Professional Documents
Culture Documents
Irriagtion Engineering Amp Hydraulic Structures Santosh Kumar Garg 19 Edition 2
Irriagtion Engineering Amp Hydraulic Structures Santosh Kumar Garg 19 Edition 2
130
Thisflood approaches a reservoir with an uncontrolled spillway, the crest of whi
ch is kept at RL 140.0 m. Determine the maximum reservoir level and the hydrogra
ph of the routed flood. Values of reservoir capacity'(above spillway crest) and
outflow discharge at various elevations are tabulated in Tables 18.23 and 18.24
respectively.
Table 18.23
Elev~~tion metres in Reservoir storage with spillway crest as datum inmillion cr
tblc metres (m.c.rn.) 140.0 0.0 141.0 15.0 142.0 35.0 143.0 -60.0144.0 145.0 146
.0 240.0
.
95.0----140.0Table 18.24
Elevation 140.0
I
Outfow discharge in cumecs
0
Solution. The elevation storage curve and the elevation outflow curve are plotte
d with the help of Tables 18.23 and 18.24, as shown in Fig. 18.20 and 18.21 resp
ectively. The hydrograph of the given flood is plotted in Fig. 18.22. Flood rout
ing is carried out by hit and trial method as shown in Table 18.25 and as explai
ned earlier. This table is otherwise self-explanatory.