Professional Documents
Culture Documents
CAREER OBJECTIVE:-
EDUCATION QUALIFICATION:-
Project -: Construction of Elevated Road Corridor from AIIMS (On NH-98) to Digha
(on Gangapath)
(11.90 KM) at Patna in the state of Bihar.South Side ApprochRoadDighaRAILCum-
Road Bridge from AIIMS ( on NH-98) TO Digha including Elevated Structure over
Ashok Rajpath and Remaining Elevated Structure up to Digha Rail-Cum -Road
Bridge[NHAILeftoverPortion]
(Ch.0.00to2.600,Ch.3.400.to11.344&Ch.12.270to12.420)at Patna.
Project:TwoLainingwithpavedshoulderofBhopal_sanchiwsectionofNH86extfromk.
m0.00to
k.m:53.775inthestateofMadhyaPradeshNHDPphaselllonbot(annuity)patternpet
Poject:-Design, construction, finance operstion and maintence of our Iane bridge across river Kosi
Include approaches and guide bund and afflux bund from km155.00tokm165.00 on-NH-57 in the state
of Bihar annuity basis.
WORK RESPONSIBILITY
Soil :-Free Swelling index (FSI), grain size Analysis(GSA)LL-Pl Proctor ,CBR, F.D.D test.
GSB :-Gradation , ll- pl, proctor, CBR 10%Fines Value &F.D.D Test.
WMM:-Gradation,LLPL,Flakiness&ElongationIndex,AIV,Proctor,LosangelesabrasionValueWater
absorption& FDD.Test
Concrete :- Responsibility, Concrete Mix Design (M-10 to M-50)and all types of Testing
related to concrete.
(Normal Consistency , Initial and final setting time , fineness of cement & mortarCube Casting testing)
Aggregate testing Gradation , specific gravity,ofagg(40mm,20mm,10mm&sand),Bulk Density
crushingvalue of Agg. AIV, FI+EI, Sieve Analysis of sand &FM value.ALL IN AGGREGATE
Bituminous Section :-
Personal Details:-