Prerequisites
The tools and materials, such as an ESD wrist strap or a pair of ESD gloves, ESD box or bag, and key to the cabinet door are ready.
The quantity and model of the faulty modules are confirmed, and new modules of the same quantity and model are ready.
The authorized personnel are permitted to enter the site. The required keys are available.
Context
Figure 1 shows the installation position of the AC surge protector in the EPS subrack.
Figure 1 Installation position of the AC surge protector
When the color of the protecting hood on the front panel of the surge protector changes from green to red, the protector is faulty and you must replace it.
Procedure
1. Wear an ESD wrist strap or a pair of ESD gloves.
CAUTION:
Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of ESD gloves, to prevent electrostatic damage to the boards, modules, or electronic
components.
2. Press the upper and lower ends of the surge protector, and then remove the protector, as shown in Figure 2.
Figure 2 Removing the surge protector
Follow-up Procedure
Place the replaced module into the ESD box or bag. Then, place the ESD box or bag into a carton padded with foam or into the packing box of the new module.
Fill in the fault form with the details of the replaced module.