CE505-TRANSPORTATION ENGINEERING-I

K.Vinay
Ass.Professor
Gudlavalleru engineering college

ROAD DEVELOPMENT PLAN, VISION 2021


The Indian Roads Congress have Prepared a Vision2021 Document for road development in India
 The salient features of the plan are
 The road network shall be expanded as Under


Achievements
till 2000 (Km)

Targets for
2021 (Km)

Expressways

15,766

National Highways

57,700

80,000

State Highways

1,24,300

1,60,000

Major District Roads


Other District Roads and Village
Roads

3,20,000
29,94,000

No Target
Suggested

Lane concept

ROAD DEVELOPMENT PLAN, VISION 2021










Half of the national Highway length should have four/ six


lanes, and the remaining half should have two-lane
carriageways with hard shoulders..
10,000 Km of State Highways should have four lanes and
the balance should have two lanes
Forty percent of the major District Roads should have two
lane carriageways
The targets for basic access to village should have two lane
carriageways
Maintenance of existing assets should receive adequate
attention
Alternative sources of funding such as toll financing,
creation of a dedicated Road Fund through additional levies
on fuel.

ROAD DEVELOPMENT PLAN, VISION 2021


Greater recourse to Public- Private Partnership should
be taken
 Training of engineers should receive attention
 Research and Development activities in the road
Sector should receive good attention
 Up-gradation of construction technology through
adoption of innovative procedures and specification
should be favored.
 Road safety should be enhanced through engineering
measures
 Environmental Concerns caused by road and road
traffic should be addressed


ROAD DEVELOPMENT PLAN, VISION 2021


Rural Roads , Vision 2025
 The Indian Roads Congress Have Prepared a Rural Road
Development Plan, Vision 2025 The salient features of the Plan
 Master Plans should be Prepared for Rural Roads showing
the core Network which gives accessibility to each village.
All future programmes should strictly conform to this network
 All habitations with a population of above 100 will be
connected by all weather roads - PMGSY

ROAD DEVELOPMENT PLAN, VISION 2021

RURAL ROADS , VISION 2025


It is estimated that a length of 2,90,000 Km of new
roads will be needed to achieve full connectivity. Out of
this 40,000 Km will be black topped and the
remaining 2,50,000 Km will be gravel.
 Up-gradation of existing Rural Roads shall be taken
up at a cost of Rs 1,64,000 crores.
 The maintenance of the rural road network will
require Rs 7,500 crores every year.
 Greater emphasis shall be given to adoption of new
technologies for construction and maintenance of
roads.