Professional Documents
Culture Documents
Downloaded CD -51048902_8
CLNT: 000 (Mandatory)
Process :->
Go to transaction I18N > I18N Menu > I18N Customizing > I18N System Configuration.
After activation of new NLS setting , make the profile parameter changes as suggested in the report
zcsa/installed_languages
1E
Upload the lang package on the server in /usr/sap/trans/EPS/in and click Find packages
After importing the language, you must also import the language data in the Support Packages. To do this, execute transaction SMLT, select the language that was imported and
navigate as follows: Language > Special Actions > Import Support Packages.
Txn SMLT : Choose Language Special Actions Import Support Packages.
System will list the SAP Support packs that are to be needed to be made available in RED.
Download the patches which are in red and place the PAT files of the same in EPS/in directory.
Once the pat files are placed in EPS/in directory ,all the patches which were in red will turn green.
Press F6
Language Supplementation :
Note : Language supplementation should be run on all the Business clients separately.
Txn : SMLT
Go to the language that you want to supplement and select Language Supplement Language.
Yes
After you have done all the above mentioned steps your new language has been installed.
*******************************************THANK YOU*************************************************