You are on page 1of 13

WATSAN

Operational Team

Drinking Water Supply Scheme:

DWSS JABBER GHAON

U/C JABBER DEVLI

STAND POST

Detail of Quantities
Sub
Head
No

Description

Length
ft

in Breadth
ft

in Depth/Ht
in ft

No of
Units

Pad

4.50

4.50

1.00

1.00

20.25

Cft

stand post

0.75

0.42

1.00

1.00

0.32

Cft

5.41

1.00

1.00

1.00

Total

5.41

Cft

25.98

Cft

Pad

4.50

4.50

0.33

1.00

6.68

Cft

stand post

0.75

0.42

0.33

1.00

0.10

Cft

5.41

1.00

0.33

1.00

1.79

Cft

8.57

Cft

Total

Sand

(cft)

Gravel/ Crush
(cft)

Shingle

Unskilled
Labour

Men-days

Men-days

0.57

8.57

0.13

P/L PCC (1:4:8)


Pad

4.50

4.50

0.33

1.00

6.68

Cft

stand post

0.75

0.42

0.33

1.00

0.10

Cft

dispose off drain

5.41

1.00

0.33

1.00

1.79

Cft

8.57

Cft

Total
4

Cement
(Bags)

Shingle bed

dispose off drain


3

Unit

Labour
Skilled
Labour

Excavation (gravelly soil)

dispose off drain


2

Quantity

(1.5' X 1.5'X 2.25')


Detail of Materials

0.90

4.50

9.00

0.27

0.97

2.60

6.50

13.00

0.39

1.42

0.20

0.40

0.86
12.84

3.49
52.36

P/L PCC (1:2:4)


Pad

4.00

4.00

0.33

1.00

5.28

Cft

stand post

0.75

0.75

3.42

1.00

1.92

Cft

dispose off drain

6.00

1.00

0.58

1.00

3.48

Cft

pad boundary projection Lond side

4.50

0.25

0.58

2.00

1.31

Cft

Short sides (stand post side)

3.25

0.25

0.48

1.00

0.39

Cft

(Drain side)

3.00

0.25

0.48

1.00

0.36

Cft

1.00

1.00

0.50

1.00

0.50

Cft

13.24

Cft

6.00

0.33

0.33

1.00

0.65

Cft

12.59

Cft

Seat pad
Total
deduct for drain flow
Net Total
5

GI Pipe 1/2 " dia

10.00

Rft

GI Socket 1/2" dia

No.

GI Elbow 1/2 " dia

No.

Brass tap 1/2"

No.

Quantities for 1 Tap Stand


Quantities for 15 Tap Stands

CRS-Mansehra

3.50
52.50

11.00
165.00

22.00
330.00

8.57
128.58

Engr. Amir Jamal Qureshi

Hydraulic Statement of DWSS


S.NO

Sector

Zone

H.H

JABBER GHAON

U/C JABBER DEVLI


U/End

L/End

Remarks

Supply Main
1

S-ST

120

all

all

93

1256

10.46

1.5

1.57

14.40

1.73

6430

6428.27

6388

40.3

Proposed

ST-WST

4900

all

all

93

1256

10.46

1.25

3.21

64.70

317.03

6388

6070.97

5971

100.0

Proposed

5971

Distribution NetWork (Peaking Factor=1.5)


1

WST--1

20

93

1256

15.69

1.25

3.21

64.70

1.29

5969.71

5965

4.7

Proposed

1--1'

100

27

0.34

0.5

0.52

5.80

0.58

5969.71 5969.13

5960

9.1

Proposed

1--2

200

41

0.51

0.5

0.52

5.80

1.16

5969.13 5967.97

5955

13.0

Proposed

1--3

420

88

1188

14.85

1.25

3.21

64.70

27.17

5967.97 5940.79

5846

94.8

Proposed

3--4

500

54

0.68

0.5

0.52

5.80

2.90

5940.79 5937.89

5824

113.9

Proposed

3--5

20

84

1134

14.18

1.25

3.00

56.90

1.14

5940.79 5939.65

5840

99.7

Proposed

5--5'

300

95

1.18

0.5

1.57

48.00

14.40

5939.65 5925.25

5833

92.3

Proposed

5--6

300

77

1040

12.99

1.25

2.57

42.80

12.84

5939.65 5926.81

5777

149.8

Proposed

6--7

800

15

203

2.53

0.5

2.63

116.50

93.20

5926.81 5833.61

5741

92.6

Proposed

10

7--8

200

81

1.01

0.5

1.05

48.00

9.60

5833.61 5824.01

5735

89.0

Proposed

11

6--9

40

62

837

10.46

1.25

2.14

30.50

1.22

5926.81 5925.59

5735

190.6

Proposed

12

9--10

20

27

0.34

0.5

0.52

5.82

0.12

5925.59 5925.48

5735

190.5

Proposed

13

9--11

200

95

1.18

0.5

1.03

21.00

4.20

5925.48 5921.28

5725

196.3

Proposed

14

9--12

400

53

716

8.94

1.25

2.14

30.50

12.20

5925.48 5913.28

5725

188.3

Proposed

15

12--13

40

108

1.35

0.5

1.57

48.00

1.92

5913.28 5911.36

5722

189.4

Proposed

16

13--14

200

68

0.84

0.5

1.03

21.00

4.20

5911.36 5907.16

5708

199.2

Proposed

17

12--15

700

11

149

1.86

0.5

2.10

73.00

51.10

5913.28 5862.18

5676

186.2

Proposed

18

12--16

300

10

135

1.69

0.75

1.20

19.00

51.10

5862.18 5811.08

5722

89.1

Proposed

19

12--17

400

81

1.01

0.5

1.03

21.00

8.40

5862.18 5853.78

5702

151.8

Proposed

20

12--18

300

28

378

4.73

0.75

3.01

104.00

31.20

5862.18 5830.98

5702

129.0

Proposed

21

18--18'

20

27

0.34

0.5

0.52

5.82

0.12

5830.98 5830.86

5699

131.9

Proposed

22

18--19

100

26

351

4.39

0.75

2.40

69.00

6.90

5830.98 5824.08

5695

129.1

Proposed

23

19--20

20

108

1.35

0.5

1.57

48.00

0.96

5824.08 5823.12

5692

131.1

Proposed

24

20--21

200

54

0.68

0.5

0.52

5.82

1.16

5823.12 5821.95

5682

140.0

Proposed

25

19--22

100

18

243

3.04

0.75

1.80

41.00

4.10

5824.08 5819.98

5689

131.0

Proposed

26

22--23

60

108

1.35

0.5

1.03

21.00

1.26

5819.98 5818.72

5685

133.7

Proposed

27

22--24

60

95

1.18

0.5

1.03

21.00

1.26

5819.98 5818.72

5685

133.7

Proposed

28

22--25

400

41

0.51

0.5

0.52

5.82

2.33

5819.98 5817.65

5659

158.6

Proposed

JABBER GHAON

Drinking Water Supply Scheme:

U/C JABBER DEVLI

VALVE CHAMBER

Detail of Materials

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Excavation (gravelly soil)

4.00

4.00

2.50

1.00

40.00

Cft

P/L PCC (1:4:8) as in Foundation

4.00

4.00

0.25

1.00

4.00

Cft

Stone Masonry in (1:3) CSM


Long Wall

3.50

1.00

2.25

2.00

15.75

Cft

Short Wall

1.50

1.00

2.25

2.00

6.75

Cft

22.50

Cft

30% (1:3) CSM

6.75

Cft

Stone

15.75

Cft

Total

PCC (1:2:4) as coping

Cement
(Bags)

Sand
(cft)

0.50

1.87

2.50

Unskilled
Labour

Men-days Men-days

5.00

0.12

0.45

0.90

2.03

0.05

0.18

0.18

0.27

15.75

4.00

0.25

1.00

4.00

Cft

3.50

1.00

0.16

2.00

1.12

Cft

Short Wall

1.50

1.00

0.16

2.00

0.48

Cft

1.60

Cft

0.20

1.00

1.50

2.25

4.00

13.50

Sft

3.73

14.00

1.50

1.50

2.25

Sft

Quantities for 1 Valve Chamber

Stone
(cft)

7.00

4.00

P/L Plaster 3/4" thick in (1:3) CSM


Steel Man hole cover 1.5'x1.5' (16
Guage sheet)

Gravel/
Crush
(cft)

Labour
Skilled
Labour

0.88

Long Wall
Total
5

(1.5' X 1.5'X 2.25')

2.00

0.06
6.30

24.50

7.00

15.75

1.31

3.81

Drinking Water Supply Scheme:

JABBER GHAON U/C JABBER DEVLI

SOURCE TANK

Detail of Materials

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Excavation (in hard soil)

7.00

7.00

1.50

73.50

Cft

P/L PCC (1:4:8) as in Foundation

7.00

7.00

0.50

24.50

Cft

Stone Masonry in (1:3) CSM


Long Wall

7.00

1.50

3.50

73.50

Cft

Short Wall

2.00

1.50

3.50

21.00

Cft

94.50

Cft

30% (1:3) CSM

28.35

Cft

Stone

66.15

Cft

4.00

Cft

Total

P/L PCC (1:2:4) as in Bed

4.00

Vertical Reinforcement in walls

P/L Plaster 3/4" thick in (1:3) CSM

4.00

P/L Pointing 3/4" in (1:2) CSM


P/L RCC (1:2:4) as in Slab
Decuction for man hole cover

(#4 @ 12" c/c all around)

8.1

Sand
(cft)

Gravel/
Crush
(cft)

12.50

25.00

Stone
(cft)

Steel
#4 bars
(kg)

Labour
Steel
#3 bars
(kg)

Skilled
Unskilled
Binding Labour
Labour
wire
(kg)
Men-days Men-days

2.28
2.50

7.73

29.00

1.00

2.50

3.50

0.76

2.77

3.78

8.51

0.12

0.45

66.15

0.25

20

45.50

kg

3.50

56.00

Sft

0.93

7.00

2.25

63.00

Sft

0.16

0.39

7.56

7.50

0.33

18.71

Cft

4.00

10.00

2.00

2.00

0.33

1.32

Cft

17.39

Cft

Net Total
8.2

Cement
(Bags)

4.00

7.50

(4' X 4'X 3')

5.00
50.00

0.46

20.00

0.46
0.73

1.12

1.13

1.76

0.88

1.78

Steel
(#3 @ 6" c/c as main steel)

7.56

15

19.30

kg

(#3 @ 9" c/c as temp. steel)

7.50

10

12.80

kg

32.10

kg

18.71

Cft

Total
9

Centring and shuttring

10

Binding wire

2.33

kg

11

GI strainer 2" dia

3.00

12

GI Over flow pipe 1.5" dia

6.00

13

GI wash out pipe 1" dia

14

GI Plug 1"

15

Steel Man hole cover (2'x2')


Quantities for 1 Source Tank

7.56

2.00

7.50

2.00

0.33

38.00

0.32

0.32
0.37

0.19

Rft

0.06

0.12

Rft

0.12

0.24

5.00

Rft

0.10

0.20

1.00

No

4.00

Sft

0.10
16.32

57.89

50.00

66.15

50.00

38.00

0.78

8.16

20.19

WATSAN

Opertaional Team

Drinking Water Supply Scheme:

JABBER GHAON

U/C JABBER DEVLI

SUB STORAGE TANK

Detail of Materials

Detail of Quantities
Sub
Head
No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Excavation (in hard soil)

8.50

8.50

2.00

1.00

144.50

Cft

P/L PCC (1:4:8) as in Foundation

8.50

8.50

0.50

1.00

36.13

Cft

Stone Masonry in (1:3) CSM


Long Wall

8.00

1.50

4.00

2.00

96.00

Cft

Short Wall

5.00

1.50

4.00

2.00

60.00

Cft

156.00

Cft

46.80

Cft

Total
30% (1:3) CSM
Stone
4

P/L PCC (1:2:4) as in Bed

Vertical Reinforcement in walls

P/L Plaster 3/4" thick in (1:3) CSM

7
8.1

Sand
(cft)

Stone
(cft)

Steel
#4 bars
(kg)

Labour
Steel
#3 bars
(kg)

Binding
wire
(kg)

Skilled
Labour

Unskilled
Labour

Men-days Men-days

4.48
3.60

18.00

13.07

49.00

1.40

3.50

36.00

1.12

4.08

6.24

14.04

0.19

0.71

109.20

Cft

6.25

Cft

20.00

30.30

kg

4.00

80.00

Sft

1.33

5.00

1.04

1.60

2.75

4.00

88.00

Sft

0.22

0.55

1.58

2.46

8.50

0.33

1.00

23.84

Cft

2.00

0.33

1.00

1.32

Cft

22.52

Cft

4.60

11.50

1.06

2.14

34.00

49.20

kg

1.00

23.84

Cft

0.48

0.24

0.25

5.00

4.00

P/L Pointing 3/4" in (1:2) CSM

8.00

P/L RCC (1:2:4) as in Slab

8.50

Decuction for man hole cover

2.00

5.00

Net Total
8.2

Cement
(Bags)

Gravel/
Crush
(cft)

1.00

5.00

(#4 @ 12" c/c all around)

5.00

(5' X5'X 4')

109.20
7.00
35.00

0.30

23.00

0.30

Steel
(#3 @ 6" c/c both ways)

8.50

GI strainer 2" dia

3.00

Rft

0.06

0.12

12

GI Over flow pipe 1.5" dia

6.00

Rft

0.12

0.24

13

GI wash out pipe 1" dia

5.00

Rft

0.10

0.20

14

GI Plug 1"

1.00

No

15

Steel Man hole cover (2'x2')

4.00

Sft

CRS-Mnasehra

2.00

0.33

0.49

10

2.00

8.50

0.49

Centring and shuttring

Quantities for 1 Sub Storage Tank

8.50

55.00

0.10
24.22

87.55

66.00

109.20

35.00

55.00

0.80

12.09

31.10

Engr. Amir Jamal Qureshi

WATSAN

Operational Team

U/C JABBER GHAON

DRINKING WATER SUPPLY SCHEME JABBER GHAON


DESIGN PERIOD
Design Period
=
20 years
DESIGN POPULATION
No. of persons/H.H for present population
Design growth rate
Design growth rate factor G.R.F

=
=
=

7.5
3%
1.8

SECTOR NO. 1
Design
population
(July 2026)
Persons
504
504

Present population
# of persons/
(July 2006)
Sr. # Zone Name
H.Hs H.H
Persons
G.R.F
1
1
40
7
280
1.8
TOTAL
280
SECTOR NO. 2

Design
population
(July 2026)
Persons
668
668

Present population
# of persons/
(July 2006)
Sr. # Zone Name
H.Hs H.H
Persons
G.R.F
1
2
53
7
371
1.8
TOTAL
371
TOTAL DESIGN POPULATION =

1172 Persons

DESIGN WATER DEMAND


Water requirement of design population @ 7 gpcd =

8204 GPD (Imp)


6.837 GPM (US)

Additional water requirement

1 Schools

NO.

# students in
2026

# students in 2006
1

20

taking half as
outsiders
36

Daily req. @ 2.5


gpcd GPD (Imp)
18
45

TOTAL

2 Mosques

NO.

# attending
Daily req. @ 3
gpcd GPD (Imp)
Population in 2026 mosques (5%)
1
1172
58.6
175.8
TOTAL
175.8

3 Animals
Large animals

No.

# in
2026

# in 2006
13

Small animals

No.

45

# in
2026

# in 2006
5

Total additional water requirements =

daily
requirement @
12 GPD (Imp)
20 240
daily
requirement @ 6
GPD (Imp)
8 48

333 GPD (Imp)


0.2775 GPM (US)

Design Water Demand of community =

7.11 GPM (US)

FLOWS AND CONSUMPTIONS


Safe Yield of source(s)
=
Design water consumption =

15.8 GPM (US)


7.11 GPM (US)

MAIN STORAGE TANK CAPACITY


Design water consumption of community =
Total water storage per day =
Taking 1/3rd day storage,
CRS-Mansehra

7.11 GPM (US)


10238 GPD (US)
10238 GALLONS (US)
Engr. Amir Jamal Qureshi

WATSAN

Operational Team

Design capacity of tank =

3413 GALLONS (US)

ALREADY EXISTING WATER STORAGE TANK = 3000 GALLONS (U.S)

CRS-Mansehra

Engr. Amir Jamal Qureshi

DRINKING WATER SUPLLY SCHEME

JABBER GHAON

U/C JABBAR DEVLI

FITTINGS AND FIXTURES DETAILS


NEW INSTALLATION
Sr
#
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
10
11
12
Sr
#
1
2
3
4

Item Description

Sockets 1.5"
Unions 1.5"
Sockets 1.25"
Unions 1.25"
Gate valve 1.25"
GI Elbows 1.25" ( 90 deg)
Sockets1"(in wash out)
GI Plug 1" (wash out)

Total length
(RFt)
120
120
4900
4900

Qty/100
Rft (No.)

Total
Qty
(No.)

SUPPLY MAIN
4
1
4
1

5
1
196
49
1
2
1
1
DISTRIBUTION SYSTEM
Sockets 1.25"
1200
4
48
Unions 1.25"
1200
1
12
Sockets 0.75"
800
4
32
Unions 0.75"
800
1
8
Sockets 0.5"
600
4
24
Unions 0.5"
600
1
6
GI T's (1.25"-0.5")
6
GI T's (0.75"-0.5")
4
Reducers ( 1.25"-0.75")
2
Reducers ( 0.75"-0.5")
2
GI T's (0.5"-0.5")
4
GI valve 1"(out lets)
2
TAP STANDS
Qty/tap
Total
Total Tap
Item Description
stand
Qty
stands
(No.)
(No.)
GI pipe 1/2" dia
15
10
150
15
2
30
GI Elbows 0.5"(90 deg)
Sockets 1/2"
15
1
15
Brass Taps
15
1
15
TOTAL FOR FITTINGS AND FIXTURES

SAY
(No.)

Unit cost
(PKR)

Total Cost
(PKR)

8
2
200
52
2
3
2
2

41
118
32
91.5
632
42.5
23
50

328
236
6400
4758
1264
127.5
46
100

52
15
35
10
30
10
10
6
3
3
6
3

32
91.5
15
49
11
40
203
68
55
35
40
350

1664
1372.5
525
490
330
400
2030
408
165
105
240
1050

SAY
(NO.)

Unit cost
(PKR)

Total Cost
(PKR)

120
26
13
13

16.5
12
11
40

1980
312
143
520
24430

Total
Cost
(PKR)
432

ACCESSORIES DETAIL
Location

Quantity

source tank

RFt

Unit
cost
(PKR)
72

source tank

RFt

23

115

4 GI Plug 1"

source tank

No.

50

50

8 Steel Man hole cover (2'x2')

Source tank

No.

600

1200

Steel Man hole cover


9 (1.5'x1.5')

Sub Storage
Tank,Valve
chamber

No.

500

1000

Sr
#

Item Description

2 GI Over flow pipe 1.5" dia


3 GI wash out pipe 1" dia

unit

Remarks

10 Barbed wire

source tank

100
Ft
40
TOTAL FOR ACCESSORIES

4000
6797

DRINKING WATER SUPPLY SCHEME

JABBER GHAON

U/C JABBER DEVLI

SUMMARY OF OVER ALL PROJECT COST


MATERIAL COST
Sr.#

A
1
2
3
4
5
6
7
8

Item Description

Quantity

CIVIL WORKS
Cement
88
Sand
335
Gravel
453
Shingle
128
Stone
191
Steel ( #3 )
93
Steel ( #4)
85
Steel Binding wire
2
SUB TOTAL - A

Unit

Bags
cft
cft
cft
cft
kg
kg
kg

PIPE WORKS
1 Supply main
1.5" dia
120
Rft
1.25" dia
4900 Rft
2 Distribution mains
1.25" dia
1200 Rft
3/4" dia
800
Rft
1/2" dia
600
Rft
Fitting & fixtures
3 (as per detail)
1
L.S.
4 Accessories (as per detail)
1
L.S.
SUB TOTAL- B
SUB TOTAL MATERIAL COST

Unit
Rate
(PKR)

Amount
(PKR)

Amount
(USD)

28160
0
0
0
0
3720
3400
120
35,400

469.33333
0
0
0
0
62
57
2
590

72
47.5

8640
232750

144
3879

47.5
16.5
10

57000
13200
6000

950
220
100

24430
6797

24430
6797
348,817
384,217

407
113
5,669
6,259

320

40
40
60

Remarks

Will be arranged locally


Will be arranged locally
Will be arranged locally
Will be arranged locally

TRANSPORTATION COST

Sr.#
1
2
3
4
1
2
3
4
5
6

up to nearest road Jeepable carriage


Item Description
site (PKR)
(PKR)
Cement
6600
0
Sand
0
0
Gravel
0
0
Shingle
0
0
Steel ( # 3)
465
0
Steel ( # 4)
425
0
Binding wire
10
0
Stone
0
0
Pipe materials
4500
0
Steel manhole cover
600
0
SUB TOTAL TRANSPORTATION COST

Donkey
carriage
(PKR)
0
0
0
0
0
0
0
0
0
0

Manual
carriage
(PKR)
4400
26800
29445
1920
465
425
8256
3960
15000
400

Total
Amount
Amount
(PKR)
(USD)
11000
183
26800
447
29445
491
1920
32
930
16
850
14
8266
138
3960
66
19500
325
1000
17
103,671
1,729

LABOUR COST
Sr.#

Category

Quantity

unit

1 Unskilled Labor
91
man-days
2 Skilled Labour
30
man-days
3 Plumber
60
man-days
SUB TOTAL LABOR COST
TOTAL COST

Rate
(PKR)

Amount
(PKR)

Amount
(USD)

300
500
500

27300
15000
30000
72,300

455
250
500
1,205

PKR 560,188

Remarks
5
3
5
13
USD

% of Total Cost
% of Total Cost
% of Total Cost
% of Total Cost
9,336

CONTINGENCIES CHARGES @ 2.5% OF TOTAL COST

GRAND TOTAL

PKR

14,005

USD

233

PKR 574,193

USD

9,570

DRINKING WATER SUPPLY SCHEME

JABBER GHAON

U/C

JABBER DEVLI

TRANSPORTATION COST
TRANSPORTATIN COST UP TO NEAREST ROAD SITE
Total
Sr.# Item Description
quantity Unit Transp. Rate (PKR)
1 Cement
88
Bags
75 per bag
2 Sand
335
cft
per cft
3 Gravel
453
cft
per cft
4 Shingle
128
cft
per cft
5 Steel ( # 3)
93
kg
5 per kg
6 Steel ( # 4)
85
kg
5 per kg
7 Binding wire
2
kg
5 per kg
8 Stone
191
cft
per cft
9 Pipe materials
1
LS
4500 per job
10 Steel manhole cover

No.

150 per No.


TOTAL

TRANSPORTATIN COST OF JEEPABLE CARRIAGE


Total
Sr.# Item Description
quantity Unit Transp. Rate (PKR)
1 Cement
88
Bags
per bag
2 Sand
335
cft
per cft
3 Gravel
453
cft
per cft
4 Shingle
128
cft
per cft
5 Steel ( # 3)
93
kg
per kg
6 Steel ( # 4)
85
kg
per kg
7 Binding wire
2
kg
per kg
8 Stone
191
cft
per cft
9 Pipe materials
1
LS
per job
10 Steel manhole cover

No.

per No.
TOTAL

TRANSPORTATIN COST OF DONKEY CARRIAGE


Total
Sr.# Item Description
quantity Unit Transp. Rate (PKR)
1 Cement
88
Bags
per bag
2 Sand
335
cft
per cft
3 Gravel
453
cft
per cft
4 Shingle
128
cft
per cft
5 Steel ( # 3)
93
kg
per kg
6 Steel ( # 4)
85
kg
per kg
7 Binding wire
2
kg
per kg
8 Stone
191
cft
per cft
9 Pipe materials
1
LS
per job
10 Steel manhole cover

No.

per No.
TOTAL

TRANSPORTATIN COST OF MANUAL CARRIAGE


Total
Sr.# Item Description
quantity Unit Transp. Rate (PKR)
1 Cement
88
Bags
50 per bag
2 Sand
335
cft
80 per cft
3 Gravel
453
cft
65 per cft
4 Shingle
128
cft
15 per cft
5 Steel ( # 3)
93
kg
5 per kg
6 Steel ( # 4)
85
kg
5 per kg
7 Binding wire
2
kg
5 per kg
8 Stone
191
cft
15 per cft
9 Pipe materials
1
LS
15000 per job
10 Steel manhole cover

No.

100 per No.


TOTAL

2 % of Total Cost
Amount
Amount
(PKR)
(USD)
6600
110
0
0
0
0
0
0
465
7.8
425
7.1
10
0.2
0
0
4500
75
600

10

12600

210.00

0 % of Total Cost
Amount
Amount
(PKR)
(USD)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Remarks
Will be arranged from siran
Will be arranged from siran
Will be arranged from siran

Remarks

0
0

16 % of Total Cost
Amount
Amount
(PKR)
(USD)
4400
73.3
26800
446.7
29445
490.8
1920
32
465
7.8
425
7.1
8256
137.6
3960
66
15000
250
400
91071

Will be arranged from siran


Will be arranged from siran
Will be arranged from siran

0
0

0 % of Total Cost
Amount
Amount
(PKR)
(USD)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Remarks

6.7
1517.85

Remarks
Will be arranged from siran
Will be arranged from siran
Will be arranged from siran

TOTAL TRANSPORTATION COST

103,671.00

1,727.85

19
% of Total Cost

You might also like