Professional Documents
Culture Documents
V152 - Intelsat-905 PDF
V152 - Intelsat-905 PDF
at www.arianespace.com
(starting 20 minutes before lift-off)
Flight 152
200 km
Altitude Apogee
35 956 km at injection
Inclination
7 degrees
The ARIANE 44L launcher liftoff for Flight 152 is scheduled on the morning of June 5, 2002
as early as possible within the following launch window :
Launch oppotunity
GMT
Paris time
Washington time
Kourou time
From 6:44 am
8:44 am
2:44 am
3:44 am
to 7:44 am
9:44 am
3:44 am
4:44 am
on June 5, 2002
June 5, 2002
June 5, 2002
June 5, 2002
www.arianespace.com
Flight 152
Dates
Satellite activities
Flight 151
May 3, 2002
Launch of SPOT 5
May 6, 2002
May 13, 2002
D-7
D-6
Monday, May 27
D-5
Tuesday, May 28
D-4
Wednesday, May 29
D-3
Thursday, May 30
Launch Rehearsal
D-2
Friday, May 31
D-1
Monday, June 3
Filling of 1st stage, and 2nd stage, and liquid boosters with UH 25 and N2O4.
D-0
Tuesday, June 4
Launch Countdown including 3rd stage filling with liquid oxygen and liquid hydrogen.
H-0
Wednesday, June 5
www.arianespace.com
Flight 152
Events
12h
30 mn 00 s
5h
35 mn 00 s
3h
35 mn 00 s
1h
5 mn 00 s
Start of the 3rd stage filling operations with liquid hydrogen and liquid oxygen.
Activation of launcher telemetry, radar transponders, telecommand.
6 mn 00 s
3 mn 40 s
1 mn 00 s
09 s
05 s
HO
Lift-off.
+ 16 s
+ 2 mn 30 s
+ 3 mn 31 s
+ 3 mn 34 s
+ 4 mn 24 s
Fairing jettison.
+ 5 mn 43 s
+ 5 mn 48 s
+ 6 mn 30 s
+ 12 mn 30 s
+ 17 mn 30 s
+ 18 mn 49 s
+ 20 mn 56 s
+ 22 mn 13 s
+ 22 mn 32 s
www.arianespace.com
Flight 152
Typical trajectory for standard geostationary transfer orbit and ground station visibility
Trajectoire de lancement
Launch trajectory
Orbite gostationnaire
Geostationary orbit
Orbite de transfert
Geostationary transfer orbit
Extinction du 3e tage
Third stage burnout
200 km
Sparation
du 2e tage
Second stage
separation
Sparation
du 1er satellite
Separation
of first satellite
Sparation
du 2e satellite
Separation
of second satellite
150 km
Largage
de la coiffe
Fairing jettison
100 km
Sparation du
1er tage
First stage
separation
50 km
Largage des
propulseurs
Booster jettison
www.arianespace.com
Flight 152
Fairing (Contraves)
8,62 m length,
4 m diameter,
750 kg
N2O4 Tank
UH25 Tank
Separation 1/2
Viking (Snecma moteurs)
1/2 interstage
N2O4 Tank
UH25 Tank
Liquid strap-on
booster - Pal (Astrium)
19 m length,
2,2 m diameter,
4,5 T
www.arianespace.com
Flight 152
Customer
Intelsat
Prime contractor
Mission
Mass
Stabilization
Dry mass
3 axis
Dimensions
Span in orbit
31 m
Platform
FS1300 Extended
Payload
On-board power
10 kW (beginning of life)
Life time
13 years
Orbital location
Coverage area
Global with beams over the Americas, Europe, Africa and the Middle-East.
www.arianespace.com
Flight 152
(CM)
Rmy KOCHER
ARIANESPACE
(RCUA)
Steve HALL
ARIANESPACE
ARIANESPACE
(DMS)
Terry EDWARDS
INTELSAT
(CPS)
Grant GOULD
(RPS)
Jeffrey LAKIN
(COEL)
Yves BONDIL
ARIANESPACE
(CPAP)
Marc ROY
ARIANESPACE
(DDO)
Bruno GILLES
CNES/CSG
(RSV)
Dominique POULAIN
CNES/CSG
www.arianespace.com
Flight 152
www.arianespace.com