Professional Documents
Culture Documents
AGCS, Munich
Voith in figures
50 42,000 5
4.7 % 1867 5.7 billion
In over
countries
R&D ratio
Employees
Family-owned since
Markets
Sales
Stand: 2011/12
Energy
A quarter of all electricity generated
by hydro power worldwide is produced with
technologies and services from Voith.
Storage Plant
P = Q H g
IN
OUT
~200m to 2.000m
2,000
Francis
1,000
~50m to ~700m
100
Kaplan
~2m to ~50m
Head (m)
10
Bulb
1
~2m to ~20m
10
100
1,000
10,000
Power (kW)
100,000
1,000,000
10
11
900
800
Three Gorges
(China)
Itaipu
(Brazil/ Paraguay)
700
Longtan (China)
600
Xiao Wan (China)
Xi Luo Du (China)
500
storage sets
400
Bath County
(USA)
300
Gordon (Australia)
200
100
Paulo Afonso II
(Brazil)
Dworshak
Gokcekaya
(USA)
(Turkey)
50
IIha Solteira
(Brazil)
Palmiet
(S. Africa)
Guangzhou II
(China)
Goldisthal
(Germany)
Ingula
(S. Africa)
Limberg II
(Austria)
0
1960
1970
1980
1990
2000
2010
Year
12
BHT(China)
(in planning)
1000
Itaipu (Brazil)
900
Water cooled
Air cooled
800
GURI II (Venezuela)
Xi Luo Du (China)
Three Gorges (China)
700
600
500
Raccoon
(USA)
400
300
200
100
0
1900
1910
1920
1930
1940
1950
1960
1970
1980
1990
2000
2010
Year
AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |
13
Logistic Challenge:
400t Stainless Steel Runner
14
15
Pumped Storage
MW
4000
3500
3000
2500
actual
2000
1500
1000
average
500
0
(765 MW)
Energy
AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |
Frequency
Storage
16
Wallace Dam
Mount Elbert
Herdecke
Saeckingen
Malta
Goldisthal
Waldeck I
Haeusling
Bath County
Coo II
Helms
Bad Creek
Frades II
Aguayo
Jocassee
Guang Zhou II
Kops II
Venda Nova II
Racoon
Seneca Mountain
La Muela I
Tedorigawa
Velebit
Hong Ping
Estangento
Fairfield
Limberg II
Rodund
Zhang He Wan
Tai An
San
Giacomo
Mingtan
La Muela II
Cheongpyung
Samrangjin
Muddy
Run
Ghatghar
Smith
Mountain
Flat Iron
Ingula
Siah Bishe
Palmiet
Rio Grande
17
Slower
Less Flexible
Faster
More Flexible
18
T
1
2
5
6
8
9
Standstill
TU-Mode
Standstill
PU-Mode
SC-Mode
TU-Mode
SC-Mode
PU-Mode
TU-Mode
PU-Mode
PU-Mode
TU-Mode
time [seconds]
A B C D E
90 75
340 160
70 20
70 50
420
190 90
90
230
60
70
470
280
90
85
40
30
45
60
65
80
20
25
25
25
Reversible PT
A advanced conventional
B extra fast response conventional
C VarSpeed,
Ternary set
D with hydraulic torque converter + hydr. short circuit, horiz, with Francis Turbine
E same as E but vertical with Pelton Turbine
AGCS Expert Days | Voith - Dr. Jiri Koutnik | 2013-11-04 |
19
DC link voltage
230
220
0.9
rotor speed
active power
200
0.7
190
0.6
180
0.5
170
0.4
160
[mwc]
[p.u.]
0.8
210
GVO
150
0.3
0
TVA PSExpert
AGCS
ForumDays
| 2011-09-13
| Voith - Dr.
| 34Jiri Koutnik | 2013-11-04 |
10
Time [sec]
15
20
20
1 min
21
Frequency regulation
Voltage / Power Factor control
Load Following
Reduced system minimum loading (i.e. many base load
units run below minimum load; resulting inefficiency and
voltage & frequency problems)
Black Start capability
Regulation Up (in the generating direction)
Fast Regulation Up & Down with variable speed pumped
storage power plants (in the generating and pumping
directions)
22
23
24
Basic philosophy
Start of the non-tolerable risk region
Safe region
Risk
Tolerable risk region
Non-tolerable
risk region
25
Risks
Assess and
document
all risks
Eliminate or
reduce risk by
inherent safe
design
measures
Install
necessary
protective
systems
Inform owner
about residual
risks
Step 1
Step 2
Step 3
Step 4
26
1.
2.
3.
4.
Distributor or nozzles
5.
6.
G
4
3
T
5
27
Complete failure
of the distributor
28
Grid breaker
opens
(2nd measure)
Generator
breaker failure
29
30
Basic philosophy
VH requires in special cases also a mitigation system in order
to limit the damage extent. Penstock rupture and landslide in
Scotland.
no intake
gate
no emergency
butterfly valve
31
32
Contact:
Dr. Jiri Koutnik
Head of Basic Development,
Voith Hydro Holding, Heidenheim, Germany
jiri.koutnik@voith.com
33