TOTAL
INKIND
420.83
117.83
76.59
615.26
-
150.00
150.00
420.83
117.83
76.59
615.26
2,525.00
707.00
459.55
3,691.55
150.00
150.00
300.00
550.00
850.00
cu.m.
-
4.00
Sub-Total
I - 3. EMBANKMENT: Filling, Grading and Compaction
3.65 man-hour/cu.m
A. Materials
Filling Materials
Sub-Total
B. Labor
Laborer
Sub-Total
I - 4. Gravel Bedding
Crew: 2 cu.m./man hour
A. Materials
Mixed and Washed Gravel
Sub-Total
B. Labor
Laborer
Sub-Total
TOTAL FOR SITEWORKS
II. CONCRETE WORKS
Day/s
20.00
Cu.m
4.00
Day/s
6.00
3.00
23.37
6.00
550.00
4.00
3.00
275.00
5.50
275.00
800.00
Cu.m.
Day/s
275.00
8.00
275.00
6,600.00
6,600.00
4,800.00
4,800.00
555.50
11,110.00
11,110.00
9,258.33
9,258.33
275.00
4,400.00
4,400.00
3,200.00
3,200.00
4,848.00
4,848.00
4,040.00
4,040.00
2,475.00
2,475.00
33,974.55
1,800.00
1,800.00
26,874.63
252.50
707.00
808.00
63,125.00
14,140.00
21,816.00
99,081.00
52,604.17
11,783.33
18,180.00
82,567.50
300.00
275.00
3,000.00
8,250.00
11,250.00
110,331.00
3,000.00
6,000.00
9,000.00
91,567.50
151.50
222.20
373.70
656.50
3,076.10
1,212.00
60.60
40,450.50
1,555.40
41,107.00
24,947.00
4,614.15
3,636.00
606.00
116,916.05
33,708.75
1,296.17
34,255.83
20,789.17
3,845.13
3,030.00
505.00
97,430.04
300.00
275.00
3,600.00
3,300.00
6,900.00
123,816.05
3,600.00
2,400.00
6,000.00
103,430.04
25.25
25.25
353.50
65.65
65.65
65.65
10,100.00
1,691.75
4,242.00
984.75
656.50
656.50
18,331.50
8,416.67
1,409.79
3,535.00
820.63
547.08
547.08
15,276.25
300.00
275.00
2,400.00
2,200.00
4,600.00
22,931.50
2,400.00
1,600.00
4,000.00
19,276.25
252.50
707.00
12.12
151.50
70.70
21,462.50
4,949.00
19,961.64
9,090.00
707.00
56,170.14
17,885.42
4,124.17
16,634.70
7,575.00
589.17
46,808.45
300.00
275.00
10,800.00
9,900.00
20,700.00
10,800.00
7,200.00
18,000.00
18,937.50
4,242.00
23,179.50
15,781.25
3,535.00
19,316.25
9,600.00
8,800.00
18,400.00
118,449.64
9,600.00
6,400.00
16,000.00
100,124.70
808.00
275.00
1,800.00
1,800.00
1,200.00
1,200.00
675.00
675.00
3,825.00
1,851.67
1,851.67
1,851.67
1,851.67
-
808.00
808.00
808.00
808.00
3,274.93
3,274.93
10,520.83
2,356.67
3,636.00
16,513.50
16,513.50
1,800.00
1,800.00
1,200.00
1,200.00
675.00
675.00
3,825.00
675.00
675.00
7,099.93
6,600.00
6,600.00
11,110.00
11,110.00
4,400.00
4,400.00
4,848.00
4,848.00
2,475.00
2,475.00
33,974.55
10,520.83
2,356.67
3,636.00
16,513.50
63,125.00
14,140.00
21,816.00
99,081.00
2,250.00
2,250.00
18,763.50
3,000.00
8,250.00
11,250.00
110,331.00
6,741.75
259.23
6,851.17
4,157.83
769.03
606.00
101.00
19,486.01
40,450.50
1,555.40
41,107.00
24,947.00
4,614.15
3,636.00
606.00
116,916.05
900.00
900.00
20,386.01
3,600.00
3,300.00
6,900.00
123,816.05
1,683.33
281.96
707.00
164.13
109.42
109.42
3,055.25
10,100.00
1,691.75
4,242.00
984.75
656.50
656.50
18,331.50
600.00
600.00
3,655.25
2,400.00
2,200.00
4,600.00
22,931.50
3,577.08
824.83
3,326.94
1,515.00
117.83
9,361.69
21,462.50
4,949.00
19,961.64
9,090.00
707.00
56,170.14
2,700.00
2,700.00
10,800.00
9,900.00
20,700.00
3,156.25
707.00
3,863.25
18,937.50
4,242.00
23,179.50
2,400.00
2,400.00
18,324.94
9,600.00
8,800.00
18,400.00
118,449.64
1,800.00
1,800.00
1,851.67
1,851.67
1,200.00
1,200.00
808.00
808.00
cu.m.
250.00
700.00
800.00
Bags
Cu.m.
Cu.m.
Day/s
Day/s
2.00
6.00
2.50
7.00
8.00
300.00
275.00
6,000.00
2,250.00
2,250.00
2,250.00
6,000.00
4,520.83
2,356.67
3,636.00
10,513.50
6,000.00
10,513.50
4,000.00
2,741.75
259.23
6,851.17
4,157.83
769.03
606.00
101.00
15,486.01
6,741.75
259.23
6,851.17
4,157.83
769.03
606.00
101.00
19,486.01
4,000.00
15,486.01
19,486.01
1,683.33
281.96
707.00
164.13
109.42
109.42
3,055.25
1,683.33
281.96
707.00
164.13
109.42
109.42
3,055.25
3,055.25
3,055.25
3,577.08
824.83
3,326.94
1,515.00
117.83
9,361.69
3,577.08
824.83
3,326.94
1,515.00
117.83
9,361.69
3,156.25
707.00
3,863.25
3,156.25
707.00
3,863.25
13,224.94
13,224.94
2,250.00
2,250.00
2,250.00
kgs.
3.00
days
267.00
7.00
110.00
38.00
1.50
3.00
10.00
Length
Length
Length
Length
rolls
Pcs.
Pcs.
3.00
3.00
Day/s
Day/s
150.00
220.00
370.00
650.00
3,046.00
1,200.00
60.00
1.50
2.20
3.70
6.50
30.10
12.00
0.60
Sub-Total
B. Labor
Steelman
Laborer
Sub-Total
TOTAL FOR REINFORCING STEEL BARS
IV. FORMWORKS & SCAFFOLDING
(USABLE 2X) 23.00 sq.m.
Materials
100-2"x2"x12' Coco Lumber
400.00
Bd.Ft
20-2"x2"x10' Coco Lumber for Bracing
67.00
Bd.Ft
1/4 thk. 4'x8' Ordinary Plywood
12.00
shts.
# 4 CWN
15.00
Kgs.
#2 CWN
10.00
Kgs.
#2-1/2 CWN
10.00
Kgs.
Sub-Total
Labor
Carpenter
4.00
Day/s
Laborer
4.00
Day/s
Sub-Total
TOTAL FOR FORMWORKS AND SCAFFOLDING
V. MASONRY WORKS
125.44 sq.m.
Crew: 2men lay 100 pcs./day
V - 1. CHB Laying
A. Materials
Portland Cement
85.00
Bags
Washed Sand
7.00
Cu.m.
4" x 8' x 16" CHB
1,647.00
Pcs
10mm dia. x 6.0m RSB
60.00
Length
# 16 G.I. Tie Wire
10.00
Kgs.
Sub-Total
B. Labor
Mason
9.00
Day/s
Laborer
9.00
Day/s
Sub-Total
V - 2. Plastering
125.44 sq.m.
Crew: 2 men plaster 8 sq.m./day
A. Materials
Bags
Portland Cement
75.00
Washed Sand
6.00
Cu.m.
Sub-Total
B. Labor
Mason
8.00
Day/s
Laborer
8.00
Day/s
Sub-Total
TOTAL FOR MASONRY WORKS
VI. CARPENTRY WORKS
1,747.00 Bd. Ft.
VI - 1. Roof Frame
899.00 Bd. Ft.
A. Materials
2 - 2" x 5" x 12' (Good Lumber)
20.00
Bd. Ft.
30 - 2" x 5" x 10' (Good Lumber)
250.00
Bd. Ft.
32 - 2" x 5" x 8' (Good Lumber)
214.00
Bd. Ft.
2- 2" x 4" x 10' (Good Lumber)
14.00
Bd. Ft.
10 - 2" x 4" x 8' (Good Lumber)
54.00
Bd. Ft.
20 - 2" x 3" x 12' (Good Lumber)
120.00
Bd. Ft.
13 - 2" x 3" x 10' (Good Lumber)
65.00
Bd. Ft.
8 - 2" x 3" x 8' (Good Lumber)
32.00
Bd. Ft.
12mm thk. x 1200mm x 2400mm Fiber Cement Board
4.00
shts.
(Fascia Board)
4" CW Nails
20.00
Kgs.
3" CW Nails
6.00
Kgs.
2 1/2" CW Nails
5.00
Kgs.
2" CW Nails
5.00
Kgs.
20.00
Pcs.
12mm dia. X 7" Machine Bolt w/ Knot and washer
4.00
4.00
300.00
275.00
25.00
25.00
350.00
65.00
65.00
65.00
2.00
2.00
300.00
275.00
250.00
700.00
12.00
150.00
70.00
4.00
4.00
2.50
7.00
0.12
1.50
0.70
300.00
275.00
250.00
700.00
4.00
4.00
0.25
0.25
3.50
0.65
0.65
0.65
2.50
7.00
300.00
275.00
252.50
707.00
300.00
275.00
4,000.00
900.00
900.00
900.00
600.00
600.00
600.00
2,700.00
2,700.00
2,400.00
2,400.00
5,100.00
900.00
900.00
900.00
600.00
600.00
600.00
2,700.00
2,700.00
2,400.00
2,400.00
5,100.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
40.40
40.40
40.40
40.40
40.40
40.40
40.40
40.40
808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80
673.33
8,416.67
7,204.67
471.33
1,818.00
4,040.00
2,188.33
1,077.33
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80
1,200.00
12.00
1,212.00
4,848.00
4,040.00
808.00
808.00
808.00
4,848.00
65.00
65.00
65.00
65.00
50.00
0.65
0.65
65.65
65.65
1,313.00
393.90
1,094.17
328.25
218.83
65.65
218.83
65.65
218.83
65.65
1,313.00
393.90
0.65
0.65
0.50
65.65
65.65
50.50
328.25
328.25
1,010.00
273.54
273.54
841.67
54.71
54.71
168.33
54.71
54.71
168.33
54.71
54.71
168.33
328.25
328.25
1,010.00
UNIT COST
QUANTITY
DESCRIPTION
Unit
3.00
gal
No. of
Crew/
Labor
COST SHARING
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
750.00
7.50
TOTAL UNIT
COST
757.50
Sub-Total
B. Labor
Carpenters
Laborer
15.00
15.00
Day/s
Day/s
2.00
3.00
300.00
275.00
300.00
275.00
Sub-Total
VI - 2. Ceiling
A. Materials
162- 2" x 2" x 12' Ceiling Joist (Good Lumber)
50 - 2" x 2" x 12' Hangers (Good Lumber)
1
/4" x 4' x 8' Ordinary Plywood
4" CW Nails
3" CW Nails
1
/2 " CW Nails
848.00
Bd. Ft.
648.00
200.00
35.00
10.00
7.00
7.00
Bd. Ft.
Bd. Ft.
Shts.
Kgs.
Kgs.
Kgs.
6.00
6.00
Day/s
Day/s
70.00
70.00
350.00
65.00
65.00
65.00
2.00
3.00
KALAHI GRANT
2,272.50
41,561.50
1,893.75
34,634.58
9,000.00
12,375.00
21,375.00
9,000.00
9,000.00
18,000.00
COMMUNITY
INKIND
3,375.00
3,375.00
BLGU
CASH
TOTAL LCC
(CASH &
INKIND)
MLGU
INKIND
CASH
INKIND
378.75
6,926.92
CASH
-
TOTAL
INKIND
378.75
6,926.92
-
3,375.00
3,375.00
378.75
6,926.92
2,272.50
41,561.50
3,375.00
3,375.00
9,000.00
12,375.00
21,375.00
0.70
0.70
70.70
70.70
45,813.60
14,140.00
38,178.00
11,783.33
7,635.60
2,356.67
7,635.60
2,356.67
7,635.60
2,356.67
45,813.60
14,140.00
3.50
0.65
0.65
353.50
65.65
65.65
12,372.50
656.50
459.55
10,310.42
547.08
382.96
2,062.08
109.42
76.59
2,062.08
109.42
76.59
2,062.08
109.42
76.59
12,372.50
656.50
459.55
65.65
459.55
73,901.70
382.96
61,584.75
76.59
12,316.95
76.59
12,316.95
459.55
73,901.70
300.00
275.00
3,600.00
4,950.00
8,550.00
145,388.20
3,600.00
3,600.00
7,200.00
121,419.33
19,243.87
1,350.00
1,350.00
23,968.87
3,600.00
4,950.00
8,550.00
145,388.20
0.65
Sub-Total
B. Labor
Carpenters
Laborer
SUB-TOTAL LCC
TOTAL
300.00
275.00
1,350.00
1,350.00
4,725.00
18.44
s-m
sets
7,000.00
70.00
7,070.00
14,140.00
11,783.33
2,356.67
2,356.67
2,356.67
14,140.00
sets
2,900.00
29.00
2,929.00
5,858.00
4,881.67
976.33
976.33
976.33
5,858.00
12
pc
pc
100.00
1,500.00
1.00
15.00
101.00
1,515.00
1,212.00
6,060.00
1,010.00
5,050.00
202.00
1,010.00
202.00
1,010.00
202.00
1,010.00
1,212.00
6,060.00
sets
1,500.00
15.00
1,515.00
9,090.00
7,575.00
1,515.00
1,515.00
1,515.00
9,090.00
sets
500.00
5.00
505.00
1,010.00
841.67
168.33
168.33
168.33
1,010.00
37,370.00
31,141.67
6,228.33
6,228.33
37,370.00
2,100.00
1,925.00
4,025.00
2,100.00
1,400.00
3,500.00
525.00
2,100.00
1,925.00
4,025.00
19,243.87
1,350.00
1,350.00
4,725.00
76.59
12,316.95
Sub-Total
TOTAL FOR CARPENTRY WORKS
VII. DOORS AND WINDOWS
DOORS
0.9
x2.10m Hard Panel Door Hinge Type w/ Fixed Glass
Sub-Total
6,228.33
B. Labor ( Installation )
Carpenters
Laborer
7
7
Days
Days
1.00
1.00
300.00
275.00
300.00
275.00
Sub-Total
525.00
525.00
525.00
WINDOWS
2"x6" wooden jamb assembly for W-1 w/ a dimension of
2.5m x 1.5m to include mollion partition at 0.60m interval
and transom.
2.00
Sets
3,000.00
30.00
3,030.00
6,060.00
5,050.00
1,010.00
1,010.00
1,010.00
6,060.00
5.00
Sets
1,700.00
17.00
1,717.00
8,585.00
7,154.17
1,430.83
1,430.83
1,430.83
8,585.00
2.00
Sets
2,700.00
20.00
2,720.00
5,440.00
4,533.33
906.67
906.67
906.67
5,440.00
20,085.00
16,737.50
3,347.50
20,085.00
4,800.00
4,400.00
9,200.00
70,680.00
4,800.00
3,200.00
51,379.17
1,200.00
1,200.00
10,775.83
4,800.00
4,400.00
9,200.00
70,680.00
2,525.00
656.50
656.50
505.00
2.02
505.00
50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50
42,083.33
8,206.25
5,470.83
841.67
2,188.33
841.67
59,632.08
8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42
50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50
300.00
200.00
3,000.00
3,000.00
6,000.00
77,558.50
3,000.00
1,875.00
4,875.00
64,507.08
1,125.00
1,125.00
13,051.42
3,000.00
3,000.00
6,000.00
77,558.50
2,525.00
84.17
3,030.00
2,525.00
1,515.00
168.33
151.50
117.83
252.50
202.00
58.92
252.50
505.00
378.75
-
505.00
16.83
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
-
505.00
16.83
505.00
16.83
3,030.00
101.00
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50
Sub-Total
B. Labor ( Installation )
Carpenters
Laborer
8.00
8.00
Day/s
Day/s
2.00
2.00
300.00
275.00
300.00
275.00
Sub-Total
TOTAL FOR DOORS & WINDOWS
VIII. ROOFING
1-foreman,2-carpenter,3-laborer
13 sq.m/day
65.00
1,200.00
1,200.00
1,725.00
3,347.50
3,347.50
9,575.83
9,575.83
8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42
8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42
11,926.42
1,200.00
1,200.00
1,200.00
sq.m.
say
5.00
day
A. Materials
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)
20.00
pcs
15.00
Colorib No. 24, x 8' Pre formed Side Gutter
pcs
10.00
Colorib No. 24, x 8' Pre formed Ridgeroll
pcs
Roof Sealant
2.00
Ltrs
Tex Screw 2 1/2" (for wood)
1,300.00
Pcs.
Blind Rivets 1/8" x 2"
2.00
box
Sub-Total
B. Labor
Carpenters
5.00
Day/s
Laborer
5.00
Day/s
Sub-Total
TOTAL FOR ROOFING
IX. PLUMBING WORKS
1.00
Lot
A. Materials
VII-I Plumbing Fixtuers:
Water closet
2.00
Units
4" x 4" PVC Floor Drain
2.00
Sets
VII-II Sewer Line:
4" x 3.0m dia. PV Pipe
6.00
Length
3" x 3.0m dia. PV Pipe
6.00
Length
2" X 3.0m PV Pipe
6.00
Length
Pcs.
2" dia. X 900 PVC Bend Elbow
4.00
0
Pcs.
4" dia. X 90 PVC Bend Elbow
2.00
Pcs.
4" dia. X 450 PVC Bend Elbow
2.00
4" x 3" Wye
2.00
Pcs.
2" dia. PVC P-Trap
3.00
Pcs.
4" dia.PVC Clean Out Plug
1.00
Pcs.
4" dia.x 4" dia. PVC Wye
2.00
Pcs.
3" dia. X 90deg. PVC elbow
12.00
Pcs.
Solvent Cement
1.00
Pint
VII-III For Water Line:
Sets
Wallhung lavatory with faucet and supply pipe
1.00
2,500.00
650.00
650.00
500.00
2.00
500.00
2.00
3.00
25.00
6.50
6.50
5.00
0.02
5.00
300.00
200.00
1,500.00
50.00
600.00
500.00
300.00
50.00
90.00
70.00
150.00
80.00
70.00
150.00
50.00
450.00
15.00
0.50
6.00
5.00
3.00
0.50
0.90
0.70
1.50
0.80
0.70
1.50
0.50
4.50
-
1,515.00
50.50
3,030.00
101.00
606.00
505.00
303.00
50.50
90.90
70.70
151.50
80.80
70.70
151.50
50.50
454.50
3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50
1,125.00
1,125.00
1,125.00
11,926.42
1,125.00
1,125.00
1,125.00
1,500.00
15.00
1,515.00
1,515.00
1,262.50
252.50
252.50
252.50
1,515.00
5.00
Length
60.00
0.60
60.60
303.00
252.50
50.50
50.50
50.50
303.00
1.00
Pcs.
400.00
4.00
404.00
404.00
336.67
67.33
67.33
67.33
404.00
9.00
Pcs.
10.00
0.10
10.10
90.90
75.75
15.15
15.15
15.15
90.90
2.00
Pcs.
20.00
0.20
20.20
40.40
33.67
6.73
6.73
6.73
40.40
3.00
Pcs.
20.00
0.20
20.20
60.60
50.50
10.10
10.10
10.10
1.00
Pcs.
20.00
0.20
20.20
20.20
16.83
3.37
3.37
3.37
20.20
1.00
Pcs.
200.00
2.00
202.00
202.00
168.33
33.67
33.67
33.67
202.00
3.00
Pcs.
30.00
90.90
15.15
90.90
353.50
95.95
606.00
353.50
2,828.00
383.80
9,696.00
353.50
30,108.10
75.75
2,356.67
319.83
8,080.00
294.58
25,090.08
15.15
350.00
95.00
600.00
350.00
0.30
3.50
0.95
6.00
3.50
30.30
length
pc
pc
pint
471.33
63.97
1,616.00
58.92
5,018.02
471.33
63.97
1,616.00
58.92
5,018.02
2,828.00
383.80
9,696.00
353.50
30,108.10
300.00
275.00
3,000.00
2,750.00
5,750.00
35,858.10
3,000.00
2,000.00
5,000.00
30,090.08
5,018.02
750.00
750.00
5,768.02
3,000.00
2,750.00
5,750.00
35,858.10
25.25
20.20
101.00
252.50
707.00
3,030.00
9,292.00
1,515.00
5,050.00
1,414.00
20,301.00
2,525.00
7,743.33
1,262.50
4,208.33
1,178.33
16,917.50
505.00
1,548.67
252.50
841.67
235.67
3,383.50
3,030.00
9,292.00
1,515.00
5,050.00
1,414.00
20,301.00
300.00
275.00
1,800.00
1,650.00
3,450.00
23,751.00
1,800.00
1,200.00
3,000.00
19,917.50
450.00
450.00
3,833.50
1,800.00
1,650.00
3,450.00
23,751.00
303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00
252.50
147.29
126.25
67.33
7,238.33
757.50
84.17
4,713.33
50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00
Teflon Tape
IX-III For Downspouts:
3" dia. x 3.0m PVC Pipe
3" dia. x 3" PVC Tee
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement
8.00
4.00
16.00
1.00
Sub-Total
B. Labor
Plumber/ Mason
Laborer
5.00
5.00
Day/s
Day/s
2.00
2.00
300.00
275.00
Sub-Total
TOTAL FOR PLUMBING WORKS
X. TILE WORKS
A. Materials
8" x 8" Glazed Tiles
8" x 8" Unglazed Tiles
tile grout
tile frame
Washed Sand
14.56
Pcs.
Pcs.
bags
length
Cu.m.
3.00
3.00
Day/s
Day/s
25.00
20.00
100.00
250.00
700.00
0.25
0.20
1.00
2.50
7.00
2.00
2.00
300.00
275.00
Sub-Total
TOTAL FOR TILEWORKS
XI. ELECTRICAL WORKS
A. Materials
Interior Rough in
2" x 4" Utility Boxes Pvc
4" x 4" Junction Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
750.00
750.00
750.00
5,018.02
505.00
1,548.67
252.50
841.67
235.67
3,383.50
505.00
1,548.67
252.50
841.67
235.67
3,383.50
3,383.50
3,383.50
750.00
750.00
750.00
sq.m.
120.00
460.00
15.00
20.00
2.00
Sub-Total
B. Labor
Mason
Laborer
15.15
471.33
63.97
1,616.00
58.92
5,018.02
60.60
1.00
Lot
12.00
7.00
1.00
1.00
pcs.
pcs.
length
pc.
2.00
30.00
10.00
80.00
box
m
Pcs.
m
25.00
25.00
150.00
80.00
0.25
0.25
1.50
0.80
25.25
25.25
151.50
80.80
4,300.00
30.00
10.00
70.00
43.00
0.30
0.10
0.70
4,343.00
30.30
10.10
70.70
450.00
450.00
450.00
50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
450.00
450.00
450.00
QUANTITY
DESCRIPTION
UNIT COST
Unit
3.00
Pcs.
7.00
2.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00
1.00
assy
set
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
unit
Pcs.
Set
7.00
7.00
Day/s
Day/s
No. of
Crew/
Labor
COST SHARING
TOTAL UNIT
COST
35.35
106.05
3.50
2.50
1.00
1.00
3.00
1.50
0.75
25.00
0.90
5.00
353.50
252.50
101.00
101.00
303.00
151.50
75.75
2,525.00
90.90
505.00
2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00
26,194.35
88.38
2,062.08
420.83
168.33
336.67
1,262.50
883.75
315.63
2,104.17
378.75
420.83
21,828.63
300.00
275.00
2,100.00
1,925.00
4,025.00
2,100.00
1,400.00
3,500.00
525.00
525.00
30,219.35
25,328.63
525.00
4,365.73
303.00
202.00
505.00
606.00
656.50
606.00
50.50
50.50
50.50
50.50
50.50
410.00
20.20
20.20
75.00
70.70
25.00
151.50
909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,640.00
101.00
202.00
300.00
282.80
100.00
303.00
20,856.30
757.50
673.33
3,366.67
4,040.00
3,282.50
2,525.00
84.17
84.17
42.08
42.08
42.08
1,366.67
84.17
168.33
250.00
235.67
83.33
252.50
17,380.25
300.00
275.00
3,600.00
4,950.00
8,550.00
29,406.30
3,600.00
3,600.00
7,200.00
24,580.25
5,000.00
10,000.00
15,000.00
4,166.67
8,333.33
12,500.00
880.00
315.00
90.00
65.65
65.00
880.00
240.00
120.00
75.00
80.00
205.00
140.00
25.00
3,180.65
3,180.65
733.33
262.50
75.00
54.71
54.17
733.33
200.00
100.00
62.50
66.67
170.83
116.67
20.83
2,650.54
2,650.54
693,444.84
577,870.70
62,700.00
84,400.00
840,544.84
840,544.84
62,700.00
61,075.00
701,645.70
701,645.70
350.00
250.00
100.00
100.00
300.00
150.00
75.00
2,500.00
90.00
500.00
Sub-Total
B. Labor
Electrician
Laborer
1.00
1.00
300.00
275.00
Sub-Total
TOTAL FOR ELECTRICAL WORKS
XII. PAINTING WORKS
265.00 sq.m.
1-foreman,2-painter,3-laborer
37.86 sq.m/day
say
7.00
days
A. Materials
Cocrete Putty
3.00
Gals
Concrete Neutralizer
4.00
Gals
Flat Latex White
8.00
Gals
Semi-Gloss Latex White
8.00
Gals
Quick Dry Enamel White
6.00
Gal
Flat Enamel White
5.00
Gals
Latex Tinting Color Rawsienna
2.00
Pints
Latex Tinting Color Red
2.00
Pints
Latex Tinting Color Blue
1.00
Pints
Latex Tinting Color Yellow
1.00
Pints
Latex Tinting Color Green
1.00
Pints
Paint Thinner
4.00
Gal
Sandpaper #100
5.00
shts
Sandpaper #200
10.00
shts
Paint Brush 4"
4.00
pcs
Roller Paint Brush 8" (with tray)
4.00
set
Putty Pallet
4.00
pcs
Body Filler
2.00
Ltrs
Sub-Total
B. Labor
Painter
6.00
Day/s
Laborer
6.00
Day/s
Sub-Total
TOTAL FOR PAINTING
XIII. STEEL BILLBOARD AND ROOF SIGNAGE
1.00
LOT
A. Materials
Supply and Install Roof Signage
1.00
lot
Supply and Install Community Project Steel Billboard
1.00
lot
TOTAL FOR STEEL BILLBOARD, ROOF SIGNAGE AND BUILDING MARKER
XIV. BASIC AMENITIES
Black Board
" thk. X 4' x 8' Marine Plywood
2.00
shts
1" x 2" x 8' s4s Wood Lumber
7.00
bd. ft.
Conc. Nails 4"
1.00
kg
CW Nails 2"
1.00
kg
CW Nails 1"
1.00
kg
Lawanet 6mm thk 4'x8'
2.00
pcs
Painting: Area = 6.71sq.m.
Slating Paint (Premium Quality)
1.50
liters
Flat White QDE (Premium Quality)
1.00
liters
Paint Brush 4"
1.00
pc
Paint Brush 2"
2.00
pcs
Paint Thinner
0.50
gal
Abrassive Paper
4.00
pads
Putty Pallet
1.00
pair
Sub-Total
TOTAL FOR BASIC AMENITIES
Direct Cost Summary
Materials
Labor :
1) Skilled
2) Unskilled
Sub-Total ( A )
TOTAL DIRECT COST
1. OVERHEAD COST
Foreman / Leadman
60
Days
3.00
1.00
1.00
1.00
1.00
10.00
5.00
10.00
1.00
pc
pc
pc
pc
pc
pc
pc
pc
Sets
7.00
14.00
days
sht
12.00
12.00
10.00
5.00
Days
Days
300.00
200.00
500.00
600.00
650.00
600.00
50.00
50.00
50.00
50.00
50.00
410.00
20.00
20.00
75.00
70.00
25.00
150.00
2.00
3.00
3.00
2.00
5.00
6.00
6.50
6.00
0.50
0.50
0.50
0.50
0.50
0.20
0.20
0.70
1.50
300.00
275.00
5,000.00
10,000.00
440.00
45.00
90.00
65.00
65.00
440.00
5,000.00
10,000.00
0.65
160.00
120.00
75.00
40.00
410.00
35.00
25.00
1.00
10.00
10.00
1.00
1.00
pc
pc
440.00
45.00
90.00
65.65
65.00
440.00
160.00
120.00
75.00
40.00
410.00
35.00
25.00
350.00
350.00
TOTAL
KALAHI GRANT
21,000.00
21,000.00
COMMUNITY
INKIND
1,350.00
1,350.00
1,350.00
23,325.00
23,325.00
23,325.00
CASH
4,890.73
30,219.35
3,476.05
3,476.05
3,600.00
4,950.00
8,550.00
29,406.30
833.33
1,666.67
2,500.00
833.33
1,666.67
2,500.00
833.33
1,666.67
2,500.00
5,000.00
10,000.00
15,000.00
146.67
52.50
15.00
10.94
10.83
146.67
40.00
20.00
12.50
13.33
34.17
23.33
4.17
530.11
530.11
146.67
52.50
15.00
10.94
10.83
146.67
40.00
20.00
12.50
13.33
34.17
23.33
4.17
530.11
530.11
146.67
52.50
15.00
10.94
10.83
146.67
40.00
20.00
12.50
13.33
34.17
23.33
4.17
530.11
530.11
880.00
315.00
90.00
65.65
65.00
880.00
240.00
120.00
75.00
80.00
205.00
140.00
25.00
3,180.65
3,180.65
10,000.00
105,574.14
115,574.14
115,574.14
693,444.84
10,000.00
10,000.00
0.00
105,574.14
105,574.14
115,574.14
115,574.14
23,325.00
138,899.14
138,899.14
62,700.00
84,400.00
840,544.84
840,544.84
21,000.00
21,000.00
21,000.00
21,000.00
21,000.00
21,000.00
21,000.00
21,000.00
225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
1,266.67
225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
1,266.67
225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
1,266.67
Recommending Approval:
525.00
3,476.05
2,100.00
1,925.00
4,025.00
3,000.00
3,000.00
1,750.00
700.00
2,450.00
1,750.00
700.00
2,450.00
9,600.00
-
9,600.00
9,600.00
3,000.00
12,600.00
9,600.00
3,000.00
12,600.00
9,600.00
3,000.00
12,600.00
2,000.00
1,250.00
3,250.00
20,000.00
20,000.00
4,000.00
4,000.00
3,375.00
3,375.00
21,010.16
21,010.16
95,285.16
935,830.00
3,000.00
136,576.00
10,000.00
1,750.00
700.00
2,450.00
3,000.00
23,325.00
23,325.00
23,325.00
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
7,600.00
0.00
1,750.00
700.00
2,450.00
333.33
208.33
541.66
666.67
666.67
3,375.00
3,375.00
4,151.86
4,151.86
31,001.86
23,325.00
525.00
525.00
750,879.00
525.00
525.00
935,830.00
106.05
2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00
26,194.35
9,600.00
3,000.00
12,600.00
16,858.30
16,858.30
49,233.30
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
4,365.73
909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,640.00
101.00
202.00
300.00
282.80
100.00
303.00
20,856.30
80.24%
151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
273.33
16.83
33.67
50.00
47.13
16.67
50.50
3,476.05
1,666.67
1,041.67
2,708.34
20,000.00
20,000.00
3,333.33
3,333.33
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
4,365.73
2,000.00
1,250.00
3,250.00
20,000.00
20,000.00
4,000.00
4,000.00
3,375.00
3,375.00
21,010.16
21,010.16
95,285.16
TOTAL
INKIND
151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
273.33
16.83
33.67
50.00
47.13
16.67
50.50
3,476.05
1,750.00
700.00
2,450.00
200.00
250.00
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
4,365.73
CASH
151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
273.33
16.83
33.67
50.00
47.13
16.67
50.50
3,476.05
250.00
50.00
200.00
250.00
INKIND
4,365.73
250.00
50.00
800.00
250.00
CASH
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
7,600.00
TOTAL LCC
(CASH &
INKIND)
MLGU
INKIND
450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00
800.00
250.00
1,125.00
416.67
891.67
316.67
583.33
833.33
1,458.33
291.67
416.67
6,333.33
BLGU
450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00
Prepared by :
SUB-TOTAL LCC
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
0.35
35.00
Approved by :
12,050.00
333.33
208.33
541.67
666.67
666.67
3,375.00
3,375.00
4,151.86
4,151.86
31,001.86
15,050.00
333.33
208.33
541.67
666.67
666.67
3,375.00
3,375.00
4,151.86
4,151.86
46,051.86
12,050.00
146,576.00
38,375.00
184,951.00
Noted by:
ELSA A. TRUNO
RODSON R. ESCORA
CARMEN A. GAUDIANO
REYNALDO DOMIO
GEORGE S. ISULAT
MEO Staff
Municipal Engineer
BSPMC Chairperson
QUANTITY
DESCRIPTION
UNIT COST
Unit
No. of
Crew/
Labor
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
COST SHARING
TOTAL UNIT
COST
SUB-TOTAL LCC
TOTAL
KALAHI GRANT
COMMUNITY
INKIND
BLGU
CASH
MLGU
INKIND
CASH
INKIND
CASH
INKIND
TOTAL LCC
(CASH &
INKIND)
TOTAL
Barangay
Tugawe
Municipality
DAUIN
Sub-project Duration
Province
NEGROS ORIENTAL
SOURCES OF FUNDS
DESCRIPTION
KC Grant:
525,615.30
150,175.80
PACKAGES
PACKAGE ITEMS
75,087.90
TOTAL
QTY
UNIT
TOTAL UNIT
COST
750,879.00
PROC
METHOD
TOTAL
1st Tranche
KC Grant
PACKAGE 1 : HARDWARE
Materials:
Nylon # 16
2.00
Kgs.
353.50
707.00
589.17
Portland Cement
410.00
Bags
252.50
103,525.00
86,270.83
327.00
Length
151.50
49,540.50
41,283.75
7.00
Length
222.20
1,555.40
1,296.17
110.00
Length
373.70
41,107.00
34,255.83
38.00
Length
656.50
24,947.00
20,789.17
3,845.13
1.50
rolls
3,076.10
4,614.15
10.00
Kgs.
70.70
707.00
589.17
3.00
Pcs.
1,212.00
3,636.00
3,030.00
Hacksaw Blade
10.00
Pcs.
60.60
606.00
505.00
47.00
shts.
353.50
16,614.50
13,845.42
2.00
shts
440.00
880.00
733.33
2.00
pcs
440.00
880.00
733.33
1.00
kg
90.00
90.00
75.00
# 4 CWN
45.00
Kgs.
65.65
2,954.25
2,461.88
3" CW Nails
20.00
Kgs.
65.65
1,313.00
1,094.17
#2 CWN
16.00
Kgs.
65.65
1,050.40
875.33
#2-1/2 CWN
15.00
Kgs.
65.65
984.75
820.63
1.00
kg
65.00
65.00
54.17
7.00
Kgs.
65.65
459.55
382.96
4.00
shts.
1,212.00
4,848.00
4,040.00
20.00
Pcs.
50.50
1,010.00
841.67
CW Nails 1"
1/2 " CW Nails
12mm thk. x 1200mm x 2400mm Fiber Cement Board (Fascia Board)
12mm dia. X 7" Machine Bolt w/ Knot and washer
Anti-Termite (e.g. solignum, )
3.00
gal
757.50
2,272.50
1,893.75
2.00
sets
2,929.00
5,858.00
4,881.67
12.00
pc
101.00
1,212.00
1,010.00
4.00
pc
1,515.00
6,060.00
5,050.00
25.25
3,030.00
2,525.00
120.00
Pcs.
460.00
Pcs.
20.20
9,292.00
7,743.33
tile grout
15.00
bags
101.00
1,515.00
1,262.50
tile frame
20.00
length
252.50
5,050.00
4,208.33
2.00
Units
1,515.00
3,030.00
2,525.00
Water closet
Page 64 of 135
S (LSG)
PLUMBING WORKS
PACKAGES
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
PROC
METHOD
TOTAL
1st Tranche
4" x 4" PVC Floor Drain
2.00
Sets
50.50
101.00
84.17
6.00
Length
606.00
3,636.00
3,030.00
6.00
Length
505.00
3,030.00
6.00
Length
303.00
1,818.00
4.00
Pcs.
50.50
202.00
2.00
Pcs.
90.90
181.80
2.00
Pcs.
70.70
141.40
2.00
Pcs.
151.50
303.00
3.00
Pcs.
80.80
242.40
1.00
Pcs.
70.70
70.70
2.00
Pcs.
151.50
303.00
Page 65 of 135
PACKAGE 1
KC Grant
2,525.00
1,515.00
168.33
151.50
117.83
252.50
202.00
58.92
252.50
QTY
UNIT
TOTAL UNIT
COST
PACKAGES
PACKAGE 1
PACKAGE ITEMS
PROC
METHOD
TOTAL
1st Tranche
KC Grant
12.00
Pcs.
50.50
606.00
Solvent Cement
1.00
Pint
454.50
454.50
378.75
1.00
Sets
1,515.00
1,515.00
1,262.50
5.00
Length
60.60
303.00
252.50
1.00
Pcs.
404.00
404.00
336.67
9.00
Pcs.
10.10
90.90
75.75
2.00
Pcs.
20.20
40.40
33.67
3.00
Pcs.
20.20
60.60
50.50
1.00
Pcs.
20.20
20.20
16.83
1.00
Pcs.
202.00
202.00
168.33
Teflon Tape
3.00
Pcs.
30.30
90.90
75.75
8.00
length
353.50
2,828.00
2,356.67
4.00
pc
95.95
383.80
319.83
16.00
pc
606.00
9,696.00
8,080.00
1.00
pint
353.50
353.50
294.58
12.00
pcs.
25.25
303.00
252.50
7.00
pcs.
25.25
176.75
147.29
1.00
length
151.50
151.50
126.25
Screw Insulator
1.00
pc.
80.80
80.80
67.33
2.00
box
4,343.00
8,686.00
7,238.33
505.00
ELECTRICAL WORKS
Electrical Wires
30.00
30.30
909.00
757.50
PVC Clamp
10.00
Pcs.
10.10
101.00
84.17
80.00
70.70
5,656.00
4,713.33
3.00
Pcs.
35.35
106.05
88.38
7.00
assy
353.50
2,474.50
2,062.08
2.00
set
252.50
505.00
420.83
2.00
Pcs.
101.00
202.00
168.33
4.00
Pcs.
101.00
404.00
336.67
5.00
Pcs.
303.00
1,515.00
1,262.50
7.00
Pcs.
151.50
1,060.50
883.75
Female Adoptor
5.00
Pcs.
75.75
378.75
315.63
1.00
unit
2,525.00
2,525.00
2,104.17
5.00
Pcs.
90.90
454.50
378.75
Safety Switch
1.00
Set
505.00
505.00
Electrical Fixtures
Sub-Total
420.83
352,686.45
Cocrete Putty
3.00
Gals
303.00
Concrete Neutralizer
4.00
Gals
202.00
808.00
8.00
Gals
505.00
4,040.00
8.00
Gals
606.00
4,848.00
6.00
Gal
656.50
3,939.00
5.00
Gals
606.00
3,030.00
2.00
Pints
50.50
101.00
2.00
Pints
50.50
101.00
1.00
Pints
50.50
50.50
1.00
Pints
50.50
50.50
Page 66 of 135
909.00
PACKAGE 2
293,905.39
QTY
UNIT
TOTAL UNIT
COST
PROC
METHOD
TOTAL
1.00
Pints
50.50
50.50
Paint Thinner
4.50
Gal
410.00
1,845.00
Sandpaper #100
5.00
shts
20.20
101.00
Sandpaper #200
10.00
shts
20.20
202.00
5.00
pcs
75.00
375.00
2.00
pcs
40.00
80.00
4.00
set
70.70
282.80
Putty Pallet
5.00
pcs
25.00
125.00
Body Filler
2.00
Ltrs
151.50
303.00
1.50
liters
160.00
240.00
1.00
liters
120.00
120.00
Abrassive Paper
4.00
pads
35.00
Sub-Total
1st Tranche
KC Grant
140.00
21,741.30
Page 67 of 135
PACKAGES
PACKAGE 2
PACKAGE ITEMS
PACKAGES
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
TOTAL
PROC
METHOD
1st Tranche
KC Grant
PACKAGE 3: LUMBER
Materials
25- 2" x 2" x 12' Coco Lumber
100.00
Bd. Ft.
25.25
2,525.00
2,104.17
400.00
Bd.Ft
25.25
10,100.00
8,416.67
67.00
Bd.Ft
25.25
1,691.75
1,409.79
7.00
bd. ft.
45.00
315.00
262.50
20.00
Bd. Ft.
40.40
808.00
673.33
250.00
Bd. Ft.
40.40
10,100.00
214.00
Bd. Ft.
40.40
8,645.60
14.00
Bd. Ft.
40.40
565.60
471.33
54.00
Bd. Ft.
40.40
2,181.60
1,818.00
120.00
Bd. Ft.
40.40
4,848.00
4,040.00
65.00
Bd. Ft.
40.40
2,626.00
2,188.33
PACKAGE-3
8,416.67
LSG
7,204.67
32.00
Bd. Ft.
40.40
1,292.80
1,077.33
648.00
Bd. Ft.
70.70
45,813.60
38,178.00
200.00
Bd. Ft.
70.70
Sub-Total
14,140.00
11,783.33
105,652.95
88,044.12
9,258.33
PACKAGE 4: AGGREGATES
PACKAGE-4
Materials:
Filling Materials
20.00
Cu.m
555.50
11,110.00
6.00
Cu.m.
808.00
4,848.00
4,040.00
Washed Sand
35.00
Cu.m.
707.00
24,745.00
20,620.83
Washed Gravel
27.00
Cu.m.
808.00
21,816.00
Pcs
12.12
19,961.64
16,634.70
82,480.64
68,733.86
1,647.00
Sub-Total
LSG
18,180.00
PACKAGE 5: ROOFING
PACKAGE-5
Materials:
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)
20.00
pcs
2,525.00
50,500.00
15.00
pcs
656.50
9,847.50
10.00
pcs
656.50
6,565.00
2.00
Ltrs
505.00
1,010.00
1,300.00
Pcs.
2.02
2,626.00
2.00
box
505.00
Roof Sealant
Tex Screw 2 1/2" (for wood)
Blind Rivets 1/8" x 2"
Sub-Total
LSG
1,010.00
71,558.50
PACKAGE 6: FURNITURE
Materials:
PACKAGE-6
0.9 x2.10m Hard Panel Door Hinge Type w/ Fixed Glass Transom on
50mm x 150mm Wood Jambs/Frames (Tugas or Narra) INSTALLED
sets
7,070.00
14,140.00
2.00
Sets
3,030.00
6,060.00
5.00
Sets
1,717.00
8,585.00
7,154.17
28,785.00
23,987.50
Sub-Total
Page 68 of 135
11,783.33
LSG
5,050.00
PACKAGES
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
PROC
METHOD
TOTAL
1st Tranche
KC Grant
PACKAGE-7
PACKAGE 7: GLASS
Materials:
0.60m x 15 blades jalousie glass with alluminum frame (INSTALLED)
sets
1,515.00
9,090.00
sets
505.00
1,010.00
Sub-Total
LSG
10,100.00
P-8
Sets
2,720.00
Sub-Total
5,440.00
5,440.00
LSG
P-9
1.00
lot
5,000.00
Sub-Total
5,000.00
LSG
5,000.00
P-10
1.00
lot
10,000.00
10,000.00
Sub-Total
10,000.00
693,444.84
8,333.33
LSG
8,333.33
-
483,004.20
CFA
P-11
62,700.00
unskilled
61,075.00
15,569.43
Sub-Total
123,775.00
31,569.43
1,720,223.63
817,219.84
16,000.00
514,573.63
PACKAGE-12
3.00
pc
450.00
1,350.00
1,125.00
Crow Bar
1.00
pc
500.00
500.00
416.67
Wheel Barrow
1.00
pc
1,070.00
1,070.00
891.67
1.00
pc
380.00
380.00
1.00
pc
700.00
700.00
Concrete Pail
10.00
pc
100.00
1,000.00
833.33
Hard hat
5.00
pc
350.00
1,750.00
1,458.33
Hand gloves
10.00
pc
35.00
350.00
291.67
1.00
Sets
500.00
Medicine kit
PACKAGE-13
Sub-Total
316.67
583.33
LSG
500.00
416.67
7,600.00
6,333.34
10.00
pc
200.00
2,000.00
5.00
pc
250.00
1,250.00
Sub-Total
1,666.67
LSG
1,041.66
3,250.00
2,708.33
Overhead
21,000.00
Administrative Cost
20,000.00
Material Testing
4,000.00
Treasurers Bond
2,000.00
CFA
PACKAGE-14
j. Indirect Cost
3,375.00
Contingency
21,010.16
Sub-Total
69,385.16
2,000.00
80,235.16
11,041.67
897,455.00
525,615.30
897,455.00
(0.00)
SAY
%
525,615.30
70.00%
(0.00)
Page 69 of 135
PACKAGES
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
TOTAL
PROC
METHOD
1st Tranche
KC Grant
Checked by:
ANGELITA BRIONES
DOMINGA RODQUILLO
CARMEN A. GAUDIANO
PPT
Municipal Engineer
Page 70 of 135
oposed Sub-Project
: 897,455.00
: 80 C.D.
OURCES OF FUNDS
PERCENTAGE WEIGHT
TOTAL
LCC:
TO KC GRANT
AMOUNT
FUND SOURCE
TO LCC CASH
LEGEND:
KC Cost
750,87
TOTAL LCC :
184,95
102,603.20
628,218.50
70.00
70.00
29,315.20
179,491.00
20.00
20.00
In-kind:
38,37
14,657.60
89,745.50
10.00
10.00
Cash:
146,57
146,576.00
897,455.00
100.00
100.00
TOTAL
935,83
1st Tranche
2nd Tranche
LCC Cash
KC Grant
LCC Cash
REMARKS
3rd Tranche
KC Grant
LCC Cash
TOTAL
KC Grant
-
MONTH
TOTAL
LCC Cash
-
1
-
117.83
589.17
117.83
707.00
17,254.17
86,270.83
17,254.17
103,525.00
8,256.75
41,283.75
8,256.75
49,540.50
259.23
1,296.17
259.23
1,555.40
6,851.17
34,255.83
6,851.17
41,107.00
4,157.83
20,789.17
4,157.83
24,947.00
769.03
3,845.13
769.03
4,614.15
117.83
589.17
117.83
707.00
606.00
3,030.00
606.00
3,636.00
101.00
505.00
101.00
606.00
2,769.08
13,845.42
2,769.08
16,614.50
146.67
733.33
146.67
880.00
146.67
733.33
146.67
880.00
15.00
75.00
15.00
90.00
492.38
2,461.88
492.38
2,954.25
218.83
1,094.17
218.83
1,313.00
175.07
875.33
175.07
1,050.40
164.13
820.63
164.13
984.75
10.83
54.17
10.83
65.00
76.59
382.96
76.59
459.55
808.00
4,040.00
808.00
4,848.00
168.33
841.67
168.33
1,010.00
378.75
1,893.75
378.75
2,272.50
976.33
4,881.67
976.33
5,858.00
202.00
1,010.00
202.00
1,212.00
1,010.00
5,050.00
1,010.00
6,060.00
505.00
2,525.00
505.00
3,030.00
1,548.67
7,743.33
1,548.67
9,292.00
252.50
1,262.50
252.50
1,515.00
841.67
4,208.33
841.67
5,050.00
505.00
2,525.00
Page 71 of 135
505.00
PROPOSED
IMPLEMENTATI
SCHEDULE
3,030.00
1st Tranche
2nd Tranche
LCC Cash
KC Grant
LCC Cash
REMARKS
3rd Tranche
KC Grant
LCC Cash
TOTAL
KC Grant
LCC Cash
MONTH
TOTAL
16.83
84.17
16.83
101.00
606.00
3,030.00
606.00
3,636.00
505.00
2,525.00
505.00
3,030.00
303.00
1,515.00
303.00
1,818.00
33.67
168.33
33.67
202.00
30.30
151.50
30.30
181.80
23.57
117.83
23.57
141.40
50.50
252.50
50.50
303.00
40.40
202.00
40.40
242.40
11.78
58.92
11.78
70.70
50.50
252.50
50.50
303.00
Page 72 of 135
PROPOSED
IMPLEMENTATI
SCHEDULE
1st Tranche
2nd Tranche
LCC Cash
KC Grant
REMARKS
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
MONTH
TOTAL
LCC Cash
101.00
505.00
101.00
606.00
75.75
378.75
75.75
454.50
252.50
1,262.50
252.50
1,515.00
50.50
252.50
50.50
303.00
67.33
336.67
67.33
404.00
15.15
75.75
15.15
90.90
6.73
33.67
6.73
40.40
10.10
50.50
10.10
60.60
3.37
16.83
3.37
20.20
33.67
168.33
33.67
202.00
15.15
75.75
15.15
90.90
471.33
2,356.67
471.33
2,828.00
63.97
319.83
63.97
383.80
1,616.00
8,080.00
1,616.00
9,696.00
58.92
294.58
58.92
353.50
50.50
252.50
50.50
303.00
29.46
147.29
29.46
176.75
25.25
126.25
25.25
151.50
13.47
67.33
13.47
80.80
1,447.67
7,238.33
1,447.67
8,686.00
151.50
757.50
151.50
909.00
16.83
84.17
16.83
101.00
942.67
4,713.33
942.67
5,656.00
17.68
88.38
17.68
106.05
412.42
2,062.08
412.42
2,474.50
84.17
420.83
84.17
505.00
33.67
168.33
33.67
202.00
67.33
336.67
67.33
404.00
252.50
1,262.50
252.50
1,515.00
176.75
883.75
176.75
1,060.50
63.13
315.63
63.13
378.75
420.83
2,104.17
420.83
2,525.00
75.75
378.75
75.75
454.50
84.17
420.83
84.17
505.00
293,905.39
58,781.06
352,686.45
58,781.06
757.50
151.50
757.50
151.50
909.00
673.33
134.67
673.33
134.67
808.00
3,366.67
673.33
3,366.67
673.33
4,040.00
4,040.00
808.00
4,040.00
808.00
4,848.00
3,282.50
656.50
3,282.50
656.50
3,939.00
2,525.00
505.00
2,525.00
505.00
3,030.00
84.17
16.83
84.17
16.83
101.00
84.17
16.83
84.17
16.83
101.00
42.08
8.42
42.08
8.42
50.50
42.08
8.42
42.08
8.42
50.50
Page 73 of 135
PROPOSED
IMPLEMENTATI
SCHEDULE
1st Tranche
2nd Tranche
LCC Cash
KC Grant
REMARKS
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
MONTH
TOTAL
LCC Cash
42.08
8.42
42.08
8.42
50.50
1,537.50
307.50
1,537.50
307.50
1,845.00
84.17
16.83
84.17
16.83
101.00
168.33
33.67
168.33
33.67
202.00
312.50
62.50
312.50
62.50
375.00
66.67
13.33
66.67
13.33
80.00
235.67
47.13
235.67
47.13
282.80
104.17
20.83
104.17
20.83
125.00
252.50
50.50
252.50
50.50
303.00
200.00
40.00
200.00
40.00
240.00
100.00
20.00
100.00
20.00
120.00
116.67
23.33
116.67
23.33
140.00
18,117.75
3,623.55
18,117.75
3,623.55
21,741.30
Page 74 of 135
PROPOSED
IMPLEMENTATI
SCHEDULE
1st Tranche
2nd Tranche
LCC Cash
KC Grant
REMARKS
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
MONTH
TOTAL
LCC Cash
420.83
2,104.17
420.83
2,525.00
1,683.33
8,416.67
1,683.33
10,100.00
281.96
1,409.79
281.96
1,691.75
52.50
262.50
52.50
315.00
134.67
673.33
134.67
808.00
1,683.33
8,416.67
1,683.33
10,100.00
1,440.93
7,204.67
1,440.93
8,645.60
94.27
471.33
94.27
565.60
363.60
1,818.00
363.60
2,181.60
808.00
4,040.00
808.00
4,848.00
437.67
2,188.33
437.67
2,626.00
215.47
1,077.33
215.47
1,292.80
7,635.60
38,178.00
7,635.60
45,813.60
2,356.67
11,783.33
2,356.67
14,140.00
88,044.12
17,608.83
105,652.95
1,851.67
9,258.33
1,851.67
11,110.00
808.00
4,040.00
808.00
4,848.00
4,124.17
20,620.83
4,124.17
24,745.00
3,636.00
18,180.00
3,636.00
21,816.00
3,326.94
16,634.70
3,326.94
19,961.64
68,733.86
13,746.78
82,480.64
17,608.83
13,746.78
42,083.33
8,416.67
42,083.33
8,416.67
50,500.00
8,206.25
1,641.25
8,206.25
1,641.25
9,847.50
5,470.83
1,094.17
5,470.83
1,094.17
6,565.00
841.67
168.33
841.67
168.33
1,010.00
2,188.33
437.67
2,188.33
437.67
2,626.00
841.67
168.33
59,632.08
11,926.42
841.67
168.33
1,010.00
59,632.08
11,926.42
71,558.50
2,356.67
11,783.33
2,356.67
14,140.00
1,010.00
5,050.00
1,010.00
6,060.00
1,430.83
7,154.17
1,430.83
8,585.00
23,987.50
4,797.50
28,785.00
4,797.50
Page 75 of 135
PROPOSED
IMPLEMENTATI
SCHEDULE
1st Tranche
2nd Tranche
LCC Cash
KC Grant
3rd Tranche
LCC Cash
REMARKS
KC Grant
TOTAL
LCC Cash
KC Grant
96,600.84
77,749.83
15,549.97
1,515.00
7,575.00
1,515.00
9,090.00
841.67
168.33
841.67
168.33
1,010.00
8,416.67
1,683.33
8,416.67
1,683.33
10,100.00
4,533.33
906.67
4,533.33
906.67
5,440.00
4,533.33
906.67
4,533.33
906.67
5,440.00
4,166.67
833.33
4,166.67
833.33
5,000.00
4,166.67
833.33
4,166.67
833.33
5,000.00
8,333.33
1,666.67
10,000.00
8,333.33
1,666.67
10,000.00
577,870.70
115,574.14
693,444.84
17,116.67
3,423.33
26,000.00
20,700.00
25,092.64
96,600.84
51,092.64
128,842.47
20,412.93
15,549.97
7,575.00
1,666.67
1,666.67
MONTH
TOTAL
LCC Cash
41,112.93
58,229.60
3,423.33
62,700.00
62,700.00
61,075.00
61,075.00
123,775.00
123,775.00
701,645.70
115,574.14
817,219.84
225.00
1,125.00
225.00
1,350.00
83.33
416.67
83.33
500.00
178.33
891.67
178.33
1,070.00
63.33
316.67
63.33
380.00
116.67
583.33
116.67
700.00
166.67
833.33
166.67
1,000.00
291.67
1,458.33
291.67
1,750.00
58.33
291.67
58.33
350.00
83.33
1,266.66
333.33
208.34
541.67
152.36
666.67
13,765.23
7082.41
83.33
500.00
1,266.66
7,600.00
1,666.67
333.33
2,000.00
1,041.66
208.34
1,250.00
2,708.33
541.67
3,250.00
21,000.00
21,000.00
20,000.00
3,333.33
3,333.33
3,375.00
4,194.03
416.67
6,333.34
18,000.00
666.67
20,000.00
4,000.00
3,375.00
3,375.00
16,858.30
4,151.86
16,858.30
4,151.86
21,010.16
11,234.27
40,191.63
29,193.53
69,385.16
21,333.33
13,765.23
16,858.30
6,002.36
21,333.33
13,765.23
16,858.30
11,234.27
49,233.30
31,001.86
80,235.16
102,603.20
150,175.80
29,315.20
75,087.90
14,657.60
750,879.00
146,576.00
897,455.00
102,603.20
150,175.80
29,315.20
75,087.90
14,657.60
750,879.00
146,576.00
897,455.00
(0.00)
(0.00)
20.00%
-
(0.00)
10.00%
0.00
0.00
Page 76 of 135
PROPOSED
IMPLEMENTATI
SCHEDULE
1st Tranche
LCC Cash
2nd Tranche
KC Grant
Reviewed by:
LCC Cash
REMARKS
3rd Tranche
KC Grant
TOTAL
LCC Cash
Submitted by:
KC Grant
LCC Cash
TOTAL
PROPOSED
IMPLEMENTATI
SCHEDULE
MONTH
1
Noted by:
RODSON R. ESCORA
REYNALDO DOMIO
GEORGE S. ISULAT
BSMPC
Page 77 of 135
AMOUNT
(PESO)
750,879.00
184,951.00
38,375.00
146,576.00
935,830.00
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 78 of 135
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 79 of 135
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 80 of 135
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 81 of 135
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 82 of 135
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 83 of 135
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
2
Page 84 of 135
:
:
Barangay
Municipality
DAUIN
Sub-project Duration
Province
NEGROS ORIENTAL
SOURCES OF FUNDS
DESCRIPTION
PACKAGES
PACKAGE ITEMS
KC Grant:
525,615.30
150,175.80
75,087.90
TOTAL
QTY
UNIT
TOTAL UNIT
COST
750,879.00
PROC
METHOD
TOTAL
1st Tranche
KC Grant
PACKAGE 1 : HARDWARE
Materials:
Nylon # 16
2.00
Kgs.
285.00
570.00
475.00
Portland Cement
410.00
Bags
250.00
102,500.00
85,416.67
327.00
Length
128.00
41,856.00
34,880.00
7.00
Length
185.00
1,295.00
1,079.17
110.00
Length
324.50
35,695.00
29,745.83
38.00
Length
520.00
19,760.00
16,466.67
1.50
rolls
1,530.00
2,295.00
1,912.50
10.00
Kgs.
50.00
500.00
416.67
3.00
Pcs.
1,095.00
3,285.00
2,737.50
Hacksaw Blade
10.00
Pcs.
40.00
400.00
333.33
47.00
shts.
356.00
16,732.00
13,943.33
2.00
shts
425.00
850.00
708.33
2.00
pcs
210.00
420.00
350.00
1.00
kg
85.00
85.00
70.83
# 4 CWN
45.00
Kgs.
44.00
1,980.00
1,650.00
3" CW Nails
20.00
Kgs.
45.00
900.00
750.00
#2 CWN
16.00
Kgs.
48.00
768.00
640.00
#2-1/2 CWN
15.00
Kgs.
48.00
720.00
600.00
1.00
kg
52.00
52.00
43.33
CW Nails 1"
1/2 " CW Nails
12mm thk. x 1200mm x 2400mm Fiber Cement Board (Fascia Board)
12mm dia. X 7" Machine Bolt w/ Knot and washer
7.00
Kgs.
50.00
350.00
291.67
4.00
shts.
350.00
1,400.00
1,166.67
20.00
Pcs.
35.00
700.00
583.33
3.00
gal
1,065.00
3,195.00
2,662.50
2.00
sets
1,850.00
3,700.00
3,083.33
12.00
pc
50.00
600.00
500.00
4.00
pc
850.00
3,400.00
2,833.33
Pcs.
15.50
1,860.00
1,550.00
TILEWORKS
120.00
460.00
Pcs.
16.00
7,360.00
6,133.33
tile grout
15.00
bags
55.00
825.00
687.50
tile frame
20.00
length
30.00
600.00
500.00
2.00
Units
3,140.00
6,280.00
5,233.33
PLUMBING WORKS
Water closet
2.00
Sets
10.00
20.00
16.67
6.00
Length
540.00
3,240.00
2,700.00
6.00
Length
410.00
2,460.00
6.00
Length
185.00
1,110.00
GOODS (LSG)
2,050.00
925.00
4.00
Pcs.
20.40
81.60
2.00
Pcs.
61.20
122.40
2.00
Pcs.
46.90
93.80
2.00
Pcs.
90.00
180.00
3.00
Pcs.
63.25
189.75
1.00
Pcs.
47.95
47.95
PACKAGE 1
68.00
102.00
78.17
150.00
158.13
39.96
2.00
Pcs.
97.95
195.90
12.00
Pcs.
36.75
441.00
Solvent Cement
1.00
Pint
172.85
172.85
144.04
1.00
Sets
1,485.00
1,485.00
1,237.50
5.00
Length
53.20
266.00
221.67
1.00
Pcs.
200.00
200.00
166.67
9.00
Pcs.
4.00
36.00
30.00
2.00
Pcs.
6.75
13.50
11.25
3.00
Pcs.
9.25
27.75
23.13
1.00
Pcs.
7.85
7.85
6.54
1.00
Pcs.
135.00
135.00
112.50
Teflon Tape
3.00
Pcs.
13.50
40.50
33.75
8.00
length
410.00
3,280.00
2,733.33
163.25
367.50
4.00
pc
65.00
260.00
216.67
16.00
pc
36.75
588.00
490.00
1.00
pint
172.85
172.85
144.04
ELECTRICAL WORKS
12.00
pcs.
22.50
270.00
225.00
7.00
pcs.
27.50
192.50
160.42
1.00
length
60.00
60.00
50.00
Screw Insulator
1.00
pc.
16.50
16.50
13.75
Electrical Wires
2.00
box
3,400.00
6,800.00
5,666.67
30.00
20.00
600.00
500.00
PVC Clamp
10.00
Pcs.
1.50
15.00
12.50
80.00
8.50
680.00
566.67
3.00
Pcs.
22.50
67.50
56.25
Electrical Fixtures
7.00
assy
265.00
1,855.00
2.00
set
46.50
93.00
77.50
2.00
Pcs.
87.50
175.00
145.83
4.00
Pcs.
58.00
232.00
193.33
5.00
Pcs.
87.50
437.50
364.58
7.00
Pcs.
30.00
210.00
175.00
Female Adoptor
5.00
Pcs.
22.50
112.50
93.75
1.00
unit
1,300.00
1,300.00
1,083.33
5.00
Pcs.
35.00
175.00
145.83
Safety Switch
1.00
Set
345.00
345.00
Sub-Total
1,545.83
287.50
289,437.20
63,249.25
52,707.71
352,686.45
293,905.39
Cocrete Putty
3.00
Gals
310.00
930.00
Concrete Neutralizer
4.00
Gals
195.00
780.00
8.00
Gals
415.00
3,320.00
8.00
Gals
580.00
4,640.00
6.00
Gal
565.00
3,390.00
5.00
Gals
510.00
2,550.00
2.00
Pints
50.00
100.00
2.00
Pints
60.00
120.00
1.00
Pints
55.00
55.00
1.00
Pints
65.00
65.00
1.00
Pints
55.00
55.00
PACKAGE 2
241,197.68
4.50
Gal
294.50
Sandpaper #100
5.00
shts
16.50
82.50
Sandpaper #200
10.00
shts
16.50
165.00
5.00
pcs
65.00
325.00
2.00
pcs
30.00
60.00
4.00
set
80.00
320.00
Putty Pallet
5.00
pcs
25.00
125.00
Body Filler
2.00
Ltrs
160.00
320.00
1.50
liters
214.00
321.00
1.00
liters
565.00
565.00
Abrassive Paper
4.00
pads
8.50
Sub-Total
1,325.25
LOCAL SHOPPING F
PACKAGE
Paint Thinner
34.00
19,647.75
2,093.55
21,741.30
PACKAGE 3: LUMBER
Materials
25- 2" x 2" x 12' Coco Lumber
100.00
Bd. Ft.
17.50
1,750.00
1,458.33
400.00
Bd.Ft
17.50
7,000.00
5,833.33
67.00
Bd.Ft
17.50
1,172.50
977.08
7.00
bd. ft.
50.00
350.00
291.67
20.00
Bd. Ft.
250.00
Bd. Ft.
214.00
Bd. Ft.
14.00
Bd. Ft.
54.00
Bd. Ft.
120.00
Bd. Ft.
65.00
Bd. Ft.
32.00
Bd. Ft.
648.00
Bd. Ft.
36.20
23,457.60
200.00
Bd. Ft.
36.20
7,240.00
6,033.33
Sub-Total
40,970.10
34,141.74
64,682.85
53,902.38
105,652.95
88,044.12
PACKAGE-3
LSG
19,548.00
PACKAGE 4: AGGREGATES
PACKAGE-4
Materials:
Filling Materials
20.00
Cu.m
225.00
4,500.00
3,750.00
6.00
Cu.m.
600.00
3,600.00
3,000.00
Washed Sand
35.00
Cu.m.
400.00
14,000.00
Washed Gravel
27.00
Cu.m.
600.00
16,200.00
7.50
12,352.50
1,647.00
Pcs
11,666.67
LSG
13,500.00
10,293.75
Sub-Total
50,652.50
31,828.14
42,210.41
26,523.45
82,480.64
68,733.86
PACKAGE 5: ROOFING
PACKAGE-5
Materials:
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)
20.00
pcs
1,330.00
26,600.00
15.00
pcs
510.00
7,650.00
10.00
pcs
510.00
5,100.00
2.00
Ltrs
395.00
790.00
1,300.00
Pcs.
1.50
1,950.00
2.00
box
275.00
550.00
Roof Sealant
Tex Screw 2 1/2" (for wood)
Blind Rivets 1/8" x 2"
LSG
Sub-Total
42,640.00
28,918.50
71,558.50
PACKAGE 6: FURNITURE
Materials:
KAGE-6
0.9 x2.10m Hard Panel Door Hinge Type w/ Fixed Glass Transom on
50mm x 150mm Wood Jambs/Frames (Tugas or Narra) INSTALLED
sets
7,800.00
15,600.00
13,000.00
LSG
PACKAGE-6
2.00
Sets
2,550.00
5,100.00
5.00
Sets
1,600.00
8,000.00
LSG
4,250.00
6,666.67
Sub-Total
28,700.00
85.00
23,916.67
70.83
28,785.00
23,987.50
PACKAGE-7
PACKAGE 7: GLASS
Materials:
0.60m x 15 blades jalousie glass with alluminum frame (INSTALLED)
sets
796.60
4,779.60
sets
590.00
1,180.00
LSG
Sub-Total
5,959.60
4,140.40
10,100.00
P-8
Sets
2,720.00
Sub-Total
5,440.00
5,440.00
LSG
5,440.00
P-9
1.00
lot
5,000.00
Sub-Total
5,000.00
LSG
5,000.00
5,000.00
Variation Order
P-10
1.00
lot
8,500.00
8,500.00
LSG
7,083.33
Sub-Total
8,500.00
1,500.00
7,083.33
1,250.00
10,000.00
8,333.33
Aggregates
Sand (Approved Source)
5.00
Cu.m.
500.00
Sub-Total
2,500.00
LSG
2,500.00
Hardware
Materials:
Variation Order
25.00
length
145.00
3,625.00
5.00
kgs
75.00
375.00
2.00
pcs
80.00
160.00
5.00
gal.
885.00
4,425.00
Steel Brush
5.00
pcs
35.00
175.00
4.00
pcs
65.00
260.00
1.00
unit
450.00
450.00
2.00
pcs
265.00
530.00
1.00
pcs
265.00
Sub-Total
LSG
265.00
10,265.00
Trusses
Materials:
a.) Trusses: (7 units)
1.5mmx2"x6"x6m Cee-Purlins
12.00
lght
795.00
9,540.00
8.00
pcs
135.00
1,080.00
8.00
pcs
85.00
680.00
2.00
boxes
350.00
700.00
Variation Order
2.00
boxes
265.00
530.00
10.00
kilo
130.00
1,300.00
3.00
gal
775.00
2,325.00
rust converter
2.00
gal
325.00
650.00
lacquer thinner
1.00
gal
410.00
410.00
Welding Rod
LSG
Variat
b.) Purlins
26.00
lgth
525.00
13,650.00
1.00
lgth
975.00
975.00
3.00
lgth
975.00
2,925.00
6.00
lght
665.00
3.00
lght
420.00
3,990.00
1,260.00
Sub-Total
40,015.00
496,947.15
348,549.83
Skilled
62,700.00
unskilled
61,075.00
Sub-Total
123,775.00
Savings amount determined after procurement
CFA
P-11
16,000.00
123,775.00
31,569.43
1,720,223.63
620,722.15
380,119.26
PACKAGE-12
3.00
pc
250.00
750.00
625.00
Crow Bar
1.00
pc
325.00
325.00
270.83
Wheel Barrow
1.00
pc
1,945.00
1,945.00
1,620.83
1.00
pc
320.00
320.00
1.00
pc
1,350.00
1,350.00
Concrete Pail
10.00
pc
45.00
450.00
375.00
Hard hat
5.00
pc
90.00
450.00
375.00
Hand gloves
10.00
pc
16.00
160.00
133.33
1.00
Sets
1,750.00
1,750.00
1,458.33
PACKAGE-13
Medicine kit
266.67
1,125.00
LSG
Sub-Total
7,500.00
100.00
6,250.00
83.34
7,600.00
6,333.34
10.00
pc
216.00
2,160.00
Barricades
5.00
pc
216.00
1,080.00
Sub-Total
1,800.00
LSG
899.99
3,240.00
2,708.33
10.00
3,250.00
2,708.33
Overhead
21,000.00
Administrative Cost
20,000.00
Material Testing
4,000.00
6,000.00
Treasurers Bond
3,375.00
2,000.00
CFA
PACKAGE-14
j. Indirect Cost
4,800.00
Contingency
Sub-Total
54,375.00
6,800.00
65,115.00
15,120.16
(4,716.66)
80,235.16
11,041.67
143,827.69
134,537.71
685,837.15
395,877.60
897,455.00
SAY
211,617.85
15,758.33
525,615.30
70.00%
Checked by:
ANGELITA BRIONES
DOMINGA RODQUILLO
CARMEN A. GAUDIANO
PPT
Municipal Engineer
sed Sub-Project
: 897,455.00
: 80 C.D.
RCES OF FUNDS
PERCENTAGE WEIGHT
TOTAL
LCC:
TO KC GRANT
AMOUNT
(PESO)
FUND SOURCE
TO LCC CASH
LEGEND:
KC Cost
750,879.00
102,603.20
628,218.50
70.00
70.00
29,315.20
179,491.00
20.00
20.00
TOTAL LCC :
In-kind:
184,951.00
38,375.00
14,657.60
89,745.50
10.00
10.00
Cash:
146,576.00
146,576.00
897,455.00
100.00
100.00
TOTAL
935,830.00
1st Tranche
2nd Tranche
LCC Cash
KC Grant
LCC Cash
REMARKS
3rd Tranche
KC Grant
LCC Cash
TOTAL
KC Grant
-
MONTH
TOTAL
LCC Cash
-
1
-
95.00
475.00
95.00
570.00
17,083.33
85,416.67
17,083.33
102,500.00
6,976.00
34,880.00
6,976.00
41,856.00
215.83
1,079.17
215.83
1,295.00
5,949.17
29,745.83
5,949.17
35,695.00
3,293.33
16,466.67
3,293.33
19,760.00
382.50
1,912.50
382.50
2,295.00
83.33
416.67
83.33
500.00
547.50
2,737.50
547.50
3,285.00
66.67
333.33
66.67
400.00
2,788.67
13,943.33
2,788.67
16,732.00
141.67
708.33
141.67
850.00
70.00
350.00
70.00
420.00
14.17
70.83
14.17
85.00
330.00
1,650.00
330.00
1,980.00
150.00
750.00
150.00
900.00
128.00
640.00
128.00
768.00
120.00
600.00
120.00
720.00
8.67
43.33
8.67
52.00
58.33
291.67
58.33
350.00
233.33
1,166.67
233.33
1,400.00
116.67
583.33
116.67
700.00
532.50
2,662.50
532.50
3,195.00
616.67
3,083.33
616.67
3,700.00
100.00
500.00
100.00
600.00
566.67
2,833.33
566.67
3,400.00
310.00
1,550.00
310.00
1,860.00
1,226.67
6,133.33
1,226.67
7,360.00
137.50
687.50
137.50
825.00
100.00
500.00
100.00
600.00
1,046.67
5,233.33
1,046.67
PROPOSED
IMPLEMENTATION
SCHEDULE
6,280.00
3.33
16.67
3.33
20.00
540.00
2,700.00
540.00
3,240.00
410.00
2,050.00
410.00
2,460.00
185.00
925.00
185.00
1,110.00
13.60
68.00
13.60
81.60
20.40
102.00
20.40
122.40
15.63
78.17
15.63
93.80
30.00
150.00
30.00
180.00
31.63
158.13
31.63
189.75
7.99
39.96
7.99
47.95
32.65
163.25
32.65
195.90
73.50
367.50
73.50
441.00
28.81
144.04
28.81
172.85
247.50
1,237.50
247.50
1,485.00
44.33
221.67
44.33
266.00
33.33
166.67
33.33
200.00
6.00
30.00
6.00
36.00
2.25
11.25
2.25
13.50
4.63
23.13
4.63
27.75
1.31
6.54
1.31
7.85
22.50
112.50
22.50
135.00
6.75
33.75
6.75
40.50
546.67
2,733.33
546.67
3,280.00
43.33
216.67
43.33
260.00
98.00
490.00
98.00
588.00
28.81
144.04
28.81
172.85
45.00
225.00
45.00
270.00
32.08
160.42
32.08
192.50
10.00
50.00
10.00
60.00
2.75
13.75
2.75
16.50
1,133.33
5,666.67
1,133.33
6,800.00
100.00
500.00
100.00
600.00
2.50
12.50
2.50
15.00
113.33
566.67
113.33
680.00
11.25
56.25
11.25
67.50
309.17
1,545.83
309.17
15.50
77.50
15.50
1,855.00
93.00
29.17
145.83
29.17
175.00
38.67
193.33
38.67
232.00
72.92
364.58
72.92
437.50
35.00
175.00
35.00
210.00
18.75
93.75
18.75
112.50
216.67
1,083.33
216.67
1,300.00
29.17
145.83
29.17
175.00
57.50
287.50
57.50
345.00
241,197.68
48,239.51
289,437.20
48,239.51
10,541.54
52,707.71
10,541.54
63,249.25
58,781.06
293,905.39
58,781.06
352,686.45
775.00
155.00
775.00
155.00
930.00
650.00
130.00
650.00
130.00
780.00
2,766.67
553.33
2,766.67
553.33
3,320.00
3,866.67
773.33
3,866.67
773.33
4,640.00
2,825.00
565.00
2,825.00
565.00
3,390.00
2,125.00
425.00
2,125.00
425.00
2,550.00
83.33
16.67
83.33
16.67
100.00
100.00
20.00
100.00
20.00
120.00
45.83
9.17
45.83
9.17
55.00
54.17
10.83
54.17
10.83
65.00
45.83
9.17
45.83
9.17
55.00
1,104.38
220.88
1,104.38
220.88
1,325.25
68.75
13.75
68.75
13.75
82.50
137.50
27.50
137.50
27.50
165.00
270.83
54.17
270.83
54.17
325.00
50.00
10.00
50.00
10.00
60.00
266.67
53.33
266.67
53.33
320.00
104.17
20.83
104.17
20.83
125.00
266.67
53.33
266.67
53.33
320.00
267.50
53.50
267.50
53.50
321.00
470.83
94.17
470.83
94.17
565.00
28.33
5.67
28.33
5.67
34.00
16,373.13
3,274.63
16,373.13
3,274.63
19,647.75
1,744.63
348.93
1,744.63
348.93
2,093.55
18,117.75
3,623.55
18,117.75
3,623.55
21,741.30
291.67
1,458.33
291.67
1,750.00
1,166.67
5,833.33
1,166.67
7,000.00
195.42
977.08
195.42
1,172.50
58.33
291.67
58.33
350.00
3,909.60
19,548.00
3,909.60
1,206.67
6,033.33
1,206.67
23,457.60
7,240.00
6,828.35
34,141.74
6,828.35
40,970.10
10,780.48
53,902.38
10,780.48
64,682.85
17,608.83
88,044.12
17,608.83
105,652.95
750.00
3,750.00
750.00
4,500.00
600.00
3,000.00
600.00
3,600.00
2,333.33
11,666.67
2,333.33
14,000.00
2,700.00
13,500.00
2,700.00
16,200.00
2,058.75
10,293.75
2,058.75
12,352.50
8,442.09
42,210.41
8,442.09
50,652.50
5,304.69
26,523.45
5,304.69
31,828.14
13,746.78
68,733.86
13,746.78
82,480.64
22,166.67
4,433.33
22,166.67
4,433.33
26,600.00
6,375.00
1,275.00
6,375.00
1,275.00
7,650.00
4,250.00
850.00
4,250.00
850.00
5,100.00
658.33
131.67
658.33
131.67
790.00
1,625.00
325.00
1,625.00
325.00
1,950.00
458.33
91.67
458.33
91.67
550.00
35,533.33
7,106.67
35,533.33
7,106.67
42,640.00
24,098.75
4,819.75
24,098.75
4,819.75
28,918.50
59,632.08
11,926.42
59,632.08
11,926.42
71,558.50
2,600.00
13,000.00
2,600.00
15,600.00
850.00
4,250.00
850.00
5,100.00
1,333.33
6,666.67
1,333.33
8,000.00
28,700.00
4,783.33
23,916.67
4,783.33
14.17
70.83
14.17
85.00
4,797.50
23,987.50
4,797.50
28,785.00
3,983.00
796.60
3,983.00
796.60
4,779.60
983.33
196.67
983.33
196.67
1,180.00
4,966.33
993.27
4,966.33
993.27
5,959.60
3,450.33
690.07
3,450.33
690.07
4,140.40
8,416.67
1,683.33
8,416.67
1,683.33
10,100.00
4,533.33
906.67
4,533.33
906.67
5,440.00
4,533.33
906.67
4,533.33
906.67
5,440.00
4,533.33
906.67
4,533.33
906.67
5,440.00
4,166.67
833.33
4,166.67
833.33
5,000.00
4,166.67
833.33
4,166.67
833.33
5,000.00
4,166.67
833.33
1,416.67
4,166.67
833.33
5,000.00
7,083.33
1,416.67
8,500.00
8,500.00
1,416.67
7,083.33
1,416.67
250.00
1,250.00
250.00
1,500.00
1,666.67
8,333.33
1,666.67
10,000.00
2,083.33
416.67
2,083.33
416.67
2,500.00
2,083.33
416.67
2,083.33
416.67
2,500.00
3,020.83
604.17
3,020.83
604.17
3,625.00
312.50
62.50
312.50
62.50
375.00
133.33
26.67
133.33
26.67
160.00
3,687.50
737.50
3,687.50
737.50
4,425.00
145.83
29.17
145.83
29.17
175.00
216.67
43.33
216.67
43.33
260.00
375.00
75.00
375.00
75.00
450.00
441.67
88.33
441.67
88.33
530.00
220.83
44.17
220.83
44.17
265.00
8,554.17
1,710.83
8,554.17
1,710.83
10,265.00
7,950.00
1,590.00
7,950.00
1,590.00
9,540.00
900.00
180.00
900.00
180.00
1,080.00
566.67
113.33
566.67
113.33
680.00
583.33
116.67
583.33
116.67
700.00
441.67
88.33
441.67
88.33
530.00
1,083.33
216.67
1,083.33
216.67
1,300.00
1,937.50
387.50
1,937.50
387.50
2,325.00
541.67
108.33
541.67
108.33
650.00
341.67
68.33
341.67
68.33
410.00
UDIANO
69,709.97
51,906.46
10,381.29
11,375.00
2,275.00
13,650.00
162.50
812.50
162.50
975.00
487.50
2,437.50
487.50
69,709.97
665.00
3,325.00
665.00
1,050.00
210.00
1,050.00
210.00
1,260.00
33,345.83
6,669.17
33,345.83
6,669.17
40,015.00
13,666.33
2,733.27
414,122.63
82,824.53
496,947.15
3,990.00
26,000.00
20,700.00
62,700.00
25,092.64
20,412.93
61,075.00
61,075.00
123,775.00
123,775.00
51,092.64
2,925.00
3,325.00
2,275.00
812.50
2,437.50
11,375.00
-
51,092.64
102,999.10
41,112.93
10,381.29
41,112.93
54,779.26
2,733.27
123,775.00
62,700.00
123,775.00
537,897.63
82,824.53
620,722.15
125.00
625.00
125.00
750.00
54.17
270.83
54.17
325.00
324.17
1,620.83
324.17
1,945.00
53.33
266.67
53.33
320.00
225.00
1,125.00
225.00
1,350.00
75.00
375.00
75.00
450.00
75.00
375.00
75.00
450.00
26.67
133.33
26.67
160.00
1,458.33
291.67
1,750.00
1,250.00
291.67
-
6,250.00
1,250.00
7,500.00
16.66
83.34
16.66
100.00
1,266.66
6,333.34
1,266.66
7,600.00
360.00
1,800.00
360.00
2,160.00
180.01
899.99
180.01
1,080.00
2,708.33
541.67
3,240.00
541.67
541.67
152.36
666.67
13,765.23
2,708.33
7082.41
10.00
541.67
3,250.00
21,000.00
21,000.00
18,000.00
20,000.00
3,333.33
3,333.33
666.67
4,000.00
4,800.00
1,200.00
6,000.00
1,200.00
3,375.00
20,000.00
3,375.00
3,375.00
16,858.30
4,151.86
16,858.30
4,151.86
21,010.16
5,394.03
21,333.33
13,765.23
16,858.30
11,234.27
44,991.63
30,393.53
75,385.16
6,002.36
21,333.33
13,765.23
16,858.30
11,234.27
53,949.96
32,185.20
86,125.16
(4,716.66)
(1,183.34)
(5,890.00)
6,002.36
21,333.33
13,765.23
16,858.30
11,234.27
49,233.30
31,001.86
80,235.16
26,907.53
25,843.38
5,168.68
3,450.33
690.07
163,831.42
32,766.28
196,607.69
75,712.33
124,332.43
24,146.52
71,637.57
13,967.53
591,847.58
115,009.73
706,847.31
102,603.20
150,175.80
29,315.20
75,087.90
14,657.60
750,879.00
146,576.00
897,455.00
20.00%
10.00%
Reviewed by:
Submitted by:
RODSON R. ESCORA
REYNALDO DOMIO
BSMPC
AMOUNT
(PESO)
750,879.00
184,951.00
38,375.00
146,576.00
935,830.00
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
3
MARIBEL MAGALSO
Barangay Treasurer
Unit
used
No. of
Units
Per Unit
Cost
Total Sub-Project
Pro-posed
Cost
Amount of Grant
1,380.00
2,600.00
4,600.00
1,750.00
630.00
3,040.00
6,000.00
20,000.00
1,380.00
2,600.00
4,600.00
1,750.00
630.00
3,040.00
6,000.00
20,000.00
21,000.00
7,600.00
2,450.00
12,600.00
3,250.00
4,000.00
3,375.00
21,010.16
75,285.16
16,858.30
29,233.31
147,100.00
693,444.84
840,544.84
935,830.00
123,775.00
577,870.70
701,645.70
750,879.01
0.00
0.00
935,830.00
0.00
750,879.01
6,333.33
2,708.34
3,333.33
MC Form No. 3
DSS: MCC PROJECT
PART CONTRIBUTION PLAN
angay Tugawe
cipality of Dauin
Oriental, Region VII, Philippines
Mun LGU
0.00
21,000.00
1,266.67
2,450.00
9,600.00
541.66
666.67
3,375.00
4,151.86
43,051.85
0.00
0.00
0.00
0.00
3,000.00
3,000.00
0.00
105,574.14
105,574.14
148,625.99
10,000.00
10,000.00
13,000.00
23,325.00
23,325.00
23,325.00
0.00
0.00
0.00
148,625.99
0.00
13,000.00
0.00
23,325.00
0.00
0.00
0.00
0.00
184,950.99
Approved by:
REYNALDO DOMIO
BSPMC Chairperson
June 4, 2014
June 7, 2014
-do-
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
Procurement Activities
Package 1: Hardware
Package 4: Aggregates
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
Package 6: Furniture
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
July 7, 2014
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
Package 5: Roofing
July 7, 2014
Package 7: Glass
July 7, 2014
Felix Savillano, Erick Adora, Cristituta Rigon PT, Ricky T. Panoy- ACT-CF
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
7: Opening of Canvass
-do-
July 9, 2014
-do-
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
9. Evaluation of Canvass
July 9, 2014
-do-
-do-
-do-
-do-
Procurement Activities
Package 2: Painting Works, Package 5: Roofing,
Package 7: Glass, Package 8: Window Grills,
Package 9: Roof Signage
Timeline to complete
the activity (Inclusive
Dates)
July 12, 2014
August 1, 2014
-do-
Prepared by:
Reviewed & Checked by:
ANGELITA BRIONES
PT Chairperson
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
POW/Detailed
Estimates
Draft PCPP
Final PCPP
Final PCPP
Conference Conducted
Office supplies
Minutes of Conference
Invitation to Bid/Bid
Documents
Supplier's Office,
Establishment
Supplier's: Zenith
Commercials, Golden Rule,
Octagon Hardware
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Supplier's: Gold
Enterprises, Lucky
Enterprises, JM
Commercials
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Supplier's: Alagasi's
Welding Shop, Zamora
Welding Shop, Orient Pearl
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Supplier's: Earthworks,
Dumaguete Painthaus, JB
Marketing
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Supplier's: Alagasi's
Welding Shop, Zamora
Welding Shop, Orient Pearl
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Supplier's Office,
Establishment
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Canvass
Form/Request for
Qoutation,
Acknowledgement
Receipt
Canvass Form/Request
for Qoutation Served,
Signed AR
Submitted Canvass
Form/Request for
Qoutation
Abstract of Canvass
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Office Supplies
Minutes of Opening
Office Supplies
Submitted Canvass
Form/Request for
Quotation
Minutes of Evaluation
Submitted Canvass
Form/Request for
Quotation
Minutes of Evaluation
Submitted Canvass
Form/Request for
Quotation
Abstract of Canvass
Submitted Canvass
Form/Request for
Quotation
Abstract of Canvass
Abstract of Canvass
Purchased Order
Abstract of Canvass
Purchased Order
Purchased Order
Approved Purchased
Order
Name of Potential
Suppliers Contractors
Supplier's Office,
Establishment
Resources
Requirement
Purchased Order
Expected outputs/
Remarks
Approved Purchased
Order
Purchased Order
Approved Purchased
Order
Supplier's Office,
Establishment
Project Site
Delivery
Receipt/Delivered
Goods
Goods Received
Project Site
Delivery
Receipt/Delivered
Goods
Goods Received
Project Site
Notice to Commence
Mobilization Started
Noted by:
Approved by:
REYNALDO DOMIO
BSPMC Chairperson
:
:
:
Local Counterpart :
KALAHI Grant
Community
Barangay LGU
Municipal LGU
TOTAL
II
III
Siteworks
STRUCTURAL CONCRETE
PHP
PHP
PHP
PHP
PHP
Negative Impact
Mitigati
a.
Deep Excavation/Ground
Leveling
a-1.
b.
Backfilling of Excavated
Materials
b-1.
c.
a.
a-1.
b.
Construction Waste
b-1.
a.
Negative Impact
Mitigati
IV
MASONRY WORKS
a.
a.
a-1.
VI
a.
a-1.
VII
TILEWORKS
a.
VIII
IX
X
XI
XII
XIII
XIV
a.
none
a-1.
none
none
none
Increase Hazard due to live
and high voltage current
a-1.
none
none
none
Reviewed by:
Prepared By:
REYNALDO DOMIO
BSPMC Chair
Concurred by:
CARMEN A. GAUDIANO
Municipal Engineer
struction of 1 Unit ( 7.0m x 9.0m ) Classroom Building with CR, ceiling, tiles,
bing fixtures , electrical fixtures, paintings and basic amenities.
750,879.00
23,325.00
13,000.00
148,626.00
935,830.00
Mitigating Measures
Provide baricades and warning signs
to make aware of the community of
the on-going activity. And Strickly
follow the desired elevation on plan.
Provide workers Dust Mask during
execution of work to prevent workers
from inhailing dust particles.
Replace cut-down trees with new tree
seedlings within the vicinity
Mitigating Measures
Workers must wear Hardhats and
Safety Boots on Site, removal of
scaffoldings must be placed on
designated areas to prevent workers
from injuries.
Provide workers Dust Mask during
execution of work to prevent workers
from inhailing dust particles.
none
none
none
Provide safety equipment and
appropriate warning signs along the
construction sites.
none
none
none
SIMPLICIO SUAYBAGUIO
Community Facilitator
RODSON R. ESCORA
Deputy Area Coordinator
Destination/Description
Fare/
Allowance/
Unit Price
Qty.
Unit
pesos
No of
transactions
1 times
40.00
persons x
1 times
30.00
60.00
x
x
2
2
persons x
persons x
1 times
2 times
=
=
40.00
persons x
4 times
Dgte. transport
meals
30.00
60.00
x
x
3
3
persons x
persons x
4 times
4 times
=
=
40.00
persons x
4 times
Dgte. transport
meals
30.00
60.00
x
x
2
2
persons x
persons x
4 times
4 times
=
=
100.00
20.00
8
19
meetings
persons x
10 times
=
=
30.00
persons x
5 times
Meals
40.00
persons x
5 times
30.00
persons x
9 times
Meals
40.00
persons x
9 times
350.00
5.00
2.00
945.00
50.00
50.00
50.00
100.00
15.00
30.00
350.00
50.00
35.00
20.00
x
x
x
x
x
x
x
x
x
x
x
x
x
x
1
5
325
1
1
1
1
1
1
2
1
2
1
1
Dgte. transport
meals
Sub-Total
2. TE for procurement transactions of CVs
Serving of Canvass
Sub-Total
3. Project Meetings
Supplies
Snacks
Sub-Total
4. ACT-initiated Meetings
Sub-Total
5. Treasurer Payroll Processing
Sub-Total
6. Forms/Supplies and Reproduction
Bondpaper long
Ballpens
Reproduction
Petty cash box w/ padlock
Rubber Stamp
Stampad
Stamping Ink
Stapler
Stapler Remover
Staple Wire
Calculator
Columnar Book
Liquid Eraser
Paste/Glue
reams
pcs
sheets
set
pc
pc
pc
pc
pc
boxes
pc
pcs
ps
pc
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Folder long
Paper clip
Pentil pen
Log book
Sub-Total
TOTAL for Items 1-4
7. Filing Cabinet
SUPPLY & INSTALL OF BSPMC
FILING CABINET
TOTAL for Filing Cabinet
Total for Admin Cost
3.00
20.00
30.00
80.00
Qty
unit
1
UNIT
Prepared by :
x
x
x
x
10
1
1
2
pcs
box
pc
pcs
=
=
=
=
Unit Cost
6,000.00
Approved by :
ELSA A. TRUNO
REYNALDO DOMIO
MEO Staff
BSPMC Chairperson
Checked by:
Concurred by :
RODSON R. ESCORA
JORJIC A. BAJADO
Barangay Captain
Municipal Mayor
Recommending Approval:
Noted by:
1,000.00
80.00
60.00
240.00
1,380.00
480.00
360.00
720.00
320.00
240.00
480.00
2,600.00
800.00
3,800.00
4,600.00
750.00
1,000.00
1,750.00
270.00
360.00
630.00
350.00
25.00
650.00
945.00
50.00
50.00
50.00
100.00
15.00
60.00
350.00
100.00
35.00
20.00
30.00
20.00
30.00
160.00
3,040.00
14,000.00
Total Amount
6,000.00
6,000.00
20,000.00
REYNALDO DOMIO
BSPMC Chairperson
JORJIC A. BAJADO
Barangay Captain
I. SITE WORKS
Nylon # 16
Portland Cement
Portland Cement
Portland Cement
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
20mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
# 16 G.I. Tie Wire
1-1/2" G.I. Pipe
Hacksaw Blade
1/4 thk. 4'x8' Ordinary Plywood
" thk. X 4' x 8' Marine Plywood
Lawanet 6mm thk 4'x8'
Conc. Nails 4"
# 4 CWN
4" CW Nails
4" CW Nails
3" CW Nails
3" CW Nails
3" CW Nails
#2 CWN
#2-1/2 CWN
2 1/2" CW Nails
CW Nails 1"
1
/2 " CW Nails
12mm thk. x 1200mm x 2400mm Fiber Cement Board
(Fascia Board)
12mm dia. X 7" Machine Bolt w/ Knot and washer
Anti-Termite (e.g. solignum, )
0.80 x 2.10m Flush Type Plastic Door w/ door jambs
3-1/2"x3-1/2" Loose pin Hinges (quality brand)
Door knob (QUALITY BRAND)
IX. PLUMBING WORKS
A. Materials
VII-I Plumbing Fixtuers:
Water closet
4" x 4" PVC Floor Drain
VII-II Sewer Line:
4" x 3.0m dia. PV Pipe
3" x 3.0m dia. PV Pipe
2" X 3.0m PV Pipe
2" dia. X 900 PVC Bend Elbow
4" dia. X 900 PVC Bend Elbow
4" dia. X 450 PVC Bend Elbow
4" x 3" Wye
2" dia. PVC P-Trap
4" dia.PVC Clean Out Plug
4" dia.x 4" dia. PVC Wye
3" dia. X 90deg. PVC elbow
Solvent Cement
VII-III For Water Line:
Wallhung lavatory with faucet and supply pipe
1
/2" x 3.0m PVC pipe
1
/2" dia. Gate valve
1
/2" PVC Coupling
1
/2" PVC 90 deg. Bend elbow
1
/2" PVC Tee
1
/2" PVC female threaded adoptor
1
/2" Faucet, hosebib, brass
Teflon Tape
IX-III For Downspouts:
3" dia. x 3.0m PVC Pipe
3" dia. x 3" PVC Tee
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement
X. TILE WORKS
8" x 8" Glazed Tiles
8" x 8" Unglazed Tiles
tile grout
tile frame
XI. ELECTRICAL WORKS
A. Materials
Interior Rough in
2" x 4" Utility Boxes Pvc
4" x 4" Junction Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Electrical Fixtures
Flourescent Lamp, 40 watts
50 watts incandescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Ligthing Outlet ( 4" Porcelain Receptacle w/
Female Adoptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Safety Switch
XII. PAINTING WORKS
A. Materials
Cocrete Putty
Concrete Neutralizer
Flat Latex White
Semi-Gloss Latex White
Quick Dry Enamel White
Flat Enamel White
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Sandpaper #100
Sandpaper #200
Paint Brush 4"
Paint Brush 2"
Roller Paint Brush 8" (with tray)
Putty Pallet
Body Filler
Slating Paint (Premium Quality)
Flat White QDE (Premium Quality)
UNIT COST
COST SHARING
QUANTITY
DESCRIPTION
Unit
2.00
410.00
85.00
75.00
327.00
7.00
110.00
38.00
1.50
10.00
3.00
10.00
47.00
2.00
2.00
1.00
45.00
10.00
20.00
6.00
7.00
7.00
16.00
10.00
5.00
1.00
7.00
Kgs.
Bags
Bags
Bags
Length
Length
Length
Length
rolls
Kgs.
Pcs.
Pcs.
shts.
shts
pcs
kg
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
Kgs.
kg
Kgs.
350.00
250.00
250.00
250.00
150.00
220.00
370.00
560.00
3,046.00
70.00
1,200.00
60.00
350.00
440.00
440.00
90.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
3.50
2.50
2.50
2.50
1.50
2.20
3.70
5.60
30.10
0.70
12.00
0.60
3.50
4.00
shts.
1,200.00
20.00
3.00
2
12
4
1.00
Pcs.
gal
sets
pc
pc
Lot
2.00
2.00
Units
Sets
6.00
6.00
6.00
4.00
2.00
2.00
2.00
3.00
1.00
2.00
12.00
1.00
Length
Length
Length
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pint
600.00
500.00
300.00
50.00
90.00
70.00
150.00
80.00
70.00
150.00
50.00
450.00
1.00
5.00
1.00
9.00
2.00
3.00
1.00
1.00
3.00
Sets
Length
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
1,500.00
60.00
400.00
10.00
20.00
20.00
20.00
200.00
30.00
8.00 length
4.00
pc
16.00
pc
1.00
pint
9.00
sq.m.
120.00
Pcs.
460.00
Pcs.
15.00
bags
20.00
length
1.00
Lot
No. of
Crew/
Labor
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
TOTAL UNIT
COST
SUB-TOTAL LCC
TOTAL
KALAHI GRANT
0.65
353.50
252.50
252.50
252.50
151.50
222.20
373.70
565.60
3,076.10
70.70
1,212.00
60.60
353.50
440.00
440.00
90.00
65.65
65.65
65.65
65.65
65.65
65.65
65.65
65.65
65.65
65.00
65.65
707.00
103,525.00
21,462.50
18,937.50
49,540.50
1,555.40
41,107.00
21,492.80
4,614.15
707.00
3,636.00
606.00
16,614.50
880.00
880.00
90.00
2,954.25
656.50
1,313.00
393.90
459.55
459.55
1,050.40
656.50
328.25
65.00
459.55
589.17
86,270.83
17,885.42
15,781.25
41,283.75
1,296.17
34,255.83
17,910.67
3,845.13
589.17
3,030.00
505.00
13,845.42
733.33
733.33
75.00
2,461.88
547.08
1,094.17
328.25
382.96
382.96
875.33
547.08
273.54
54.17
382.96
12.00
1,212.00
4,848.00
50.00
750.00
6,000.00
100.00
1,500.00
0.50
7.50
60.00
1.00
15.00
50.50
757.50
6,060.00
101.00
1,515.00
1,010.00
2,272.50
12,120.00
1,212.00
6,060.00
1,500.00
50.00
1,515.00
50.50
3,030.00
101.00
606.00
505.00
303.00
50.50
90.90
70.70
151.50
80.80
70.70
151.50
50.50
454.50
3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50
1,515.00
60.60
404.00
10.10
20.20
20.20
20.20
202.00
30.30
1,515.00
303.00
404.00
90.90
40.40
60.60
20.20
202.00
90.90
350.00
95.00
600.00
350.00
15.00
0.50
6.00
5.00
3.00
0.50
0.90
0.70
1.50
0.80
0.70
1.50
0.50
4.50
15.00
0.60
4.00
0.10
0.20
0.20
0.20
2.00
0.30
3.50
0.95
6.00
3.50
353.50
95.95
606.00
353.50
25.00
20.00
100.00
250.00
0.25
0.20
1.00
2.50
25.00
25.00
150.00
80.00
CASH
TOTAL LCC
(CASH &
INKIND)
MLGU
INKIND
CASH
INKIND
CASH
TOTAL
INKIND
117.83
17,254.17
3,577.08
3,156.25
8,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
109.42
218.83
65.65
76.59
76.59
175.07
109.42
54.71
10.83
76.59
117.83
17,254.17
3,577.08
3,156.25
8,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
109.42
218.83
65.65
76.59
76.59
175.07
109.42
54.71
10.83
76.59
707.00
103,525.00
21,462.50
18,937.50
49,540.50
1,555.40
41,107.00
21,492.80
4,614.15
707.00
3,636.00
606.00
16,614.50
880.00
880.00
90.00
2,954.25
656.50
1,313.00
393.90
459.55
459.55
1,050.40
656.50
328.25
65.00
459.55
4,040.00
808.00
808.00
808.00
4,848.00
841.67
1,893.75
10,100.00
1,010.00
5,050.00
168.33
378.75
2,020.00
202.00
1,010.00
168.33
378.75
2,020.00
202.00
1,010.00
168.33
378.75
2,020.00
202.00
1,010.00
1,010.00
2,272.50
12,120.00
1,212.00
6,060.00
505.00
16.83
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15
471.33
63.97
1,616.00
58.92
505.00
16.83
505.00
16.83
3,030.00
101.00
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50
252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15
252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15
1,515.00
303.00
404.00
90.90
40.40
60.60
20.20
202.00
90.90
2,828.00
383.80
9,696.00
353.50
2,525.00
84.17
3,030.00
2,525.00
1,515.00
168.33
151.50
117.83
252.50
202.00
58.92
252.50
505.00
378.75
1,262.50
252.50
336.67
75.75
33.67
50.50
16.83
168.33
75.75
2,356.67
319.83
8,080.00
294.58
471.33
63.97
1,616.00
58.92
471.33
63.97
1,616.00
58.92
2,828.00
383.80
9,696.00
353.50
25.25
20.20
101.00
252.50
3,030.00
9,292.00
1,515.00
5,050.00
2,525.00
7,743.33
1,262.50
4,208.33
505.00
1,548.67
252.50
841.67
505.00
1,548.67
252.50
841.67
505.00
1,548.67
252.50
841.67
3,030.00
9,292.00
1,515.00
5,050.00
0.25
0.25
1.50
0.80
25.25
25.25
151.50
80.80
50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00
106.05
2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00
151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00
151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00
151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00
909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,845.00
101.00
202.00
375.00
80.00
282.80
125.00
303.00
240.00
120.00
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
pcs.
pcs.
length
pc.
2.00
30.00
10.00
80.00
3.00
box
m
Pcs.
m
Pcs.
4,300.00
30.00
10.00
70.00
35.00
43.00
0.30
0.10
0.70
0.35
4,343.00
30.30
10.10
70.70
35.35
303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00
106.05
7.00
assy
2.00
set
2.00
Pcs.
Pcs.
4.00
5.00
Pcs.
7.00
Pcs.
5.00
Pcs.
1.00
unit
5.00
Pcs.
1.00
Set
265.00 sq.m.
350.00
250.00
100.00
100.00
300.00
150.00
75.00
2,500.00
90.00
500.00
3.50
2.50
1.00
1.00
3.00
1.50
0.75
25.00
0.90
5.00
353.50
252.50
101.00
101.00
303.00
151.50
75.75
2,525.00
90.90
505.00
2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00
252.50
147.29
126.25
67.33
7,238.33
757.50
84.17
4,713.33
88.38
2,062.08
420.83
168.33
336.67
1,262.50
883.75
315.63
2,104.17
378.75
420.83
300.00
200.00
500.00
600.00
650.00
600.00
50.00
50.00
50.00
50.00
50.00
410.00
20.00
20.00
75.00
40.00
70.00
25.00
150.00
160.00
120.00
3.00
2.00
5.00
6.00
6.50
6.00
0.50
0.50
0.50
0.50
0.50
303.00
202.00
505.00
606.00
656.50
606.00
50.50
50.50
50.50
50.50
50.50
410.00
20.20
20.20
75.00
40.00
70.70
25.00
151.50
160.00
120.00
909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,845.00
101.00
202.00
375.00
80.00
282.80
125.00
303.00
240.00
120.00
757.50
673.33
3,366.67
4,040.00
3,282.50
2,525.00
84.17
84.17
42.08
42.08
42.08
1,537.50
84.17
168.33
312.50
66.67
235.67
104.17
252.50
200.00
100.00
Gals
Gals
Gals
Gals
Gal
Gals
Pints
Pints
Pints
Pints
Pints
Gal
shts
shts
pcs
pcs
set
pcs
Ltrs
liters
liters
BLGU
117.83
11,254.17
3,577.08
3,156.25
4,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
109.42
218.83
65.65
76.59
76.59
175.07
109.42
54.71
10.83
76.59
12.00
7.00
1.00
1.00
3.00
4.00
8.00
8.00
6.00
5.00
2.00
2.00
1.00
1.00
1.00
4.50
5.00
10.00
5.00
2.00
4.00
5.00
2.00
1.50
1.00
COMMUNITY
INKIND
0.20
0.20
0.70
1.50
6,000.00
4,000.00
QUANTITY
DESCRIPTION
Abrassive Paper
4.00
Sub-Total
2. HANDTOOLS AND PROTECTIVE EQUIPMENTS
Shovel w/ handle
3.00
Crow Bar
1.00
Wheel Barrow
1.00
Bolo (multi-purpose) w/ handle
1.00
Sledge Hammer (5kg) w/ handle
1.00
Concrete Pail
10.00
5.00
Hard hat
10.00
Hand gloves
1.00
Medicine kit
Sub-Total
I - 3. EMBANKMENT: Filling, Grading and Compaction
A. Materials
Filling Materials
20.00
Mixed and Washed Gravel
6.00
Washed Sand
35.00
Washed Gravel
27.00
4" x 8' x 16" CHB
1,647.00
Sub-Total
VI - 1. Roof Frame
899.00
A. Materials
25- 2" x 2" x 12' Coco Lumber
100.00
100-2"x2"x12' Coco Lumber
400.00
20-2"x2"x10' Coco Lumber for Bracing
67.00
1" x 2" x 8' s4s Wood Lumber
7.00
2 - 2" x 5" x 12' (Good Lumber)
20.00
30 - 2" x 5" x 10' (Good Lumber)
250.00
32 - 2" x 5" x 8' (Good Lumber)
214.00
2- 2" x 4" x 10' (Good Lumber)
14.00
10 - 2" x 4" x 8' (Good Lumber)
54.00
20 - 2" x 3" x 12' (Good Lumber)
120.00
13 - 2" x 3" x 10' (Good Lumber)
65.00
8 - 2" x 3" x 8' (Good Lumber)
32.00
162- 2" x 2" x 12' Ceiling Joist (Good Lumber)
648.00
50 - 2" x 2" x 12' Hangers (Good Lumber)
200.00
Sub-Total
VII.
0.9 DOORS
x2.10m AND
Hard WINDOWS
Panel Door Hinge Type w/ Fixed Glass 18.44
Furniture
Transom on 50mm x 150mm Wood Jambs/Frames (Tugas
or Narra) INSTALLED
2
2"x6" wooden jamb assembly for W-1 w/ a dimension of
2.5m x 1.5m to include mollion partition at 0.60m interval
2.00
and transom.
2"x6" wooden jamb assembly for W-2 w/ a dimension of
1.225m x 1.5m to include mollion partition at 0.60m interval
5.00
and transom.
Sub-Total
WINDOWS
0.60m x 15 blades jalousie glass with alluminum frame
6
(INSTALLED)
0.60m x 5 blades jalousie glass with alum.frame
(INSTALLED)
UNIT COST
Unit
pads
No. of
Crew/
Labor
COST SHARING
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
35.00
pc
pc
pc
pc
pc
pc
pc
pc
Sets
450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00
Cu.m
Cu.m.
Cu.m.
Cu.m.
Pcs
550.00
800.00
700.00
800.00
12.00
TOTAL UNIT
COST
35.00
450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00
5.50
8.00
7.00
8.00
0.12
555.50
808.00
707.00
808.00
12.12
Bd. Ft.
Bd.Ft
Bd.Ft
bd. ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
140.00
419,605.05
116.67
223,242.38
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
7,600.00
1,125.00
416.67
891.67
316.67
583.33
833.33
1,458.33
291.67
416.67
243,826.75
11,110.00
4,848.00
24,745.00
21,816.00
19,961.64
82,480.64
9,258.33
4,040.00
20,620.83
18,180.00
16,634.70
9,258.33
2,525.00
10,100.00
1,691.75
315.00
808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80
45,813.60
14,140.00
105,652.95
2,104.17
8,416.67
1,409.79
262.50
673.33
8,416.67
7,204.67
471.33
1,818.00
4,040.00
2,188.33
1,077.33
38,178.00
11,783.33
25,889.67
BLGU
CASH
INKIND
10,000.00
10,000.00
TOTAL LCC
(CASH &
INKIND)
MLGU
CASH
-
23.33
34,648.48
225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
38,765.35
1,851.67
808.00
4,124.17
3,636.00
3,326.94
1,851.67
420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93
INKIND
CASH
TOTAL
INKIND
23.33
44,648.48
23.33
44,648.48
140.00
267,890.85
225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
48,765.35
225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
48,765.35
1,851.67
808.00
4,124.17
3,636.00
3,326.94
1,851.67
1,851.67
808.00
4,124.17
3,636.00
3,326.94
1,851.67
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
292,592.10
11,110.00
4,848.00
24,745.00
21,816.00
19,961.64
11,110.00
25.00
25.00
25.00
45.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
70.00
70.00
0.25
0.25
0.25
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.70
0.70
25.25
25.25
25.25
45.00
40.40
40.40
40.40
40.40
40.40
40.40
40.40
40.40
70.70
70.70
420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93
420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93
2,525.00
10,100.00
1,691.75
315.00
808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80
45,813.60
14,140.00
31,067.60
s-m
sets
8,000.00
80.00
8,080.00
16,160.00
13,466.67
2,693.33
2,693.33
2,693.33
16,160.00
Sets
3,000.00
30.00
3,030.00
6,060.00
5,050.00
1,010.00
1,010.00
1,010.00
6,060.00
Sets
1,700.00
17.00
1,717.00
8,585.00
7,154.17
1,430.83
1,430.83
1,430.83
8,585.00
30,805.00
sets
sets
2.00
Sets
Sub-Total
Roofing
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)
20.00
pcs
Colorib No. 24, x 8' Pre formed Side Gutter
15.00
pcs
Colorib No. 24, x 8' Pre formed Ridgeroll
10.00
pcs
Roof Sealant
2.00
Ltrs
Tex Screw 2 1/2" (for wood)
1,300.00
Pcs.
Blind Rivets 1/8" x 2"
2.00
box
Sub-Total
XIII. STEEL BILLBOARD AND ROOF SIGNAGE
1.00
LOT
A. Materials
Supply and Install Roof Signage
1.00
lot
TOTAL FOR STEEL BILLBOARD, ROOF SIGNAGE AND BUILDING MARKER
Supply and Install Community Project Steel Billboard
1.00
lot
TOTAL FOR BASIC AMENITIES
5. ENVIRONMENTAL IMPACT
5.1 Warning signs
10.00
pc
5.2 Barricades
5.00
pc
TOTAL FOR BASIC AMENITIES
Prepared by :
KALAHI GRANT
COMMUNITY
INKIND
Bd. Ft.
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
1,500.00
15.00
1,515.00
9,090.00
7,575.00
1,515.00
1,515.00
1,515.00
500.00
5.00
505.00
20.00
2,720.00
841.67
Err:522
4,533.33
168.33
Err:522
906.67
#REF!
168.33
Err:522
906.67
#REF!
2,700.00
1,010.00
10,100.00
5,440.00
5,440.00
168.33
Err:522
906.67
#REF!
2,500.00
650.00
650.00
500.00
2.00
500.00
25.00
6.50
6.50
5.00
0.02
5.00
2,525.00
656.50
656.50
505.00
2.02
505.00
50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50
42,083.33
8,206.25
5,470.83
841.67
2,188.33
841.67
59,632.08
5,000.00
5,000.00
10,000.00
10,000.00
4,166.67
Err:522
8,333.33
8,333.33
2,000.00
1,250.00
3,250.00
1,666.67
1,041.67
1,041.67
Sub-Total
Window Grills (fabricated & installed)
SUB-TOTAL LCC
TOTAL
5,000.00
5,000.00
10,000.00
10,000.00
200.00
250.00
200.00
250.00
Err:522
Err:522
#REF!
Recommending Approval:
Err:522
#REF!
Err:522
-
#REF!
Err:522
-
8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42
833.33
Err:522
1,666.67
1,666.67
333.33
208.33
208.33
Err:522
Approved by :
Err:522
#REF!
8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42
833.33
Err:522
1,666.67
1,666.67
333.33
208.33
208.33
Err:522
Err:522
#REF!
-
Err:522
-
Err:522
9,090.00
1,010.00
Err:522
5,440.00
#REF!
8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42
50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50
833.33
Err:522
1,666.67
1,666.67
5,000.00
Err:522
10,000.00
10,000.00
333.33
208.33
208.33
2,000.00
1,250.00
1,250.00
Noted by:
ELSA A. TRUNO
RODSON R. ESCORA
CARMEN A. GAUDIANO
REYNALDO DOMIO
GEORGE S. ISULAT
MEO Staff
Municipal Engineer
BSPMC Chairperson
I. SITE WORKS
Nylon # 16
Portland Cement
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
20mm dia. x 6.0m RSB
# 16 G.I. Tie Wire
# 16 G.I. Tie Wire
1-1/2" G.I. Pipe
Hacksaw Blade
1/4 thk. 4'x8' Ordinary Plywood
" thk. X 4' x 8' Marine Plywood
Lawanet 6mm thk 4'x8'
Conc. Nails 4"
# 4 CWN
3" CW Nails
#2 CWN
#2-1/2 CWN
CW Nails 1"
1
/2 " CW Nails
12mm thk. x 1200mm x 2400mm Fiber Cement Board
(Fascia Board)
12mm dia. X 7" Machine Bolt w/ Knot and washer
Anti-Termite (e.g. solignum, )
0.80 x 2.10m Flush Type Plastic Door w/ door jambs
3-1/2"x3-1/2" Loose pin Hinges (quality brand)
Door knob (QUALITY BRAND)
X. TILE WORKS
8" x 8" Glazed Tiles
8" x 8" Unglazed Tiles
tile grout
tile frame
IX. PLUMBING WORKS
Water closet
4" x 4" PVC Floor Drain
4" x 3.0m dia. PV Pipe
3" x 3.0m dia. PV Pipe
2" X 3.0m PV Pipe
2" dia. X 900 PVC Bend Elbow
4" dia. X 900 PVC Bend Elbow
4" dia. X 450 PVC Bend Elbow
4" x 3" Wye
2" dia. PVC P-Trap
4" dia.PVC Clean Out Plug
4" dia.x 4" dia. PVC Wye
3" dia. X 90deg. PVC elbow
Solvent Cement
Wallhung lavatory with faucet and supply pipe
1
/2" x 3.0m PVC pipe
1
/2" dia. Gate valve
1
/2" PVC Coupling
1
/2" PVC 90 deg. Bend elbow
1
/2" PVC Tee
1
/2" PVC female threaded adoptor
1
/2" Faucet, hosebib, brass
Teflon Tape
3" dia. x 3.0m PVC Pipe
3" dia. x 3" PVC Tee
3" dia. X 90 deg. bend PVC Elbow
Solvent Cement
XI. ELECTRICAL WORKS
2" x 4" Utility Boxes Pvc
4" x 4" Junction Boxes PVC
3/4" dia. RSC Pipe
Screw Insulator
Electrical Wires
3.5mm2 THW Stranded
Service Drop Wire
PVC Clamp
Flexible tube 3/4" dia
Electrical Tape (Big)
Electrical Fixtures
Flourescent Lamp, 40 watts
50 watts incandescent Lamp
2 Gang Switch with Plate
1 Gang Switcth w/ Plate
Duplex Convenience Outlet
Ligthing Outlet ( 4" Porcelain Receptacle w/
Female Adoptor
KWHR meter w/ Base
Entrance Cap # 1" dia.
Safety Switch
XII. PAINTING WORKS
Cocrete Putty
Concrete Neutralizer
Flat Latex White
Semi-Gloss Latex White
Quick Dry Enamel White
Flat Enamel White
Latex Tinting Color Rawsienna
Latex Tinting Color Red
Latex Tinting Color Blue
Latex Tinting Color Yellow
Latex Tinting Color Green
Paint Thinner
Sandpaper #100
Sandpaper #200
Paint Brush 4"
Paint Brush 2"
Roller Paint Brush 8" (with tray)
Putty Pallet
Body Filler
Slating Paint (Premium Quality)
Flat White QDE (Premium Quality)
Abrassive Paper
Sub-Total
2. HANDTOOLS AND PROTECTIVE EQUIPMENTS
Shovel w/ handle
Crow Bar
Wheel Barrow
Bolo (multi-purpose) w/ handle
Sledge Hammer (5kg) w/ handle
Concrete Pail
Hard hat
Hand gloves
Medicine kit
Sub-Total
I - 3. EMBANKMENT: Filling, Grading and Compaction
A. Materials
Filling Materials
UNIT COST
COST SHARING
QUANTITY
DESCRIPTION
Unit
2.00
410.00
327.00
7.00
110.00
38.00
1.50
10.00
3.00
10.00
47.00
2.00
2.00
1.00
45.00
20.00
16.00
15.00
1.00
7.00
Kgs.
Bags
Length
Length
Length
Length
rolls
Kgs.
Pcs.
Pcs.
shts.
shts
pcs
kg
Kgs.
Kgs.
Kgs.
Kgs.
kg
Kgs.
350.00
250.00
150.00
220.00
370.00
560.00
3,046.00
70.00
1,200.00
60.00
350.00
440.00
440.00
90.00
65.00
65.00
65.00
65.00
65.00
65.00
3.50
2.50
1.50
2.20
3.70
5.60
30.10
0.70
12.00
0.60
3.50
4.00
shts.
1,200.00
20.00
3.00
2
12
4
9.00
120.00
460.00
15.00
20.00
1.00
2.00
2.00
6.00
6.00
6.00
4.00
2.00
2.00
2.00
3.00
1.00
2.00
12.00
1.00
1.00
5.00
1.00
9.00
2.00
3.00
1.00
1.00
3.00
8.00
4.00
16.00
1.00
1.00
12.00
7.00
1.00
1.00
Pcs.
gal
sets
pc
pc
sq.m.
Pcs.
Pcs.
bags
length
Lot
Units
Sets
Length
Length
Length
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pint
Sets
Length
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
length
pc
pc
pint
Lot
pcs.
pcs.
length
pc.
2.00
30.00
10.00
80.00
3.00
No. of
Crew/
Labor
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
TOTAL UNIT
COST
SUB-TOTAL LCC
TOTAL
KALAHI GRANT
0.65
353.50
252.50
151.50
222.20
373.70
565.60
3,076.10
70.70
1,212.00
60.60
353.50
440.00
440.00
90.00
65.65
65.65
65.65
65.65
65.00
65.65
707.00
103,525.00
49,540.50
1,555.40
41,107.00
21,492.80
4,614.15
707.00
3,636.00
606.00
16,614.50
880.00
880.00
90.00
2,954.25
1,313.00
1,050.40
984.75
65.00
459.55
589.17
86,270.83
41,283.75
1,296.17
34,255.83
17,910.67
3,845.13
589.17
3,030.00
505.00
13,845.42
733.33
733.33
75.00
2,461.88
1,094.17
875.33
820.63
54.17
382.96
12.00
1,212.00
4,848.00
50.00
750.00
6,000.00
100.00
1,500.00
0.50
7.50
60.00
1.00
15.00
50.50
757.50
6,060.00
101.00
1,515.00
1,010.00
2,272.50
12,120.00
1,212.00
6,060.00
25.00
20.00
100.00
250.00
0.25
0.20
1.00
2.50
25.25
20.20
101.00
252.50
1,500.00
50.00
600.00
500.00
300.00
50.00
90.00
70.00
150.00
80.00
70.00
150.00
50.00
450.00
1,500.00
60.00
400.00
10.00
20.00
20.00
20.00
200.00
30.00
350.00
95.00
600.00
350.00
15.00
0.50
6.00
5.00
3.00
0.50
0.90
0.70
1.50
0.80
0.70
1.50
0.50
4.50
15.00
0.60
4.00
0.10
0.20
0.20
0.20
2.00
0.30
3.50
0.95
6.00
3.50
25.00
25.00
150.00
80.00
box
m
Pcs.
m
Pcs.
7.00
2.00
2.00
4.00
5.00
7.00
5.00
1.00
5.00
1.00
COMMUNITY
INKIND
BLGU
CASH
TOTAL LCC
(CASH &
INKIND)
MLGU
INKIND
CASH
INKIND
CASH
TOTAL
INKIND
117.83
11,254.17
4,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
218.83
175.07
164.13
10.83
76.59
117.83
17,254.17
8,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
218.83
175.07
164.13
10.83
76.59
117.83
17,254.17
8,256.75
259.23
6,851.17
3,582.13
769.03
117.83
606.00
101.00
2,769.08
146.67
146.67
15.00
492.38
218.83
175.07
164.13
10.83
76.59
707.00
103,525.00
49,540.50
1,555.40
41,107.00
21,492.80
4,614.15
707.00
3,636.00
606.00
16,614.50
880.00
880.00
90.00
2,954.25
1,313.00
1,050.40
984.75
65.00
459.55
4,040.00
808.00
808.00
808.00
4,848.00
841.67
1,893.75
10,100.00
1,010.00
5,050.00
168.33
378.75
2,020.00
202.00
1,010.00
168.33
378.75
2,020.00
202.00
1,010.00
168.33
378.75
2,020.00
202.00
1,010.00
1,010.00
2,272.50
12,120.00
1,212.00
6,060.00
3,030.00
9,292.00
1,515.00
5,050.00
2,525.00
7,743.33
1,262.50
4,208.33
505.00
1,548.67
252.50
841.67
505.00
1,548.67
252.50
841.67
505.00
1,548.67
252.50
841.67
3,030.00
9,292.00
1,515.00
5,050.00
1,515.00
50.50
606.00
505.00
303.00
50.50
90.90
70.70
151.50
80.80
70.70
151.50
50.50
454.50
1,515.00
60.60
404.00
10.10
20.20
20.20
20.20
202.00
30.30
353.50
95.95
606.00
353.50
3,030.00
101.00
3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50
1,515.00
303.00
404.00
90.90
40.40
60.60
20.20
202.00
90.90
2,828.00
383.80
9,696.00
353.50
2,525.00
84.17
3,030.00
2,525.00
1,515.00
168.33
151.50
117.83
252.50
202.00
58.92
252.50
505.00
378.75
1,262.50
252.50
336.67
75.75
33.67
50.50
16.83
168.33
75.75
2,356.67
319.83
8,080.00
294.58
505.00
16.83
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15
471.33
63.97
1,616.00
58.92
505.00
16.83
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15
471.33
63.97
1,616.00
58.92
505.00
16.83
606.00
505.00
303.00
33.67
30.30
23.57
50.50
40.40
11.78
50.50
101.00
75.75
252.50
50.50
67.33
15.15
6.73
10.10
3.37
33.67
15.15
471.33
63.97
1,616.00
58.92
3,030.00
101.00
3,636.00
3,030.00
1,818.00
202.00
181.80
141.40
303.00
242.40
70.70
303.00
606.00
454.50
1,515.00
303.00
404.00
90.90
40.40
60.60
20.20
202.00
90.90
2,828.00
383.80
9,696.00
353.50
0.25
0.25
1.50
0.80
25.25
25.25
151.50
80.80
4,300.00
30.00
10.00
70.00
35.00
43.00
0.30
0.10
0.70
0.35
4,343.00
30.30
10.10
70.70
35.35
303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00
106.05
assy
set
Pcs.
Pcs.
Pcs.
Pcs.
Pcs.
unit
Pcs.
Set
350.00
250.00
100.00
100.00
300.00
150.00
75.00
2,500.00
90.00
500.00
3.50
2.50
1.00
1.00
3.00
1.50
0.75
25.00
0.90
5.00
353.50
252.50
101.00
101.00
303.00
151.50
75.75
2,525.00
90.90
505.00
2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00
252.50
147.29
126.25
67.33
7,238.33
757.50
84.17
4,713.33
88.38
2,062.08
420.83
168.33
336.67
1,262.50
883.75
315.63
2,104.17
378.75
420.83
50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
50.50
29.46
25.25
13.47
1,447.67
151.50
16.83
942.67
17.68
412.42
84.17
33.67
67.33
252.50
176.75
63.13
420.83
75.75
84.17
303.00
176.75
151.50
80.80
8,686.00
909.00
101.00
5,656.00
106.05
2,474.50
505.00
202.00
404.00
1,515.00
1,060.50
378.75
2,525.00
454.50
505.00
3.00
4.00
8.00
8.00
6.00
5.00
2.00
2.00
1.00
1.00
1.00
4.50
5.00
10.00
5.00
2.00
4.00
5.00
2.00
1.50
1.00
4.00
Gals
Gals
Gals
Gals
Gal
Gals
Pints
Pints
Pints
Pints
Pints
Gal
shts
shts
pcs
pcs
set
pcs
Ltrs
liters
liters
pads
300.00
200.00
500.00
600.00
650.00
600.00
50.00
50.00
50.00
50.00
50.00
410.00
20.00
20.00
75.00
40.00
70.00
25.00
150.00
160.00
120.00
35.00
3.00
2.00
5.00
6.00
6.50
6.00
0.50
0.50
0.50
0.50
0.50
303.00
202.00
505.00
606.00
656.50
606.00
50.50
50.50
50.50
50.50
50.50
410.00
20.20
20.20
75.00
40.00
70.70
25.00
151.50
160.00
120.00
35.00
909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,845.00
101.00
202.00
375.00
80.00
282.80
125.00
303.00
240.00
120.00
140.00
377,235.55
757.50
673.33
3,366.67
4,040.00
3,282.50
2,525.00
84.17
84.17
42.08
42.08
42.08
1,537.50
84.17
168.33
312.50
66.67
235.67
104.17
252.50
200.00
100.00
116.67
189,575.71
151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00
23.33
27,915.14
151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00
23.33
37,915.14
151.50
134.67
673.33
808.00
656.50
505.00
16.83
16.83
8.42
8.42
8.42
307.50
16.83
33.67
62.50
13.33
47.13
20.83
50.50
40.00
20.00
23.33
37,915.14
909.00
808.00
4,040.00
4,848.00
3,939.00
3,030.00
101.00
101.00
50.50
50.50
50.50
1,845.00
101.00
202.00
375.00
80.00
282.80
125.00
303.00
240.00
120.00
140.00
227,490.85
3.00
1.00
1.00
1.00
1.00
10.00
5.00
10.00
1.00
pc
pc
pc
pc
pc
pc
pc
pc
Sets
450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00
450.00
500.00
1,070.00
380.00
700.00
100.00
350.00
35.00
500.00
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
7,600.00
1,125.00
416.67
891.67
316.67
583.33
833.33
1,458.33
291.67
416.67
208,518.83
225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
31,703.77
225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
41,703.77
225.00
83.33
178.33
63.33
116.67
166.67
291.67
58.33
83.33
41,703.77
11,110.00
9,258.33
1,851.67
1,851.67
1,350.00
500.00
1,070.00
380.00
700.00
1,000.00
1,750.00
350.00
500.00
250,222.60
11,110.00
20.00
Cu.m
550.00
0.65
0.65
0.65
0.65
0.20
0.20
0.70
1.50
5.50
555.50
6,000.00
4,000.00
10,000.00
10,000.00
1,851.67
UNIT COST
QUANTITY
DESCRIPTION
Unit
6.00
35.00
27.00
1,647.00
Cu.m.
Cu.m.
Cu.m.
Pcs
899.00
Bd. Ft.
100.00
400.00
67.00
7.00
20.00
250.00
214.00
14.00
54.00
120.00
65.00
32.00
648.00
200.00
Bd. Ft.
Bd.Ft
Bd.Ft
bd. ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
Bd. Ft.
18.44
s-m
No. of
Crew/
Labor
COST SHARING
ADD:
UNIT RATE / FREIGHT
RATE PER
AND
DAY
HANDLIN
G COST
800.00
8.00
700.00
7.00
800.00
8.00
12.00
0.12
TOTAL UNIT
COST
808.00
707.00
808.00
12.12
Sub-Total
VI - 1. Roof Frame
A. Materials
25- 2" x 2" x 12' Coco Lumber
100-2"x2"x12' Coco Lumber
20-2"x2"x10' Coco Lumber for Bracing
1" x 2" x 8' s4s Wood Lumber
2 - 2" x 5" x 12' (Good Lumber)
30 - 2" x 5" x 10' (Good Lumber)
32 - 2" x 5" x 8' (Good Lumber)
2- 2" x 4" x 10' (Good Lumber)
10 - 2" x 4" x 8' (Good Lumber)
20 - 2" x 3" x 12' (Good Lumber)
13 - 2" x 3" x 10' (Good Lumber)
8 - 2" x 3" x 8' (Good Lumber)
162- 2" x 2" x 12' Ceiling Joist (Good Lumber)
50 - 2" x 2" x 12' Hangers (Good Lumber)
Sub-Total
VII. DOORS
0.9
x2.10m AND
Hard WINDOWS
Panel Door Hinge Type w/ Fixed Glass
Furniture on 50mm x 150mm Wood Jambs/Frames (Tugas
Transom
or Narra) INSTALLED
2"x6" wooden jamb assembly for W-1 w/ a dimension of
2.5m x 1.5m to include mollion partition at 0.60m interval
and transom.
2"x6" wooden jamb assembly for W-2 w/ a dimension of
1.225m x 1.5m to include mollion partition at 0.60m interval
and transom.
Sub-Total
WINDOWS
0.60m x 15 blades jalousie glass with alluminum frame
(INSTALLED)
0.60m x 5 blades jalousie glass with alum.frame
(INSTALLED)
25.00
25.00
25.00
45.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
70.00
70.00
0.25
0.25
0.25
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.70
0.70
25.25
25.25
25.25
45.00
40.40
40.40
40.40
40.40
40.40
40.40
40.40
40.40
70.70
70.70
4,848.00
24,745.00
21,816.00
19,961.64
82,480.64
4,040.00
20,620.83
18,180.00
16,634.70
9,258.33
2,525.00
10,100.00
1,691.75
315.00
808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80
45,813.60
14,140.00
105,652.95
2,104.17
8,416.67
1,409.79
262.50
673.33
8,416.67
7,204.67
471.33
1,818.00
4,040.00
2,188.33
1,077.33
38,178.00
11,783.33
25,889.67
BLGU
CASH
INKIND
TOTAL LCC
(CASH &
INKIND)
MLGU
CASH
808.00
4,124.17
3,636.00
3,326.94
1,851.67
420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93
INKIND
CASH
TOTAL
INKIND
808.00
4,124.17
3,636.00
3,326.94
1,851.67
808.00
4,124.17
3,636.00
3,326.94
1,851.67
4,848.00
24,745.00
21,816.00
19,961.64
11,110.00
420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93
420.83
1,683.33
281.96
52.50
134.67
1,683.33
1,440.93
94.27
363.60
808.00
437.67
215.47
7,635.60
2,356.67
5,177.93
2,525.00
10,100.00
1,691.75
315.00
808.00
10,100.00
8,645.60
565.60
2,181.60
4,848.00
2,626.00
1,292.80
45,813.60
14,140.00
31,067.60
sets
8,000.00
80.00
8,080.00
16,160.00
13,466.67
2,693.33
2,693.33
2,693.33
16,160.00
Sets
3,000.00
30.00
3,030.00
6,060.00
5,050.00
1,010.00
1,010.00
1,010.00
6,060.00
5.00
Sets
1,700.00
17.00
1,717.00
1,430.83
8,585.00
8,585.00
30,805.00
sets
sets
2.00
Sets
Sub-Total
Roofing
Colorib Longspan 0.40mm x 1.10m x 4.5m (Green)
20.00
pcs
Colorib No. 24, x 8' Pre formed Side Gutter
15.00
pcs
Colorib No. 24, x 8' Pre formed Ridgeroll
10.00
pcs
Roof Sealant
2.00
Ltrs
Tex Screw 2 1/2" (for wood)
1,300.00
Pcs.
Blind Rivets 1/8" x 2"
2.00
box
Sub-Total
1.00
LOT
XIII. STEEL BILLBOARD AND ROOF SIGNAGE
A. Materials
Supply and Install Roof Signage
1.00
lot
TOTAL FOR STEEL BILLBOARD, ROOF SIGNAGE AND BUILDING MARKER
Supply and Install Community Project Steel Billboard
1.00
lot
TOTAL FOR BASIC AMENITIES
5. ENVIRONMENTAL IMPACT
5.1 Warning signs
10.00
pc
5.2 Barricades
5.00
pc
TOTAL FOR BASIC AMENITIES
Prepared by :
KALAHI GRANT
COMMUNITY
INKIND
2.00
7,154.17
Err:522
1,430.83
Err:522
Err:522
Err:522
Err:522
1,430.83
Err:522
Err:522
Err:522
Err:522
1,500.00
15.00
1,515.00
9,090.00
7,575.00
1,515.00
1,515.00
1,515.00
500.00
5.00
505.00
20.00
2,720.00
841.67
Err:522
4,533.33
168.33
Err:522
906.67
#REF!
168.33
Err:522
906.67
#REF!
2,700.00
1,010.00
10,100.00
5,440.00
5,440.00
168.33
Err:522
906.67
#REF!
2,500.00
650.00
650.00
500.00
2.00
500.00
25.00
6.50
6.50
5.00
0.02
5.00
2,525.00
656.50
656.50
505.00
2.02
505.00
50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50
42,083.33
8,206.25
5,470.83
841.67
2,188.33
841.67
59,632.08
5,000.00
5,000.00
10,000.00
10,000.00
4,166.67
Err:522
8,333.33
8,333.33
2,000.00
1,250.00
3,250.00
1,666.67
1,041.67
1,041.67
Sub-Total
Window Grills (fabricated & installed)
SUB-TOTAL LCC
TOTAL
5,000.00
5,000.00
10,000.00
10,000.00
200.00
250.00
200.00
250.00
Err:522
Err:522
#REF!
Recommending Approval:
Err:522
#REF!
Err:522
-
#REF!
Err:522
-
8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42
833.33
Err:522
1,666.67
1,666.67
333.33
208.33
208.33
Err:522
Approved by :
Err:522
#REF!
8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42
833.33
Err:522
1,666.67
1,666.67
333.33
208.33
208.33
Err:522
Err:522
#REF!
-
Err:522
-
Err:522
9,090.00
1,010.00
Err:522
5,440.00
#REF!
8,416.67
1,641.25
1,094.17
168.33
437.67
168.33
11,926.42
50,500.00
9,847.50
6,565.00
1,010.00
2,626.00
1,010.00
71,558.50
833.33
Err:522
1,666.67
1,666.67
5,000.00
Err:522
10,000.00
10,000.00
333.33
208.33
208.33
2,000.00
1,250.00
1,250.00
Noted by:
ELSA A. TRUNO
RODSON R. ESCORA
CARMEN A. GAUDIANO
REYNALDO DOMIO
GEORGE S. ISULAT
MEO Staff
Municipal Engineer
BSPMC Chairperson
ENHANCED PLANNED C
Date Prepared
October 9, 2013
Barangay
Baslay
Municipality
Dauin
Province
Negros Oriental
DESCRIPTION
PACKAGE-1
PACKAGES
TOTAL
PACKAGE ITEMS
QTY
UNIT
Filling Materials
18.00
Cu.m
TOTAL UNIT
COST
404.00
7,272.00
1,647.00
Pcs
12.12
19,961.64
6.00
Cu.m.
808.00
4,848.00
Washed Sand
10.00
Cu.m.
707.00
7,070.00
Washed Gravel
16.00
Cu.m.
808.00
12,928.00
Washed Sand
5.00
Cu.m.
707.00
3,535.00
Washed Sand
6.00
Cu.m.
707.00
Sub-Total
4,242.00
59,856.64
Portland Cement
280.00
Bags
252.50
70,700.00
157.00
Length
181.80
28,542.60
35.00
Length
232.30
8,130.50
55.00
Length
404.00
22,220.00
25.00
Kgs.
70.70
1,767.50
Hacksaw Blade
10.00
Pcs.
60.60
606.00
4" CW Nails
30.00
Kgs.
65.65
1,969.50
3" CW Nails
13.00
Kgs.
65.65
853.45
2 1/2" CW Nails
5.00
Kgs.
65.65
328.25
2" CW Nails
5.00
Kgs.
65.65
328.25
Nylon # 16
3.00
rolls
505.00
1,515.00
3" CW Nails
7.00
Kgs.
65.65
459.55
12.00
shts.
353.50
4,242.00
# 4 CWN
15.00
Kgs.
65.65
984.75
#2 CWN
5.00
Kgs.
65.65
328.25
#1 CWN
5.00
Kgs.
65.65
328.25
35.00
Shts.
353.50
12,372.50
7.00
Kgs.
65.65
459.55
Sets
858.50
1,717.00
Sets
50.50
404.00
20.00
Pcs.
50.50
1,010.00
3.00
gal
757.50
2,272.50
Roof Sealant
2.00
Ltrs
505.00
1,010.00
1,300.00
Pcs.
2.02
2,626.00
2.00
box
505.00
1,010.00
TOTAL
PROC
METHOD
LSG
PACKAGES
PACKAGE ITEMS
TOTAL UNIT
COST
PROC
METHOD
QTY
UNIT
TOTAL
1.00
Units
1,515.00
1,515.00
1.00
Sets
50.50
50.50
6.00
Length
606.00
3,636.00
6.00
Length
505.00
3,030.00
6.00
Length
303.00
1,818.00
4.00
Pcs.
50.50
202.00
2.00
Pcs.
90.90
181.80
2.00
Pcs.
70.70
141.40
2.00
Pcs.
151.50
303.00
3.00
Pcs.
80.80
242.40
1.00
Pcs.
70.70
70.70
2.00
Pcs.
151.50
303.00
12.00
Pcs.
50.50
606.00
Solvent Cement
1.00
Pint
454.50
454.50
1.00
Sets
1,515.00
1,515.00
5.00
Length
60.60
303.00
1.00
Pcs.
404.00
404.00
9.00
Pcs.
10.10
90.90
2.00
Pcs.
20.20
40.40
3.00
Pcs.
20.20
60.60
1.00
Pcs.
20.20
20.20
1.00
Pcs.
202.00
202.00
Teflon Tape
3.00
Pcs.
30.30
90.90
180.00
Pcs.
25.25
4,545.00
200.00
Pcs.
20.20
4,040.00
303.00
3.00
kls.
101.00
Tile Trim
3.00
Pcs.
90.90
272.70
8.00
length
353.50
2,828.00
4.00
pc
95.95
383.80
16.00
pc
606.00
9,696.00
Solvent Cement
1.00
pint
353.50
353.50
100.00
Bd. Ft.
25.25
2,525.00
400.00
Bd.Ft
25.25
10,100.00
67.00
Bd.Ft
25.25
1,691.75
20.00
Bd. Ft.
40.40
808.00
250.00
Bd. Ft.
40.40
10,100.00
214.00
Bd. Ft.
40.40
8,645.60
14.00
Bd. Ft.
40.40
565.60
54.00
Bd. Ft.
40.40
2,181.60
120.00
Bd. Ft.
40.40
4,848.00
65.00
Bd. Ft.
40.40
2,626.00
32.00
Bd. Ft.
40.40
1,292.80
130.00
Bd. Ft.
40.40
5,252.00
648.00
Bd. Ft.
70.70
45,813.60
200.00
Bd. Ft.
70.70
14,140.00
Sub-Total
PACKAGE-4
LSG
203,888.70
LSG
LSG
PACKAGE-4
PACKAGES
LSG
PACKAGE ITEMS
QTY
UNIT
TOTAL UNIT
COST
PACKAGE-5
Sub-Total
110,589.95
2.00
Sets
1,515.00
3,030.00
5.00
Sets
1,010.00
5,050.00
2.00
Sets
909.00
1,818.00
1.00
Sets
606.00
606.00
2.00
Sets
505.00
1,010.00
20.00
pcs
2,525.00
50,500.00
15.00
pcs
656.50
9,847.50
10.00
pcs
656.50
6,565.00
Sub-Total
P-6
PROC
METHOD
TOTAL
LSG
11,514.00
Sub-Total
LSG
66,912.50
Interior Rough in
2" x 4" Utility Boxes Pvc
12.00
7.00
1.00
Screw Insulator
1.00
pcs.
25.25
303.00
pcs.
25.25
176.75
length
151.50
151.50
pc.
80.80
80.80
2.00
box
4,343.00
8,686.00
30.00
30.30
909.00
PVC Clamp
10.00
Pcs.
10.10
101.00
80.00
70.70
5,656.00
3.00
Pcs.
35.35
106.05
7.00
assy
353.50
2,474.50
2.00
set
252.50
505.00
2.00
Pcs.
101.00
202.00
4.00
Pcs.
101.00
404.00
5.00
Pcs.
303.00
1,515.00
7.00
Pcs.
151.50
1,060.50
Female Adoptor
5.00
Pcs.
75.75
378.75
1.00
unit
2,525.00
2,525.00
5.00
Pcs.
90.90
454.50
Safety Switch
1.00
Set
505.00
PACKAGE-7
Electrical Wires
Electrical Fixtures
Sub-Total
505.00
26,194.35
PACKAGE-8
A. Materials
Cocrete Putty
3.00
Gals
303.00
Concrete Neutralizer
4.00
Gals
202.00
808.00
8.00
Gals
505.00
4,040.00
8.00
Gals
606.00
4,848.00
6.00
Gal
656.50
3,939.00
5.00
Gals
606.00
3,030.00
2.00
Pints
50.50
101.00
2.00
Pints
50.50
101.00
1.00
Pints
50.50
50.50
909.00
LSG
TOTAL UNIT
COST
UNIT
1.00
Pints
1.00
Pints
50.50
50.50
Paint Thinner
4.00
Gal
303.00
1,212.00
Sandpaper #100
5.00
shts
20.20
101.00
Sandpaper #200
10.00
shts
20.20
202.00
4.00
pcs
101.00
404.00
4.00
set
70.70
282.80
Putty Pallet
4.00
pcs
20.20
80.80
Body Filler
2.00
Ltrs
151.50
303.00
P-9
lot
5,000.00
Sub-Total
P-10
50.50
LSG
20,513.10
1.00
TOTAL
50.50
Sub-Total
PACKAGE-11
PROC
METHOD
QTY
LSG
5,000.00
1.00
lot
10,000.00
Sub-Total
LSG
10,000.00
D - 1, (1.0m x 2.10m) Panel Door with on 150mm hard wood jamb (e.g.
yakal, guijo)
Sets
5,050.00
10,100.00
Set
4,040.00
4,040.00
Sub-Total
14,140.00
528,609.24
LSG
PACKAGE-8
PACKAGES
PACKAGE ITEMS
Skilled
62,700.00
unskilled
73,447.50
Sub-Total
136,147.50
664,756.74
CFA
P-12
Labor:
Handtools
7,600.00
Environmental impact
3,250.00
Material Testing
4,000.00
Administrative Cost
20,000.00
Treasurers Bond
CFA
PACKAGE-13
j. Indirect Cost
3,375.00
Contingency
21,010.16
Sub-Total
59,235.16
GRAND TOTAL CASH
723,991.90
SAY
897,455.00
-173,463.10
Workshop output of:
Checked by:
LUCY DAYOT
TEODOCIO LARANJO
CARMEN A. GAUDIANO
PPT
Municipal Engineer
: 723,991.90
Sub-project Duration
: 75 C.D
SOURCES OF FUNDS
PERCENTAGE WEIGHT
FUND SOURCE
TOTAL
KC Grant:
LEGEND:
LCC:
TO KC GRANT
TO LCC CASH
600,703.20
117,260.80
717,964.00
80.00
80.00
75,087.90
14,657.60
89,745.50
10.00
10.00
75,087.90
14,657.60
89,745.50
10.00
10.00
750,879.00
146,576.00
897,455.00
100.00
100.00
1st Tranche
KC Grant
2nd Tranche
LCC Cash
KC Grant
KC Cost
TOTAL LCC :
In-kind
Cash
TOTAL
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
LCC Cash
TOTAL
5,817.60
1,454.40
5,817.60
1,454.40
7,272.00
15,969.31
3,992.33
15,969.31
3,992.33
19,961.64
3,878.40
969.60
3,878.40
969.60
4,848.00
5,656.00
1,414.00
5,656.00
1,414.00
7,070.00
10,342.40
2,585.60
10,342.40
2,585.60
12,928.00
2,828.00
707.00
2,828.00
707.00
3,535.00
3,393.60
848.40
3,393.60
848.40
4,242.00
47,885.31
11,971.33
47,885.31
11,971.33
59,856.64
56,560.00
14,140.00
56,560.00
14,140.00
70,700.00
22,834.08
5,708.52
22,834.08
5,708.52
28,542.60
6,504.40
1,626.10
6,504.40
1,626.10
8,130.50
17,776.00
4,444.00
17,776.00
4,444.00
22,220.00
1,414.00
353.50
1,414.00
353.50
1,767.50
484.80
121.20
484.80
121.20
606.00
1,575.60
393.90
1,575.60
393.90
1,969.50
682.76
170.69
682.76
170.69
853.45
262.60
65.65
262.60
65.65
328.25
262.60
65.65
262.60
65.65
328.25
1,212.00
303.00
1,212.00
303.00
1,515.00
367.64
91.91
367.64
91.91
459.55
3,393.60
848.40
3,393.60
848.40
4,242.00
787.80
196.95
787.80
196.95
984.75
262.60
65.65
262.60
65.65
328.25
262.60
65.65
262.60
65.65
328.25
9,898.00
2,474.50
9,898.00
2,474.50
12,372.50
367.64
91.91
367.64
91.91
459.55
1,373.60
343.40
1,373.60
343.40
1,717.00
323.20
80.80
323.20
80.80
404.00
808.00
202.00
808.00
202.00
1,010.00
1,818.00
454.50
1,818.00
454.50
2,272.50
808.00
202.00
808.00
202.00
1,010.00
2,100.80
525.20
2,100.80
525.20
2,626.00
808.00
202.00
808.00
202.00
1,010.00
1st Tranche
KC Grant
2nd Tranche
LCC Cash
-
KC Grant
3rd Tranche
LCC Cash
KC Grant
TOTAL
LCC Cash
KC Grant
TOTAL
LCC Cash
-
1,212.00
303.00
1,212.00
303.00
1,515.00
40.40
10.10
40.40
10.10
50.50
2,908.80
727.20
2,908.80
727.20
3,636.00
2,424.00
606.00
2,424.00
606.00
3,030.00
1,454.40
363.60
1,454.40
363.60
1,818.00
161.60
40.40
161.60
40.40
202.00
145.44
36.36
145.44
36.36
181.80
113.12
28.28
113.12
28.28
141.40
242.40
60.60
242.40
60.60
303.00
193.92
48.48
193.92
48.48
242.40
56.56
14.14
56.56
14.14
70.70
242.40
60.60
242.40
60.60
303.00
484.80
121.20
484.80
121.20
606.00
363.60
90.90
363.60
90.90
454.50
1,212.00
303.00
1,212.00
303.00
1,515.00
242.40
60.60
242.40
60.60
303.00
323.20
80.80
323.20
80.80
404.00
72.72
18.18
72.72
18.18
90.90
32.32
8.08
32.32
8.08
40.40
48.48
12.12
48.48
12.12
60.60
16.16
4.04
16.16
4.04
20.20
161.60
40.40
161.60
40.40
202.00
72.72
18.18
72.72
18.18
90.90
3,636.00
909.00
3,636.00
909.00
4,545.00
3,232.00
808.00
3,232.00
808.00
4,040.00
242.40
60.60
242.40
60.60
303.00
218.16
54.54
218.16
54.54
272.70
2,262.40
565.60
2,262.40
565.60
2,828.00
307.04
76.76
307.04
76.76
383.80
7,756.80
1,939.20
7,756.80
1,939.20
9,696.00
282.80
70.70
282.80
70.70
353.50
163,110.96
40,777.74
163,110.96
40,777.74
203,888.70
2,020.00
505.00
2,020.00
505.00
2,525.00
8,080.00
2,020.00
8,080.00
2,020.00
10,100.00
1,353.40
338.35
1,353.40
338.35
1,691.75
646.40
161.60
646.40
161.60
808.00
8,080.00
2,020.00
8,080.00
2,020.00
10,100.00
6,916.48
1,729.12
6,916.48
1,729.12
8,645.60
452.48
113.12
452.48
113.12
565.60
1,745.28
436.32
1,745.28
436.32
2,181.60
3,878.40
969.60
3,878.40
969.60
4,848.00
2,100.80
525.20
2,100.80
525.20
2,626.00
1,034.24
258.56
1,034.24
258.56
1,292.80
4,201.60
1,050.40
4,201.60
1,050.40
5,252.00
36,650.88
9,162.72
36,650.88
9,162.72
45,813.60
11,312.00
2,828.00
11,312.00
2,828.00
14,140.00
1st Tranche
KC Grant
2nd Tranche
LCC Cash
88,471.96
KC Grant
22,117.99
3rd Tranche
LCC Cash
-
KC Grant
-
KC Grant
-
TOTAL
LCC Cash
88,471.96
22,117.99
110,589.95
2,424.00
606.00
2,424.00
606.00
3,030.00
4,040.00
1,010.00
4,040.00
1,010.00
5,050.00
1,454.40
363.60
1,454.40
363.60
1,818.00
484.80
121.20
484.80
121.20
606.00
808.00
202.00
808.00
202.00
1,010.00
9,211.20
2,302.80
9,211.20
2,302.80
11,514.00
40,400.00
10,100.00
40,400.00
10,100.00
50,500.00
7,878.00
1,969.50
7,878.00
1,969.50
9,847.50
5,252.00
1,313.00
5,252.00
1,313.00
6,565.00
53,530.00
13,382.50
53,530.00
13,382.50
66,912.50
TOTAL
LCC Cash
60.60
242.40
60.60
303.00
141.40
35.35
141.40
35.35
176.75
121.20
30.30
121.20
30.30
151.50
64.64
16.16
64.64
16.16
80.80
6,948.80
1,737.20
6,948.80
1,737.20
8,686.00
727.20
181.80
727.20
181.80
909.00
80.80
20.20
80.80
20.20
101.00
4,524.80
1,131.20
4,524.80
1,131.20
5,656.00
84.84
21.21
84.84
21.21
106.05
242.40
1,979.60
494.90
1,979.60
494.90
2,474.50
404.00
101.00
404.00
101.00
505.00
161.60
40.40
161.60
40.40
202.00
323.20
80.80
323.20
80.80
404.00
1,212.00
303.00
1,212.00
303.00
1,515.00
848.40
212.10
848.40
212.10
1,060.50
303.00
75.75
303.00
75.75
378.75
2,020.00
505.00
2,020.00
505.00
2,525.00
363.60
90.90
363.60
90.90
454.50
404.00
101.00
404.00
101.00
505.00
20,955.48
5,238.87
20,955.48
5,238.87
26,194.35
727.20
181.80
727.20
181.80
909.00
646.40
161.60
646.40
161.60
808.00
3,232.00
808.00
3,232.00
808.00
4,040.00
3,878.40
969.60
3,878.40
969.60
4,848.00
3,151.20
787.80
3,151.20
787.80
3,939.00
2,424.00
606.00
2,424.00
606.00
3,030.00
80.80
20.20
80.80
20.20
101.00
80.80
20.20
80.80
20.20
101.00
40.40
10.10
40.40
10.10
50.50
1st Tranche
KC Grant
MEN A. GAUDIANO
nicipal Engineer
2nd Tranche
LCC Cash
KC Grant
3rd Tranche
LCC Cash
KC Grant
40.40
8,000.00
2,000.00
8,000.00
2,000.00
360,998.23
90,249.56
TOTAL
LCC Cash
KC Grant
10.10
40.40
10.10
40.40
10.10
40.40
10.10
50.50
242.40
969.60
242.40
1,212.00
80.80
20.20
80.80
20.20
101.00
161.60
40.40
161.60
40.40
202.00
323.20
80.80
323.20
80.80
404.00
226.24
56.56
226.24
56.56
282.80
64.64
16.16
64.64
16.16
80.80
242.40
60.60
242.40
60.60
303.00
16,410.48
4,102.62
16,410.48
4,102.62
20,513.10
4,000.00
1,000.00
4,000.00
1,000.00
5,000.00
4,000.00
1,000.00
4,000.00
1,000.00
5,000.00
8,000.00
2,000.00
10,000.00
8,000.00
2,000.00
10,000.00
8,080.00
2,020.00
8,080.00
2,020.00
10,100.00
3,232.00
808.00
3,232.00
808.00
4,040.00
11,312.00
2,828.00
11,312.00
2,828.00
14,140.00
32,267.48
8,066.87
422,887.39
105,721.85
528,609.24
29,621.68
7,405.42
62,700.00
88,882.22
449,880.45
90,249.56
6,080.00
1,520.00
2,600.00
650.00
50.50
969.60
62,700.00
26,182.22
TOTAL
LCC Cash
27,202.52
1,749.05
18,313.71
27,202.52
1,749.05
18,313.71
59,470.00
9,815.92
47,935.39
71,698.45
7,405.42
62,700.00
1,749.05
73,447.50
134,398.45
1,749.05
136,147.50
557,285.84
107,470.90
664,756.74
6,080.00
1,520.00
7,600.00
650.00
3,250.00
2,600.00
2,336.58
18,574.56
1,663.42
1,425.44
18,574.56
3,375.00
16,858.30
-
4,151.86
16,858.30
4,000.00
4,000.00
1,425.44
20,000.00
3,375.00
3,375.00
4,151.86
21,010.16
27,254.56
6,970.44
2,336.58
16,858.30
5,815.28
44,112.86
15,122.30
59,235.16
477,135.01
97,220.00
59,470.00
12,152.50
64,793.69
13,220.70
601,398.71
122,593.20
723,991.90
600,703.20
117,260.80
75,087.90
14,657.60
75,087.90
14,657.60
750,879.00
146,576.00
897,455.00
80.00
123,568.19
10.00
15,617.90
10.00
10,294.21
20,040.80
Reviewed by:
2,505.10
1,436.90
Submitted by:
Noted by:
MARISSA PALANG-AT
BSMPC
GEORGE S.
Regional Community
AMOUNT
(PESO)
750,879.00
184,951.00
In-kind:
38,375.00
Cash:
146,576.00
935,830.00
REMARKS
TOTAL
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
1
REMARKS
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
1
REMARKS
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
1
REMARKS
PROPOSED
IMPLEMENTATION
SCHEDULE
MONTH
1
GEORGE S. ISULAT
Regional Community Infra. Engineer