Q: 1 Pick the right combination of key words that appear in the quality policy:
Innovative and competitive products, in time, within budget, high quality, continual improvement
Innovative and competitive products, zero defects, continual improvement
Innovative and competitive products, engineering leadership, zero defects
Q: 4 You want more information on the steps involved in size estimation and the responsibilities for the same. For this, you will refer to:
The estimation worksheets
The quality manual
The procedure for estimation
The projects technical documentation
Q: 8 One of the samples given below follows a wrong versioning convention. Identify the same:
Project Plan-V1.0
Project Plan-V2.0
Project Plan-Ver2.0
1& 2
https://tools.ctdc.siemens.co.in/eLeCT/User/ViewQuestionAnswer.aspx
7/10/2014
Page 2 of 3
a&b
Q: 13 A change in the requirements during the course of the project has to go through the:
SEPG
PIB
CCB
QMS
Q: 17 The three ingredients that are important in developing quality software are:
Mission & vision, business partner requirements, statutory requirements
Code quality, product quality, process quality
People, process, technology
None of the above
Q: 21 For my project plan document, the reviewers are located at different locations. I can use a:
Offline review method
Walkthrough review
Inspection review
https://tools.ctdc.siemens.co.in/eLeCT/User/ViewQuestionAnswer.aspx
7/10/2014
Page 3 of 3
Q: 24 Which of these roles is responsible for identifying the CAPA candidates for Org CAPA?
Process manager
QA manager
a or b
Auditor
Q: 27 The actual values for the defect density in a project are well within the specification limits, but, they show a decreasing trend. This:
Does not require any analysis
Requires further investigation and analysis
Requires comparison with a different set of metrics
None of the above
Q: 29 Which of these is not a pre-requisite for starting the project planning process:
Draft/approved PQP
Signed Project Agreement / Contract
Process Categorization is done
Availability of test specifications