Professional Documents
Culture Documents
oneNo.2462
22495
GOVERNMENT O
OF INDIA
telegrap
phicAddresss:
AE
ERONAUTIC
AL
INFORMA
ATION
SERV
VICES
Comme
ercial:AIRCIIVIL
DIRECTOR
D
GENERAL OF
F CIVIL AVIAT
TION
NEWDEELHI
OPPOSITEESAFDARJU NGAIRPORTT
Aeronau
utical:VIDDYYAYX
NEW
WDELHI1110003.
Email:dri@dgca.nic.
d
in
Fax:011
1246292221
1
AIC
SL. No. 3/20
014
07
7March,20
014
File No..9/18/2008--IR
This
T
AIC is issued for disseminat
d
ion of the d
decisions ccontained in
n the Ministtry of
Civil Av
viations letter No. AV
V. 16011/002/2008-AA
AI dated 0
04-03-2014 and decissions
containe
ed as per Airports
A
Eco
onomic Regulatory Autthority of India Order N
No. 38/2013-14
dated 24
4th February
y 2014.
(Dr. PRAB
BHAT KUM
MAR)
DIRECT
TOR GENE
ERAL OF CIVIL AVIAT
TION
MINATION OF TARIF
FFS FOR AERONAUT
A
TICAL SER
RVICES IN
N RESPECT
T OF
DETERM
RAJIV GANDHI
G
INTERNATIIONAL AIR
RPORT, SHAMSHAB
BAD, HYDERABAD FOR
THE FIR
RST CONTROL PERIO
OD (01.04.2011 31. 03.2016)
1.
The
T
Airports
s Economiic Regulato
ory Authorrity of India
a (AERA), in exercisse of
Page1of2
i.
Landing and Parking charges remain unaltered at the current level including
the conditions mentioned therein (including housing and parking charges as well
as other terms and conditions) except that there will be no landing charge for
aircrafts with less than 80 seats.
ii.
Passenger Service Fees (PSF): Passenger Service Fee will comprise only of
the security component of Rs 130/- per embarking passenger. There shall be no
facilitation component with effect from 01.04.2014. Exemptions in PSF as
indicated in the current schedule would continue.
iii.
User Development Fee (UDF): There shall be Zero (0) UDF with effect from
01.04.2014, for both domestic and international embarking passenger.
iv.
v.
Fuel Supply Charges: These would continue unaltered at their current level of
(i) Infrastructure Charges of Rs 1,500/- per Kiloliter and (ii) Fuel Throughput
Charges of Rs 670/- per Kiloliter, both being regarded as aeronautical services.
vi.
vii.
2.
All charges contained in the AERA Order No. 38/2013-14 dated 24th February
2014 referred above will be effective from 1st April 2014.
**************
Page2of2