You are on page 1of 13

PERFORMANCE OF

CONTRACTORS

PERFORMANCE OF CONTRACTORS
(KHWAR PROJECTS)

PERFORMANCE OF CONTRACTORS
(KACHHI CANAL PROJECTS)

LETTER TO
DCO DADU &
GM(SOUTH)
FUEL
ARRANGEME
NT

VISIT
PROGRAM
ME

FLIGHT
SCHEDULE

LETTER TO
DG AIR
WING
INTERIOR
MINISTRY

MINISTRY OF
INTERIOR

MAP

KHAN
KHWAR
(E&M)

SATPARA
(DAM &
POWER
HOUSES)

SATPARA
(E&M)

SATPARA
IRRIGATIO
N

GOMAL ZAM

PERFORMANCE OF CONTRACTORS
(GOMAL ZAM DAM)

PERFORMANCE OF CONTRACTORS

(KHAN KHWAR & SATPARA)

GMs Meeting on 15 Nov 2011 (0900


hrs)
Sequence of Presentations
1.

Talawat

2.

Opening address by the Chairman

3.

Briefing by the following in that sequence:i)

CEO Neelum / Jhelum

To

cover

cost

of

Project,

availability of funds, progress


of work at various sites, TBM
and other issues

ii)

GM South

iii)

GM North / MDR

iv)

GM Tarbela

v)
vi)
vii)
viii)
ix)
x)
xi)
xii)

GM
GM
GM
GM
GM
GM
GM
GM

xiii)

cases)
GM Ghazi Barotha (on Haj)

Hydel (Operation)
Central
(N As)
(P&D)
DBD
Hydro
Hydel (Dev)
CCC (on stuck up

GMs will cover latest status


of
their respective projects,
issues,
state of Hospitals and
Rest
Houses within their Zone

GMs Meeting on 15 Nov 2011 (0900


hrs)
Sequence of Presentations
4.

Talawat

5.

Opening address by the Chairman

6.

Briefing by the following in that sequence:i)

CEO Neelum/Jhelum

To cover cost of Project,


availability of funds,

progress
of work at various sites,
TBM
and other issues.
ii)

GM South

GMs will cover latest status of

iii)

GM North / MDR

their respective projects, issues,

iv)

GM Tarbela

state of Hospitals and Rest

Houses
v)

GM Hydel (Operation)

vi)

GM Central

vii)

GM (N As)

viii)

GM (P&D)

ix)

GM DBD

x)

GM Hydro

xi)

GM Hydel (Dev)

xii)

GM CCC (on stuck up cases)

xiii)

GM Ghazi Barotha (on Haj)

within their Zone.

PSO to Chairman WAPDA


734-Wapda House,
Lahore.
Subject: Acquisition of Residential

Accommodation
I am enclosing herewith a complete set of the
requisite

documents

for

acquiring

my

residential

accommodation (H.No.4/5, St: No.2 Hanif Park, Harbanspura,


Lahore). It is requested to kindly forward the same to the
quarter concerned for necessary action please.
DAs/As above:
Dated:15.11.2011
(Riaz Ahmed)
Dy: Director
(Technical)
O/o PSO to Chairman WAPDA
641- Wapda House, Lahore
Extn 2094

Director (S&E),
CHANNEL)
WAPDA, 330-Wapda House,
Lahore.
Subject:

(THROUGH PROPER

REQUEST FOR GRANT OF REVISED RENTAL REILING /


ENHANCEMENT OF RENT FOR HIRING RESIDENTIAL
ACCOMMODATION

Sir,
It is requested that my house No.648, (Ground Floor) Faisal
Street Feroze Din Road Dilkusha Park, Rajgarh Sanda, Lahore owned
and occupied by the undersigned was renewed vide your Office Order
No.AD(Estates)/SR-2485/3252-55

dated

10.10.2011

(photo

copy

enclosed) @Rs.7440/- PM w.e.f. 22.11.2011 to 21.10.2012.


Now
Residential

WAPDA

has

Revised

Accommodation

vide

Rental
your

Ceiling

for

Office

Hiring
Order

No.D(S&E)/AD(Estates)060280/20878-21378 Dated 13.12.2011 (photo


copy enclosed) @Rs.9305/-PM w.e.f. 01.07.2011.
In view of above, you are requested that Revision of Rental
Ceiling

for

my

aforesaid

house may

kindly

be granted

w.e.f.

01.07.2011 at Revised Monthly Rent @Rs.9305/- PM and oblige.


DAs/As above:
( Tahir Munir )
(Owner & Occupant)
Supervisor (D.E)
O/o PSO to Chairman WAPDA
-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.
-.
Endst: No. PSO/T/
Dated:
14/12/2011
Recommended and forwarded to Director (S&E) WAPDA, 330
Wapda House, Lahore for necessary action please.
( Riaz Ahmed)

Dy: Director (Technical)


O/o PSO to Chairman
WAPDA

SANG-E-MEEL PUBLICATIONS
BOOKS 2012
Sr.

Tag/Isbn No.

Author

Title

Price

#
1

9693522808

K.K. Aziz

Abdullah Yusuf Alis: Notes on the Quran

750.00

2
3

9693507126
9693521781

Salahuddin
Ihsan

4
5
6

9693510208
9693507878
9693506294

Raashda
Babree
Ayesha

200.00
1800.0
0
200.00
300.00
300.00

9693513401

Liaquat

8
9
10

9693521358
9693516141
9693518691

Bushra
Sikandar
Nadeem

Anthropology As Science
Cholistan to Bahawalpur: Physiography, Past,
People and Places
Communication Science
Culture of Pakitan (T)
Democracy and Authoritarianism in South
Asia(T)
Develop. Of Exemplary Educational System
Pakistan
Geography of South Asia : As a Whole Region
Gilgit & Baltistan, in the Wonderland of Asia
Historic Landmarks of Lahore (T)

11

9693512316

Dani

12

9693519043

Ihsan

13
14

9693514416
9693521447

15
16
17
18
19
20

9693515102
9693501039
9693508248
9693507029
9693508424
9693522192

21
22

9693507320
9693503163

Niazi
Majid
Sheikh
Rizvi
Faruqi
Pasha
Hanaway
Altaf
Altaf
Gauhar
Mathews
Kishwer

History of Northern Areas of Pakistan Upto


2000
Islamabad Pothohar, Taxila Valley & Beyond
(T)
Islamic Way of Life
Lahore : Tales without end

450.00
400.00
750.00
1800.0
0
900.00
1600.0
0
350.00
750.00

Military, State and Society in Pakistan


Pakistan A Crisis in Renaissance
Pakistan: The Cultural Heritage
Studies in Pakistani Popular Culture
Thoughts and after Thoughts
Translations from the Quran

695.00
400.00
150.00
500.00
350.00
300.00

Umrao Jan Ada..


Women Myth & Realities

400.00
750.00

STATUS OF PERFORMANCE OF CONTRACTORS REPORTS


RECEIVED / REQUIRED BY QUARTERS CONCERNED
AS ON __________2012
SR.
#

NAME OF OFFICES

RECEIVED

AWAITED

SENT TO
C ON

CEO (N/J HPP)

Yes

17.05.201
2

GM (Central) Water Kachhi Canal


Project

Yes

18.05.201
2

GM Projects (Northern Areas)


i)
- Khwars HPP
ii)
- Satpara

Yes
Yes

18.05.201
2
05.06.20
12

GM (Mangla Dam Raising)

No

Yes

GM (Hydel) Dev 22 MW Jabban


Hydro Electric Power Station

Yes

Yes

GM (Hydro) Planning
i)
Bunji HPP Underground
Power House
ii)
Bunji HPP Power Shaft
GM (North) Gomal Zam Dam

Yes
Yes

31.05.201
2

GM (South) -

Yes

24.05.201
2

06.06.201
2

CHECK LIST INAUGURATION OF KHAN KHWAR HPP ON


14TH JULY 2012
SR.#

NAME OF OFFICES

Confirmation of visit programme,


Naulong, Nai Gaj and Darawat Dam
Projects

Letter to DCO Dadu & GM (South) for


Coordination and Fuel Arrangements

Arrangements for Stay of Pilot

Security arrangements by Chief


Secretary, Home Secretary IG,
Commissioner, DCO and concerned
authorities etc.

Weather Forecast

Name and Telephone/Mobile numbers


of Pilot

List of Passengers

8
9
10
11
12
13
14
15

ACTION
TAKEN

ACTION
TO BE
TAKEN
/AWAITED

REMARKS

16
17
18

You might also like