Professional Documents
Culture Documents
R&M-EM-Control Cable Replacement From SWYD To GRP ST-1 and St-2
R&M-EM-Control Cable Replacement From SWYD To GRP ST-1 and St-2
KORBA
Proposal No:
S.NO.
01.
02.
03.
a.
b.
04.
05.
a..
b.
c.
d.
e.
f.
g.
h.
R&M Phase 3
DESCRIPTION
NAME OF THE PACKAGE:
Renovation and Modernisation of Control cable replacement of Generator
Protection Panel (GRP) to SWITCHYARD Protection Panel(SWYD)
SPECIFIC AREA OF THE PROBLEM:
Unit# 1, 2, 3, 4, 5 & 6 Control Cable From GRP to SWYD are very old. IR
value of Cable is degrading due to aging effect.
BRIEF DESCRIPTION OF THE PROBLEM:
Since IR Value of cable is degrading. Mal operation auxiliary relay and
unwanted tripping observed in unit.
THE EFFECT OF THE PROBLEM ON PLANT OPERATION AND
PERFORMANCE:
Faulty cable results in operation of GRP Trip relay results in unit outage..
REFERENCE TO RLA STUDY REPORTS, TECHNICAL AUDIT
REPORTS, TRIP ANALYSIS COMMITTEE REPORTS,
ENERGY AUDIT REPORTS, KNOWLEDGE TEAM STUDY
REPORTS, ROPR / RMC OBSERVATIONS ETC AS MAY BE
APPLICABLE:
CC-OS has suggested replacing old age cables.
FEASIBLE ENGINEERING SOLUTION:
Replacement of cable from GRP to SWYD for all ST-1 and ST-2 Units.
EXPLANATION OF PROPOSED SYSTEM CORRECTIONS
THROUGH R&M UNDER ONE OR MORE OF THE FOLLOWING
HEADS AS APPLICABLE:
LIFE EXTENSION OF EQUIPMENT / SYSTEM:
N/A
IMPROVEMENT IN AVAILABILITY:
YES
IMPROVEMENT IN OUTPUT:
Yes
IMPROVEMENT IN RELIABILITY:
YES
OVERCOMING OBSOLESCENCE:
No
IMPROVEMENT IN EFFICIENCY OF OPERATION / HEAT RATE
WITH CONSEQUENT REDUCTION IN COST OF GENERATION:
N/A
REDUCTION IN AUXILIARY POWER CONSUMPTION:
N/A
RESOURCE CONSERVATIONS W.R.T. CONSUMPTIONS OF
MAKE UP WATER, FUEL OIL, LUBE OIL, RAW WATER,
CHEMICALS ETC. AS APPLICABLE:
N/A
NTPC
KORBA
i.
06.
07.
08.
09.
10.
11.
12.
13.
Unit/offsite
Equipment No.
Year of
execution
01.
Unit-1
02.
Unit-2
As per mtp
plan
-do-
03.
Unit-3
04.
Unit-4
05.
Unit-5
06.
Unit-6
R&M Phase 3
-do-do-do-do-
Estimated
Cost (in
Rs. )
As per
BOQ
NTPC
KORBA
Total In Rs.
63.61 lakh
ESTIMATE:
NAME OF THE PROPOSAL:
Renovation and modernisation of Exciatiaon system in ST-2 with DVR
SL.
NO.
PRICE
COMPONENT
COST
(Rs. in Lacs)
Rs 57.95 lakh
01
Control Cable
02
F & I - FREIGHT
03
Erection cost
Rs 5.61lakh
04
05
Civil works
-------
06
07
08
@ 4%
REMARKS / BASIS OF
COST ESTIMATES
Cable offer from M/s Govind
Cable Industry ref no.
GCI/KOL/1-12/374
inclusive
- INSURANCE @ 1%
09
FREE ISSUE
OTHERS, IF ANY
Rs
14.49/per
meter
P.O.4000056338 Lump sum
inclusive
inclusive
na
----
TOTAL
Rs 63.61 lakh
R&M Phase 3
NTPC
KORBA
BROAD
BILL
OF
QUANTITIES
NAME OF WORK:
sr.
no
.
Material
code
M8112255
268
M8112255
569
M8112235
686
material
description
CBL PVC
SHTH AR
1.1kV CU
STRN
5CX2.5SQM
M
CBL PVC
SHTH AR
1.1kV CU
STR
10CX2.5SQ
MM
CABLE,
14CX2.5MM
2, 1.1KV,
CU, AR
qty .
Require
d in
meter
rate
per
mete
r
cable
cost
18,100
102
18,46,2
00
17,600
177
31,15,2
00
3,400
245
sum
8,33,00
0
57,94,4
00
erection
cost per erection
meter
cost
total
cost
14.49
262269
21,08,4
69
14.49
255024
33,70,2
24
14.49
49266
5,66,55
9
total
estimat
ed cost
in
Rupees
8,82,26
6
63,60,9
59
Renovation and Modernisation of Control cable replacement of Generator Protection Panel (GRP)
to SWITCHYARD Protection Panel(SWYD)
NOTE :
I.
II.
R&M Phase 3