Fuel Oil Tank Area Balance Work
Fuel Oil Tank Area Balance Work
Description of work
RCC drain at the periphery of dike wall area
Earth dressing
PCC
Reinforcement work
Shuttering work
RCC (For raft & wall)
date 02/11/2015
ank area
Location/Level
Approx quantity
35 m3
F. F. L.
5.25 m3
1.45 M.T.
210 m2
23 m3
1.9 m3
F. F. L.
1.8 m3
0.9 M.T.
144 m2
12 m3
F. F. L.
11 m2
2 m3
F. F. L.
F. F. L.
F. F. L.
114 m3
51 m3
5.8 M.T.
71 m3
122 m3
F. F. L.
3.6 m3
1.8 M.T.
161 m2
28 m3
Remarks