OBJECT 20
ROADS, PLATFORMS AND LANDSCAPING
1 / 12
printed: 06.02.2016
1.
SIGNATURE LIST
PROJECT NUMBER
PROJECT
OBJECT No. 20
STAGE
EXECUTION DETAILS
BENEFFICIARY
RAAVJ - PETROANI
CONTRACTOR
DESIGNER
HIDROCONSTRUCTIA S.A.
S.C. ASAR GRUP S.R.L. DEVA
DIRECTOR
ROADS
303463577.doc
2000/RO/16/P/PE/009-02
WWTP DANUTONI EXTENSION OF THE
BIOLOGICAL STAGE
ENG. A. HASCHI
2 / 12
printed: 06.02.2016
2.
TABLE of CONTENTS
WRITTEN PART
SIGNATURE LIST 2
CONTENTS3
Technical memo4
3.1. Generalities .............................................................................................4
3.2. Present situation......................................................................................4
3.3
Designed solution........................................................................................4
3.4
Designed road system................................................................................5
4. TECHNICAL SPECIFICATIONS EARTHWORKS..8
4.1. Preparatory Works......................................................................................8
4.2. Soil moving..................................................................................................7
4.3. Gravel-pits and deposits..............................................................................7
4.4. Cuttings execution.......................................................................................7
4.5. Quality Contral of Works Execution ...........................................................8
5. BALLAST FOUNDATIONS.9
5.1. Generalities8
5.2. Natural aggregates......................................................................................8
5.3. Water...........................................................................................................8
5.4
Establishment of compaction characteristics..............................................8
5.4.1.
Best compaction characteristics .........................................................8
5.4.2.
Real compaction characteristics.........................................................8
5.5.
Ballast placing.....................................................................................8
6. CRUSHED STONE FOUNDATION..9
7. CEMENT CONCRETE PAVEMENTS
9
7.1. General provisions.....................................................................................8
7.2. Used materials nature and quality.............................................................8
7.2.1.
Art. 2. Cements...................................................................................8
7.2.2.
Art. 3. Aggregates............................................Error! Bookmark not defined.
7.2.3.
Art. 4. Water.....................................................Error! Bookmark not defined.
7.2.4.
Art. 5. Additives................................................Error! Bookmark not defined.
7.3. Establishing of concrete formula...............................Error! Bookmark not defined.
7.4. Concrete preparation................................................Error! Bookmark not defined.
7.5. Concrete placing.......................................................Error! Bookmark not defined.
7.5.1.
Concrete transport...........................................Error! Bookmark not defined.
7.5.2.
Preparatory works............................................Error! Bookmark not defined.
7.5.3.
Concrete real placing.......................................Error! Bookmark not defined.
7.5.4.
Protection of pavement surface.......................Error! Bookmark not defined.
7.5.5.
Contraction joints execution............................Error! Bookmark not defined.
7.5.6.
Contact joints executions.................................Error! Bookmark not defined.
8. HOT ROLLED BITUMEN ROAD COVERS
Error!
Bookmark not defined.
9. CALCULATION NOTES
9
10. THE PROGRAM REGARDING THE QUALITY CONTROL
11
1.
2.
3.
VSB 20 - 401
VSB 20 - 402
303463577.doc
DRAWINGS LIST
Roads, platforms and landscaping Layout
- Cross sections and Road Design
3 / 12
printed: 06.02.2016
3.
Technical memo
3.1. Generalities
The present documentation contains the execution project for Extension of the WWTP
Danutoni Object 20 - Roads & Platforms.
The elements which are the basis for the preparation of the present project are the
following:
-
Geotechnical study
Topographical survey
In the existing wastewater plant are various platforms and roads, which have the following
design:
-
20-25 cm ballast foundation which in some area has been contaminated with soil
303463577.doc
4 / 12
printed: 06.02.2016
After cleaning of the bed a geotechnician shall be called for checking of the quality
of the foundation. Only after his decision the execution may be continued.
Compacting of the bed of roads and platforms at 0.55 m depth by a road roller of 10
-12 to achieving a compaction degree of 98 -100% Normal Proctor test;
All diggings shall be provided with transversal and longitudinal slopes for the rapid
discharge of rainwater.
It is recommended that earthworks shall be executed in the dry periods and on sections,
with no interruptions and in the shortest possible time to avoid major variations in humidity
of the soil during execution.
3.5
303463577.doc
5 / 12
printed: 06.02.2016
C. Walkways
- 10 cm concrete type C12/15 (B200)
-
10 cm gravel
All dimensions are measured after compaction. The width of the sidewalks is 0,7 m.
3.3.2 Quantities
The following quantities are expected:
New Roads:
2.200 m2
1.600 m2
1.830 m2
The law for labour protection no. 90/1990, annex 2, chapter 7, Construction works
for roads, bridges and railways.
Norms for labour protection, approved by Ministry of Labour and Health by order no.
34/1975 and 60/1975;
303463577.doc
6 / 12
printed: 06.02.2016
The regulation regarding the labour protection and hygiene in construction, chapter
19 approved by MLPAT by order 9/N/15.03.93.
Performance Criteria
The performance criteria for this design are according Decree 931/90:
-
B2 safety in operation
303463577.doc
7 / 12
printed: 06.02.2016
4.
303463577.doc
8 / 12
printed: 06.02.2016
5.
5.1
BALLAST FOUNDATION
See attachment no. 3
5.2
5.3
6 CALCULATION NOTES
6.1. CHECK of the ROAD SYSTEM for FREEZING-UNFREEZING
Freezing depth:
z = 100 cm
ci = 0,65;
9 / 12
printed: 06.02.2016
Z = 55 37 = 18 cm
ZCR = 100 + 18 = 118 cm
K = the degree of insurance for the penetration of frost:
K=
He
37
0,31
Z CR 118
0,3
303463577.doc
10 / 12
printed: 06.02.2016
5.
Determinant phases regarding quality control in accordance with Law 10/1995, Normative C
56/1985 and HG 273/1995
Extension of biological stage WWTP Danutoni Petrosani
Roads and platforms
NR. CRT.
2
Checking roads bedding and platforms, slope
compaction
Quality control, dimensions and slopes after
compaction of gravel sub-layer
Quality control, dimensions and slopes of the gravel
layer stabilized with concrete
Quality control of concrete layer
Checking of the design levels
1.
2.
3.
4.
5.
BENEFICIARY
CONSTRUCTOR
I.S.C.
WRITTEN
DOCUMENT
CONCLUDED
3
PVLA
PVLA
WHO CHECK
THE
DOCUMENT
4
I,B,E,P
(geotechnician)
B,E
PVR
B,E
PVR
PV
I,B,E
B,E,P
DESIGNER
NOTE:
PVLA report of hidden works
PVR report quality reception
PV report on other problems regarding the project
I State Inspection of Constructions
B Beneficiary
E Constructor
P Designer
According to Law 10/1995 section 3 art. 23d the Constructor should arrange for verification
within max. 3 days after finishing of each phase.
303463577.doc
11 / 12
printed: 06.02.2016
Name and surname, signature and stamp are required for each party.