0 TITLE
PROPOSAL FOR IMPROVEMENT THE FACILITIES AT TAMAN DESA KEMPAS JOHOR
BAHRU
2.0 INTRODUCTION
This area is at Taman Desa Kempas, 81200 Johor Bahru, Johor, Malaysia. Before
that this project is conduct by Maju Delima Sdn Bhd.but they cannot finished until 12 years
This project is schedule can complete at 2003 and this building have been declare
abandoned at 2013. This area have be neglected almost 14 years.This area is 660 unit
flatted area, 231 medium cost house and 429 low cost house. Picture below is example of
the building that not be done from this project.
4.0 COMPANY
BACKGROUND
AND
FACILITIES
ORGANIZATION
MANAGEMENT
STRUCTURE
Facilities management company that can conduct to take care of this project is Jaya
Facilities Mangement Sdn Bhd. Our company had experienced many contruction and
services in related to the falility. Thiis our organizationsstructure chart.
CHAIRMAN
CEO
GENERAL
ADMINISTRATION
AND HUMAN
RESOURCES AND
FINANCE
(EXECUTIVE)
TEAM ADMIN
DESIGN AND
PLANNING
(ENGINEER)
OPERATION AND
MAINTENANCE
(ENGINEER)
TEAM PLANNING
(SUPERVISOR)
TEAM OPERATION
(SUPERVISOR)
SAFETY AND
HEALTH
TEAM SAFETY
CHAIRMAN
Leading the company in its relationships with shareholders, financial institutions and
commentators
Chairing board and general meetings.
CEO
GENERAL MANAGER
Administers student loan, medical insurance, savings bond, and disability programs
by advising employees of eligibility; providing application information; helping with
form completion; verifying submission; notifying employees of approvals.
Documents human resources actions by completing forms, reports, logs, and records.
This job is conducted by the engineer and it help from the suoervisor and other
worker.
It works to plan and design the project that the company need. For example is design
the facility at the building and sytem in sentence building. It includes the knowleged of
the civil strucrure,mechanical and electrical sytem and design. Design always related
to HVAC system, wiring, interior design and other related to facility.
This job is conducred by the engineer lead and the supervisor to conduct the
operation.
Work for this team is to conduct all related to repairinf, improvement and operation at
NO.
ITEMS
PROPOSE COST
1.0
Contract fee
RM 5000
2.0
(include wage)
3.0
(include wage)
3.0
Sanitary
RM 40000 ++
4.0
RM 40000 ++
5.0
Other
RM 15000
RM 7,393,000
TOTAL
7.0 CONCLUSION
As a concusion, total of project repairement is RM 7,393,000. This project must be
run faster because it can help to solve the people that have buy the house can give a trust
from the government. The MBJB must accept the proposal to complete this project and
increse the facility at the surrounding.
8.0 REFERENCES
Dan
Kerajaan
Tempatan
retreived
from
http://ehome.kpkt.gov.my/index.php/pages/view/244.
Artikel
Penuh:
Utusan
Melayu
the
(M)
website
Bhd
http://ww1.utusan.com.my/utusan/info.asp?
y=2012&dt=0316&pub=Utusan_Malaysia&sec=Johor&pg=wj_01.htm#ixzz42tAKqFo
m
Builing
https://www.youtube.com/watch?v=R52mLoQT_d0
Projek pemulihan dan disenarai terbengkali terkini.
http://www.hba.org.my/index.htm
Job descreption retreived at
abandoned
at
Taman
Desa
website
Kempas
Retreived
Retreived
at
at
website
website
http://hiring.monster.com/hr/hr-best-
practices/recruiting-hiring-advice/job-descriptions/general-manager-job-descriptionsample.aspx.
9.0 APPENDIX