NOTE
OISD publications are prepared for use in the oil and gas industry under
Ministry of Petroleum & Natural Gas. These are the property of Ministry of
Petroleum & Natural Gas and shall not be reproduced or copied and loaned or
exhibited to others without written consent of OISD.
Though every effort has been made to assure accuracy and reliability of
the data contained in the documents. OISD hereby expressly disclaims any
liability or responsibility for loss or damage resulting from there use.
These documents are intended only to supplement and not to replace
the statutory requirements
( i )
FOREWORD :
This standard has been compiled to give information to all the users
about safety precautions to be observed while carrying out various
wireline jobs. This standard should be used as a guide for safe
wireline operations.
The standard also deals with the wireline job specific safety
precautions which will help to reduce chances of accident while
executing such jobs. With the advancement in well completion
technology, wireline operation is also becoming a complicated
activity.
In the absence of concrete safe operation and maintenance
procedures in wireline operation, a comprehensive document on this
subject matter is the need of the hour. Accordingly, OISD formed a
functional committee to make this document (OISD standard-185 ) on
safe practices in Wireline operations. This document is based on
the knowledge & experience of industry members and information on
national & international recommended practices. This document is to
be used as a reference only and not as a replacement of existing
recommended and accepted practices and codes available on the
subject. The contents of this document, when followed, will go a long
way to improve safety and reduce accidents in Oil & Gas industry.
Suggestions for from the users of this standard shall highly be
appreciated, to improve the document further.Suggestions for
improvement to this standard should be addressed to:
The Coordinator,
Committee on Wireline operations
OIL INDUSTRY SAFETY DIRECTORATE
7th Floor, New Delhi House
27-Barakhamba Road
New Delhi 110001
( ii )
COMMITTEE
ON
WIRE LINE OPERATIONS
Name
1.
Shri
2.
Organisation
D. Kumar
Position in
Committee
ONGC
Leader
Shri B. Das
OIL
Member
3.
ONGC
Member
4.
ONGC
Member
5.
Shri P. Saikia
OIL
Member
6.
ONGC
Member
7.
OISD
( iii )
Member -Coordinator
CONTENTS
Sr. No.
1.
2.
3.
4.
5.
6.
7.
8.
Description
Introduction
Scope
Description of Wireline Equipment /Tools
a) Surface Equipment
b) Wireline tools
Recommended Safe Handling and Maintenance practices
for wireline equipment
Different types of wireline operations
Recommended safe
procedures and practices for
operations
a) General
b) Onshore
c) Offshore
Job specific safe practices
References
Page
no.
1
1
1
1
4
7
12
13
17
19
21
24
( iv)
1.0 INTRODUCTION:
shore oil & gas production activities. It also
Wireline operations are in practice since the
covers
the
recommended
maintenance
operations. Wireline is
maintenance
to set,
of
schedules,
the
rejection
testing
equipment,
&
where-ever
lift valves.
With
the
advancement
of
oil
3.0
grew
in
complexity.
The
wireline
3.1.0
SURFACE EQUIPMENT
the
operations
operation.
truck
mounted
winches
are
various
surface
equipment
3.1.1
Wireline
operations.
Wireline
operations.
The
common
and 0.108.
This
standard
covers
the
safe
or
constant
speeds
are
desired,
240,000 psi.
API specification 9A
wire specifications.
strength is required.
sometimes used.
This line is
Grease
injection
head
is
are used. One reel is for routine wireline work, and has approximately
3.1.2
Measuring device:
3.1.5
Weight indicators:
reel
to
the
stuffing-box
sheave,
3.1.6
Electronic.
perform
work
on
well
under
circular
drum
and
assorted
and
wireline.
Present
day
reels
have
gland.
sheave
which
guides
the
(H2S) or CO2.
The lubricator is
update.
3.1.8
Quick unions:
completely
seals
the
flow
and
(including
electric
3.1.9
Line wipers
line)
3.1.7
Lubricator
maintenance
and
house
keeping
The
with
entire
location.
wireline
line.
connections.
quick
For
unions.
The
offshore
This line
to
providing
In
positive
3.2.0
WIRELINE TOOLS
3.2.1.
Bailer:
pressure
from
the
lubricator
line.
by
It is
manually
or
well.
3.2.2
Blanking Plug :
devices.
loaded
sealing section
governing
offshore
Regulation
wire-line
In the basic
plug
bean
construction
assembly
which
and
plugs the
both direction.
3.2.3 Blind Box:
It is a service tool used when heavy
at wireline socket.
When
the
work
is
Wire-line boats
3.2.5 Fish:
Any object left in the well-bore during
drilling, workover and well servicing
operations.
3.2.6 Fishing Neck:
well.
control devices.
3.2.8 Go-Devil:
3.2.15 Scraper:
deposits
tubing.
(as
scale,
paraffin)
from
sleeve.
tool
used
to
selectively
locate
enabling it
deviated wells or
crooked tubing.
used to cut
stuck
tubing .
4.0
Percussion
tool
that
operates
on
MAINTENANCE
PRACTICES
4.1
units
are
required
Diesel
to
be
retrieval.
bearings
Flange
sprockets
assembly
Reel drive and level wind drive
chains
All
of
other
moving
joints
and
engine
and
connectors
Before
starting
the
4.1.2 Filters :
The
engine
oil
filter
should
be
oil is done.
In hydraulic system :
should
toxic emissions.
be
replaced
as
per
or vehicle operation.
recommendations.
All
filters
should
be
cleaned
Keep
away from
moving
parts
as
per
manufacturer's
runs.
Oil Changes :
recommendations.
4.1.3
recommendations.
coolant
recommended
dangerous
by
the
manufacturer.
per
the
manufacturer's
pressure
coolant
can
as
be
operation,
under
hot
discharged.
is
it
milky or
immediately.
electrical system.
way valve
fully
on
the
operator
console.
Step 3.
protection solution).
assistance immediately.
Step 2.
Step 4.
Step 5.
properly connected.
Step 6.
tools.
following :
manual thoroughly.
Step 7.
4.1.5
Initial
Checks
and
Precautions:
Self Start .
box lever in 1
th
to 4
or top gear
/ top
gear.
Step 8.
The
RPM
of
engine
should
be
the
control
in
Neutral
as per requirement).
pulls
the
wire
down
between
WIRELINE
The service life of a wire line is
dependent on the correct choice of steel
grade for the well conditions. However,
mechanical damage caused by improper
handling can drastically reduce the life
time. In order to realize good service and
maximum life from wire line, it is
necessary to take certain precautions in
its handling and usage:
Properly transferring the measuring
line from the shipping spool to the
reel is very important for extending
the performance and service life of
the line. The recommended method
of re-spooling or transferring the
measuring line is shown as below:
or
notching
of
the
during
extended
work
Wireline Dia.
inch
0.072
0.082
0.092
0.105
0.108
0.125
D=
35 X d
6
------------- X 10 or
Rm
D=
Where
D
d
Rm
P
27.5 X d
6
----------------- X 10
P
MEASURING DEVICES
Care should also be taken to avoid
over tightening the pressure wheels,
which would result in the flattening of
the wire and reduced life of the
wireline.
Snatch-block
type
pulleys
should
and
stuffing
box
4.7
STUFFING BOXES
sheave
The
Stuffing
cause hardening.
box
should
be
properly
the
grooves
cut
into
the
measuring wheel.
4.4
4.8
LUBRICATORS
WEIGHT INDICATORS
recovered
and
have
working
REEL SYSTEMS
compact
system
with
the
power
should always be
Test
the
lubricator
to
maximum
exceed
the
manufacturers
QUICK UNIONS
For
accurate
weight
indicator
assembly.
assembly.
4.10
WIRELINE BOP
communication
between
tubing
and
casing.
The BOP should be pressure tested
before beginning any job.
wireline
4.11
BOP
to
Test the
the
maximum
working pressure.
DIFFERENT
TYPE
OF
WIRELINE
OPERATIONS:
gas lift .
5.5
Installation
retrieval
of
sub-
Basic
design
principle
of
subsurface
5.1
Removal
inside
of
paraffin
deposition
tubing by scraping
Safety Valve (SCSSV) is activated to shutoff the well flow consequent upon receipt
5.6
operation
5.7 Fishing
operations
An operation to recover
in the well .
object(s) left
obtain
various
sub-surface
well
f)
following information:
& PRACTICES
Wellhead
top
connections
and
necessary
equipment
wireline
should
be
the
prime
consideration.
b) Before beginning any wireline operation,
the wireline operator must familiarize
himself with all posted facility and safety
special
tools
equipment
material,
e.g.
lubricator
6.1.2
in time.
Drift
start of a job:
a) Bottom hole pressure survey:
diameter
through
packer
(if any).
f)
b) Wellhead pressure:
g)
head pressure.
c) Support facilities:
h)
Wireline
unit
anchored
d) Timing for wireline operation:
must
be
before
securely
starting
operations.
Necessary fishing
lost
in
the
hole
during
operation.
-
to
tools
which
case
immediate
remedial
anticipated
well
pressure.
Stuffing box.
Weight indicator.
Jars
More
unknown condition.
frequent
checks
may
be
plug
well
anticipated
tubing
or
subdued
wellhead
pressure
by
external means.
operating
Failure
condition
of
any
at
item
all
times.
that
could
the
hole,
e.g.,
paraffin
scraping
valve etc.
Also, a crown or
valve.
of transmission gear.
pressure
while
performing
wireline
operations.
control
valve.
When
Engine
oil
pressure
and
should be ensured.
monitored periodically.
Do
not
operate
without
protective
k)
operator/production
engineer]
6.
include:
i)
Date
ii)
Well identification
iii)
Chronology
of
operation
performed
including
pressures
and
depth,
7.
equipment
involved.
iv)
v)
vi)
8.
reported.
9.
It
attempt to
install it manually.
6.2
RECOMMENDED ONSHORE
10.
OPERATIONAL PROCEDURES
In addition to
the general safety
guidelines as mentioned in 6.1 the
following should be followed.
1.
2.
wellhead is cleared.
consist
the
connection.
x-mas
Make
tree
sure
12.
proper
Be
wrenches.
thread connection.
The wireline unit shall be positioned at a
convenient safe location (at a minimum
of 50 ft from wellhead).
5.
of
valve
4.
length
top
the
proper
the
of
3.
13.
surface
anchored.
Before
rigging
up
the
14.
21.
mas
22.
attached,
to
There should be no
side.
24.
released
the
and
removed
from
25.
convenient
working
level.
The
will
20.
Check
the
19.
has
18.
pressure
17.
the
valve fully.
indicator/converter
until
tree
16.
26.
zero,.
as
testing
of
the
lubricator
line
until
the
wireline
operating
27.
connection of the
preventer (BOP).
8.
9.
have
trash
or
debris
that
might
10.
RECOMMENDED OFFSHORE
OPERATIONAL PROCEDURES
Make sure
wellhead is cleared.
2.
Record
the
Shut-in-well
pressure
confirm the
of the well.
11.
pressure
to
withstand
the
12.
thread connection.
13.
fittings.
5.
14.
15.
7.
16.
24.
25.
contained
26.
27.
tool string.
BOP.
Pressure
lubricator
possible.
testing
of
the
23.
surrounding
22.
to
21.
the
allowed
20.
not
/environment.
19.
and
contaminate
18.
28.
valve fully.
the
lubricator.
When
the
should be done.
Plug
and
retrieving
of
standing
valves:
Installation
valves:
Consequences:
7.5
and
retrieving
of
standing
7.2 Sliding
Sleeve
/Sliding
Side
Door
Operations :
the
sliding
sleeve
for
various
followed
taken
for
the
retrievable
of
wireline
SCSSVs valves:
from
individual
mandrel.
e) Check shall be made to ascertain
locked.
f)
landing
nipple
depth,
hole
condition etc.
to
necessary
be
performed
special
including
equipment
e.g.,
and 4b.
b) Pressures shall be equalized across
closed SCSSV.
c) Specific
manufacturers
operating
straight or deviated.
anticipated
pressure,
stuck point.
where
steps
the
tubing
condition
is
should
be
taken
to
balance
the
safety valve.
below.
taken.
shall
be
if required.
4. Always
use
combination
of
tubular
and
taken.
survey operation:
the tubing.
2. Assess for any anticipated pressures below
plugged tubing.
3. Maximum precautions need to observed while
their soundness.
Consequences:
previous
above
survey
records),
sub-surface
against
each
job
specific
wireline
condition etc.
Care
shall
be
recommended
taken
safe
for
all
practices
applicable
in
wireline
standard code.
8.0
References:
1.
undertaking
any
such
wireline
API
Recommended
Practice
14B,
Well No._____________
Date __________
ITEMS
S.NO
A
GENERAL
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Engine oil
14.
15.
Hydraulic oil
16.
Diesel /Petrol
17.
Coolant
18.
19.
20.
21.
22.
Brake Condition
23.
24.
25.
26.
27.
All controls in position (Gear lever, direction valve, hand brake release,
accelerator knob, remote control valve, floor control valve of oil cooler )
28.
29.
30.
31.
32.
33.
34.
35.
YES /
SATISFACTORY
NO
/UNSATISFACTORY