Professional Documents
Culture Documents
Alcatel-Lucent
Distributed Base Station | B12
Installation Manual
3MN-00460-1511-RJZZA
Issue 4c | June 2013
Legal notice
Legal notice
Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other trademarks are the property of their respective
owners.
The information presented is subject to change without notice. Alcatel-Lucent assumes no responsibility for inaccuracies contained herein.
Copyright 2013 Alcatel-Lucent. All rights reserved.
Note:
Contents
About this document
Purpose
............................................................................................................................................................................................. xi
xi
........................................................................................................................................................................ xi
xi
...................................................................................................................................................................... xii
xii
Intended audience
....................................................................................................................................................................... xii
xii
Supported systems
...................................................................................................................................................................... xii
xii
........................................................................................................................................................ xii
xii
...................................................................................................................................................................... xii
xii
.................................................................................................................................................................................. xii
xii
Conventions used
........................................................................................................................................................................ xii
xii
................................................................................................................................................................................ xiii
xiii
How to comment
1
....................................................................................................................................................................... xiii
xiii
........................................................................................................................................................................ xiii
xiii
Safety Information
Structure of safety statements ............................................................................................................................................... 1-1
1-1
Overview
Overview ...................................................................................................................................................................................... 2-1
2-1
Presentation ................................................................................................................................................................................. 2-1
2-1
Preparation
.................................................................................................................................................................................. 2-7
2-7
Contents
....................................................................................................................................................................................................................................
Forms
.......................................................................................................................................................................................... 2-15
2-15
.............................................................................................................................................................................. 3-8
3-8
......................................................................................................................................................... 3-59
3-59
........................................................................................................................................................... 3-59
3-59
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
iv
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Contents
....................................................................................................................................................................................................................................
...................................................................................................................................................... 3-77
3-77
...................................................................................................................................................... 3-124
3-124
................................................................................................................................................. 3-131
3-131
........................................................................................................................................ 3-133
3-133
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
v
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Contents
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
vi
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
List of tables
3-1
......................................................................................... 3-10
3-2
3-3
.................................................................................. 3-10
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
vii
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
List of tables
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
viii
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
List of figures
2-1
........................................................................................... 2-2
2-2
2-3
3-1
............................................................ 3-13
3-2
............................................................ 3-14
3-3
3-4
3-5
L907/8 Cable
3-6
3-7
3-8
3-9
3-10
3-11
3-12
3-13
3-14
3-15
3-16
............................................................................ 2-3
.............................................................................................................................. 3-16
................................................................................................... 3-22
............................................................................................................................................................ 3-40
3-40
.......................................... 3-61
................................................................................................ 3-61
....................................................................................................................................................... 3-73
3-73
....................................................................................................................................................... 3-85
3-85
....................................................................................................................................................... 3-96
3-96
.............................................................................................................................. 3-108
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
ix
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
List of figures
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
x
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Purpose
This document describes the installation procedure for the Distributed BTS in the
Alcatel-Lucent BSS.
Reason for reissue
Issue number
4c
4b
4a
...................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
xi
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
None.
Other changes
None.
Intended audience
Installers
Site administrators
Project managers
Field service technicians
Supervisors
Occasional users (e.g. subcontractors).
Supported systems
This document applies starting with release B11 MR3 of the Alcatel-Lucent BSS.
How to use this document
No specific recommendation applies regarding the way readers should read this
document.
Safety information
For your safety, this document contains safety statements. Safety statements are given at
points where risks of damage to personnel, equipment, and operation may exist. Failure to
follow the directions in a safety statement may result in serious consequences.
Prerequisites
Conventions used
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
xii
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Vocabulary conventions
None.
Typographical conventions
Description
Italicized text
Emphasized information.
Document reference,
reference number
Related information
None.
Document support
For support in using this or any other Alcatel-Lucent document, contact Alcatel-Lucent at
one of the following telephone numbers:
Technical support
For technical support, contact your local Alcatel-Lucent customer support team. See the
Alcatel-Lucent Support web site (http://www.alcatel-lucent.com/support/) for contact
information.
How to order
To order Alcatel-Lucent documents, contact your local sales representative or use Online
Customer Support (OLCS) (http://support.alcatel-lucent.com)
How to comment
To comment on this document, go to the Online Comment Form (http://infodoc.alcatellucent.com/comments/) or e-mail your comments to the Comments Hotline
(comments@alcatel-lucent.com).
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
xiii
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
xiv
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Safety Information
1
This topic describes the components of safety statements that appear in this document.
General structure
E
L
P
M
CAUTION
Lifting hazard
SA
F
G
H
Item
Structure element
Purpose
Safety symbol
Signal word
Hazard type
Safety message
Avoidance message
...................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
1-1
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Safety Information
....................................................................................................................................................................................................................................
Item
Structure element
Purpose
Identifier
Signal words
Meaning
DANGER
WARNING
CAUTION
NOTICE
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
1-2
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
2
Overview
Purpose
This Overview gives information needed by project managers and foremen, for
presentation to the customer and for site planning.
Contents
Presentation
2-1
Preparation
2-7
Scheduling
2-8
Resources
2-9
Forms
2-15
Supplies
2-15
Presentation
Hardware Description
One SUMX 19 Inch module, providing the transmission termination and Base Station
Control function
Up to six RRH2x40 units, the main radio unit containing the transmitter and receiver
functions as well as the GSM baseband processing.
Star
...................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-1
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Presentation
....................................................................................................................................................................................................................................
Chain/Ring
Note: Is applicable only if One Logical Cell feature is available.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-2
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Presentation
....................................................................................................................................................................................................................................
The following table provides the weight and dimensions of the distributed BTS
components.
Characteristics
SUMX 19 Inch
Width (mm)
483
443
460
Height (mm)
56
300
300
Depth (mm)
312
150
154
18
18
The following table lists essential information about the distributed BTS.
Distributed BTS
Installation
On a pole or mast
On a wall.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-3
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Presentation
....................................................................................................................................................................................................................................
Distributed BTS
Position
Clearance
Note: The RRH can also be connected to the d2U V2 or BBU using the CPRI
interface with CCM boards.
Figure 2-3 Multi-standard configuration
HSO
RRH
2G/3G
CPRI
RRH
2G/3G
CPRI
HSO
GSM
SUMx 19
W-CDMA
d2U V2/BBU
RRH
2G/3G
HSO
CPRI
Cases
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-4
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Presentation
....................................................................................................................................................................................................................................
Options
Initial State
The equipments and the installation kits are packed and delivered on site.
Final State
None.
Grouped Task Sequence
The following figure shows the task sequence used to install a distributed BTS.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-5
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Presentation
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-6
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Preparation
....................................................................................................................................................................................................................................
Preparation
Prerequisites
The site must comply with the safety rules given in the General Wiring Handbook
The site is ready to receive the BTS, according to the SPP 68 - Specification for
Alcatel-Lucent Multi-Standard distributed BTS solution Site Preparation
The equipment is delivered on site (packed) with the associated kits (the BTS unit will
be put into position during commissioning).
The cabinet hosting the SUMX 19 Inch must:
As follows:
not allow unauthorized access to the equipment
The following site specific information is needed before starting the installation:
Site
As follows:
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-7
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Scheduling
....................................................................................................................................................................................................................................
Scheduling
Time based on technical constraints
The number of resources shown in the following table does not take into account
individual customer or safety requirements.
More time can be required, depending on the options to be installed and other site
constraints.
Grouped Task
Time / Task
10
10
10
40
20
50
10
Total
2h 30'
Notes:
1.
The time required depends on the options; refer to the following table.
The following table provides an estimate of the time required to install optional
equipment and to perform case-dependent tasks.
Grouped Task
Time / Task
2h
1h30
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-8
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Resources
....................................................................................................................................................................................................................................
Resources
Tools
The following tables describe the necessary hardware tools and installation kits.
Hardware Tools
Reference
OUT 001
OUT 024
Installation Kits
The following table lists the mandatory or optional delivery item kits.
The symbols used are:
mandatory kit
technical choice kit
[loz ] customer option kit.
Kits
Mnemonic
Code
Quantity
3BK 50198
AAAA
1 / site with 1,
2 or 3 RRH
3BK 50199
AAAA
1 / unit
3BK 50054
AAAA
1/unit
109761072
1/unit
109751768
1/unit
Lifting ring M8
1AD 01198
0005
2/installation
team
3BK 50400
AAAA
1/installation
team
1AB 29282
0001
1/RRH with
cable
2.5/4mm2
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-9
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Resources
....................................................................................................................................................................................................................................
Kits
Code
Quantity
300988607
1/RRH with
cable 6 mm2
3BK 50200
AAAA
1/ for 3 RRH
if Lg : max
30m
3BK 50200
ABAA
1/ for 8 RRH
if Lg : max
30m
3BK 50201
AAAA
1/ for 5 RRH
if Lg : max 48
m
3BK 50113
ABAA
1/ for 3 RRH
if Lg : max 72
m
1AB 27221
0001
1/RRH if Lg
>72m
3BK 50119
ABAA
1/for 2 RRH if
Lg > 72- 120m
3BK 08957
BAAA
1 / 5 sites if Lg
: 20 m
3BK 08957
BBAA
1/ for 12 sites
if Lg : 20 m
3BK 50098
AFAA
1 / SUMX
module
3BK 50194
AAAA
1/MBI
3BK 05360
BAAA
2/unit
3BK 05360
CAAA
2/unit
3BK 05360
DAAA
2/unit
849138136
1/RRH
849141684
1/RRH
849170519
1/RRH
849170675
1/RRH
Mnemonic
2
SU19DCP
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-10
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Resources
....................................................................................................................................................................................................................................
Kits
Mnemonic
Code
3BK 08942
AAAA
3BK 08942
ABAA
Quantity
CACOAX4
3BK 08940
AAAA
Lm / if 0 m<
L<100 m
CACOAX4
3BK 08940
ABAA
Lm / if 0 m<
L<100 m
CA120S
3BK 08941
AAAA
Lm/E1 cable
120 Ohm
jumpers
CACOAX1
3BK 08939
AAAA
Lm/E1 cable
75 Ohm
jumpers
1AB 24948
0001
2/SUMX 19
Inch
3BK 28905
ABAA
2/SUMX 19
Inch
3BK 08949
AAAA
2/SUMX 19
Inch
1AF 05068
AFAA
1/RRH if
RETA length <
3m
1AF 05068
AGAA
1/RRH if
RETA length <
5m
1AF 05068
AKAA
1/RRH if
RETA length <
10m
1AF 05068
AHAA
1/RRH if
RETA length <
25m
1AF 05068
ACAA
1/RRH if
RETA length <
40m
1AF 05068
AJAA
1/RRH if
RETA length <
50m
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-11
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Resources
....................................................................................................................................................................................................................................
Kits
Mnemonic
Code
Quantity
1AF 05068
AAAA
1/RRH if
RETA length <
80m
849147590
1/RRH if SM
Lg<2.5m
849134879
1/RRH if SM
Lg<5m
849122239
1/RRH if SM
Lg<15m
849125380
1/RRH if SM
Lg<30m
849122247
1/RRH if SM
Lg<50m
849123591
1/RRH if SM
Lg<70m
849125398
1/RRH if SM
Lg<85m
849123609
1/RRH if SM
Lg<100m
849125406
1/RRH if SM
Lg<150m
849125414
1/RRH if SM
Lg<200m
849125422
1/RRH if SM
Lg<250m
849125430
1/RRH if SM
Lg<300m
849147608
1/RRH if MM
Lg<2.5m
849125513
1/RRH if MM
Lg<5m
849122270
1/RRH if MM
Lg<15m
849125521
1/RRH if MM
Lg<30m
849122288
1/RRH if MM
Lg<50m
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-12
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Resources
....................................................................................................................................................................................................................................
Kits
Mnemonic
Code
Quantity
849123633
1/RRH if MM
Lg<70m
849125539
849123641
849125547
849125554
849125562
849125570
1AB 18728
0029
1AB 19467
0019
1AB 19467
0018
1AB 18728
0063
1AB 18728
0064
1AB 18728
0065
1AB 18728
0066
1AB 02722
0001
1/RRH unit
Mnemonic
Code
JS10
1AD 06634
0011
LAB
1AD 02853
0001
MP24
1AD 02844
0001
DDF
1AD 02846
0001
Quantity
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-13
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Resources
....................................................................................................................................................................................................................................
Mnemonic
Code
FKW
1AD 02844
0001
FKR
1AD 02845
0001
Quantity
1AB 02546
0013
If needed
1AD 04119
0001
2/Cable or 16
block by
MP24
1AB 37520
0001
2/Cable
1AB 00642
0011
2/Jumper
1AB 02546
0013
2/Jumper
1AB 08579
0001
1 for 2 STM1
1AB 08579
0002
1/Casket
1AB 16987
0016
1/Cable
optical fiber
SM for FC
connection
customer
1AB 30026
0001
1/Cable
optical fiber
MM for FC
connection
customer
1AD 03905
0001
1 rack for
SUMX if
needed
1AD 17013
0001
1 if needed
with labo rack
3BK 28310
AAAA
1 for 6 sites if
length 15m
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-14
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Forms
....................................................................................................................................................................................................................................
Forms
Overview
You must have the Site Premises Inspection Form (CEL) (8BL 00704 0015 DRBRA).
Supplies
Overview
The following table lists the necessary items that are not included in the Alcatel-Lucent
kits.
Consumable Supplies
Quantity
Indelible markers
1 / rack
Lugs
1 / rack
Adhesive tape
Applicable Documents
You must have the following documents, or have electronic access to the following
documents:
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-15
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Supplies
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
2-16
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
Purpose
Install Distributed BTS presents all the checks needed before starting the installation, and
all detailed tasks to be performed onsite.
Contents
Before Going Onsite
3-3
3-3
3-4
3-4
Check Equipment
3-5
3-5
3-6
3-6
3-6
3-7
Install Cables
3-8
3-18
Clearance Recommendations
3-18
3-19
3-25
3-36
3-38
...................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-1
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Overview
....................................................................................................................................................................................................................................
3-53
3-56
3-59
3-59
Installation Procedure
3-59
3-60
3-63
3-63
Clearance Recommendations
3-63
3-66
3-77
3-100
3-103
3-113
3-124
3-127
3-131
3-133
3-133
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-2
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Before going onsite, you must check that the following information and supplies are
available:
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-3
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Check that safety precautions have been taken in accordance with the General Wiring
Handbook
Check if any Cases (p. 2-4) and Options (p. 2-5) apply
Complete the header field of the Installation Manual Generic CCL
Refer to the Tools Catalogue for Field Activity for GSM and note the measurement
accuracy when indicated in the tool kit list.
Complete the Site Premises Inspection Form (CEL)
Check that the resistance of the antistatic wrist strap is greater than 1MOhm. Connect
the anti-static wrist strap to the rack earth.
Required Knowledge
The safety rules and precautions given in the General Wiring Handbook
How to document faults and anomalies, as described in the General Wiring Handbook
.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-4
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Check Equipment
How to Check Equipment
Procedure
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-5
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
This section tells you how to run cables towards the BTS and how to connect the cables.
The distance between the cable tray and BTS housing must be less than 15 cm
The following cable ways groups must be isolated:
As follows:
Power and ground cables
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-6
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
When the distance between the RRH, and the power box and the DDF is less than 70
cm, only flexible metallic pipe must be used for a wall installation
On the RRH side, the conduit must reach the middle bottom end of the RRH, and stop
at 40 cm below the cover
On the power box and DDF box sides, the conduit must stop 25 cm above the
equipment
At each end of the conduit, flexible metallic pipe must be used to guide the cables
inside the covers (RRH, power box and DDF)
Two different conduits must be used:
As follows:
One for power and ground cables
One for optical fiber and alarm cables.
Mast Installation
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-7
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Install Cables
....................................................................................................................................................................................................................................
Install Cables
Procedure
Note: On the RRH side, all the cables are connected at the lower part of the module.
Run Earth Cable to Equipment
Use an earth cable and lugs, as described in Supplies (p. 2-15), to connect to earth.
...................................................................................................................................................................................................
To avoid confusion, clearly identify the earthing connection to a trolley, and the earthing
plate.
...................................................................................................................................................................................................
Cut the cable to the required length. On the RRH, the cable must reach the bottom middle
side of the module.
Leave a reserve of 10 cm for connection purposes.
...................................................................................................................................................................................................
On the earth terminal side, strip 10 mm of cable insulation and crimp one lug on that end.
...................................................................................................................................................................................................
Choose the required terminal to connect the cable to the trolley or to the earthing plate:
As follows:
...................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-8
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Install Cables
....................................................................................................................................................................................................................................
WARNING
Optional Content
Optional Content added above. Please modify as needed.
Do not work under power. Open the circuit breakers to ensure that the power supply is
disconnected.
Run and connect the power supply cable to the site power terminal:
...................................................................................................................................................................................................
Cut the cable to the required length. On the RRH side, the cable must reach the bottom
side of the module.
Leave a reserve of 40 cm for connection purposes.
...................................................................................................................................................................................................
On the site power terminal, strip the power cable and terminate each wire with a ferrule or
a cable lug.
...................................................................................................................................................................................................
Connect the power cable to the corresponding circuit breaker within the power terminal
(line L, neutral N and protective earth PE).
...................................................................................................................................................................................................
If there is more than one RRH on the site, check that the power supply circuit breakers are
labeled.
E...................................................................................................................................................................................................
N D O F S T E P S
Result
The power supply cable is run and connected to the site power terminal.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-9
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Install Cables
....................................................................................................................................................................................................................................
4 pair L907 cable (120 ohm) for lengths less then 100 m
L904 cable (120 ohm) for lengths between 100 m and 300 m
...................................................................................................................................................................................................
Cut the cable to the required length. On the rack where the SUMX 19 Inch is installed,
the cable must reach the middle of the SUMX 19 Inch.
Leave a reserve of 20 cm at one end for connection purposes.
...................................................................................................................................................................................................
Strip the cable and affect the pair numbers, as shown in the following tables:
Table 3-1
Quad 1
White
Grey
TX
Abis 2
Blue
Purple
TX
Abis 1
Quad 2
Yellow
Grey
RX
Abis 2
Brown
Purple
RX
Table 3-2
Coax number
Abis
Abis IN RX
Abis OUT RX
Abis IN TX
Abis OUT TX
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-10
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Install Cables
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
To connect the cables on the DDF, proceed according to the type of DDF already installed
or to be installed on the site (refer to the site documentation).
...................................................................................................................................................................................................
Result
Run the external alarms cable from the SUMX 19 Inch to the DDF or the sensors.
...................................................................................................................................................................................................
Cut the cables to the required length. On the RRH side, the cable must reach the bottom
of the module.
Leave a reserve of 20 cm at one end for connection purposes.
...................................................................................................................................................................................................
Connect the cables to their sensors or to the DDF (refer to the site documentation).
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-11
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Install Cables
....................................................................................................................................................................................................................................
Result
Quad 1
Color
1/2
White
Grey
Blue
5/6
Purple
Yellow
Grey
Brown
Purple
CAUTION
Optional Content
Optional Content added above. Please modify as needed.
The antenna connectors must be dry before connection.
Note: Antenna jumpers will be connected to the antenna outputs of the RRH after the
module installation.
The corresponding ends of antenna jumpers are protected by a protection cap.
On the RRH side, the antenna jumpers must reach the bottom part of the module
housing and there must be at least 30 cm of cable available for connection.
For Indoor Sites
To connect the feeders:
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-12
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Install Cables
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-13
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Install Cables
....................................................................................................................................................................................................................................
Figure 3-2 First Tighten Manually, then Use the Specific Tightening Tool
...................................................................................................................................................................................................
...................................................................................................................................................................................................
Fit the rubber splicing tape (3) of Figure 3-3, Water Proof the Connections
(p. 3-16) over the vinyl electrical tape.
Start taping from 20 mm top of the connector (coaxial cable side) and go down stretching
and overlapping (50%) 20 mm over the connector (1 layer).
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-14
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Install Cables
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Fit the vinyl electrical tape (1) over the rubber splicing tape.
Start taping from 30 mm from the connector (jumper side) and go down stretching and
overlapping (50%) 30 mm over the connector (1 layer).
At the end of taping do not stretch the tape in the last few turns.
...................................................................................................................................................................................................
Secure with tie wraps to avoid tape removing (2) of Figure 3-3, Water Proof the
Connections (p. 3-16).
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-15
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Install Cables
....................................................................................................................................................................................................................................
E...................................................................................................................................................................................................
N D O F S T E P S
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-16
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Install Cables
....................................................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-17
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Clearance Recommendations
....................................................................................................................................................................................................................................
At the top of SUMX19 Inch unit: 1UE (44,45 mm, for natural convection)
Bottom clearance: 0 mm.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-18
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Note: The following table lists the items required to complete the task.
Description
Reference
Kit
SUMX 19 Inch
WARNING
Optional Content
Optional Content added above. Please modify as needed.
Before making any electrical connections, ensure that:
Open the door of the BTS where the SUMX 19 Inch must be installed.
...................................................................................................................................................................................................
Connect the power cable supplying the SUMX 19 Inch to the subrack cable.
Note: For MBI5 it can be connected to the free power cable of SR1 subrack.
...................................................................................................................................................................................................
Install the 19 Inch adapter on the uprights below the lowest subrack.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-19
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Install the SUMX 19 Inch on the 19 Inch adapter and secure it with the provided screws.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-20
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Note: The bracket on the SUMX should be fixed in the middle position.
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-21
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
E...................................................................................................................................................................................................
N D O F S T E P S
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-22
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Result
Note: The following table lists the items required to complete the task.
Description
Reference
Kit
SUMX 19 Inch
WARNING
Optional Content
Optional Content added above. Please modify as needed.
Before making any electrical connections, ensure that:
Open the door of the BTS where the SUMX 19 Inch must be installed.
...................................................................................................................................................................................................
Connect the power cable supplying the SUMX 19 Inch to the subrack cable.
Note: For MBO/MBOE it can be connected to the PDU1 (Power Distribution Unit)
connector at (BOMU/BOMUE).
...................................................................................................................................................................................................
Install the SUMX 19 Inch in its final position and secure it with the provided screws.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-23
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Note: The bracket on the SUMX should be fixed in the middle position.
...................................................................................................................................................................................................
Connect the power cable to the SUMX 19 Inch. See Figure 3-4, SUMX 19 Inch Ground
and Power Cables (p. 3-22).
E...................................................................................................................................................................................................
N D O F S T E P S
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-24
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
The following table lists the items required to complete the task.
Description
Reference
Kit
SUMX 19 Inch
WARNING
Optional Content
Optional Content added above. Please modify as needed.
Before making any electrical connections, ensure that:
Open the door of the S6 cabinet where the SUMX 19 Inch must be installed.
...................................................................................................................................................................................................
Install the SUMX 19 Inch in a free slot in the customer equipment area and secure it with
the provided screws.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-25
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-26
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-27
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-28
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Connect the power cable to the SUMX 19 Inch. See Figure 3-4, SUMX 19 Inch Ground
and Power Cables (p. 3-22).
...................................................................................................................................................................................................
On the connection area loosen the screws from both sides of the cover protection then
remove the cover.
...................................................................................................................................................................................................
Connect the power cable supplying the SUMX 19 Inch to the distribution unit, -48V RRH
area.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-29
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
When finished, install the cover on the connection area and secure it with the screws.
E...................................................................................................................................................................................................
N D O F S T E P S
Result
WARNING
Optional Content
Optional Content added above. Please modify as needed.
Before making any electrical connections, ensure that:
Open the door of the Md6 cabinet where the SUMX 19 Inch must be installed.
...................................................................................................................................................................................................
Install the SUMX 19 Inch in a free slot in the customer equipment area and secure it with
the provided screws.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-30
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-31
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-32
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-33
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Connect the power cable to the SUMX 19 Inch. See Figure 3-4, SUMX 19 Inch Ground
and Power Cables (p. 3-22).
...................................................................................................................................................................................................
Connect the power cable supplying the SUMX 19 Inch to the distribution unit.
E...................................................................................................................................................................................................
N D O F S T E P S
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-34
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-35
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
The following table lists the items required to complete the task.
Description
Reference
Kit
SUMX 19 Inch
Procedure
WARNING
Optional Content
Optional Content added above. Please modify as needed.
Before making any electrical connections, ensure that:
Open the door of the cabinet where the SUMX 19 Inch must be installed, if applicable.
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-36
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Install the SUMX 19 Inch in its final position and secure it with the provided screws.
...................................................................................................................................................................................................
Connect the power cable supplying the SUMX 19 Inch to the cabinet distribution unit.
See Figure 3-4, SUMX 19 Inch Ground and Power Cables (p. 3-22).
E...................................................................................................................................................................................................
N D O F S T E P S
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-37
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Note: The following table lists the items required to complete the task.
Description
Reference
Kit
849147590
849147608
SFP transceiver *
* : Refer to Resources (p. 2-9) for more optical fiber cables and SFP variants
To connect the E1 optical fiber cables:
...................................................................................................................................................................................................
Run the optical fiber cables through the cable gland/cable entry inside the cabinet.
...................................................................................................................................................................................................
Insert a SFP transceiver module in the OPT1 slot and lock it.
...................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-38
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Note: The following table lists the items required to complete the task.
Description
Reference
Kit
or
or
Run the E1 cables through the cable gland/cable entry inside the cabinet.
Note: Around 20m of cable is used per site. The cable roll is to be reused from site to
site.
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-39
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-40
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Connect the cable to the F6 adapter for Port 2 as described in the following table.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-41
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
The following table gives the wires color, connecting position and signal.
Table 3-3
Connector
Position
Signal
Quad 1
white
Port 1
Abis1/TX
grey
Abis1/TX
Abis2/TX
Abis2/TX
Abis1/RX
Abis1/RX
Abis2/RX
Abis2/RX
blue
Port 2
violet
Quad 2
yellow
grey
brown
violet
Port 1
Port 2
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-42
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Table 3-3
(continued)
Connector
Position
Signal
...................................................................................................................................................................................................
Connect the cable to the F6 adapter for Port 1 as described in the previous table.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-43
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
10
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-44
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
11
Connect the SUMX_AP Abis cable between the Port 1/2 connector on SUMX 19 Inch
connection area and the E1 Port 1/2 connector on SUMX main board.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-45
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
12
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-46
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Note: The following table lists the items required to complete the task.
Description
Reference
Kit
or
or
Run the E1 cables through the cable gland/cable entry inside the cabinet.
Note: Around 20m of cable is used per site. The cable roll is to be reused from site to
site.
...................................................................................................................................................................................................
Using Hot Air Blower, fit a heat shrink sleeve on each coaxial. Fit a rubber sleeve on head
of cable
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-47
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Connect the cable to the F6 adapter for Port 2 as described in the following table.
The following table gives the wires connecting position and signal.
Coaxial
Connector
Position
Signal
Port 1
4 -braid
Abis 1 (TX)
5 -inner conductor
2
Port 1
1 - braid
Abis 1 (RX)
2 - inner conductor
3
Port 2
4 -braid
Abis 2 (TX)
5 -inner conductor
4
Port 2
1 - braid
Abis 2 (RX)
2 - inner conductor
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-48
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Connect the cable to the F6 adapter for Port 1 as described in the previous table.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-49
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-50
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
10
11
Fit two SP2M 75-ohm adapter at PCM sub-D connector Port1 and Port2 on SUMX
connection area.
...................................................................................................................................................................................................
12
Connect the SUMX_AP Abis cable between the Port 1/2 connector on SUMX 19 Inch
connection area and the E1 Port 1/2 connector on SUMX main board.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-51
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
13
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-52
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
The following table lists the items required to complete the task.
Description
Reference
Kit
849147590
849147608
SFP transceiver *
or
1AB 18728 0065 (for both SUMX/d2U and
RRH)
or
1AB 18728 0018 (for SUMX/d2U) with
1AB 18728 0019 (for RRH)
Notes:
1.
* Refer to Resources (p. 2-9) for more optical fiber cables and SFP variants
Procedure
Run the optical fiber cables through the cable gland/cable entry inside the cabinet.
...................................................................................................................................................................................................
For each cable to be connected insert a SFP transceiver module in the HSO1, HSO2 and
HSO3 slots and lock it.
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-53
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
To:
HSO1 the cable for RRH1 (HSO1)
HSO2 the cable for RRH2 (HSO1)
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-54
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-55
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
The following table lists the items required to complete the task.
Description
Reference
Kit
or
or
Procedure
Run the external alarm cables through the cable gland/cable entry inside the cabinet.
Note: Around 20m of cable is used per site. The cable roll is to be reused from site to
site.
...................................................................................................................................................................................................
On the SUMX19 Inch subrack connection area remove the straps from the position where
the external alarms will be connected.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-56
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Connect the external alarm cables to the connectors on SUMX19 Inch subrack connection
area.
Quad 1
Position
Pin
Signal
XI25
Alarm 1 In
GND
Alarm 2 In
GND
Alarm 3 In
GND
Alarm 4 In
GND
XI26
XI27
XI28
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-57
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Quad 2
Position
Pin
Signal
XI29
Alarm 5 In
GND
Alarm 6 In
GND
Alarm 7 In
GND
Alarm 8 In
GND
XI30
XI31
XI32
...................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-58
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Installation Procedure
Overview
In an Indoor BTS (for details refer to 08-6180 Alcatel-Lucent 9926 BBU Installation
Manual in MBI Cabinet)
In an Outdoor BTS (for details refer to 08-6168 Alcatel-Lucent 9926 BBU Installation
Manual in MBO Cabinet)
In any other cabinet allowing 19 Inch modules installation in horizontal position (for
details refer to 08-6182 Alcatel-Lucent 9926 BBU Installation Manual in Standalone
Configuration)
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-59
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
The following table lists the items required to complete the task.
Description
Reference
Kit
849147590
849147608
SFP transceiver *
or
1AB 18728 0065 (for both SUMX/d2U and
RRH)
or
1AB 18728 0018 (for SUMX/d2U) with
1AB 18728 0019 (for RRH)
Notes:
1.
* Refer to Resources (p. 2-9) for more optical fiber cables and SFP variants
Procedure
Run the optical fiber cables through the cable gland/cable entry inside the cabinet.
...................................................................................................................................................................................................
For each cable to be connected insert a SFP transceiver module in the Optic1, Optic2 and
Optic3 slots and lock it.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-60
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Figure 3-6 Optical Connectors Location on the d2U V2 or BBU with CCM boards
...................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-61
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-62
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
This section tells you how to position and fix the RRH equipment.
Clearance Recommendations
Procedure
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-63
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Clearance Recommendations
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-64
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
Clearance Recommendations
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-65
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Fix the equipment on a wall, for an indoor installation, without using the cover:
The following table lists the items required to complete the task.
Description
Reference
Kit
Expanding plug
Screw HM 10 x 70 mm
Mounting bracket
Screw M8 x 30 mm
Lifting ring M8
RRH mounting
bracket kit
3BK 50054 AA
Procedure
Mark the position of the fixation holes, using the dimensions shown in the following
drawing and using a spirit level.
Note: Four fixation points must be used. Depending on wall condition select the
apropriate holes using two from the upper row and two from the lower row.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-66
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-67
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Punch, drill and plug the hole (use the fixation method appropriate to the type of wall, as
shown in the following figure.
...................................................................................................................................................................................................
Mount the frame on the wall, using the flanges, screws and washers, without tightening
them, as shown in the following figure.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-68
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
If the distance bolts are not attached to the mounting frame tighten it using a maximum
torque of 14 Nm.
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-69
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
...................................................................................................................................................................................................
Use the lifting kit, if available, to lift the RRH up to the mounting frame level.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-70
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-71
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-72
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
10
In case the lifting rings are not available or the thread in the RRH body is missing, attach
the lifting kit to the RRH, between the fins, on the position closer to the RRH sides.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-73
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
11
Fit the RRH module on the support and tighten the securing screws at the bottom side of
the module.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-74
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
E...................................................................................................................................................................................................
N D O F S T E P S
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-75
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-76
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Fix the equipment on a mast, for an outdoor installation, using the cover:
Installation for Pole Diameter from 50 mm to 152 mm
The following table lists the items required to complete the task.
Description
Reference
Kit
Pole bracket
849118823
84933954
Screw M10 x 20 mm
901342667
Bolt M10 x 80 mm
901342923
901264747
901344309
Mounting bracket
Screw M8 x 30 mm
3BK 50054 AA
Lifting ring M8
109761072
Procedure
Identify the position where the equipment must be installed (see Site-Specific
Information (p. 2-7)).
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-77
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-78
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Attach the assembly to the pole but do not tighten the screws.
...................................................................................................................................................................................................
In case of back to back installation, cut the threaded rod at 200 mm length and install the
second support.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-79
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-80
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-81
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
...................................................................................................................................................................................................
Use the lifting kit, if available, to lift the RRH up to the mounting frame level.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-82
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-83
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-84
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
10
In case the lifting rings are not available, attach the lifting kit to the RRH, between the
fins, on the position closer to the RRH sides.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-85
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
11
Fit the RRH module on the support and tighten the securing screws.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-86
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
E...................................................................................................................................................................................................
N D O F S T E P S
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-87
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Result
Note: The following table lists the items required to complete the task.
Description
Reference
Kit
Mounting bracket
Screw M8 x 30 mm
3BK 50054 AA
849021829
849123179
109751768
Bolt/Clamp
901341867
Washer flat
901344564
901344648
Bolt M10 x 25 mm
901341651
Lifting ring M8
Identify the position where the equipment must be installed (see Site-Specific
Information (p. 2-7)).
You must have the following equipment.
Description
Reference
Pole bracket
849118823
849118815
84933954
Screw M10 x 20 mm
901342667
Bolt M10 x 80 mm
901342923
901264747
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-88
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Description
Reference
Plain washer
901344309
Mounting bracket
3BK 50054 AA
Screw M8 x 30 mm
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-89
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-90
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Attach the assembly to the pole but do not tighten the spanner nuts.
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-91
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-92
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Use the lifting kit, if available, to lift the RRH up tp the mounting frame level.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-93
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-94
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-95
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
In case the lifting rings are not available, attach the lifting kit to the RRH, between the
fins, on the position closer to the RRH sides.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-96
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Fit the RRH module on the support and tighten the securing screws.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-97
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
E...................................................................................................................................................................................................
N D O F S T E P S
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-98
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-99
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Note: The ground cable is connected to the bottom middle part of the RRH.
The following table lists the items required to complete the task.
Description
Ground Y/G cable 16 mm2 in 100m roll
2
Reference
Kit
Basic installation
kit
3BK 50198 AAxx
Procedure
...................................................................................................................................................................................................
Cut the ground cables to the necessary length, as shown in the following figure.
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-100
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
E...................................................................................................................................................................................................
N D O F S T E P S
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-101
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-102
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
The following table lists the items required to complete the task.
Description
Reference
Kit
300972874
300988607
Basic installation
kit
3BK 50198 AAxx
WARNING
Optional Content
Optional Content added above. Please modify as needed.
Do not work under power. Open the circuit breakers to ensure that the power supply is
disconnected.
To connect the power cable:
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-103
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
If 10 mm2 cables are used, fit the 6mm2 to 10mm2 adapter on the cables.
...................................................................................................................................................................................................
Run the cable through the connector lower part (1) and sealing rings (2).
Note: When shielded cable is used the shield must be connected to position (3) of the
power connector. See Figure 3-16, Cables Connection Position (p. 3-108).
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-104
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-105
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Run the cables with terminals connected in the connector body (4).
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-106
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-107
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
10
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-108
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
11
12
13
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-109
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-110
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
14
Result
The power cable is connected from one RRH to the power panel.
Procedure for cable with connector
WARNING
Optional Content
Optional Content added above. Please modify as needed.
Do not work under power. Open the circuit breakers to ensure that the power supply is
disconnected.
To connect the power cable:
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-111
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Result
The power cable is connected from one RRH to the power panel.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-112
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
The following table lists the items required to complete the task.
Description
Reference
Kit
849147590
849147608
SFP transceiver *
Notes:
1.
* Refer to Resources (p. 2-9) for more optical fiber cables and SFP variants
Procedure
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-113
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-114
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Insert the LC connectors into the nut spiral (2) along the cable assembly.
...................................................................................................................................................................................................
Insert the tightening cone (3) and slide it over the cable jacket.
...................................................................................................................................................................................................
Place and close over the cable the clamp nut (5) over the clamp split gasket (4).
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-115
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-116
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Insert the LC connectors into the plug body (1) and Insert the tightening cone into the nut
spiral.
...................................................................................................................................................................................................
Insert the sub-assembly [ clamp nut (5) + clamp split gasket (4)] into the plug body (1).
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-117
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Begin manually to thread the nut spiral (included tightening cone) (2) onto the plug body
(1). Do not tighten the nut.
...................................................................................................................................................................................................
10
11
Identify one SFP transceiver and remove protector cover from transceiver.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-118
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
12
Insert the SFP optical transceiver in the appropriate location and lock it.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-119
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
13
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-120
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
14
...................................................................................................................................................................................................
15
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-121
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
16
Push and Rotate clockwise the coupling nut (7) until secured onto the receptacle.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-122
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
17
Begin to thread manually the nut spiral (2) and then apply torque via 21 mm adapted
wrench to achieve approximately 3.5 N.m torque.
...................................................................................................................................................................................................
18
19
In case of chain or ring configuration, use the same procedure to connect the optical fiber
cable between:
HS02 port of one RRH and the HS01 port of the next RRH in the chain or ring, for
RRH middle position
HS02 port of the last RRH in the ring and the SUMX 19 Inch, for RRH end position.
Note: In case of RRH connection to d2U, use the same procedure to connect the
optical fiber cable between CPRI PRI port of the RRH and d2U.
E...................................................................................................................................................................................................
N D O F S T E P S
Result
The optical fiber cable is connected from one RRH to the SUMX 19 Inch.
Note: Following the procedure the connection of the RRH to the d2U can also be
achieved.
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-123
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
The following table lists the items required to complete the task.
Description
Reference
Kit
Procedure
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-124
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-125
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-126
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
The following table lists the items required to complete the task.
Description
Reference
Kit
849138136
849141684
849170519
849170675
The following table lists the wire color of the RRH alarm cable.
Pin Number
Function
Color Code
Alarm 4 (P)
White / Brown
Green
Alarm 1 (P)
White / Black
Orange
Alarm 2 (P)
White / Orange
Alarm 4 (N)
Brown
Alarm 3 (P)
White / Green
Black
The following table lists the RRH alarm cable pin-definition for GSM.
Pin Number
Cable Color
Alarm
GND
White / Brown
Alarm 1
Green
Alarm 2
White / Black
Orange
GND1
White / Orange
Brown
White / Green
GND2
Black
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-127
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Procedure
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-128
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-129
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-130
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Note: This cable must be connected only if the Remote Electrical Tilt (RET) or Tower
Mounted Amplifier (TMA) is used.
The following table lists the items required to complete the task.
Description
Reference
Kit
Procedure
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-131
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
...................................................................................................................................................................................................
Result
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-132
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
Close and lock the cabinet door. Return the key to the site manager.
...................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-133
3MN-00460-1511-RJZZA B12
Issue 4c June 2013
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
Alcatel-Lucent Distributed BTS
3-134
3MN-00460-1511-RJZZA B12
Issue 4c June 2013