Professional Documents
Culture Documents
Process ID
7/26/16
Process Code
Engineering Release Date of Process Methodology
7/26/16
Revision Number
Comments
EM 636 - Assignment 4
Process
Time
1
2
[sec]
Dropped the hair dryer
240
Process
Cost
15.00
[USD]
1.00
Accumulated
Process Cost
[USD]
1.00
ID 1.1
ID 1.2
ID 1.3
ID 2.1
Clamps on Robotic Arm to pick up tree/branches Tree/Branches, Container in the Back of Vehicle
3600
15.00
16.00
ID 2.2
ID 2.3
900
3.75
19.75
300
1.25
21.00
ID 3.1
ID 3.2
ID 4.1
ID 5.1
360
1.50
22.50
ID 5.2
ID 5.3
200
0.83
23.33
ID 6.1
ID 6.2
1800
7.50
30.83
ID 7.1
10800
45.00
75.83
ID 8.1
ID 9.1
10
1500
6.25
82.08
ID 9.2
ID 9.3
11
12
600
2.50
84.58
14400
60.00
144.58
ID 10.1
ID 11.1
ID 11.2
Alodie Vargas
PFRA Team
RPN (Risk
Priority
Number)
Severity
Rating
Detection
Rating
Occurrence
Rating
(1-10)
(1-10)
(1-10)
8
5
3
1
4
2
96
10
36
90
36
10
250
144
48
10
250
168
Max. RPN
Tooling
Factor
Clamping/
Fixturing
Factor
Skill Factor
Any Other
Factor You
Define
Accumulated
RPN
Risk
Associated
96.00
Low
216
36
120
96
250
144
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
250.00
144.00
HIGH
Low
250
1.00
1.00
1.00
1.00
250.00
HIGH
216
1.00
1.00
1.00
1.00
216.00
HIGH
120
1.00
1.00
1.00
1.00
120.00
Low
200
1.00
1.00
1.00
1.00
200.00
Low
0
8
200
200
216
168
10
5
6
6
4
200
180
216
180
1.00
1.00
1.00
200.00
System failure!
Safety Violation
Safety Violation
Safety Violation
Safety Violation
System failure!
Cost Impact
Integrity of Construction
Air/Water/Waste Pollution
Environmental Violation
Air/Water/Waste Pollution
Environmental Violation
Time Impact
Cost/Time Impact
Cost/Time Impact
Time Impact
Integrity of Construction
Safety Violation
Time Impact
Low
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
216.00
180.00
HIGH
Low
240
240
1.00
180
1.00
1.00
1.00
160
1.00
240.00
HIGH
Detection Mode
Visual inspection
Attempt re-assembly
Visual inspection
Visual inspection
Attempt re-assembly
Attempt re-assembly
Visual inspection
Attempt re-assembly
Visual inspection
Visual inspection
Attempt re-assembly
Attempt to remove tree/branch, and reassemble. Make sure the machine warranty
information is in place.
Attempt re-assembly
Visual inspection
Attempt re-assembly
Visual inspection
Attempt re-assembly
Visual inspection
Attempt re-assembly
Visual inspection
Visual inspection
Attempt re-assembly
Attempt re-assembly
Logistics/Receiving Department
Visual inspection
Visual inspection
System-Self Inspection
Procurement Department
Visual inspection
Visual inspection
Project Manager
Project Manager/HR
Visual inspection
Visual inspection
75
150
225
300
65
130
195
260