1.Create items:
Finished Item
(N): InventoryItemsMaster Item
Item Name: OSP_FIN_ITEM
(M) ToolsCopy from
Select template as Finished Good Click Done
Save
(T) Purchasing:
Check Purchasable: Set this attribute to Yes to include an item on a purchase order line.
Check Outside Processing Item: Set this attribute to Yes to link an outside processing item with an
outside resource and to include an item on an outside processing purchase order line.
Outside Processing Unit Type Select Resource (If you want to requisition the usage rate or
amount of the outside resource for each assembly you move to an outside operation, you should set
the Outside Processing Unit Type to Resource).
If you want to requisition one outside processing item for each assembly you ship to a supplier, then
you should set the Outside Processing Unit Type to Assembly.
Assign to M1 organization.
Create subassembly item:
(N): InventoryItemsMaster Item
(M) ToolsCopy from
Select template as subassembly
Item name: OSP_SUB_ITEM click done
Save.
Save.
Purchased item 2:
Name: OSP_PUR2 (purchased item2)
(N): InventoryItemsMaster Item
(M) ToolsCopy from
Select template as Purchased Item
Assign to M1 organization
(N): Inventorycostitem cost
Enter item and click find
Save.
Purchased item 3:
Name: OSP_PUR3 (purchased item3)
(N): InventoryItemsMaster Item
(M) ToolsCopy from
Select template as Purchased Item
Assign to M1 organization
(N): Inventorycostitem cost
Enter item and click find
Save.
2: Define outside Resources:
You must define outside resources and link them to outside processing items in order to
automatically generate purchase requisitions for outside processing. When assigning outside
resources to a routing you also specify a usage rate or amount that determines the quantity you are
requisitioning and/or charging to work in process jobs or repetitive schedules.
(N) Order ManagementBills of materialsRoutingsResources
Create resource named OSP-RES (new)
Select Type -- Person
Select UOM -- HR
Select Charge Type -- PO Move (type PO Move or PO Receipt will perform automatically
requisition. Purchasing charges these resource to jobs and repetitive schedules when you receive
against purchase order lines linked to the resources.
Click Enabled for the outside processing item - and enter OSP_ITEM (OSP Item name)
Select Basis -- Item.
Select Activity -- Move
Click Standard Rate (If you charge at standard, then Purchasing writes any variance between the
purchase order actual and the source standard cost to the purchase price variance account of the
resource at purchase order receipt) You can also charge at actual PO line price.
Save.
3: Set the department and link to resources
(N) Order ManagementBills of materialsRoutings
Enter Department -- OSP-DEP (Department name)
Enter Description
Class -- Vendor
Location -- Select WILLINGTON.
Units -- Enter 10
Group -- Select Vendor
Save
Save.
2nd Operation
Seq - 20
Department -- OSP-DEP (Department name)
Click on Operation Resources.
Do the same routing process for subassembly item with routing name= OSP-SUB-ITEM
(Subassembly Item)
Save
Go to viewRequest find
Save
Select the Material Control Tab
For each component select the following:
Supply Type -- Operation Pull
Subinventory -- Floorstock
Save.
Check that in Subinventory Floorstock we have the on hand of 100
8: setup Employee
Purchasing requires an employee for all requisitions/purchase orders to be created and approved.
ResponsibilityUS HRMS Manager.
(N) PeopleEnter and Maintain
Click on new button
Enter Last Name, Gender
Action -- Create Employment
Person Type -- Employee
Social Security Number -- number with format: xxx-xx-xxxx
Enter Birthdate
Save
Group-- Financial
Position-- MM400.Material manager (this is a position that will have the approval authority for
your purchase order)
(B) Yes to accept the default values
Assign a Supervisor:
(T) Supervisor
Name-- Brown, Ms. Casey
Save
Select the attributes button.
Choose Release Method Field and enter Release Using Autocreate
Do not enter any values for the Price Update Tolerance
Do not enter any values for the Purchasing UOM
Choose the bottom portion of the form - in the field TYPE - Enter Quotation
Choose the Number field - Hit the List of Values.
Save.
Creation of Sourcing Rule:
(N) PurchasingSupply BaseSourcing Rules
Choose Sourcing Rule Name field -- OSP-Advanced Networking Source
Choose Description field and enter -- Sourcing Rule for Quotation to Req to PO
Select the ALL ORGS radio button to the right of the above two fields
Select Effect Date field - enter first portion of the effective date -- todays date drops
Select lower section of screen - Type field -- Choose BUY FROM
Skip the Org Field
Move to the Supplier Field -- select Advanced Networking Devices
Move to the Supplier Site field -- select SANTA CLARA - Vision operations
Enter Allocation field -- set this to 100%
Select the Rank field -- insert a value of 1
Save.
Save.
Sourcing Rule Assignment Profile Setup and Logic:
(N) Purchasing Personal Profiles
Query on the profile name with: MRP:Default Sourcing Assignment Set
Click in the User Value section
Select the newly created assignment Set -- PR_OSP_TEST
Save
WIPSetupParameters
Select the Outside Processing tab
select At operation for Requisition Creation Time
this way, requisitions will be automatically imported into Purchasing immediately upon performing
a WIP Move transaction
Save.
10: Create job for Finished Good:
(N) WIPDiscreteDiscrete Jobs
Click on new button
Enter Job number -- OSP_-FIN_JOB (new)
Enter Assembly -- OSP_FIN_ITEM (Finished Good)
Class -- Discrete
Status -- Released
Type -- Standard
Start Quantity -- 10
Start Date -- Enter todays date.
In TAB Routing enter the Completion Subinventory Stores
Save
Save.
Check with requisition
Copy the purchased order number. Check whether purchase order is approved or not.
After approve Create a receipt based on the purchased order number.
Now complete the job for finished item (OSP_FIN_JOB) from Queue to To move as specified in
subassembly job.
Check finished item in on hand quantity.