CLIENT
PROJECT MANAGER
DOCUMENT
DESCRIPTION:
20-Jul-10
Rev.
Date
HBS
ASP
SPC
ICM
Prepared
Checked
Reviewed
Approved
DOCUMENT NUMBER
Type
Discipline
Job
SJ
Sequence
Format
RC
4902
00
XXXX
A4
PAGES
OF
91
RECORD OF REVISIONS
REV
DATE
7/20/2010
DESCRIPTION
Issued for Client's Approval
Date :
20-Jul-10
Date :
20-Jul-10
Date :
20-Jul-10
TABLE OF CONTENTS
S.L.
NO.
DESCRIPTION
Page No.
DESIGN CALCULATION FOR EAST - WEST INSIDE PIPE RACK GRID 3 TO 10.
DESIGN CALCULATION FOR EAST - WEST INSIDE PIPE RACK GRID 13, 17, 27, 28, 44 .
47
DESIGN CALCULATION FOR EAST - WEST INSIDE PIPE RACK GRID 14 to 16, 18 to 26, 29 to 43 .
71
ATTACHMENTS
90
Date :
20-Jul-10
Contractor Logo
Client Logo
DESIGN CALCULATION FOR TRENCH
Rev :
Doc No
Date :
BS8110
Materials:
Grade of concrete
Grade of steel
Unit weight of concrete
C40
T460
25.0 kN/m
Bending Moment :
Factored moment
(from Staadpro output)
Concrete design (values for a strip of 1m width)
Maximum ultimate bending moment near the face of the column
Overall depth =
Diameter of reinforcement bar at bottom
Cover to reinforcement
Effective depth = 200 - 75 - 12 / 2 =
K=Mu/bd2*fcu
z=d{0.50+sqrt(0.25-K/0.90)} <0.95d
Area of reinforcement required=M/0.95fyz
(Cl.3.4.4.4)
Minimum area of reinforcement required
Spacing required for T12 reinforcement
Spacing provided
Percentage reinforcement provided
Permissible shear stress
(Table:3.8)
Area of reinforcement provided=
Provide T12 @ 100mm c/c at bottom
Check for shear :Factored shear force =
v v = Nominal shear stress = V1 / (b x d)
vv=
31.54 kN
0.265 N/mm2
26 KN-m
= 26.2 kNm
200 mm
= 12 mm
= 75 mm
= 119 mm
= 0.046
= 112.5
= 533 mm
= 260 mm
= 212 mm
= 100 mm
= 0.950
= 0.841 N/mm
= 1130 mm