CHAPTER1VUDAANOVERVIEW
INTRODUCTION
1.
CONSTITUTIONOFVADODARAURBANDEVELOPMENTAUTHORITY(VUDA)
2.
i.
ii.
iii.
ChairmanVadodaraUrbanDevelopmentAuthority,Vadodara.
ChairmanStandingCommitteeVadodaraMunicipalCorporation.
Secretary, Urban Development & Urban Housing Department or his
nomineenotbelowtherankofDeputySecretary.
iv. President,VadodaraDistrictPanchayat.
v
Collector,VadodaraDistrictVadodara.
vi
MunicipalCommissionerVadodaraMunicipalCorporationVadodara.
vii Chief Town Planner Town Planning & Valuation Department,
GovernmentofGujarat.
viii. CityEngineer,VadodaraMunicipalCorporationVadodara.
ix. FinancialAdvisor,UrbanDevelopment&UrbanHousingDepartment.
DistrictDevelopmentOfficerVadodaraDistrict,Vadodara.
xi
ChiefExecutiveAuthority,VadodaraUrbanDevelopmentAuthority,
Vadodara.
Chairman
Member
Member
Member
Member
Member
Member
Member
Associated
Member
Invited
Member
Member
Secretary
1-1
VUDA an Overview
MapNo.1.1MapshowingUrbanLocalbodiesincludedintheauthorityarea
II REVISED DEVELOPMENT PLAN (DRAFT) PROPOSED LANDUSE 2031AD
GSFC
Township
GSFC
Heavy
Water Plant
GEB
SUB
STATION
N
W
E
S
2
KM
VUDA BOUNDARY
VMC BOUNDARY
TALUKA BOUNDARY
VILLAGE BOUNDARY
VILLAGE SITE(GAMTAL)
EXISTING EXPRESSWAY
NATIONAL HIGHWAY
STATE HIGHWAY
MAJOR ROADS
EXISTING ROADS
PROPOSED ROADS
1-2
VUDA an Overview
FUNCTIONSOFVUDA:
3.
TheimportantpowersandfunctionassignedbytheactoftheAuthorityaregivenbelow:
i.
ii.
iii.
iv.
v.
to undertake the preparation and execution of town planning schemes under the
provisionsofthisAct,fortheurbandevelopmentarea;
to undertake the preparation and execution of town planning schemes under the
provisionsofthisAct,ifsodirectedbytheStateGovernment;
to carry out surveys in the urban development area for the preparation of
developmentplansortownplanningschemes;
to guide, direct and assist the local authority or authorities and other statutory
authorities functioning in the urban development area in matters pertaining to the
planning,developmentanduseofurbanland;
tocontrolthedevelopmentactivitiesinaccordancewiththedevelopmentplaninthe
urbandevelopmentarea;
va. to leavy and collect such scrutiny fees for scrutiny as documents submitted to the
appropriate authority for permission for development as may be prescribed by
regulations;
vi.
via. toleavyandcollectsuchfeesfortheexecutionofworksreferredtoinclause(vi)and
for provision of other services and amenities as may be prescribed by the
regulations;
vii.
viii.
ix.
x.
toacquire,hold,manageanddisposeofproperty,movableorimmovable,asitmay
deemnecessary;
to enter into contracts, agreements or arrangements, with any local authority,
personororganizationastheurbandevelopmentauthoritymayconsidernecessary
forperformingitsfunctions;
tocarryanydevelopmentworksintheurbandevelopmentareaasmaybeassigned
toitbytheStateGovernmentfromtimetotime;
to exercise such other powers and perform such other functions as are
supplemental, incidental or consequential to any of the foregoing powers and
functionsorasmaybedirectedbytheStateGovernment.
As a statutory provision of the said act the VUDA had prepared its principal draft
developmentplanin1980andforsanction,wassubmittedtoGovt.on14.11.80.Thesaid
plan was sanctioned by the Govt. of Gujarat wide Notification No.GH/P/278/of 83/BVP
12804384(83)/L,dated22.12.83andwasinforcefrom25.1.84.
Oncompletionoftenyearstheauthorityhadin1992,decidedtopreparethefirstrevised
developmentplanandthesamewaspublishedin1996,andthesamewassanctionedby
thegovernmentin1996.videnotificationnumber:
VUDA has started to implement the planned proposals of development plan and started
controllingthedevelopment.
1-3
VUDA an Overview
VUDA have taken up several Town planning schemes around the periphery of BMC limit.
VUDAhaveprparedsevendraftschemes.i.e.Sevasi,Sayajipura1&2,Bil,Nimetha,Sama1
&2etc.andsubmittedtotheGovt.forsanctionoutofwhichBil,Nimetha,Sayajipura1&
2,havealreadybeensanctionedandT.P.O.isundertheprocessoffinalizingit.Furtherthe
surveyworkisoverfordraftschemeofVemali,andHarni1&2whichwillbepreparedin
comingdaysandwillbesubmittedtoGovt.inadditiontothissurveyworkforanothersix
town planning schemes is under progress. Thus VUDA is trying hard to develop the
developingareasassuggestedinthesanctionedplaninVUDAareaandtryingtodevelopit
in planned manner at micro level. This will give healthy and planned development with
soundroadnetworkandinfrastructurefacilities.
VUDAhavemadealltheeffortstoacquirethelandsatvariousplacesasperthereservation
shown in the plan. But VUDA got success to acquire the lands at Gotri for land
development schemes for plotted Residential / Commercial scheme with consent award.
Thislandadmeasuresabove6.43hectors.
InadditiontothissumofftheGovt.landsandU.L.C.surpluslandshavebeenalsotakenup
byVUDAtodevelopitfortheplannedpurposes,Thedetailsoftheselandsaregivenbelow.
Aspertheprovisionsoftheactundersection21VUDA,havetakenupthetasktoreview
the sanctioned development plan. Once in 10 years VUDA have resolved to revise the
developmentplaninitsboardMeetingNo.119resolutionNo.965,dated30.12.92.Asper
the Resolution this revised Draft Development Plan (19932011) for Vadodara Urban
DevelopmentAuthorityDevelopmentAreaispreparedherewith.
4.
APPROACHANDMETHODOLOGYFORPREPARATIONOFDEVELOPMENTPLAN
a.
b.
DuringtheseyearsVUDAhastakenuptopreparethebasemapaspertikasheets.
Further taken up the task to collect data necessary surveys and information
regarding the development VUDA have entrusted to make authority fresh survey
for air pollution zone to NIOH, and finding & recommendations are to be
incorporatedfortheplan.
Aspertheprovisionsoftheactundersection21VUDA,havetakenupthetaskto
reviewthesanctioneddevelopmentplan.Oncein10yearsVUDAhaveresolvedto
revisethedevelopmentplaninitsboardMeetingNo.119resolutionNo.965,dated
30.12.92.AspertheResolutionthisrevisedDraftDevelopmentPlan(19932011)
for Vadodara Urban Development Authority Development Area is prepared
herewith.
1-4
BaseMap
Corrections
Assessmentof
Requirements
Analysis
PublishforPublicConsultation&Feedback
ComparisonwithStandards
Efforts
SocioEconomic
Industry
Housing
OpenSpace
Transportation
Infrastructure
UrbanGovernance
LegalIssues
Regionallocation
ReviewofPastPlanning
Studies&FieldSurveys
Modifications
PreparationofDevelopmentPlan
2031
PlanningGoals&
Objectives
Issues&Problems
Experts
PublicRepresentatives
Localbodies
Architects
Engineers
Builders
Associations
ChamberofCommerce
SubmissionofDraftPlanfor
approvaltogovernment
PublicAwareness&Participation
PreplanningConsultations
VUDA an Overview
VUDA Development Plan 2031
1-5
VUDA an Overview
5.
CONSULTATIONPROCESS
During the year 1990 State Govt. appointed an expert committee to prepare model
regulationforallsixAuthoritiesofGujaratState.Seriesofmeetings,debatesandseminars
weredonewithlocalauthorities,expertsweredonewithlocalauthorities,expertsinthe
field and professionals. The committee have submitted the model Development Control
RegulationsfortheAuthoritiestotheGovt.VUDAhavestudiedthesamewithcontextto
theVadodaracityandhavealsodebatedthesamewithMunicipalCorporation,Architects
andEngineers,Buildersanddifferentinstitutions,forthedevelopmentplanproposals.
VUDAhavearrangedseriesofmeetingswithlocalauthorities,differentGovt.departments,
institutions, professionals and elected members of state and Central Govt. VUDA have
received fruitful suggestions and have tried to incorporate in the plan. Further since the
previous plan was prepared, during three years number of new development have taken
placeinVUDAarea.TheexpressHighWay(AhmedabadVadodara)touchestheNational
Highway Byepass near Dumad. This is going to be completed by year or two. A new
Express way is planned for VadodaraBombay and plan alignment of this have been
earmarkedintheplanonwesternsideofthecity.
The Sardar Sarvoar Project has influenced the VUDA area the most. Number of main
canals,distributariescanalsandminorcanalsarepassingthroughVUDAarea.Thedetails
ofcanalsactasabarrierfordevelopmentatthesametimeothercanalsenrichesthearea
for irrigation. It has a vital influence on planning of VUDA area. Further details of Gas
Authoritylines,G.E.B.lines,JillaPanchayatroads,CorporationroadsandB.SC.Roadshave
alsocollectedandincorporatedinthebasemap.
AdetailedstudywasconducedbyVUDAandNIOHtostudytheAirPollutionAreaaround
majorindustrialestablishmentsinthenorthernarea.AnewAirPollutionZoneareahave
beenearmarkedandadoptedintheproposals.
1-6