S46ME-B
Accumulators
Data
106-23
SAFETY PRECAUTIONS For detailed sketch, see 900-2
==] [=>]
‘Stopped engine
‘Shut off starting air supply - At starting air receiver
Block the main starting vaive
‘Shut off starting air distributoridistibuting system supply
‘Shut off safety air supply - Not ME engines
‘Shut off contro air supply
‘Shut off air supply to exhaust valve - Only with stopped lubricating oil pumps
X | Engage turning gear
‘Shut off cooling water
‘Shut off uel oil
X_| Stop lubricating oll supply
Lock the turbacharger rotors
X_| Shut down hydraulic power supply
I CAUTION FOR SAFETY
Risk of high pressure oil
Data
Ref. Description Value [Unit
006-201 | Accumulator 24) kg
006-202 | N2 Charging pressure 13.6|MPa
at 20°
006-204 | Pressure Adjustment Table
Accumulator temperature
"c MPa
0 12.4
10 13.0
20 13.6
30 142
40 148
50 15.4
60 16.0
70 16.6
80 17.2
90 178
100 185
Filling pressure must be as stated above
Check pressure within + 0.5 MPa
006-226 | Screw, flange to Accumulator
Ast step 55] Nm
final 110] Nm
When referring to this page, please quote Data D10623 Ecttion 0014Ma Page 1 (2)
MITSUI ENGINEERING & SHIPBUILDING CO, LTD,
AX-64587106-23
Accumulators S46ME-B
Data
The task-specific tools used in this procedure are shown on the plates at the end of this chapter or in the
chapters indicated by the first three digits in the plate number, e.g. P90951 refers to chapter 909.
Plate | item No. Description
P90664 Test Equipment for Accumulators
P90665 Accumulator - Tools
P91356 Lifting Tools, Ete.
P91364 Torque Spanners,
P9136 Instruments,
Page 2 (2) When referring to this page, please quote Data 010623 Extion 0014Ma
MITSUI ENGINEERING & SHIPBUILDING CO,, LTD.
4X6 4587S46ME-B Accumulators
Checking
906-23.1
Check of Accumulators on Hydraulic
Cylinder Unit
Check of the hydraulic accumulator can only be
done with stopped engine and with stopped
electrical hydraulic pumps
1, Mount the pressure gauge at “minimess”
point 455. Check the pressure.
Close the high pressure inlet valve 420 and
open the high pressure outlet valve 421 to
drain all oil out of the hydraulic cylinder
unit, Check that the hydraulic cylinder unit
is pressure free.
Mount the pressure gauge connected with
a “minimess” hose on the accumulator.
Check the nitrogen pressure.
For correct pressure, see Data D06-204.
For use of pressure setting tool, see step 4
Caution!
Charge pressure check intervals:
1) First week of service
2) 4 month later
3) Every 6 month
* Always check
= Check for leakages at minimess
- Always mount the minimess cap after
check and charging
It is recommended, that these checks are
logged for later use and documentation.
When referring to this page, please quote Procedure M90623 Eoition 0231Ma
MITSUI ENGINEERING & SHIPBUILDING CO, LTD,
AX-64587
Page 1 (8)906-23.1
Accumulators ‘S46ME-B
Checking
Check of Accumulators on Hydraulic Power
Supply Unit
2. Check of accumulator on the HPS pump
unit can only be performed on a stopped
engine and with stopped hydraulic pumps.
Mount a pressure gauge on the “minimess”
coupling No. 340, Check the pressure.
Open valve 315 to release the hydraulic
pressure from the system and drain all oil
out of the accumulators.
3. Check on the pressure gauge that the sys-
tem is pressure free.
Mount the pressure gauge connected with
a “minimess” hose on the accumulator.
Check the nitrogen pressure.
For correct pressure, see Data D06-204.
For use of pressure setting tool, see step 4.
Page 2 (8)
When referring to this page, please quote Procedure M90623 Edition 0231Ma
MITSUI ENGINEERING & SHIPBUILDING CO, LTD,
4X.64587S46ME-B
Checking
Accumulators
906-23.1
Use of Reducing Valve as Pressure Setting
Tool
4. Assemble the reducing valve as shown in
the figure, and mount the reducing valve on
the nitrogen cylinder. If necessary, use a
threaded adaptor.
Before mounting the filling hose on the ac-
cumulator, check that the accumulator top
is clean
Check that valves A and D are closed.
Mount the filling hose on the relevant accu-
mulator with the charging tool E
It is now possible to read the actual nitro-
gen pressure in the accumulator on the dial
gauge C on the filling valve.
If the accumulator needs to be refilled with
nitrogen, open valve A and adjust the outlet
pressure on spindle B to 0.1 - 0.2 MPa
above the pressure stated in the Pressure
Adjustment Table. See Data 006-204.
Keep valve A open until the accumulator is
filled.
Close valve A.
Wait five minutes for the temperature to
stabiles.
Check the pressure in the accumulator on
gauge C according to the Pressure Adjust-
ment Table. See Data D06-204.
Adjust the pressure in the accumulator at
bleed screw D
Unscrew the charging tool E to remove the
filling hose from the accumulator.
When referring to this page, please quote Procedure M90623 Eoition 0231Ma
MITSUI ENGINEERING & SHIPBUILDING CO, LTD,
AX-64587
Page 3 (8)906-23.2
Accumulators ‘S46ME-B
Dismantling
O O
Note!
Great care must be taken to ensure that
the area around the workplace is clean
before and during assembly of the
hydraulic system.
Dismantling of Accumulators from Hydraulic
Cylinder Unit
Notet
All operation of valve 420 and 421 must
only be performed on a stopped engine
with stopped hydraulic pumps.
1. Connect a pressure gauge at “minimess”
point 455. Check the pressure.
Close the high pressure inlet valve 420 and
open the high pressure outlet valve 421 to
drain all oil out of the accumulator.
Check that the hydraulic cylinder unit is
pressure free.
Look the valve
2. Turn the square to closed, lift off the locking
disc
Turn the locking disc 180° and place it on
the square again to lock the valve.
Page 4 (8)
When referring to this page, please quote Procedure M90623 Edition 0231Ma
MITSUI ENGINEERING & SHIPBUILDING CO, LTD,
4X.64587S46ME-B Accumulators 906-23.2
Dismantling
3. Dismount the accumulator from the hydrau-
lic cylinder unit.
Dismantling of Accumulators from Hydraulic
Power Supply Unit
4. Dismantling of accumulators can only be
performed on a stopped engine and with
stopped hydraulic pumps.
Mount a pressure gauge on the “minimess”
coupling No. 340 on the accumulator block
and check the pressure.
Open valve 315 on the accumulator block
to release the hydraulic pressure from the
system.
Check on the pressure gauge that the sys-
tem is pressure free.
5. The accumulators on the hydraulic power
supply unit are dismounted as shown
Remove the accumulator from the flange.
DO6-201
When referring to this page, please quote Procedure M90623 Eoition 0231Ma Page 5 (8)
MITSUI ENGINEERING & SHIPBUILDING CO, LTD,
AX-64587906-23.3 Accumulators S46ME-B
Overhaul
3. 1, Remove the accumulator.
a See Procedure 906-23.2.
‘ear 2. Use the pressure setting tool to drain the
accumulator of nitrogen gas.
See Procedure 906-23.1.
3. Lift the accumulator by the lifting tool and
put it on the holding tool.
Fit the accumulator on the holding tool by
the screws.
3 4. Overhaul the accumulator by the following
method,
1)Remove the gas valve and retaining ring
from the top cover.
4
2)Fit the overhauling tool with the accumu-
gasvave o 7 lator, screw the both end of studs to the
shell and screw the coupling on the top
=H fan cover of accumulator.
in Fwamngring Make sure that the coupling is contacted
coupling If with the top cover.
3)Push the top cover downward until the
rn spacer and sectional ring can be
t 7 removed by turning the handle to the
T clockwise direction.
spacer ff 4)After removing the spacer ring and sec-
Space tional ring, remove the top cover with
LU bladder by turning the handle to counter-
clockwise direction
| sectional ring
5)Take off the bladder and back-up ring
—— from the top cover.
1 6)Clean both accumulator halves thor-
¢ 1 oughly and make sure that the parts are
dry afterwards.
| __bladder
Page 6 (8) When referring to this page, please quote Procedure M90623 Edition 0231Ma
MITSUI ENGINEERING & SHIPBUILDING CO, LTD,
4X.64587S46ME-B Accumulators
Overhaul
906-23.3
5. Carefully check the condition of the bladder
and replace it with new one, if necessary.
Apply the grease on the surface of the blad-
der and inside of shell as shown in Fig.5
when fitting the bladder.
+ Using grease: JIS No.2 (mineral oil)
+ Applying area: Whole surface
+ Applying method: By hand
+ Applying amount: Form the oil mem-
brance on the whole surface
6. Assemble the accumulator by the reverse
order when overhauling,
7. Make sure that the top cover is perfectly in-
serted into the shell of the accumulator by
the spacer and sectional ring
Fix the retaining ring on the top cover which
is placed on the spacer.
Fit the gas valve in the top cover by the
torque of 24Nm after applying the grease
on the bottom of the gas valve.
8. Remove the overhauling tool after checking
the item 7, again.
9. Fill the accumulator with nitrogen gas as
described Procedure 906-23.1
Use soapy water to check the accumulator
for any leakage
(Blow off the soapy water fully after check-
ing)
10. Remove the accumulator from the over-
holding tool.
2) back-up ring
SS) tadaer
Apply
the grease
shell
Apply
the grease
When referring to this page, please quote Procedure M90623 Eoition 0231Ma Page 7 (8)
MITSUI ENGINEERING & SHIPBUILDING CO, LTD,
AX-64587906-23.4
Accumulators ‘S46ME-B
Mounting
Note!
Great care must be taken to ensure that
the area around the workplace is clean
before and during assembly of the hy-
draulic system
Mounting of Accumulators on Hydraulic Cyl-
inder U
1, Mount the accumulator with a new sealing
ring on the hydraulic cylinder unit
Note!
Use Loctite 243 to secure the screws
when mounting the flange and the acou-
mulator.
2. Connect at pressure gauge at “minimess”
point No. 455. Check the pressure
Close the high pressure outlet valve 421
and open the high pressure inlet valve 420,
Check that the hydraulic cylinder unit is
pressurised.
Mounting of Accumulators on Hydraulic
Power Supply Unit
3. This can only be performed on a stopped
engine and with hydraulic pumps.
Mount the flange and a new sealing ring on
the accumulator.
Mount the accumulator assembly and a new
second sealing ring on the accumulator
block.
Close valve 315 on the accumulator block.
Mount a pressure gauge on the “minimess”
coupling No. 340 on the accumulator block
and check the pressure.
Check on the pressure gauge that the sys-
tem is pressurised
Page 8 (8)