You are on page 1of 4

QUARRY OPERATIONS

Code
DIRECT
4000
4100
4110
4120
4130
4140
4150
4160
4200
4220
4230
4300
4310
4320
4330
4340
4350
4400
4410
4411
4420
4421
4422
4430
4431
4432
4440
4441
4442

Description
Direct Cost
Quarry Operations
Drilling and Blasting
Quarry Construction
Quarry Production
Platforms
Roads
Channels
Smooth Blasting (Controlled)
Temporary roads (Maintenance included)
Roads Maintenance
Quarry Construction
Selection and Loading
Quarry - Selection and Loading - All rock types
Quarry - Loading Type 1
Quarry - Loading Type 2
Plant - Loading Type 1
Plant - Loading Type 2
Material Hauling
Topsoil Hauling
Topsoil Hauling Quarry to Dump
Waste Hauling
Waste Hauling Quarry to Dump
Waste Hauling Plant to Dump
Rock Hauling
Rock Hauling Quarry to Location 1
Rock Hauling Quarry to Location 2
Aggregate Hauling
Rock Hauling Plant to Location 1
Rock Hauling Plant to Location 2

CVC
QUARRY OPERATIONS

FLUJOGRAMA DE MATERIALES, DISPOSICION Y PROCEDENCIA

STOCK 1

BOTADERO

STOCK 2

Roca 2

Roca 1

PLAYA 1

Dique
Coraza
Nucleo

Desmonte

CANTERA
- Drilling
- Blasting
- Selection
- Loading
- Hauling

ZARANDA
- Screening
- Selection
- Loading
- Hauling

Nucleo

PLAYA 2
Terraplen
Suba-Base

CVC
QUARRY OPERATIONS

TABLA DE CODIGOS
MATERIAL
01
02
03
04
05
06
07

Dique
Coraza
Nucleo
Terraplen
Sub-Base
Base
Desmonte

TIPO DE MATERIAL

CLASE DE MATERIAL
Roca
Desmonte
Transicion
ORIGENES
01
02
03
04

Roca
Agregados
Lastre

CALIDAD DE ROCA (for drills)


1
2
3
4

Dura
Regular
Suave
Fracturada

Cantera B1
Zaranda
Stock 1
Stock 2

DESTINOS
01
02
03
04
05
06
07
08

HLT
VG
LP
Stock1
Stock2
Botadero
Stemming
Lastre

CVC
QUARRY OPERATIONS

OPERACIONES UNITARIAS BASICAS EN EL PROCESO DE PRODUCCION DE CANTERA


(ETAPAS BASICAS DEL PROCESO)

2. VOLADURA

CICLO
DE
MINADO
(EXPLOTACION)
1. PERFORACION

4. ACARREO

3. CARGUIO

You might also like