Professional Documents
Culture Documents
**This template is not used for BAU INCs (sites operationally accepted) and project installation
Problem Statement :
(Should not be a single line)
Project Name
Impact
ORCA Status
Service Affecting?
Requested by
INC requested /Fault date &
Time
MSL ID
Sector/cell
TU alignment
Phase Name (if known)
Major
Urgency
Site/TU on AIR, Not Yet Submitted for ORCA 7.5/ORCA 8.0
No
RF Underlying Issue?
Thomas Ward
Assign to
5/9/2016 8:16
Technology
440143
Huawei ID
CR/INC details
See B
NO
RTWP Values
If Req
All Information in BOLD are mandatory, If not provided, request will be REJECTED.
d) and project installation issues for sites not yet submitted to ORCA (use NRS Tasks)
Low
Yes
Activation
Priority
P4
PKE Ref
Technology
U900/L850
Huawei ID
CR/INC details
440143
See Below
RTWP Values
-98
If Required
none
SMR or Activation
Refer Sheet2 for P1-P4 Details
KPI
P1 - "Critical"
4hrs
P2 - "High"
12hrs
SLA
90% of faults resolved in this timeframe
P3 - "Low"
72hrs (3 days)
240hrs (10
days)
Escalation
n/a
Escalation automatic upon any of the below conditions:
- 20 child tickets - metro site
- 5 child ticket - rural site
- Critical site (Optus)
- Platinum site (VHA)
Escalation automatic upon any of the below conditions:
- 5 child tickets - metro
- 1 child ticket - rural site
- Critical site (Optus)
- Platinum site (VHA)
n/a
Priority
P1
P2
P3
P4
Options
PhASE
Site/TU on AIR, SubmiSMR
Service Affecting?
YES
NO