You are on page 1of 33

Voith Hydro

Hydro Power Plants


Dr. Jiri Koutnik, 2013-11-04

AGCS, Munich

Voith in figures

50 42,000 5
4.7 % 1867 5.7 billion
In over

countries

R&D ratio

Employees

Family-owned since

Markets

Sales

Stand: 2011/12

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

Energy
A quarter of all electricity generated
by hydro power worldwide is produced with
technologies and services from Voith.

Pumped Storage Plant

Run of River Plant

Storage Plant

140 Years of Major Projects


1873
1903
1912
1934
1938
1964
1970
1995
1997
1998
2000
2010
2011
AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

First Voith Francis turbine


First Pelton turbine
Niagara Falls, Canada
Pedreira, Brazil
Sungari, China
Roenkhausen, Germany
Raccoon Mountain, USA
First fish-friendly turbine design
Three Gorges, China
Goldisthal, Germany
Guangzhou II, China
Frades II, Portugal
Belo Monte, Brazil
4

Flow Q and Head H are decisive for the power

P = Q H g
IN

OUT

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

Head H is mainly influencing the turbine type


Pelton:
10,000

~200m to 2.000m

2,000

Francis

1,000

~50m to ~700m
100

Kaplan
~2m to ~50m
Head (m)

10

Bulb
1

~2m to ~20m
10

100

1,000

10,000

Power (kW)

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

100,000

1,000,000

Pit ~2m to ~10m


6

Head H is mainly influencing the turbine type


Pelton
~200 m to 2,000 m

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

Head H is mainly influencing the turbine type


Francis (pump turbine)
~50 m to 700 m

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

Head H is mainly influencing the turbine type


Kaplan
~2 m to 50 m

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

Head H is mainly influencing the turbine type


Bulb
~2 m to 20 m

Ohio River. Cannelton, USA

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

10

Complete Plant Systems


Pump Storage Powerhouse using full 3D CAD Capabilities

11

History of hydro power turbines and pump-turbines


BHT(China)
(in planning)
turbines

900
800

Three Gorges
(China)

Itaipu
(Brazil/ Paraguay)

700

Longtan (China)
600
Xiao Wan (China)

Xi Luo Du (China)

500

storage sets

400
Bath County
(USA)

300
Gordon (Australia)
200
100

Paulo Afonso II
(Brazil)
Dworshak
Gokcekaya
(USA)
(Turkey)

50

IIha Solteira
(Brazil)

Palmiet
(S. Africa)

Guangzhou II
(China)
Goldisthal
(Germany)

Ingula
(S. Africa)
Limberg II
(Austria)

0
1960

1970

1980

1990

2000

2010

Year

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

12

History of hydro power generators


and motor-generators

BHT(China)
(in planning)

1000
Itaipu (Brazil)

900

Water cooled
Air cooled

800

GURI II (Venezuela)
Xi Luo Du (China)
Three Gorges (China)

700
600

Bath County (USA)


(2000)

500
Raccoon
(USA)

400

Bath County (USA)


(1976)

300
200
100
0
1900

1910

1920

1930

1940

1950

1960

1970

1980

1990

2000

2010

Year
AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |
13

Logistic Challenge:
400t Stainless Steel Runner

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

14

Rotor Assembly Precision with > 2000t

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

15

Pumped Storage

Wind, Solar and Hydro Integration


Reserves
Frequency regulation

MW

Wind Production in Denmark in 2009

4000
3500
3000
2500
actual

2000
1500
1000

average

500
0

(765 MW)

Jan Feb Mar Apr May Jun Jul

Aug Sep Oct Nov Dec

Energy
AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

Frequency

Storage
16

Major pumped storage projects of Voith Hydro


Wehr
Castaic

Wallace Dam

Mount Elbert

Herdecke

Saeckingen
Malta

Goldisthal

Waldeck I

Haeusling

Bath County
Coo II
Helms
Bad Creek

Frades II
Aguayo

Jocassee

Guang Zhou II

Kops II

Venda Nova II

Yang Zhou Yong

Racoon
Seneca Mountain

La Muela I

Tedorigawa

Velebit
Hong Ping

Estangento
Fairfield

Shi San Ling

Pan Jia Kou

Limberg II
Rodund

Zhang He Wan

Tai An

San
Giacomo

Mingtan

La Muela II

Cheongpyung

Samrangjin

Muddy
Run

Ghatghar

Smith
Mountain
Flat Iron

Ingula

Siah Bishe
Palmiet

Rio Grande

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

17

Possible Unit Configurations Depending on


Regulation Responsiveness and Grid Needs

Conventional reversible unit

Fast & frequent response reversible unit

Conventional units in short circuit arrangement

Variable Speed reversible unit

Ternary unit arrangement

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

Slower
Less Flexible

Faster
More Flexible

18

Mode change times for various Unit concepts Flexibility


Pump Turbine
Mode change

T
1
2
5
6
8
9

Standstill

TU-Mode

Standstill

PU-Mode

SC-Mode

TU-Mode

SC-Mode

PU-Mode

TU-Mode

PU-Mode

PU-Mode

TU-Mode

time [seconds]
A B C D E
90 75
340 160
70 20
70 50
420
190 90

90
230
60
70
470
280

90
85
40
30
45
60

65
80
20
25
25
25

Reversible PT
A advanced conventional
B extra fast response conventional
C VarSpeed,

Ternary set
D with hydraulic torque converter + hydr. short circuit, horiz, with Francis Turbine
E same as E but vertical with Pelton Turbine
AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

19

Fast control of var. speed units


Effect on water hammer
1.1

DC link voltage

230

220

0.9

rotor speed
active power

200

Spiral case pressure

0.7

190

0.6

180

0.5

170

0.4

160

[mwc]

[p.u.]

0.8

210

GVO
150

0.3
0

TVA PSExpert
AGCS
ForumDays
| 2011-09-13
| Voith - Dr.
| 34Jiri Koutnik | 2013-11-04 |

10
Time [sec]

15

20
20

Start up Pump Turbine

1 min

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

21

Ancillary Services of Conventional and


Pumped Storage Power Plants

Frequency regulation
Voltage / Power Factor control
Load Following
Reduced system minimum loading (i.e. many base load
units run below minimum load; resulting inefficiency and
voltage & frequency problems)
Black Start capability
Regulation Up (in the generating direction)
Fast Regulation Up & Down with variable speed pumped
storage power plants (in the generating and pumping
directions)

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

22

The Voith Hydro Policy for


Plant Operational Safety

23

Objective and goals


The Voith Hydro Safety Policy is deduced from the idea of
Engineered reliability.
The goal of this policy in Voith Hydro is to sustain highest protection of:
Human lives
Environment
The capital investment of our customers

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

24

Basic philosophy
Start of the non-tolerable risk region

Safe region

Unsafe / hazard region

Risk
Tolerable risk region

Non-tolerable
risk region

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

One major failure tolerant in areas with


high energy flow or where the loss of
protection is not acceptable.
Voith Hydro requires for emergency
situations and/or in case of failure of
one safety element a second
countermeasure.

25

Risk reduction process

Risks

Assess and
document
all risks

Eliminate or
reduce risk by
inherent safe
design
measures

Install
necessary
protective
systems

Inform owner
about residual
risks

Step 1
Step 2
Step 3
Step 4

Project life cycle


AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

26

Hydro power plant water ways


Plant safety
water closing devices
1

1.

Gate or roller stop log

2.

Gate or butterfly valve

3.

Butterfly valve or spherical


valve

4.

Distributor or nozzles

5.

Gate or stop log or


butterfly valve

6.

Gate or stop log

G
4
3

T
5

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

27

Hydro power plant


Example of 1 major failure tolerance in the water ways.
Minimum requirement of two closing devices.

Complete failure
of the distributor

Cutting the water flow


via inlet valve
(2nd measure)

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

28

Hydro power plant


HV transmission line

Grid breaker
opens
(2nd measure)

Generator
breaker failure

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

Example of 1 major failure


tolerance in the power train.
Minimum requirement of two
circuit breaker levels, for
interrupting each current -even in
short circuit condition.

29

Example of penstock buckling

Safety Policy requires redundant aeration valves or natural


aeration for the penstock.
After a penstock pressure test the valve for the penstock
dewatering has been opened. Either the aeration valve was
not able to open or it was too small designed.
The same accident happens, if an emergency valve in the
upstream section closes and the aeration valve does not
open.

Source: From a publication of Vattenfall Europe (former HEW): Strom vom


Strom 40 Jahre Pumpspeicherwerk Geesthacht.

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

30

Basic philosophy
VH requires in special cases also a mitigation system in order
to limit the damage extent. Penstock rupture and landslide in
Scotland.

no intake
gate
no emergency
butterfly valve

Source: International water power


and dam construction, Oct. 2006
AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

31

Voith Hydro Safety Policy


Our Safety Policy is a crucial element in the supply of our products to owners and
operators. Highest reliability and safety of our equipment safeguard capital
investment of owners on a long-term basis and sustain the balance of state-of-the
art technological standards with highest demands in this area. Technological,
economical, environmental and social responsibility are incorporated in our
values of engineered reliability.

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

32

Contact:
Dr. Jiri Koutnik
Head of Basic Development,
Voith Hydro Holding, Heidenheim, Germany
jiri.koutnik@voith.com

AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |

33

You might also like