You are on page 1of 35

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp.

Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

01.0

Revision No.: 00

Page 1 of 35
Effective Date: 31/10/2008

INDEX

Sr. No.

Content

Page No.

01.0

Index

02.0

Pre-Approval Sheet

03.0

Objective

04.0

Scope

05.0

Responsibilities

06.0

Introduction

07.0

Equipment And Material

08.0

Air Velocity Test And Calculation Of Air Changes Per Hour

09.0

HEPA Filter Integrity Testing

10.0

Air Flow Pattern Test

13

11.0

Non Viable Particulate Count Test

14

12.0

Recovery Study

18

13.0

Differential Pressure Test

19

14.0

Temperature Control Test

20

15.0

Humidity Control Test

21

16.0

Light Intensity Measurement: (Lux Measurement)

22

17.0

Noise Level Measurement

23

18.0

General Requirments

24

19.0

Annexure

25

20.0

Reference

35

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

Revision No.: 00

Doc. No.: AR/P/HVAC/01


Page 2 of 35
Effective Date: 31/10/2008

2.0 PRE-APPROVAL SHEET:


Signing of this approval page of Performance Qualification protocol no. AR/P/HVAC/01
indicates agreement with the performance qualification approach described in this document.
Shall modifications to the performance qualification become necessary, on addendum will be
prepared and approved.
PREPARED BY

SIGNATURE

DATE

CHECKED BY

SIGNATURE

DATE

APPOVED BY

SIGNATURE

DATE

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

Revision No.: 00

Doc. No.: AR/P/HVAC/01


Page 3 of 35
Effective Date: 31/10/2008

3.0 OBJECTIVE:
To establish that the documented evidence of HVAC System is meeting predetermined
specifications performing,

Air velocity (ACPH) measurement

HEPA Filter leak testing (using Hot or Cold DOP)

Air flow pattern test (Smoke test)

Nonviable particulate counts measurement

Recovery test

Monitoring of Differential pressure of the area

Monitoring of Temperature within the area

Monitoring of relative humidity within the area

Area light level measurement (LUX measurement)

Area noise level measurement (dB level)

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 4 of 35

Revision No.: 00

Effective Date: 31/10/2008

4.0 SCOPE:
The scopes of this study will verify that the HVAC System is effective & reproducible.
FREQUENCY: To be performed once in six months basis except Temperature, Relative
Humidity and Differential pressure, monitoring on daily basis.

5.0 RESPONSIBILITIES:
A team comprising of the representatives of the following functions shall be responsible to
undertake the qualification studies.

DESIGNATION
Validation Head

Validation Incharge
EDP Staff

RESPONSIBILITY
Responsible for final review and approval of protocol and
report
Responsible for perform site work within the time bond
period.
Responsible for Prepare Report.

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

Revision No.: 00

Doc. No.: AR/P/HVAC/01


Page 5 of 35
Effective Date: 31/10/2008

6.0 INTRODUCTION:
The Heating, ventilation & air conditioning system installed at service floor of any company, It
consists of following AHU's & configuration of filters
SR.
NO.

AIR
HANDLING

HEPA
ROOM NAME

FILTERS

CLASS

UNITS

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

Doc. No.: AR/P/HVAC/01


Page 6 of 35

Revision No.: 00

Effective Date: 31/10/2008

7.0 EQUIPMENT AND MATERIAL:

TSI Hot wire Anemometer / TSI air capture hood

Photometer with Aerosol generator

Fog generator (Smoke generator)

Airborne Non viable Particle counter

Calibrated Temperature & Relative Humidity data logger

Light level meter-Lux meter

Noise level meter-dBA meter

8.0
8.1
8.2

8.3

AIR VELOCITY TEST AND CALCULATION OF AIR CHANGES PER HOUR:


OBJECTIVE: To demonstrate that the required air velocity is delivered by HEPA
Filters and to calculate the Air changes per hour for each area.
ACCEPTANCE CRITERIA:
CRITERIA

ACCEPTANCE

Air velocity and ACPH

As per design NLT + 20 %

PROCEDURE: [FOR HOT WIRE ANEMOMETER]


STEP

ACTION
Start

Switch on respective air-handling unit (AHU) of clean room.

Ensure that AHU is operational for the last 5 to 10 minutes.

Take the relevant details, like No of filters of area, filter size, room volume,
AHU No, design CMH/CFM and ACPH for each room.

Switch `ON the calibrated hot wire Anemometer. Check the Zero reading
on the display.

Hold the `velocity measurement-probe at the working height 6 inches


(approx.150 mm) below the face of HEPA filter in clean room.

Record air velocity at different points of HEPA filter i.e. Four corners and one
center [Terminal HEPA]. For HEPA filter list with AHU & room

Calculate the average velocity of each filter.


Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 7 of 35

Revision No.: 00

STEP

Effective Date: 31/10/2008

ACTION

Average air velocity at each point.

Record velocity. [Reference is made to Annexure-I].


End

8.4 CALCULATION OF AIR CHANGES PER HOUR


STEP

ACTION
Start

Measure the filter face area in square meter.

Calculate the actual volume of supplied air in each room as below.

Air flow discharge [m3/minute] = Air velocity of HEPA filter [m/s] Filter area
[m2] x 60.

Calculate the volume of the room in cubic meter, of which air changes are to
be calculated.

Calculate the no. of air changes as follows.

No. of ACPH = Airflow discharge in room 60(CMH) Room volume.

For filling and sealing area, ACPH should not be less than 300.

For all the Classified areas, ACPH should not be less than 20.

If the air changes in the area are not within the limit, trouble shoot the cause
and rectify.

10

Engineering and QA staff should investigate the reason for the deviation.
Engineering will take immediate action to rectify it.

11

Record the ACPH [Annexure-I].


End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

8.5

Page 8 of 35

Revision No.: 00

Effective Date: 31/10/2008

PROCEDURE: [BY CAPTURE HOOD]

STEP

ACTION
Start

Switch on respective air-handling unit (AHU) of clean room.

Ensure that AHU is operational for the last 5 to 10 minutes.

Take the relevant details, like No of filters of area, filter size, room volume, AHU

Take the mean velocity reading of each filter [cfm) by capture hood

Calculate CMH of room by sum of all filter cfm multiply into 60.

Calculate the ACPH of room i.e.

Record the ACPH [Annexure-I]. If done by capture Hood.


End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 9 of 35

Revision No.: 00

Effective Date: 31/10/2008

9.0 HEPA FILTER INTEGRITY TESTING:


9.1 OBJECTIVE: To demonstrate and validate the filter integrity leak monitoring of the HEPA
filters installed in different areas like.
9.2 ACCEPTANCE CRITERIA:
CRITERIA
HEPA Filter Integrity Test
With Using Aerosol

ACCEPTANCE
An unacceptable leak is a local reading
greater than 0.01%

9.3 PROCEDURE: (FOR GENERATION OF AEROSOL):


STEP

ACTION
Start

Check the Aerosol oil level in Aerosol generator.

Connect Compressed air / Nitrogen gas to aerosol generator & adjust


the pressure regulator to 20PSI.

Direct the outlet of the aerosol generator to return duct [riser] or fresh
air intake of AHU.

Start the aerosol generator by switching on the Compressed air /


Nitrogen gas to produce the upstream concentration required for leak
detection till photometer reads the Photometric concentration of 100%.
End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

Doc. No.: AR/P/HVAC/01


Page 10 of 35

Revision No.: 00

Effective Date: 31/10/2008

9.4 CALIBRATION OF THE INSTRUMENT [PHOTOMETER]


STEP

ACTION
Start

Put the photometer selector switch on upstream mode.

Connect the tube of photometer to upstream port of HEPA filter.

Wait until the photometer displays 100% upstream concentration.

Remove the tube of photometer and close the upstream port of HEPA filter
and ensure fir zero leakage.

Put the photometer selector switch on down stream mode.

Wait until photometer display 0 [ZERO].


On any installation the sealing gasket should be considered as part of the
filter and this should be scanned separately from the filter pack.
Select the sample port; scan the filter pack and the gasket at a distance
of 50 to 100 mm.
For a filter to efficiency 0.001% the range selected should be 0.01%
and the alarm set for 0.001%, which is 10% of the full scale, which
assumes an efficiency of 99.99% against the challenge aerosol.
End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 11 of 35

Revision No.: 00

Effective Date: 31/10/2008

9.5 TESTING PROCEDURE [TERMINAL HEPA FILTER WITHOUT INDIVIDUAL UPSTREAM


PORT]
STEP

ACTION
Start

Ensure that before staring activity AHU is operational for 5 to 10 minutes.

Ensure that the air velocity, air balancing and flow adjustments are done
before proceeding to the Filter integrity testing of HEPA filters.

Check that a sampling point is provided and accessible immediately


upstream of the filter to be tested.

Start the compressed air / nitrogen gas to Aerosol generator to generate the
test aerosol at minimum 20 psi and monitor the pressure.

Direct the test aerosol to riser of room.

Ensure that it is possible to introduce test aerosol so that 100%


concentration can be detected at the upstream sampling point.

Place the aerosol generator in an accessible position, ideally near the riser,
and adjust the aerosol concentration to the specified density.

Prior to the generation of the aerosol place the photometer probe down
stream of the HEPA filter until the instrument has stabilized.

Put photometer selector switch on upstream mode.

10

Check the upstream concentration of Aerosol at port provided for


representative HEPA filter for each room ;Until photometer displays 100 %
upstream.

11

After getting the upstream conc. & put selector switch to clear position and
close upstream Aerosol port.

12

Put photometer selector switch on down stream mode.

13

Wait until photometer displays 0.

14

Measure the down stream concentration by holding the probe approx.1 inch
away from the face of filter.

15

The photometer has a sample flow rate of 1 cfm. Hold the probe at a
distance between 50 to 100 mm from the filter face and scan the filter and
perimeter by passing the probe in slightly overlapping strokes so that the
entire area of filter and sealing gasket is sampled. The probe traverse rate
should not exceed 10 feet per minute.

16

Observe the percentage of leakage directly on photometer

17

If any leakage observed through the sealing of filter tighten the filter nuts
and check again for any leakage.

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

Page 12 of 35

Revision No.: 00

STEP

Doc. No.: AR/P/HVAC/01

Effective Date: 31/10/2008

ACTION

18

If any leakage is more than 0.01% of the upstream aerosol concentration


then repair it.

19

Repair the patches on filter s should not exceed maximum of 5% of the total
filter face area & maximum width / length of each patch should not be more
than 1.5 inches. Total no of patches should not exceed 5 number / filter.

20

If above mentioned limit exceeds then replace the filter & check the integrity
of the filter as per above procedure.

21

Record the result [Annexure-II].

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 13 of 35

Revision No.: 00

Effective Date: 31/10/2008

10.0 AIR FLOW PATTERN TEST


10.1 OBJECTIVE: To determine airflow pattern of terminal HEPA filters and laminar air flow
units.
10.2 ACCEPTANCE CRITERIA:

10.3

CRITERIA

ACCEPTANCE

Air flow pattern of HEPA filter

Unidirectional

PROCEDURE:
STEP

ACTION
Start

Start the respective AHU of which airflow pattern is to be checked.

Person carrying out airflow pattern activity should follow clean room
gowning.

Fog generator should be used for smoke generation.

During the process, hands of operator and facemask should be


covered properly with gloves and facemask.

Expose the smoke at supply end of the system.

Observe the smoke pattern and ensure the following.


The airflow pattern should be within specification in order to ensure
environmental contamination control.
The smoke should be diffused uniformly at supply grill and pass
through return riser.

Carry out Videography/ Photography of the entire airflow pattern


checking activity.

Record the result [Annexure-III].

End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Doc. No.: AR/P/HVAC/01

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

Page 14 of 35

Revision No.: 00

Effective Date: 31/10/2008

11.0

NON VIABLE PARTICULATE COUNT TEST:

11.1

OBJECTIVE: To establish that zone meets predefined conditions for non-viable

particles.
11.2

ACCEPTANCE CRITERIA: As Per EU Guide

CRITERIA

ACCEPTANCE
Maximum number of permitted particles per cubic meter
equal to or above
Grade

Non viable
particulate
count test

AT REST

IN OPERATION

0.5-5m

>5 m

0.5-5m

>5 m

3500

3500

3500

350000

2000

350000

2000

3500000

20000

3500000

20000

Not defined

Not
defined

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 15 of 35

Revision No.: 00

Effective Date: 31/10/2008

11.3 PROCEDURE: ESTABLISHMENT OF SAMPLING LOCATION:


STEP

ACTION
Start

All components of the clean air system affecting air quality must be
operating in accordance with the specification and all aspects of the
controlled environment, which contribute to the operational integrity, are
complete.
Measure on a centered grid pattern determined by dividing the total floor
area, into approximately equal areas such that:

The number of sub-areas is as specified in any relevant national


standard or as agreed between the client and the contractor
sampling positions should be at the intersection of the corners of
each sub-area and at a height of 900 mm from the floor, unless
agreed otherwise by the client.

Take the required number of samples at the specified flow rate at


each point on the grid. These can be determined from the relevant
national standards or agreed by the customer.
Calculate the number of sampling locations with the formula

N = Square root of Room in cubic meter made it to approx. [Reference is


made to ISO14644-1].
The sampling location shall be evenly distributed throughout the area of
clean room or clean zone and position at the height of work activity. In
case of additional sampling locations their number and position will be
specified.

End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 16 of 35

Revision No.: 00

Effective Date: 31/10/2008

11.4 ESTABLISHMENT OF SINGLE SAMPLE VOLUME PER LOCATION:


STEP

ACTION
Start

Sample a sufficient volume of air at each location such that minimum of


20 particles would be detected if the particle concentration for the
relevant class were at the class limit for the largest considered particle
size.
The single sample volume Vs per location will be determined by
Vs =20x1000 / Cnm Where
Vs = is the minimum sample volume per location expressed in liters.
Cnm =class limit (number of particles/ m3) for the largest considered
particles size specified for the relevant class.

20 = is the defined number of particles that could be counted if particle


concentration were at the class limit.
The volume sampled at each location shall be at least 2 liters with a
minimum time at each location of 1 minute.
Since particle counter operate at a flow rate of 1CFM, which is equal to
28.3 lits per minute, therefore particle analyzed per cubic feet will need
to be multiply with 35.31 to convert to m3.
Direct measurement with 1 M3 particle counter,
Specification are: 50 LPM i.e. 1M3 i.e. 1000 liters per 20 minutes.

Sample at each location is taken for 20 minutes, which is equivalent to


50 LPM i.e. 1M3/20 minutes. There fore for grade A/B/C areas
[ISO/5/6/7] and for grade D area 1 minute per location. Sampling
locations are abased on the criticality of the work zone [Reference is
made to AnnexureIV].

End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 17 of 35

Revision No.: 00

Effective Date: 31/10/2008

11.5 SAMPLING AT SPECIFIED LOCATIONS AT WORKING HEIGHT:


STEP

ACTION
Start

Start the sampling and take minimum of single sample volumes from
each location and compute the average particle concentration at
specified location.

Sampling will be conducted at rest and during operation.


End

11.6 PARTICLE COUNTING AT EACH LOCATION


STEP

ACTION
Start

Switch on the AHU and let it run for 10-15 minutes.

Switch `ON the particle counter and set the sampling rate as 1.0 cfm
(Approximately 28.0 liters/minute).

Hold the particle counter probe to the working height at different


locations of control/critical areas and take the print out of the particle
counts of mentioned locations of control/critical areas.

Take the particle count at different location under HEPA filters covering
total area of the control / critical room as mentioned in layout & take
printouts of particle count.

Switch OFF the particle counter.

Get report of the particle count by the external party (Supplier)

Such reports should be preserved by the Quality Assurance department.

Particle count test of all control /critical rooms under AHUs to be carried
out once in six months or earlier immediately after any major change in
AHU facility.

10

Record the results and make the trend of particle count [Reference is
made to Annexure IV].
End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

12.0

Page 18 of 35

Revision No.: 00

Effective Date: 31/10/2008

RECOVERY STUDY

12.1 OBJECTIVE: To determine the recovery period for the HEPA filters installed in critical
areas.
12.2 ACCEPTANCE CRITERIA:

CRITERIA

ACCEPTANCE
Not more than 10 minutes/As per
Design Specification

Recovery period
12.3 PROCEDURE:
STEP

ACTION
Start

Measure the clean room or clean zone non-viable particulate counts at


rest [before disturbing the area for Recovery test].

Shut OFF the AHU of required zone.

Allow the required zone to reach next higher grade (i.e. Grade B To
Grade C).

Measure the non-viable particulate counts when area achieve the next
higher grade with help of particle counter for one day.

Continue the particle counting for at least 5 counts.

Start the AHU and measure the particle counts till it the area achieves
the desired level of counts approximately equivalent to the initial counts
taken at rest before the test.

Measure time taken to recovery the initial grade.

Record the results and enclose the particle count printouts and calculate
the recovery time as-

5 minutes-Initial count after AHU shut OFF

X minutes-Time taken by the area to recover to initial counts after


getting the next grade.

Recovery time = X minutes.

Record the result [Reference is made to Annexure-V].


End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

13.0

Doc. No.: AR/P/HVAC/01


Page 19 of 35

Revision No.: 00

Effective Date: 31/10/2008

DIFFERENTIAL PRESSURE TEST

13.1 OBJECTIVE: To demonstrate the capability of the air system to provide pressure
gradient among the different room.
13.2

ACCEPTANCE CRITERIA:
CRITERIA

Differential pressure of rooms

ACCEPTANCE
As per design sheet + 0.5 mm of water

13.3 PROCEDURE:
STEP

ACTION
Start

All HVAC systems of the clean room facility are to be in continuous


operation when performing these tests.

To avoid unexpected changes in pressure and to establish baseline, all


doors in sterile facility must be closed and no traffic is to be allowed through
the facility during the test.

Adjust the Magnehelic gauge to give a reading of zero in accordance with


the manufacturers instructions.

Connect one end of the tubes to the higher-pressure side of the Magnehelic
gauge(Calibrated) & place the other end of the tube in the area of higher
pressure such that it is free from obstruction and directed away from any
airflows.

Next, connect one end of the second tube to the lower pressure input side
of the Magnehelic gauge and place the other end of the tube in the area of
lower pressure such that it is free from obstruction and directed away from
any airflows. If the tubing passes a surface ensure that any gap surrounding
the tube are sealed.

Record the pressure displayed on the Magnehelic gauge three times ,for
design differential pressure.

Record the result [Reference is made to Annexure-VII].


End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

14.0

Page 20 of 35

Revision No.: 00

Effective Date: 31/10/2008

TEMPERATURE CONTROL TEST

14.1 OBJECTIVE: To demonstrate the ability of the AHU's to provide the required
temperature in critical and controlled areas.
14.2

ACCEPTANCE CRITERIA:
CRITERIA
Temperature of controlled areas

14.3

ACCEPTANCE
NMT 25 0C

PROCEDURE
STEP

ACTION
Start

Verify that the air conditioning system is operating in the stable condition
and all equipment that is specified is running.

Divide the room area in four equal zones test as required by the
specification or on a grid pattern of 3m x 3m.

Use calibrated Data logger to record the temperature.

Record the temperature for location in each room .

Record the result [Reference is made to Annexure-VI].


End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

15.0

Page 21 of 35

Revision No.: 00

Effective Date: 31/10/2008

HUMIDITY CONTROL TEST

15.1 OBJECTIVE: To demonstrate the capability of air handling system to control relative
humidity at the specified level in each room in critical area and controlled areas.
15.2

ACCEPTANCE CRITERIA:
CRITERIA

ACCEPTANCE

Relative humidity in critical area

NMT 50 %

Relative humidity in controlled area

NMT 55%

15.3 PROCEDURE:
STEP

ACTION
Start

Execute humidity control test after all the air balancing procedure have been
concluded and air conditioning system is completely in operation and stable
conditions have been achieved

Use calibrated Data Logger to record the relative humidity.

Record the relative humidity in room as per layout of relative humidity record in
each room.

Record the result for three consecutive days [Reference is made to Annexure-VI].
End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

16.0

Page 22 of 35

Revision No.: 00

Effective Date: 31/10/2008

LIGHT INTENSITY MEASUREMENT: LUX MEASUREMENT

16.1 OBJECTIVE: To determine the lighting level and its uniformity throughout an area at predetermined points
16.2

ACCEPTANCE CRITERIA:
ACCEPTANCE

CRITERIA
Light level

16.3

Not less than 300 lux / As per Design Specification

PROCEDURE
STEP

ACTION
Start

Record the light levels on a pre-determined grid pattern/ layout of lux


level or in the absence of a specification on a 3m x 3m grid pattern.

Divide the room into four equal locations.

Record the light level at working height or 750 mm above finished floor
height.

The area under test must have all fitted lights working and the area
structure should be complete also if required emergency lighting levels
can be recorded.

Record the light levels in lux for each position on the grid [Reference is
made to AnnexureVII].

Note down all variations from the specification if any.


End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 23 of 35

Revision No.: 00

Effective Date: 31/10/2008

17.0

NOISE LEVEL MEASUREMENT:

17.1

OBJECTIVE: To determine the noise level and its uniformity throughout an area
at pre-determined points.

17.2

ACCEPTANCE CRITERIA:

CRITERIA

ACCEPTANCE

Noise level

Not more than 85 dB / As per Design Secification

17.3 PROCEDURE
STEP

ACTION
Start

Verify that the air conditioning system is operating in the stable condition
and all equipment that is specified is running [In operational condition].

Map out the area under test as required by the specification in a 2400 mm
x 2400 mm x grid or on a previously agreed location basis i.e divide the
area into fur equal parts.

Set the instrumentation to work and ensure unauthorized entry and exits
from the room are prevented.

Measure the sound levels at work surface height or 750 mm from the
finished floor level and layout of noise level.

Record the data [Reference is made to Annexure- VII].

Note down all variations from the specification if any.


End

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Revision No.: 00

Page 24 of 35
Effective Date: 31/10/2008

18.0 GENERAL REQUIRMENTS:


18.1 The protocol should be signed off (prior to start validation activities).
18.2 Under responsibility of the Validation Head, Performance Qualification will be executed.
18.3 After execution of required tests, the Validation Head should

Check the results versus the Acceptance Criteria.

Write the report.

18.4 The report will be approved by the same persons (or same designations) who has
Undersigned the protocol.
18.5 The report should contain the following information:

Report of all measurements and/or analytical results

List of all documentation and or certifications.

Check of the results against the Acceptance Criteria.

Conclusions concerning this validation study

Name and designations of persons who has executed the protocol

Any (relevant) deviation from the prescriptions in this protocol and the
Justification for the deviation.

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Doc. No.: AR/P/HVAC/01

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

19.0

Page 25 of 35

Revision No.: 00

Effective Date: 31/10/2008

ANNEXURE
ANNEXURE I (Air Velocity & ACPH Calculation)

Ambient Condition:- NMT 25 & 50-55%RH


:
:
:
:
:
:

Area/Room Name
Department
Code No.
AHU No.
Test
Equipment Used

Air Velocity & ACPH Calculation

Test Performed Date


Test End Date
Next Due Date
Acceptance Criteria
Occupancy State
Test Method

:
:
:
: 20%
: At rest/ At operation
:

Observation Table:
Sr.
No.

Filter
Tag No.

Obs. Rdg.
(m/s)/(ft/min)
1

Avg.
Velocity

CMM/
CFM

Total
CMM/ CFM

Room
Volume

Graphical Representation: Filters v/s CMH & Filters v/s ACPH


Filters v/s CMH

Filters v/s ACPH

Conclusion:
Certified As Per ISO 14644

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

ACPH

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 26 of 35

Revision No.: 00

Effective Date: 31/10/2008

ANNEXURE II (Filter Integrity test (DOP/PAO)


Ambient Condition:- NMT 25 & 50-55%RH
Area/Room Name
Department
Code No.
AHU No.

:
:
:

Test
Equipment Used

:
:

:
Filter Integrity test (DOP/PAO)

Test Performed Date


Test End Date
Next Due Date
Acceptance Criteria

:
:
:

Occupancy State
Test Method

:
:

0.01% As Per ISO


14644

At rest/ At operation

Observation Table:
Sr.
No.

Filter Tag
No.

Concentration

----

----

Upstream
Conc. %

Leak in %

DOP/ PAO
Test Result

Remark

Graphical Representation: Filters v/s Leak in %

Conclusion:
Certified As Per ISO 14644

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Doc. No.: AR/P/HVAC/01

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

Page 27 of 35

Revision No.: 00

Effective Date: 31/10/2008

ANNEXURE III (Air Flow Visualization)


Ambient Condition:- NMT 25 & 50-55%RH
Area/Room Name
Department
Code No.
AHU No.
Test
Equipment Used

:
:
:
:
:
:

Test Performed Date

Air Flow Visualization

Test End Date


Next Due Date
Test Method
Occupancy State

:
:
:
:
:

Trace Injection Air Flows Visualization

At rest/ At operation

Observation Table:
Sr. No.

Filter Tag No.

Flow Pattern Observed

Remark

Photographic Representation:

Conclusion:
Certified As Per Design Qualification.

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 28 of 35

Revision No.: 00

Effective Date: 31/10/2008

ANNEXURE IV (Non Viable Particle Count Measurement)


Ambient Condition:- NMT 25 & 50-55%RH
Area/Room Name
Department
Code No.
AHU No.
Test
Equipment Used

:
:
:
:
:
:

Non Viable Particle Count. Meas.

Test Performed Date


Test End Date
Next Due Date
For Class
Occupancy State
Test Method

:
:
:
:
:
:

At rest/ At operation

Observation Table:
Location
No.

Occupancy
State

1
2

At rest
At operation

No. of Particles Per CFM/CMM


0.5
5

Remark

Conclusion:
Meets/ Does not meets the acceptance Criteria as per ISO 14644/USFDA/USP/EU/GMP.

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Revision No.: 00

Page 29 of 35
Effective Date: 31/10/2008

ANNEXURE V (Recovery)
Ambient Condition:- NMT 25 & 50-55%RH
Area/Room Name
Department
Code No.
AHU No.
Test
Equipment Used

:
:
:
:
:
:

Test Performed Date


Test End Date
Next Due Date
Acceptance Criteria
Recovery

Occupancy State

Test Method

:
:
:
:
:
:

At rest

Observation Table:- For Class


Location

AHU
STATUS

Time
Required

No. of Partical Per CFM/CMM


0.5m
5m

Remark

Conclusion:
Certified As Per Design Qualification.

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Revision No.: 00

Page 30 of 35
Effective Date: 31/10/2008

ANNEXURE VI (Temp. & RH Mapping)


Ambient Condition:- NMT 25 & 50-55%RH
Area/Room Name
Department
Code No.
AHU No.
Test
Equipment Used
Occupancy State

:
:
:
:
:
:
:

Test Performed Date


Mapping Duration
Frequency of Rdg.
Acceptance Criteria
Next Due Date
No. of Channel

Temp. & RH Mapping

:
:
:
:
:
:

At rest/ At operation

Schematic Diagram:

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 31 of 35

Revision No.: 00

Effective Date: 31/10/2008

Mapping Observations Table:


Time

P1
Temp

P2
RH

Temp

RH

Positions
P3
Temp
RH

P4
Temp

P5
RH

Temp

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

RH

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol


CLEAN ROOM
Issue No.: 01

Revision No.: 00

Doc. No.: AR/P/HVAC/01


Page 32 of 35
Effective Date: 31/10/2008

Graphical Representation: [Temperature ( C) v/s Time]

Graphical Representation: [Relative Humidity (% RH) v/s Time]

Conclusion:
Certified As Per Design Qualification.

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 33 of 35

Revision No.: 00

Effective Date: 31/10/2008

ANNEXURE VII (Differential Pressure & Lux Level Measurement)


Ambient Condition:- NMT 25 & 50-55%RH
Area/Room Name
Department
Code No.
AHU No.
Test
Equipment Used

:
:
:
:
:
:

Test Performed Date


Test End Date
Next Due Date
Acceptance Criteria
Test Method
Occupancy State

:
:
:
:
:
:

Observation Table: (For Differential Pressure)


Designed Press.
mm of of H2O

Actual Press. (mm of H2O)


1

mm of H2O
Average

Remark

Average
(Lux)

Remark

Conclusion:
Certified As Per Design Qualification.
Observation Table: (For Lux Level)
Designed
(Lux)

Actual (Lux)
1

Conclusion:
Certified As Per Design Qualification.

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 34 of 35

Revision No.: 00

Effective Date: 31/10/2008

ANNEXURE VIII (Sound Level (dB))


Observation Table: (For Sound Level)
Design (dB)

Actual (dB)
2

Average (dB)

Remark

Conclusion:
Certified As Per Design Qualification.

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

FLAT No. A/1, Shrusthi Shobha Co-op Hsg Society Opp. Hotel Pratik, Tembhode Road, Palghar PIN 401210 Dist : Thane

Performance Qualification Protocol

Doc. No.: AR/P/HVAC/01

CLEAN ROOM
Issue No.: 01

Page 35 of 35

Revision No.: 00

Effective Date: 31/10/2008

20.0 REFERENCE:NO.

CODE

TITLE

ISO 14644

Clean Room & Associated Environment

VMP-2006

Validation Master Plan.

SCH.M Pt. I-A

Drug and Cosmetics act 1940.

Annex 6

WHO Technical report series No 902, 2002.

USP

2005 USP NF the Official compendia of standards.

EC GUIDE

EC guide to good manufacturing practice annexure-1 September 2003.

Prepared by:

Approved by:

Issued by:

Validation Incharge

Validation Head

Validation Head

You might also like